Delete Subcontracting Requirements in MD04.

Hi SAP Gurus,
Sub contracting PO created on 2004 for Material 'x'. The component also same as the header material. ( Issuing component and recceiving component both are same ).
I have deleted the PO before issuing components to Vendor ( before 541 Mvt.)
But in MD04 the system driving sub contracting requirements against the deleted PO.
Is there any std correction program available to fix teh Issue.
Regards
Senthil.

Yes, there is correct progam, i have faced teh same problem
Check this OSS Note 128061 - Subcontracting: Inconsistencies in dependent requirements
Bhima

Similar Messages

  • Goods receipt for subcontract does not erase requirement in MD04

    Hi,
    I have a subcontract material for example X which is built of 3 components - A,B & C.
    Initially the BOM in the Purchase Order of X did not have any component. I mistakenly posted a goods receipt and realized that the requirement were not getting deleted from MD04 of the components. There after to correct this, I reversed the goods receipt and populated the BOM with components A, B & C and again posted goods receipt for the subcontract material X.
    When I receive material X, the requirement still exists in the stock requirement list (MD04) of A, B & C.  I also went to Transaction ME2O and saw that the stock at the vendor did not get reduced.
    I have checked the Goods Receipt material document and the components A, B & C have a movement type of 543 O. In MB51 Goods movement for the components, I can see the deduction from the vendor.
    Why are the requirements not getting deleted from MD04 of A, B & C and why is not  the component stock at the vendor getting reduced?
    For all other orders, the requirements get erased in MD04 of A, B & C when I receive X
    Please help me out with this issue.
    Sincerely,
    Ketan

    thread closed

  • Delivery deleted but requirements are still shown in MD04

    Hi Gurus,
    I have an issue , where the item has been deleted from the delivery . However the requirements for the material are still being shown in MD04. I want the requirements should be removed from MD04.
    Please help me  in  resolving this issue.
    Thanks in advance.

    Once the sale order is created and saved, the requirements will be transferred to MD04 which means, through sale order, you are asking the system to consider those requirements for production.
    In the same way, if you delete a delivery document, it will not  be passed on to MD04.  In order to remove those requirements from MD04, go to VA02, input the sale order reference against which you have created and deleted the delivery and execute.  There assign Reason for Rejection for those line items and save.
    Now again go to MD04 and refresh it and see how it works.
    thanks
    G. Lakshmipathi

  • Delivery completed subcon POs & deleted PRs appearing in MD04

    Dear Experts,
    We have observed that, delivery completed subcontracting POs & deleted PRs are appearing in the stock requirement list (MD04).
    Could you please let me know if there is any OSS note to fix this?
    Thanks in advance.

    Hi,
    The report RM06C020 provided in SAP note 115899 should clear this inconsistency.
    Regards,
    Marcelo

  • How to delete dependent requirement

    I need to delete dependent requirement but when tried to delete it by using change mode in MD04, I got message that planned order 0000**** does not exists.

    Hi,
    In MD04 screen, using material number and the plant you can view all the planned orders. From MD04 screen, u can celect the planned order by change mode and you can delete the planned order.
    Regards,
    V. Suresh

  • MD04 - How to create a requirement in MD04 for a scheduling agreement

    Hi,
    Pls advice How to create a requirement in MD04 for a scheduling agreement. pls mention the steps and t codes.
    thanks in advance.

    Hi Prajit,
    Sales people will create sales scheduling greements through VA31 T-Code (normally for finished products).In that they define forecast schedules as well as JIT schedules.After creation, these will be appeared in MD04 screen as requirement for that finish material.
    In MRP run,system will create procurement elements (planned orders for example) for these requirements.
    Regards,
    Raja.

  • Why does old sale order (The deliver date before current date) show VSF (independent requirement) in MD04?

    Dear All,
    I face one issue, the old sales order (the delivery date before current date) has became VSF (independent requirement) in MD04, could someone let me know why and how to fix it?
    Take 01.09.2014 as example, we have one 50PC's sales order with delivery date as 25.08.2014, in MD04, the system will show two independent requirements, one is 50PC's customer order and another is 50PC's VSF.
    We are looking forward to your kind help and answer, thanks in advance!
    Best Regards,
    Gavin

    Hi Gavin
    If I understood the issue correctly, system is showing both the sales order and the PIR on the same date, right?
    If this is the case, it's probably a PIR consumption issue. Take a look on the following note, especially question 10:
    772856
    FAQ: Consumption of planned independent requirements
    BR
    Caetano

  • Deleting a Requirement Plan

    Hello All,
    I have a issue regarding PIR -> Requirement Plan.
    We have uploaded a Requirement Plan through a BADI which read Excel File with TCode ZMD61 which has the Prodn Plan for Jan2010, plan named as JAN10.
    Requirement Qty of this plan is getting updated in table MDPB.
    Now i want to Delete this requirement plan, how can i do that !?
    I tried to delete the requirements through MD62, was able to delete all, but the table (MDPB) still shows the Requirement plan JAN10 still existing at the table level. Becuase of which the reports which are linked to MDPB table are giving values of the Plan which i have deleted.
    How can i remove  / edit these values at table level.
    Thanks in advance,
    Harris

    Dear All,
    Thank you so much for your inputs and valuable comments.
    But the Issue got resolved in rather orthodox manner.
    Issue: Plan not existing, but the table was displaying the
    1. I uploaded the Materials which were being displayed in the table MDPB through MD61.
    2. Put any Qty as a Requirement.
    3. Saved the Plan
    4. Deleted the plan.
    Result: The entries got cleared from the Table.
    Thanks and regards,
    Harris

  • Delete Blank Order Requirement in MD04

    Hi All,
    We created a new material for MRP recently but when we created it we used the wrong Availability check type. We then created an order for this material, ran MRP and the line showed up as a blank order on MRP.
    We realised the masterdata error, corrected it, and re-ran MRP. Now our order appears correctly on MRP however the blank order requirement still appears.
    I have read here and on other forums that this order can not be deleted but one of the other analysts thinks there may be a program to delete this blank line.
    Does anyone know of this program, or any other way, of deleting the blank order requirement from MRP in MD04.
    Many thanks,
    Colm

    Dear
    I am not sure  wether SDRQCR21 will solve the problem  even you refer SAP  Note : 207942 / 25444  .You can raise OSS notes with SAP  in this matter  and they will be the best person to comment on it .
    This is just my perception .Frist you try SDRQCR21  and decide accrodingly .
    Regards
    JH

  • Delete the Planned Inedependent Requirements (PIR) MD04

    Hi Experts,
    I have a problem like below:
    For a semi finished product in MD04, the Planned order dt 01.10.2007 and PIRs dt 01.10.2007 are not deleted.  As the today's date 23.10.2007, still they exist.
    Where as for the same component in MS04, the planned orders 01.10.2007 and PlRs dt01.10.2007 are deleted.
    What are reasons for not deleted in MD04 and deleted in MS04.
    Pl guide me.
    Best answers will be rewarded.
    Thanks in advance.
    Regards,
    surya.

    Hi
    In MD04 as long as requirements (PIR's)exisit, the planned order will exiist.
    If that planned order is not firmed , in the next MRPrun, it will  be there but with rescheduling message.
    If you want that to be deleted you have torun reorganization run.MD74/MD75.
    For MS04 you have to set up your settings.
    Regards
    YMREDDY

  • Duplicated Requirement at MD04

    Hallo,
    I have an issue related with a duplicated requirement for a Sales Order.
    Our system is customized in order of working with the next process [Make-to-Order strategy]:
    Sales Order--> Planned Order --> Process Order --> Outbound Delivery --> Billing Doc
    The problem is that at MD04 I have the next requeriment.
    2012-02-28     CustSt     "Sales Order"/000001                               0      0                  
    2012-02-27     CusOrd     "Sales Order"/000001/0001                       1-     1-                 
    2012-02-28     PldOrd     "Planned Order"/SO                        62     1      0      10     WHSE
    It is a planned order, but I know that is a duplicated requirement, because for that Sales Order there is already a Outbound Delivery and a Billing Doc.
    I know that deleting the billing and Outbound Delivery, and executing the MD41 the Sales Order will disappears from MD04. But I can not do that, because the billing doc. is already with the customer.
    It is a way to delete that duplicated requirement?

    Can you run program SDRQCR21 in SA38 for that material and check again in MD04? Also check the production order has been set with technically completed or not. You can also take a looks at OSS  Note 25444 - SDRQCR21: Recovery of sales and delivery requirements and Note 547277 - FAQ: Requirements in SD and in the delivery
    Regards,
    Edited by: Shiva Ram on Feb 28, 2012 2:17 PM

  • Stock Requirement List - MD04 - adding columns in this list

    Dear All,
    I am working on the Stock Requirement list ( transactioncode MD04) and the customer wants to add columns with the fields STPO-DATUV ,date of change of a drawing, and the drawing number with revision level STPO-YY_DZEINR.
    There is a badi MD_ADD_COL_EZPS which provides in adding columns, but according the structures MDPSX , MDEZX and MDSUX there are no fields in thoser structures, which directly match with the required fields; somebody has a clue to help me out and get it working.
    For instance: Vendor- and Customer data  can be added by using the pushbuttons and those fields are available from above mentioned structures.
    Thanks in advance and kindest regards,
    Rene.

    Hi Utpal Mishra
    You guessed correctly. I missed to inform our Strategy. We are using Strategy group  11  Make-to-stock prod./gross reqmts plnning.
    User is not able to do PGI or create delivery. He says I have enough stock in MMBE but why system is not allowing.
    Here there are some pending document like -
    1. Pending sales order
    2. Pending deliveries (picking not done)
    2. Delivery created & Picking Done but PGI not done. These things will have a commitment against the stock. But we are interested in getting these document numbers, so that we can take come action against them.
    MD04 simply shows the mrp element as order / delivery but the document number is not available. How to find these documents.
    Please help. Is there any table or a standard transaction ??
    Thanks

  • Requirements in MD04

    Hello all,
    In MD04,there are many requirements for a material in the name of customer order and Delivery etc(i.e Requirements from Sales).
    in a report,I need to get the open sales order quantity for a material(OPen sales order is equal to the sales orders for which there are no PGI done).
    The sum of the MD04 elements(Cust ord,Del) is what we mean by open sales order quantity.
    So can anybody tell me ,from where (tables) I can fetch these requirements as seen in MD04..
    Please help me out..

    Hi Karthick,
    As other friends are telling is right, it is difficult to take Stock requirements list data from one table.
    However , I am giving list of some tables which may help you :
    MRP Records
    MDKP        MRP Document Header Data
    MDTB         MRP Table Structure (no data)
    PLSC          Planning Scenario (Long-term Planning)
    MDFD        MRP Firming Dates
    MDVM       Planning File Entries
    S094           LIS -- Stock/Requirements Analysis
    Also you can check in SE37 in search help F4 for PP component under MRP various other function modules as well which can fulfill your requirement.
    Hope this helps.
    Regards,
    Tejas

  • Need to delete the requirements in md61 screen for the past month

    Hi Gurus,
    I am having one requirment that my client need to auto delete the md61 screen entries , Suppose the requirement is maintained for 1000 the planned order will also generated for 1000 qty if stock is not available , then the production is done only for 500 quantities. On the next MRP run the system is considering again the past month 1000 quantities .
    How we can restrict this? If suppose the balace 500 quantities also the user dont want to produce . Then how can we delete automatically .
    Pl help me out this.

    Hello Vishnu,
    You can delete the old PIRs when the new month begins through batch job for MD74/MD75/MD76.
    Other way is to define a period of adjustment for the MRP Group in transaction OMPG and assign the MRP group to your material. Please refer F1 help there
    Adjusting in the past, that is the period of adjustment is calculated backwards - the system starts from today's date and calculates backwards by the number of days specified. Thus, planned independent requirements that lie before the date calculated by the system are not included in the planning run.
    Please refer
    MD61 considering Past requirements
    Best Regards,
    R.Brahmankar

  • Average daily requirements in MD04

    Hi gurus,
    Can anybody please help me in understanding in how the system is calcualting the average daily requirements for the following settings of the coverage profile.
    Period indicator - Weeks (W)
    Number of periods - 12
    Type of period length - 1 (work days -factory calendar)
    Range of coverage in the first period:
    Min - 17, Target - 20, Max - 30.
    and rest of all the fields are empty in the coverage profile and also there for some materials which have this coverage profile attached have the service level at 99.9% on the materila master, I do not know if this informaiton might help us in debugging the calculation.
    Now here 17, 20 and 30 do they mean days or weeks?
    The requiremetns for the next 12 weeks are as follows (including this week)
    W 50/2010 (this week ends today) - 4360
    W 51/2010 (week of 20dec - only working days as per factory calendar are, 20, 21 and 22)-1248
    W 52/2010 (no requiremetns) - 0
    W 01/2011 - 2354
    W 02/2011 - 1542
    W 03/2011 - 5038
    W 04/2011 - 1520
    W 05/2011 - 4000
    W 06/2011 - 1856
    W 07/2011 - 2950
    W 08/2011 - 3150
    W 09/2011 - 5110
    W 10/2011 - 2550
    But the system is coming up with average daily requirements as follows in the same order as above
    W 50/2010 - 676.082
    W 51/2010 - 590.906
    W 01/2011 - 578.033
    W 02/2011 - 600.400
    W 03/2011 - 617.367
    W 04/2011 - 586.200
    W 05/211 - 607.467
    W 06/2011 - 588.475
    W 07/2011 - 594.441
    W 08/2011 - 576.983
    W 09/2011 - 569.356
    W 10/2011 - 513.288
    There are no holidays in the year 2011 weeks except saturday and sunday. Which are already accounted for in the calendar. Replies are greatly appreciated. PLease help and exaplain how the system is coming with abvoe average daily reqs in MD04
    Thanks
    Anusha

    Average daily requirements
    since you have given weeks it will first sum the next 12 weeks requirements.
    Now next it will calculate how many days are there in the next 12 weeks based on  your Type of per lenght and day per period setting as per your range of coverage profile.( Config OMiA)
    Now system will do the maths ( total requirements/Total days) - which will give you the per day average daily requirement .
    This is how the system calculates.
    Once it calcuates this then based on the number of days of stock you need to maintain it will increase the stock at the end of the period.
    kindly check with the above and let us know your feedback
    reg
    dsk

Maybe you are looking for

  • I have MAC OS X 10.6.8 and want to install pages but get notice it only is good for 10.9 or later

    How to install Pages on my Mac OS X 10.6.8 ?- when I try to install Pages I get message "the application requires Mac OS 10.9 or later! Do I have to convert or update my current iMac?

  • Question for experts: SVG vs GIF

    Hello everyone Lets say I have a website that is populated with multiple simple and complex, plain white icons. These icons will be resized in muse where needed, sometimes they will be with reduced opacity. The website is heavy on parallax scrolling

  • "Open With" menu all messed up after CS4 install.

    I've got at completely fresh install of 10.5.6, and another person I know is having this same issue. In the "Open With" display in the Finder using a contextual menu, Photoshop is show a long, cryptic name. Specifically, it says: i Adobe Photoshop CS

  • Frequent JVM crashes

    The VM crashes frequently throwing this error , i understand that this happens when the VM is trying to construct an exception to be thrown from an interpreted method but could not proceed further , please help . I have attached only the partial erro

  • Rented movies lost

    I rented a couple of movies three and one week ago, respectively which I haven´t seen. Now they do not appear stored in my Apple TV? How do I know what happened or how do I recovered them?