Hello everyone
I  want the deleted material reservation within the network activities not display in resb,how can i achieve?
What is the influence?
Now,it is in the table with the field value "xloek" marked "x".
Regards
robert

Dear Mahendra
The ABAPer/BWer will show us one z-table.
They need to know what are the difference between the two kinds of deletion flag.
(1.When i del the resevration,the data in table RESB will marked as X to the field RESB-XLOEK.
2.When i tecoed the NW,all datas in table RESB will marked as X to the field RESB-XLOEK.)
TKS
Do i clarify it?

Similar Messages

  • Edit or delete  material reservation

    Dear All,
    regarding material reservation created using MB21 TCode.   some examples in which system creates reservation without date (for some items, not all items) When i am  try to edit or delete such reservations system gives us an error   "Posting date is initial" and does not allow us to edit or delete such reservations.
    1.  Why system creates material reservation without date and how to prevent it?
    2. How to delete such reservations?
    sunil

    Hi,
    Regarding this issue, the reason why you got F5669 when accessing
    reservation in MB22 is that the requirement date RESB-BDTER should be blank.
    I don't know why the requirment date of the reservation became blank
    in your system..
    Unfortunately, there is no standard report available to update the old
    reservations with requirement date. This problem can be solved by updating the value via SE16 in deabugging mode
    1. run SE16, input the table name RESB and press ENTER
    2. input the reservation number and press Run button.
    3. In transaction code bar, input the '/h' and press ENTER to activate the debugging mode, then double click the item line.
    4. in debugging mode Select 'Switch to Classic Debugger'
    5. then press F7 and Double click code, then its value was shown below.
    Currently the value is SHOW, please change it to EDIT, then click the Pencil button.
    After clicking Pencil button, press F8.
    Now you can see the field is editable. You can now change the required field's value and click the SAVE button
    ***CAUTION****
    Please be careful and not wrongly input or typing value in other fields!
    After you exit SE16, the edit mode is closed and return to normal display mode
    I hope this can be of help
    BR
    Nadia Orlandi

  • Datasource for material reservation data from SAP R/3 (RESB & RKPF table)

    Hi,
    How can i take material reservation data stored in SAP R/3 RESB and RKPF table. I can create generic data source and full upload of data is possible but how to manage daily delta. None of these table having change date to extract daily changed record to BI. Please suggest.
    Please inform if any business content data source available for Reservation data?
    Regards,
    Manish

    Hi,
    Many times we face such situation, that we need to create a generic data source and there is no field to define delta.
    In such situations you can go for psuedo delta.
    Ask the client that at any point of time till which date will the data be changed.
    Eg. the client may say that at max we will change last three months data.
    In that case everytime you can do a full update and load only data of last three months.
    Instead of date you can consider any field as per your requirement.
    Regards,
    Mansi

  • Material reservation deleted into maintenance order

    Dear,
    I'm facing with strange issue with some maintenance order... The users have created some maintenance order, done material reservation and released these order... After that they are trying change these materials reservation and then when they go until the reservation they can see the material with status "item is deleted".
    However no changes was done these reservation. The components items is maintaned with gray scale.
    Wagner S.

    Wagner
    Can you please post the full message text including message number.
    Are you using any developments that might delete these components?
    Also, can you send a screen-shot of the following:
    Components tab with deletion indicator shown
    Order header - so we can see the statuses
    Double-click into one of the material items to view the General Data sub-tab
    PeteA

  • Tieing material reservation with purchase order

    Hi,
         At my client site they make manual reservations to create demand and thus trigger purchase orders to replenish it. Once the PO is GRed then the manual reservations are manually deleted. This is extra work for the planners/buyers. Is there any way to automatically erase the manual reservations once the GR for the PO is done ?
    Thanks

    Hi,
    You can adopt the automatic deletion program for Reservations as follows:
    Reservations are deleted as follows:
    1. Reservation items that are completed or that are in the system longer than a certain number of days are marked for deletion by the reservations management program.
    2. If all of the items of a reservation are marked for deletion, the reservation is physically removed from the file.
    The Reservations management program RM07RVER carries out the following activities:
    - Marking items for deletion
    - Deleting reservations
    - Allowing movements for reservation items
    Marking Items for Deletion: The reservations management program sets the deletion indicator for reservation items:
    - that are completed (final issue indicator has been set)
    - whose requirement date is earlier than the date calculated by the system
    Consequently, old or unnecessary reservations that no longer represent an "actual" request are deleted (for example, because the material was withdrawn without the reservation being referenced during the goods issue posting).
    Calculating the Deletion Date: To allow the system to calculate a date for the deletion of the reservations, you must enter a base date on the selection screen. The system calculates the deletion date using the base date you enter minus a predefined number of days (in the standard SAP System: 30 days).
    Example: You enter 10. 01 as a base date. In this case, all reservation items whose requirement date is on or before 09.01 are marked for deletion.
    Deleting Reservations: If all of the items of a reservation are marked for deletion, the entire reservation is removed from the file.
    Running the Reservations Management Program :
    Choose Reservation --> Manage.
    The Reservations Management selection screen is displayed.
    Enter a range for the reservations to be processed. You can also narrow down the number of reservations to be processed by entering an account assignment as a selection criterion.
    Enter the base date:
    a.Only reservations whose base date is on or before the date entered are taken into account.
    b. Using the base date, the system calculates the date for deletion of the reservation items and the period for allowing movements.
    Select the actions to be carried out (for example, Set deletion indicator/delete reservation or Allow goods movement).
    If the 'Only completed items' indicator is set, only items that are completely issued or marked as completed are marked for deletion.
    If you run the program as a test run, you obtain a list of all reservations and reservation items with the changes to be carried out. You can make the changes by choosing List ® Save.
    If you do not run the program as a test run, the changes are carried out immediately. A log of the changes that are carried out is only issued if you selected the issue log indicator.
    Choose Program --> Execute to run the reservations management program.
    Regards,
    Narayana.

  • Cant see Object Services Toolbox in MB23 Material Reservation transaction

    Hi all,
    The Generic Object Services Toolbox is not available in SAP MM transaction MB23 used for accessing Material Reservations. SAP version is 4.7/620.
    As its a standard SAP transaction referring to standard business object type BUS2093, so I was expecting that the Object Services will be enabled for this.
    Kindly help as to how I can configure the display of Object Services toolbox in this transaction to link attachments. (If its regarding changing some code like including cl_gos_manager or SWU_OBJECT_PUBLISH, then kindly explain in detail.
    With Regards
    Neha

    Also it is against the SDN Forum Rules of Engagement to cross post questions.  I can see from your posting history you have sent this same question to many different forums (several of which make no sense at all).  Please avoid this action in the future or risk having your forum posting privledges suspended.

  • Generic Object Services not enabled in MB23 Material Reservation

    Hi all,
    The Generic Object Services Toolbox is not available in SAP MM transaction MB23 used for accessing Material Reservations. SAP version is 4.7/620.
    As its a standard SAP transaction referring to standard business object type BUS2093, so I was expecting that the Object Services will be enabled for this.
    Kindly help as to how I can configure the display of Object Services toolbox in this transaction to link attachments. (If its regarding changing some code like including cl_gos_manager or SWU_OBJECT_PUBLISH, then kindly explain in detail.
    With Regards
    Neha

    Thanks Deepak,
    But I thought the described methdology in the PDF pointed by the URL is for how to do it for any custom business object type, will it be useful for the SAP standard business object as well like BUS2093. When I try to edit an already created SAP object, it starts asking for an access key.
    With Regards
    Neha

  • Generic Object Services Toolbox in MB23(Material Reservation) unavailable

    Hi all,
    The Generic Object Services Toolbox is not available in SAP MM transaction MB23 used for accessing Material Reservations. SAP version is 4.7/620.
    As its a standard SAP transaction referring to standard business object type BUS2093, so I was expecting that the Object Services will be enabled for this.
    Kindly help as to how I can configure the display of Object Services toolbox in this transaction to link attachments. (If its regarding changing some code like including cl_gos_manager or SWU_OBJECT_PUBLISH, then kindly explain in detail.
    With Regards
    Neha

    Thanks Deepak,
    But I thought the described methdology in the PDF pointed by the URL is for how to do it for any custom business object type, will it be useful for the SAP standard business object as well like BUS2093. When I try to edit an already created SAP object, it starts asking for an access key.
    With Regards
    Neha

  • Material Reservation Process for Work Order

    I am new to the Plant Maintenance work order and material reservation process.
    Here is my scenario:
    I create a work order with a material that is maintained in WM and IM.
    Reservation is created.
    I got to MB26 to post goods issue
    Once I do this I see the qty of material moved as a negative amount to storage type 914 in IM (LS26) and stock removed out of WM (MMBE).
    Is this where the business process stops?
    Do I ever remove the stock out of 914?
    Does the material go from 914 to 916 and then get cleared out of inventory?
    Thank you

    Check [thread|PR Marked for deletion after Business Complete]  and [search|http://forums.sdn.sap.com/search.jspa?threadID=&q=PR+deletion&objID=f159&dateRange=all&numResults=15&rankBy=10001]
    -S.N

  • Network Material Reservation and MRP

    How does SAP know a Material Reservation created from a project has already been processed by MRP once ?
    For example; 
    If I create a Material Reservation in a project and then run MRP on that project a Purchase Requisition will be created for the Reservation.  If I run MRP again on the same project, the system will not create another purchase requisition from the same reservation.  Somehow the system knows this reservation has already been processed.  I canu2019t find the status field that identifies this reservation as being previously processed.  It is not anywhere in the Reservation record, it must be in the MRP tables somewhere.
    Thanks,
    Dave Flick

    Hi,
    Not sure if i have fully understood your report, but here is a suggestion which could help.
    Use the stock requirements FM stated in my prev posting & in addition to that use the FM - MD_PEGGING_NODIALOG.
    Now for each procurement proposal (STO or preq etc) read which element it is pegged to using the FM stated in this posting. Read these values into a internal table.
    Now you can compare the reservations with this internal table, if it exists you can choose not to display it, while displaying only those which does not feature in the internal table.
    Hope the above helps & meets your need.
    Regards,
    Vivek

  • Steps for delete material from system

    hi , all sap pp experts
          in material master by using mm06 we give deletion flag for material but system can't delete that material. So is it possible to delete material from system? if yes then please tell the sequence for this process
    thanks in advance
    regards
    Nitin Nerkar

    Before Archiving the Material Master the materials need to be flagged for deletion in T Code MM06/MM16.
    Archiving the materials is done thro T Code SARA. All the SAP archive functions are shown in SARA. Choose the corresponding SAP archive object, hit enter and the archive administration menu will be shown.
    When a material is no longer required in a company or plant, you can archive and delete the material master record.
    Before a material master record can be archived and deleted, other objects (such as purchasing documents) that refer to this material must themselves be archived. You can see which objects these are and the dependencies between them in the network graphic.
    Archiving object MM_MATNR for archiving material master records.
    To archive the material master, first go to transaction SARA
    Type in a variant name and click Maintain. (Tick the Test Mode for archive simulation).
    Save the variant.
    Maintain the Start date and Spool parameters and click execute.
    Click Go to Job Overview to check the archive status.
    To do a permanent delete, click Delete button.
    Maintain the Archive Selection, Start date and Spool parameters.
    Click Test Session for testing or click execute to start the deletion program.
    Click Go to Job Overview to check the delete status.
    This need to be done carefully and better to first do it in testing client.
    After archiving those materials will not be displayed in reports unless categorically selected
    Note: SARA is a general transaction where you can archive all types of records using respective archiving object

  • Deleting the inventory for deleted material

    Hi
    Can you please guide how to delete inventory for the deleted material?
    Stock is available in the inventory but the material is deleted.
    Regards
    Raja

    Hi
    Plz donot use 562 movt,if that is production system.

  • Deleting the reservations for components of a production order without TECO

    Dear Gurus,
    I forgot to activate the backflush indicator in the beginning. I activated the backflush indicator in between. But for the confirmations already made I had to issue the material as unplanned consumption for the order. This is not clearing the reservations for the material.
    How to delete the reservations for components of a production order without TECOing the production order? My order is not completed.
    Thanks and Regards,
    Raghu

    Hi Kumar,
    I have a production order for 1000 header (A) qty. My control key is PP03 (auto goods receipt from confirmation in CO11N).
    For this order the component B qty is 1000 (BOM consumption is 1:1)
    Without doing GI, the confirmation is done for 300 A qty. I realized that auto GI is not done for the 300 qty of component B as there was no backflush indicator.
    Now the backflush indicator is activated in the production order for component B.
    In the next confirmation for another 300 A qty, automatic GI is posted for 300 B qty because of backflush now.
    Now my confirmed and GR qty for A in two rounds is 300 + 300 = 600.
    GI of component B done is only 300 (through backflush).
    Qty yet to confirm = 400.
    So I did GI of 300 B qty through MB1A (which is an unplanned issue). This does not update the withdrawn qty in the production order. Also the reservations for component B for this 300 qty are not reduced in the system.
    Now the reservations against the order for component B = 1000 - 300 = 700 (which is 300 more than the qty yet to confirm).
    Now when I run MRP for another 2000 qty of A, the procurement proposals for B will be 2000 + 300(undeleted reservations) = 2300. Though the system is behaving properly, this 300 is additional and unwanted.
    For this reason I need to delete these reservations before the MRP run. As order is still open, I cannot TECO the order. Nor can I clear all open reservations from CO11N.
    Thanks and Regards,

  • Material reservation and unrestricted Available qty report

    Hi
    SAP Buddies
    Please can anyone tell me how to get the lCollective list of Material Reservation with Available unrestricted stock??
    i.e.
    MAterial No.         Reserve Qty         Unrestricted Available Qty  
    These three parameters are must ?
    Thanks  in Advanve
    BV

    Hi,
    Please try MB25 MB25 or MF65.
    Regards,
    Mohd Ali.

  • Material Reservations and PO

    Hello,
    my question is at which stage of the network the material (components) reservations or Purchase orders, automatically trigger.
    when the project (with networks and materials) is created or released.
    because I have issue like the project is in TECO and for some reason we are planning to undo the TECO. if I undo the status, will it again creates the PO or reservation.
    Is there any document, which explains in detail about the configuration of PS -MM integration.
    Is there any concept like labor reservation just like material reservation. I am not sure is question itself true or not.
    Thank You

    Hi Gokul,
    My answer is correct considering the following in my perception and not in SAP functionality view.
    <<<<
    At what status of the WBS / network will this Material reservations or PO's get triggered. Is it at Created or Released.
    >>>>
    When WBS elements are in created status means project has not yet received the approval to go ahead from the project controller or whoever may be in the business.
    If some reasons, Management cancel the project or Customer cancel the project and its very easy to set the DLFL flag on project. But what will happen to the committed costs. Do the Management ready to take up unwanted burden and raise unwanted inventories in warehouse. Risk Mitigation is an alternate option but try to avoid inviting the risks which will save time and money.
    There are so many things to consider just not going by the SAP functionality. This is what I feel and you may not accept my statement but at the same time I respect your views and ideas.
    Regards,
    PSR
    Edited by: PSR on Nov 4, 2011 2:04 PM

Maybe you are looking for

  • How to assign directory path of File/FTP adapter into a variable insideBPEL

    Hi, i need to get the directory path given to file/Ftp adapter (write/PUT) into a variable while invoking, which will be later used in some other BPEL service for processing. i am able to get the directory path easily using "jca.file.filename/jca.ftp

  • Report Designer question

    Hi, We have problem creating queries in Report Designer  Our project has BI 7.0, Enterprise Portal, PI and ECC installed on different servers by NetWeaver team. When we open the Report Designer from the START->Business Explorer->Report Designer, we g

  • Problem starting Weblogic/SOA Server on Oracle VM VirtualBox

    Hi, I have installed Oracle VM VirtualBox on a Windows 7 Home Premium 64 bit Toshiba Laptop with 6G RAM. I then imported the Pre-built VM for SOA Suite available at http://www.oracle.com/technetwork/middleware/soasuite/learnmore/vmsoa-172279.html. Th

  • Nasty narrowing cast (bug) in ServletAuthentication class

    I'm trying to integrate a 3rd party's authentication framework with Weblogic using identity assertion. Like: 3rd party <- weblogic identity assertion <- custom SSO The 3rd party is wrapping the HttpSession, which should be transparent. However, I get

  • How do i reactivate my iphone 5 voicemail after using google voice?

    I activeated my iPhone 5 after owning a Droid.  I was using Google voice and forgot to turn it off before I set up my iPhone.  Now that I have turned Google voice off I have no voice mail at all.  How do i reactivete my iPhone 5 voicemail?