Deletetion of  service PR from maintenance order

Hi Experts ,
Is it possible to delete service PR from maintenance order. If it is created from order due to some problem I want to delete it ,so is it possible ?
With best regards,
AVI DDS.

Hi
Deletion of PR from Maintenance Order is not possible because the PR is created automatically
This PR will get deleted automatically when you cancel//teco/complete the order
Otherway around is you can always block the PRs
Regards
Kartik

Similar Messages

  • Multiple doc type setting for service PR generated from Maintenance order

    Hi Gurus,
    My client has multiple company code and has different document type for PR and PO as per the company code. For generating the  service PR  from maintenance order system take the document type of PR defined in the config.
    Is it possible to define multiple document type for service PR depend on the company code/ Plant level?
    Kindly help.
    Regards
    DP

    Hi Ravi,
    I used the User Exit COZF0001 .  Since we can assign only one PR doc type in the config .
    I have assigned one PR doc type in configuration which will work for a company code and all their respective plant. So in this case user exit wont do any job for changing the doc type.
    You will defined a condition in the User exit saying that if  company code /plant which you get it from maintenance order is not same (Config )  then provide the  PR doc type which you want to create for respect plant or company code.
    I dont have coding right now with me. You need a small coding to be done to create the separate PR doc type in EBAN-BSART
    with respect to plant . Check in your configuration at what point of time you are creating the PR either in saving or release of MO. You can take the even to activate the User exit.
    Consult your ABAPer  they can do in 10 min.
    DP

  • Printing Shop Papers from Maintenance Order Urgent !!!

    Hi All,
    I am in need of Printing Shop papers from Maintenance order , i know that the configuration of this thing is done through SPRO
    Plant Maintenance and customer service ->
    Maintenance and Service Processing -> Maintenance and Service Orders -> Print Control -> Define Shop Papers, Forms and Output Programs
    , but i want that when we give Print command through Maintenance order a smartfrom should trigger which i have developmed.
    My problem is that i am not able to configure the Print control for SMARTFORMS.
    What to do , Please suggest.
    Regards,
    Rachit Khanna

    Amol,
      Standard config doesnt provide the functionality to set the default selection dependant on PLANT. You will have to get the help of developer to do an implicit enhancement (Only If you are in ECC 6.0) to accomplish the same.
    Reagrds
    Narasimhan

  • GR from Maintenance Order

    Hi All, Please help in the below issue,
    there's a spare part material valuated with split valuation as follows:
    Defected avg price 10/EA
    Used      avg price 20/EA
    New       avg price 30/EA
    From PM module, one EA from defected valuation type issued and the accounting doc shows value of 10 (correct), after finishing maintenance work on this part it will receipt in the same sloc but with valuation type Used,
    the issue is when GR from order the accounting doc shows value of 20 (debit stock with 20) the current price in master data while the actual cost from maintenance order is 200 how to make the GR valuated with actual cost from maintenance order which is 200.
    Your help will be highly appreciated, Thanks in advance.

    Greetings Hossam,
    Looks like what you are trying to achieve is to implement the Refurbishment Order process.
    In the standard system, you can use the Order Type configured as a refurbishment order to settle the actual cost to your stock value.
    Say that you have the material master created with split valuation, as you mentioned.
    Defective avg price 10/EA
    Refurbed avg price 20/EA
    New       avg price 30/EA
    Say you have 1 EA of Defective material at €10 , your refurbishment Order actual cost total is €15 , your material price is Moving Average, and you have no other stock. You would then issue the Defective part to the order with mvt type 261 (Order total cost goes up to €25). Then you would receive the 1 EA Refurbed part from the refurbishment Work Order with movement type 101. (Order total cost drops to €5). You would subsequently settle the Work Order total to the stock of the Refurbed valuation, raising the moving price from €20 / EA to €25 / EA.
    Please refer to the documents on Refurbishment process, search the SCN, and feel free to ask any specific questions.
    Refurbishment Order - Customer Service (CS) - SAP Library
    Creating a Refurbishment Order - Customer Service (CS) - SAP Library

  • Catalog procurement from Maintenance Order

    Hi Gurus,
    My client is implementing Punchout Catalog from SAP ECC 6.0. we are not into SRM server. I made the settings in Web services ID and Description and i am able to do shopping from Vendors URl and return back to SAP ECC.
    Now 1) they want to populate the Vendor name automatically into SAP, which is not getting carried.
    2) I want to link the Punchout Catalog to Work order scenario also. For that i need to define the Order type and Catalog in the Link "Interface for Procurement Using Catalog" under the node Plant Maintenance and Customer service which i am not getting.
    Please advice me what needs to be done or what settings or any BADI needs to be activated on this issue.
    Thanks for your response in advance,
    I am not sure is this the right place to post this thread. Please advice.
    Thanks,
    Saakithyan.

    Hi,
    I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
    Because the system put away the field blank?
    There are any way for create purchase requisition with account category Q?
    The BAPI that you suggest me can avoid this problem?
    Thank you.

  • PR from Maintenance Order - Material Purchase

    Dear Experts,
    Likewise we can generate Servide PR against Maintenance Order,  also it picks service data frrom Maintenance Order....Similarly can we generate PR for Material Purchase against Order also it should pick Material from component that we have enetered in Maintenance Order ..is it possible??
    Thanks
    DM

    Hi
    Deletion of PR from Maintenance Order is not possible because the PR is created automatically
    This PR will get deleted automatically when you cancel//teco/complete the order
    Otherway around is you can always block the PRs
    Regards
    Kartik

  • Auto generated service PR from maint, order

    Dear Experts,
    As you know while processing external services using control key PM03, a service PR will be generated for the service selected from the agreement or contract & from there we will create PO.
    Here in my case while creating PO from auto generated PR it is not carrying the condition type ( Discount entered the contract).Instead of that it gives the option to enter the condition type in the drop down list.Then we can select the condition type as discount & process the order.
    where as for the same service from the same agreement,if we create the PO from the manually created PR (not the auto generated from maintenance order) it carries the condition type of agreement (discount) to PO & the discounted price will be displayed automatically.
    Why it is not happening to auto generated PR? is there any particular settings are available? is there any notes available?
    Please help me out to come out of this problem.
    Thanks & best regards,
    Praveen

    Dear,
    I am extremely sorry for this issue. there was some problem with the program & rectified the same.
    Thanks & Best regards,
    Praveen

  • Service PR from PM order

    Hi gurus,
    Is threre any way to stop PR generation from PM order, when i select any service with control key PM03 , because i am not interseted in planned cost, but need to book service required in PM Order at the time of planning.
    Any standard config or any customisation.
    thanx in advance

    you can do teh folowing change in SPRO , then yu will not get the PR from maintenance order;
    Go to
    Maintenance and service processing-->Maintenance and service orders>Functions and settings for order type->Define change document,collecctive PR indicator,operation no interval.
    Inside this there Select PR never.
    But as Pete said what you means by planning . Your query is not cleard. what you want to do.anyway by this PR will not be created.

  • BAPI or FM to assign / create service master in maintenance order

    Hi Experts,
    Can you please help which BAPI or FM to assign / create service master in maintenance order during the creation of order.
    Thanks,
    Suresh

    Hi Suresh Babu,
    Look at BAPI_ALM_ORDER_MAINTAIN from IBAPI_ALM_ORDER function group.
    As customer enhancement you can use IBAPI_ALM_ORD_MODIFY.
    In help documentation you can find more information with examples.
    Bear in mind that using the BAPI to process the order data cannot support all the functions of the transaction.
    Regards
    Pawel Pyda

  • Goods movement from Maintenance order

    Hi Experts
    I have the following scenario,
    I have a component ( with Material master) in the maintenance order  and i use Item category N to trigger  a Purchase requisition. The Pur Req is converted to Purchase Order and then the GR is done directly to the order .
    Now i have not used this Component  and want to make a goods movement to place it in stock. So the requirement is to move the material from Maintenance Order to the Storage location .
    How and which movement type can i use to do this ?
    Please help
    KK

    Hi,
    Click the below link for more information
    http://sap-img.com/plant/in-pm-how-to-return-material-backflushed.htm
    regards,
    Venkatesan Anandan

  • Automatic Reservation from Maintenance Order

    Hi,
    I have a problem. Generally from Maintenance Order type PM01 under Order Category 30, when we give some materials requirement, SAP automatically generate reservation for those materials and take the GL as Consumable Item.
    But in my case, that GL has to be changed depending on what perpose we are using the material. But Manual reservation is not allowed for the order category 30 and no GL can be changed for automatic reservation.
    Can anybody suggest any way-out so that we can give our desired GL No. for the reservation for Maintenance order (say Order type PM01 under category 30 which is SAP internal).
    Thanks in advance,
    Satadal

    Thanks for your answer. Actually I found that place, it is determined from OBYC transaction with a combination of GBB (A/c Key) and VBR (A/c Modifier).
    But for same movement type261, I need manual G/L allocation at runtime. i.e. depending upon case to case, the G/Ls will be different. So, different movement type perhaps would not serve the purpose.
    Basically I need to over-write the G/L for automatic reservation created from PM in the PM01 order type with category 30 where manual reservation is not allowed.
    Can you suggest any way out so that I can actually over-write the G/L for automatic reservation- through SPRO or some kind of development...
    Thanks
    Satadal

  • CRM- Find Service contract from Internal Order Number

    Hi Friends,
    I would like to know how to get service contract from internal oredr number.
    From service contract we can find internal order number by using CRM_ORDER_READ function module- table et_document_flow, but my requirement is how to find service contract from Internal order number.Any function module or BAPI available for this requierement ?
    Regards
    Vinayak Sapkal

    Hi,
      when the costs are transferred from CRM to R3, they are posted to an internal order. When a service order or incident is transferred to R3, we have to create an internal order for it, regardless of whether or not a contract has been assigned.
    This is all linked to the logic used in CO to find the appropriate internal order. It works as follows:
    The internal order is stored in the table IAOM_ASSIGNMENTS. This is accessed by a guid (the account assignment guid).
    To get this guid, there is a second table IAOM_EXT_OBJ_INF. This table links the GUIDs coming from CRM, dependent on the CO Customizing for CRM (Mass Controlling, Header level, item level controlling etc.)
    This is how we manage to link a service order to the internal order of a contract in the first place.
    When we call CO, CO first looks for an assignment for the object guid passed. If a service order has been linked to a contract, nothing will be found for the object guid. CO will then check for assignments to the reference guid and find the contract entry.
    If no contract has been assigned, CO will create an internal order based on the service order guid.
    From a CRM point of view, costs are assigned directly to an item, and so it makes no sense to have a reference guid for the costs or the possibility to change the guid via BADI.
    regards
    Waman

  • PR Delivery Date Issue from Maintenance Order

    Hi All,
    We have a scenario -
    - Create Maintaince Order (IW31)/Assign Basic Start Date and Basic Finish Date.
    - Auto PR Generated from Maintenance Order but the delivery date in PR is Basic  Finish Date.
    My client's requirement is Auto PR will pick up the Delivery date as Basic Start Date. What settings do we need to Do for this scenario and on wht basis the delivery date is decided in PR wrt to Maintenance Order?
    Regards
    Pankaj

    Hi SAP Gurus,
    Any updates how to solve this issue?
    Regards
    Pankaj

  • Is possible create PO from maintenance order?

    From IW31 I can create a PR, and then PO in reference to PR.
    Is possible create directly PO from maintenance order? how?
    thx for attention

    Hi Paolo,
    It is not possible to create a purchase order directly from a maintenance work order. The standard SAP process is as follows:
    Create a component for external procurement on the work order - this results in the creation of a purchase requisition. The purchase requisition is then processed by the purchasing officer - the source of supply is assigned and the purchase requisition is then converted into a purchase order. If the component referenced a material master, the material may be specified on a contract/source list. In this case, the vendor and the price can be automatically deteremined during PO creation. If the material isn't on contract however, the purchasing officer may need to manually assign the correct vendor details and the price.
    The assumption is that the maintenance personnel are not purchasing experts - they just place a request for the product, and manual intervention is required from the appropriate purchasing expert within the company before this request can be sent to an external vendor.
    Regards,
    Monika

  • Material Gate Pass from Maintenance order?

    Dear SAPIENTS,
    Is there any system to issue returnable material gate pass from maintenance order in case of sending material outside for repairing. I want to keep track of material through maintenance order i.e the reason.
    Regards,

    Hi,
    There is no STD SAP Functionality Available but You can Develope the Customising Smart Form to get this fuctionality.
    Also You can get The information about the Outgoing Material in TC MB51 if your making The Reservation Of that Material agianst the Vendor,while sending that material outside.
    Regards,
    Rakesh

Maybe you are looking for

  • Can not connect to wi-fi or even click the wi-fi botton in settings

    ok i have i think its a 2nd generation ipod touch and i lost it for about a week. Then i found it and went to get online on it and in the settings when you try and turn on and off your wi-fi, it wont even let me click into it. It just says no wi-fi a

  • HT201317 Fill my Photo-stream

    My photo stream is only showing me the last months worth of photos. I want to know if there is a way to get all of the photos from my photo stream (I have about 450).

  • How? loading seperate music player .swf into main site prob.

    hey all! Ok something that I still don't really understand, have tried to modify afew flas but with no luck. Anyhow to the point. I have a main fla file with all my content in it and a litlte music player that plays 3 to 4 external swfs with music &a

  • Workflow report:  which FM's, tables,.... to use ?

    hi there, i have a user requirement which seems not that easy as i first thought: i have to write a z-abap which lists the following informations of 2 different ESS-workflows (travel expenses and absence) Name of workflow creator Date of workflow cre

  • Shutdown DB and App services -- System Hangs

    I have installed EBS 11.5.10.2 on my laptop on a windows 2000 advanced server o/s and apps works fine. But the problem that I have is during the shutdown. I have tried several ways but without any luck. 1/ Manually shutdown the services in the Servic