Deleting components in scheduling agreement

Hello all,
I have a scheduling agreement. It has material X which has components Y1,Y2,Y3.
I want to delete component Y1 as it not required. So I select the schedule delivery in ME38, ItemComponentNew BOM explosion to see the BOM components. I find Y1,Y2,Y3. When I right click at Y1 and press delete, the component gets deleted.
I save. But when I come back in the scheduling agreement, the component will remain there.
Any idea?
reg
Sunny

When you select new Bom explosion, system  explodes  the Components  again w.r.t the BOM maintained in CS01. Instead of new BOM explosion , you should select  "Components"  icon.

Similar Messages

  • How ro delete/cancel procurement Scheduling Agreement Release in APO system

    Hi,
    Can you please tell me the ways to delete procurement schedule agreement release in APO system.
    I have gone through the thread "How to delete the old schedule line release? and found two transactions but it seems both the transactions like /sapapo/cmds_del  & sappao/cmds_sc02 are used for sales scheduling agreement release deletion.
    The system is not allowing me to delete the same in APO system as these are APO scheduling agreements.
    Please help me on the same.Thanks in advance.Revert back if any further clarification is required.
    regards,
    kaushik

    Hi,
    Thanks for your reply again.
    The /SAPAPO/DELETE_PP_ORDER program does not select the release schedule lines though it selects the Scheduling Agreement Schedule Line (Not released) for deletion.
    The transaction /SAPAPO/PWBSRC2 for Deleting External Procurement Relationship but as long as the released schedule line exists , it is not possible to delete the scheduling agreements.
    I have gone through the help.sap.com site and I was not able to found anything about deletion or cancel/closing of Scheduling Agreement Release.
    Still waiting for the solution.
    regards,
    kaushik

  • Schedule Lines deletion from Scheduling agreement

    Hello all
    There is a requirement of mass changes deletion of existing Schedlue lines from Schedling agreement ( from around 800 Scheduling agreement). 
    SAP  version is 4.7(Which doesnt have MEMASSSA-std t-code for mass maintenance of scheduling agreement).
    Please advise, how these can be deleted in bulk.
    Thanks & Regards
    Rajesh

    Hi
    Go to table :SE16 :
    Enter :EKET
    download to the excel file do the correction  then upload the file to to the table.
    Please check with your SAP ABAP team and with  your Client
    (or)
    do it manuallly .go to me38 enter the sch.agreement no and delete the qty and save . it is time consuming
    it willl  take a day or Two.
    This is the best solution
    Regards
    Ganesh

  • BAPI_SCHEDULE_MAINTAIN - Scheduling Agreement  (Deleting Item Condition)

    Dear Friends,
    My requirements is change or create the Scheduling Agreement - Schedule Lines (ME32L). I am using BAPI -->
    BAPI_SCHEDULE_MAINTAIN
    Its updating correctly, but automatically the item condition price details are deleted.
    1st time i am facing this issue.
    kindly help to rectify this issue. I am waiting for your valuable response.
    FYI - this is my code
            t_schedule-item_no    = t_alv_output-it_no.
            t_schedule-sched_line = t_alv_output-sh_no.
            WRITE t_alv_output-de_dt TO t_schedule-delivery_date.
            t_schedule-quantity      = t_alv_output-de_qt.
            t_schedule-stat_date = t_eket_qty-slfdt.
            APPEND t_schedule.
            t_schedulex-item_no       = t_alv_output-it_no.
            t_schedulex-sched_line    = t_alv_output-sh_no.
            t_schedulex-sched_linex   = lv_x.
            t_schedulex-delivery_date = lv_x.
            t_schedulex-stat_date     = lv_x.
            t_schedulex-quantity      = lv_x.
            APPEND t_schedulex.
          CALL FUNCTION 'BAPI_SCHEDULE_MAINTAIN'
            EXPORTING
              purchasingdocument = t_alv_output_head-po_no
            TABLES
              schedule           = t_schedule
              schedulex          = t_schedulex
              return             = t_return.
    I am also tried
    BAPI_SAG_CHANGE
    . this also updating the Schedule Lines. but deleting the item condition records.
    Thanks & Regards,
    Durai V

    Kindly check notes 1034912 and 1046851
    Regards
    JP Milton

  • Scheduling Agreement flagged for deletion

    Hi
    Once a scheduling agreement has been archived it is no longer visible from transaction ME33L, but can be viewed with Read program RM06ER30.
    When a scheduling agreement was flagged for deletion with the Pre-Processing program RM06EV47 it has not been archived yet, although a message stipulates that it has. ME33L is possible, but ME32L is not allowed.
    The particular scheduling agreement in question was flagged because it complied to the residence time configurations BUT business now want s it back (even though the lack of maintenance on their side caused the document to be flagged for deletion)
    How do we 'unflag' a scheduling agreement and take it back to its original state where it can be changed again?
    Your help will be appreciated
    Thanks

    Hi Jurgen
    I am waiting for authorization on MEMASSPO.
    In the interim, I noticed that field  LOEKZ contains the value L.
    I further notice that MEMASSPO is mass maintenance for Purchase Orders. Will I be able to only select one scheduling agreement to unflag?
    And lastly I noticed on our Dev environment that there are no variants created in the system. Where will I do this from?
    Thank you

  • Deleting line item in scheduling agreement

    Hi ,
    The scheduling agreement has 2 line items which are of same material. The first line item needs to deleted as it had the wrong price in it.
    We are able to block it but have not been able to set the deletion flag. There were a few GR and IR done but all of them had been reversed.
    Kindly suggest a way toset the deletion flag.
    Thanks in advance

    Hi Vinayak,
      If you have reversed all the documents of that material, then you can delete the material by selecting that in scheduling agreement ME32L.
    Regards,
    Prasath

  • Scheduling agreement condition type default deletion indicator in backend system

    Dear team,
    our business process is that-
    In SRM system scheduling agreement is created. once its approved from SRM in Backend ECC R3 system the same is getting replicated.
    But in few of the cases its been obserbved that the condition pricing is flowing but with deletion indicator selected by default.
    I have checked the IDOC for the same but there is no value found flowing from SRM to ECC.
    Even searched for the same Material & same vendor in some cases only observed with deletion indicator.
    For entire scheduling agreement the deletion conditions are updating that is for all line item in scheduling agreement.
    There is no info record exists.
    Appreciate if anyone can throw some light over this.

    Appa K wrote:
    Even searched for the same Material & same vendor in some cases only observed with deletion indicator.
    What is the special cases ?
    I hope you are using time dependent condition for you SA document type.
    Check is it fetching from last PO or SA ?
    What is happening, when you are trying to create SA manually via ME31L for the same material and vendor?

  • How to delete a scheduling agreement

    Hi,
    I have canceled all the position in the scheduling agreement and I would like to delete it.
    Is there any posibility to do it?
    Thanks

    All the items must be deleted. Once the items are deleted, the scheduling agreement is considered as deleted. You cannot delete at the header level.
    Lakshman

  • Delete/Stop Scheduling Agreement Release (Purchasing)

    Hi,
    I have a question concerning releases of a purchasing scheduling agreement in SAP APO. Basically very simple - how can I delete them or at least stop them? I did not find any transaction or report to do so (only for SD scheduling agreement releases). I know that there is a functionality of "dynamic stopping" of release done by the system but how can I do it manually? If there is no such function (which I could not really believe) what would be the business scenario to stop such a release (releases are created by APO, but I manually want to delete them). There has to be such functionality...
    Many thanks in advance
    Christian

    Hi Christian,
    Pl check this document..
    if it helps that would be great for me..
    http://help.sap.com/saphelp_SCM700_ehp01/helpdata/en/22/ec9d3b0ec10670e10000000a114084/frameset.htm
    Thanks,
    Bala.

  • Mass delete scheduling agreement and PIR

    Dear SAP Experts,
    1. My company is first time Run the MRP so i have maintain the material master MRP 1,2,3,4 tab based on the requirement.
        Currently having many old Scheduling agreements / PO is their so i am get the open goods receipt list from ME2L - based on the selection    parameter.
      I have checked the list and note the many scheduling agreement no.
      So what is the for mass delete scheduling agreement / PO ( STO, normal PO,Import PO )
      I have also try MEMASSSA - Mass delete scheduling agreement, i am select the SA item level , Copy the Agreement no, select the deletion indicator, execute and save.
    But after i have seen the list it is not updated the deletion indicator L, it is not working properly.
    Kindly share the another t.code or any other way for mass delete SA / PO 
    Thanks,
    Umapathy

    Dear Uma,
    Please check this thread. may be it can help you.  Mass deletion of PO

  • Delete Scheduling Agreements

    Dear all,
    I met a problem about inconsistency. There was a scheduling agreement created in ERP and transferred to APO. Later I deleted the scheduling agreement but it still exists in APO. Can anybody tell me how to remove this scheduling agreement from APO?
    Thanks
    Jerome

    Hi Jerome,
    Below are the few options that you can try,
    1) Run /sapapo/ccr transaction by selecting sales relevant transactional
    data and iterate the results
    2) Check and clear the inbound and outbound queues and errors
    3) Run transaction /SAPAPO/SDRQCR21
    Please confirm
    Regards
    R. Senthil Mareeswaran.

  • Issue components for a subcontracting scheduling agreement

    Hello, 
    Please can anyone tell me how (steps)  to issue components on subcontracted item on a scheduling agreement .  Item is also set up with KANBAN indicator so GR is done thru changing KANBAN bin status.
    Thanks
    Mira

    You can view, Explode during creeation of delivery schedule for SA. Use ME38 transaction you will see the BOM in item details

  • Schedule Agreement deletion from MD04

    Hii all experts
    I am confuse to see the old date (say 02.02.2007) scheduling agreement detail in my MD04 screen which consist of few pcs. These quantities has been blocked and user is not able to create delieveries for this quantity. How to remove this MRP element from the requirement list.
    regards
    kapil

    Cancel the schdelulling agreement, it will remove the requirement from MD04. Else you can switch off the availability check frm material master and make the deliveries of the other order and than again switch on the indicator.
    Regards
    Prashant

  • Subcontracting in scheduling agreement

    Dear all,
    while doing subcontracting scheduling agreement, how can we add the child components to the parent material.
    in cs01 ,we maintained the bill of material for the parent material.in CS11 we are able to view it.
    Regards,
    velu

    Hi,
    If you have already maintained the BOM in CS01, you need  not have to maintain the seperate BOM in Scheduling Agreement, because, the already existing BOM will get copied. The only thing you will have to do is that, define special procurement category as 30 (Sub-Contracting) in MRP2 view of the material master & then create the SchedulingAgreement with item category as L (Sub-Contracting).
    Hope this clears.
    Regards,
    Prashant
    - Pl. reward points if the answer is helpful to you

  • BOM in Scheduling agreement (Type LZ)

    HI
    I am using scheduling agreement (Type LZ) for maintaining my sales plan for a period of 4 months. (1st one month - daily & subsequent months as weekly requirements). Ii would create delivery and invoices for each supply.
    Pricing previously was based on the finished product (basic price for product was available). SO there was no problem.
    <u>New requirement:</u>
    finished Product above - is made up of components. Now, price should be derived from components. For this I have enabled SD Bom for my finish product.
    But the problem is when i use the Finish product code in scheduling agreement type LZ, the BOM doesn't explode (it explodes in other scheduling agreement types, say LP)
    Clarification:
    1. Is it possible to calculate price of the higher level material by summing up the components' price?, with out BOM explosion
    2. Is BOM explosion possible in scheduling agreement with delivery schedule (LZ).
    Note:
    1. Necessary settings for item category & BOM master already in place.
    2. BOM is exploding in sales order and other sheduling types, except doc type LZ.

    If it is maintained as error message, it does not allow me to maintain delivery schedule more than target quantity of 100 EA. Also the overdelivery tolerance is maintained as 20 %, so it should allow me to maintain delivery schedule of 120 EA, but it does not allow me to maintain greater than target quantity of 100 EA. Please let me know your comments.

Maybe you are looking for

  • Computer does not sleep automatically after upgrading to Windows 8.1?

    I have Windows 8.1 and my laptop will not sleep even though its settings are set on a time frame to automatically - used to sleep perfectly fine without any issues before on Windows 8. I'm sure I don't have any applications such as, Windows Media Pla

  • Planning function type Exits.

    Hi,   Could you guys tell me about Planning Function Type Exits. It will be helpful, if you guys send some Documents to [email protected] Thanks, meiy.

  • Slow display of directory contents.

    Anyone else have issues with slow directory content display with Lion? Having the same issue with 3 machines. It is agonizing up to 30 seconds to display the contents of directories. Think this would be a no brainer, but obviously not. This happens w

  • Music on Console stuck on Getting Playlist after altering files

    Header sums it all. I changed directory of some of music files which was in the playlist and mocp is stuck at "Getting the Playlist..." I edited config to not to start in playlist. I also deleted the playlist.m3u which, funnly starts to get created a

  • Can't SAVE pdf file after editing.

    So, it can understand as I can't edit my pdf as well.. I tried to click on save or save as, but apparently it didn't save the file on my computer, and I don't know why this could be. When I clossed adobe it just kept asking whether I need to save it