Deletion change pointers are not going to ECC after C5
Hi,
My issue is that I am running C5 after Planning run.But deletion change pointers are not going to ECC.Because of this we have duplicate of orders in ECC.We are running CCR to bring back the "Planned orders with deletion change pointers and deleting again using RRP4.Why deletion change pointers are not going along with creation change pointer?Help will be highly appreciated.
Thanks&Regards
Venkadesh
Hi,
Check whether you have enabled the " delete events" check box. This check box will be valid if you are publishing the planning results thru background job.
If you set this indicator, the system deletes all selected change pointers without sending them first.
Thanks,
nandha
Similar Messages
-
Change Pointers are not getting populated in BDCPV table.
Hi All,
I am trying to create IDOC for Activity type master - KL02 through change pointers. For that I have done following things.
Message type - COAMAS
1. Created Custom message type - WE81 - ZIN_COAMAS_TCSMOBILE
2. WE82 - Config for Mess Type and Idoc type combination
3. SCDO - Checked object type LSTAR and have required tables in that object.
4. BD61 - Activated Change pointers - Generally.
5. BD50 - Checked Active for ZIN_COAMAS_TCSMOBILE
6. BD52 - Added fields for I want to create Change pointers
7. BD60 - Message type and ref Mesage Type and function module config.
8. BD64 - Created distribution model for my Message type
After doing all this settings the change pointers are not getting created in BDCP and BDCPV tables.
Note - The entries are going in CDHDR and CDPOS table for activity which i change through KL02 for class LSTAR
Can anybody figure out what need to be done in this case?
Regards,
Gautam Joshi.Hi All,
Solved the problem myself.
In BD52 I have given
LSTAR CSLA KOARS
LSTAR CSLA LSTAR
LSTAR CSLT KTEXT
Here the data of activity are stored in TCLA and TCLT tables. So intially while doing config in BD52 I have given TCLA and TCLT table names.
But I debugged the KL02 and found that change pointers are not created for TCLA and TCLT table. further looking into CDHDr and CDPOS table I found that for COAMAS message type in these two tables table name was CSLAB.
CDPOS entry
LSTAR
3166442
119512890
*CSLAB*
2003166442 2400123120000101
KTEXT
U
--> BUT CSLAB is structure.
After putting these entry in BD52 the problem solved.
LSTAR CSLAB KOKRS
LSTAR CSLAB KTEXT
LSTAR CSLAB LSTAR
Regards,
Gautam Joshi. -
0CML_DELTA : Change pointers are not active
Hi All,
I have successfully did the delta init without data transfer for datasource 0CML_DELTA and 0CML_DELTA_CAP. Now, While trying to load delta, I am getting an error "Change pointers are not active" for both the datasource 0CML_DELTA and 0CML_DELTA_CAP.
The position datasources are fecthing 0 records.
I have activated the change pointers in BD61, even though I am getting the same error.
Anyone faced the similar issue or have any clue about the problem.
Thanks in advance,
Pravender
Edited by: Pravender on Sep 30, 2010 11:09 AMI resolved it. I was activating change pointers in BD61. But fot CML we need to activate in SPRO--> SAP Banking --> Loans Management --> Basic settings --> Installation parameters ---> Define general installation parameters.
Then it will work.
Pravender -
Change pointers are not generated when creating a material master
Dear Experts,
Change pointers are not generated when creating a material master.
However, when a change is made to the already created material, the change pointers are created according the fields in BD52.
Am I missing any settings?
I need to create change pointers immediately when I create the material master in MM01.
Please suggest.
Regards,
Shettydid you follow the steps given in
http://help.sap.com/saphelp_nw73/helpdata/en/4a/6dcbe9c95261a3e10000000a421937/frameset.htm -
Limit PO price changes are not replicated to ECC backend
Hi all,
SRM 5.0 ECS SP13.
When I change the value(increase/decrease) in limt PO which is already created(PO is changed for first time) and order the PO,under Overview screen.,the PO total value(at header level) shows the correct changed /new value while at the Item level,the Net price is shown as the old value!However when I go and check the item details,the field "VALUE" and "EXPECTED VALUE" have the changed/new value.
Because of the above issue,the PO changes are not replicated to ECC backend system.When I tested the BAPI BAPI_PO_CHANGE1 with the test data,there is no error mesasge in ECC backend system.
After this,when I change the PO for second time(again value increase/descrease),the total value and net price is shown correctly in SRM and changes are also replicated to ECC backend system!
I have also checked the cong for SPOOLPARAMETERS under Set Control Parameters and eveything is set correctly as shown below
SPOOL_JOB_USER User that execueds spool job. CUA_ADMIN
SPOOL_LEAD_INTERVAL intervall by which the retrytime incr. 60
SPOOL_MAX_RETRY Max. number of retrys for writing BAPIS 10
Can someone throw some pointers how to resolve the above issue.
Thanks in advance.Hi
can you recreate the same issue
are you saying that
1. create a limit po for 100 USD and replicated to ECC AS 100 USD total value.
2 . now update the PO in SRM 150 USD and it was not replicated to ECC ?
or
1. limit sc
2. Limit PO
3. update not reached ECC.
Note 1284361 - Limits not transferred to backend purchase order
Symptom
Extended classic scenario.
You have ordered a purchase order with more than one hierarchy item containing a limit.The purchase order is created or updated in the backend system without errors but the limits are missing in the backend purchase order. -
HT5627 My I messages are not going through
My I messages( text) are not going through
I have to change all to deliver as textYes, many are experiencing this issue. A phone reset or going to Settings > General > Reset > Reset Network Settings resolves the issue.
Let Apple know about the issue here: http://www.apple.com/feedback -
Uploading files are not going to correct area on server
I have switched computers and DW versions -- now have CS4.
I seem to have several folders names ***.com within main folder in my local files. But when I upload revised files, these revised files are not going to the correct folder location on server. The apparently correct folder is one folder depth in from where my revised folders are being uploaded, the revised folders are going to ***.com but apparently they should be uploaded to ***.com/***.com instead.
my site management remote is: ftp.***.com
help
octoberbenLocal: C:\Users\Carole-Lenovo\Documents\My
Webs\GoletaSports\goletasports.com\goletasports.com\goletasports.com\
(I know, it needs to be changed)
Remote: ftp.goletasports.com
Thank you for help. But in my remote files, this is the path that gets
uploaded--there is another goletasports.com within the root folder which is
where the files are seen on the web.
My local files are uploading to the root folder, not in the extra
goletasports.com folder.... Yikes
Carole -
Requests that are forwarded to another approver are not going to next stage
We are having an issue with AE 5.2 with Forwarded requests. When requests are forwarded to another approver and this person then approves the requests, they are not going on to the next stage in our workflow. We have the Forward Type option set to 'Any one Approver' for the workflow stage. Have also tried forwarding the requests with both the Forward With No Return and Forward With Return options.
The approver that is receiving these Forwards is not listed as one of the approvers for the role in the request. Is this the issue, are we not using the Forward process correctly, or is this a bug in AE 5.2. (I think we are currently on SP 9 of GRC 5.2.)
Thanks.Hi Bob,
I am running AE 5.2 but do not use the "forward" feature. For request that require "role approvers" I have set up a seperate initiaor that includes the additional Stage for Role approval.
I have initiators for 1) New User w/ no role approval 2) New User w/ role approval 3) Change User w/ no role approval 4) Change User w/ no role approval
My "no role approvals" go through three stages 1) security initial review 2) Internal Control review 3) Final security provisioning; my "role approvals" go through four stages 1) security initial review 2) Role Approval Stage 3) Internal Control review 3) Final security provisioning
If a request has roles that require approval and some that do not, the request will take the two seperate paths based on the roles defined for each; the provisoning will complete once both paths have completed all stages
This allows us to treat the role approval just like any stage with assigned approvers and if multiple approvers allow for any one approver to complete the stage
This is different from your approach of forwarding for role approval; I define the roles to the initialtors that require role approval, but gives you another perspective of doing it
Jerry Synoga
Ryerson,Inc.
630-758-2021 -
Adding new contacts but the requests are not going...
Hi,
Please assist me on this critical issue. I was using latest version of skype that is 7.5 as it upgraded itself many times during the years. I have been adding new connections to my account as i deal with social media websites. Recently i discovered that the contact requests are not going through.
I mean the contacts are real and they are active but when i add them to my skype. The request was sent but not delivered actually. I tested that by creating one more personal account. I have sent request from my primary account to the new one. I checked the new account to see if i got the request or not. And yes there was no request.
Then i tried sending request from my new account to the primary one. And i got the contact request. Wondering is that issue related to my account or version. I am sure it is not the case with the version because the new account is using the same version too.
Please let me know. My skype - [Removed for privacy] and I would like to test it with some of your guys here.Thanks everyone.
It worked when I changed "Point.java" as follows:
public class Point {
private int x;
private int y;
public int getXCoordinate()
return x;
public int getYCoordinate()
return y;
public void setXCoordinate(int newX)
x = newX;
public void setYCoordinate(int newY)
y = newY;
public Point(int x, int y)
setXCoordinate(x);
setYCoordinate(y);
}Edited by: Abder-Rahman on May 8, 2009 1:10 PM -
Emails from the organization are not going through ePrint
Hi,
I've been having some issues with the ePrint feature that's configured in one of the printers that we have in our office. The printer is a HP LaserJet 200 color MFP M276nw. Every other client from other email addresses such as Hotmail, Gmail or any other address are able to send emails to our ePrint address and are able to print on it successfully. However, all the emails that are being sent from within our organization are not going through. We get an unsuccesful delivery message from the Exchange server stating that
The server has tried to deliver this message, without success, and has stopped trying. Please try sending this message again. If the problem continues, contact your helpdesk
We had checked with our Exchange administrators and they have advised that the email is trying to be sent, but in the destination it is being rejected. How can I get this issue to be addressed?Hello praveen_haridas,
Welcome to the HP Support forums. I understand that your corporate emails are failing when trying to send an email to the Laserjet 200 MFP 276nw printer's ePrint email address.
Are you getting any messages about the failed messages in your ePrintCenter/HP Connected account? If so what does the message state about the failed job?
Thank you.
Regards,
Happytohelp01
Please click on the Thumbs Up on the right to say “Thanks” for helping!
Please click “Accept as Solution ” on the post that solves your issue to help others find the solution.
I work on behalf of HP -
Service Account details are not going through header(OSB Business service)
Hi
I have an issue with service account. Assume I have a proxy service A, Business Service B, Proxy service C.
A invokes B and B invokes C (A --> B --> C). All calls are through http protocol.
I created a service account with userid and password details and attached it to the Business service B(Static for basic authentication).
Added log activity in proxy service C for context variable $header to verify whether userid and password are coming through request header or not.
I executed proxy service A from sbconsole but I couldn't see userid and password details of created service account in the logs. Only nemespace are logged in the file.
<soap:Header xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/"></soap:Header>>
Can someone please help me why service account details are not going through business service request. Am I missing any steps?
Thanks in advance
KK
Edited by: 966531 on Oct 23, 2012 4:23 AMBasic authentication information is stored under transport headers (check $inbound) whereas $header is populated for message headers (for e.g. - SOAP headers), so you should be checking $inbound instead of $header
Regards,
Anuj -
When SC is partially rejected my manager no workitems are not going to user
Hi Gurus,
Below is our requirement:
Requester (User) creates a SC of multiple line items. Shopping cart is rejected by the manager for a particular line items and rest of the line items was approved, for the rejected line items workitems are not going to requestoru2019s inbox and also e-mail is not triggered to requistioner.(Informing that the SC is partially approved)
Help us how to implement the above functionality? We have figured out a BADI- BBP_WFL_SECUR_BADI will this BADI suit to our functionality.
IF then throw some input on this. Or please suggest any OSS note related to this functionality.
Regards
PaulHi Daniel,
Thanks for the quick response.
WF we used is WS14000133, Last approver is Manager further no approvers.
For Manger they havenu2019t set (BBP_WFL_SECURITY) any value.
Regards
Paul -
Hi Experts,
I have developed a RFC to approved leave, this RFC will send mail to required recipients. After executing the RFC, when we check into the TCODE: SCOTT mails are sending properly. While the same RFC calling from .NET mails are not going.
Please let me know any kind of configuration required in .NET or Share point.
Please do the needful.Hi,
Refer below links.
Mails are in "Waiting" status in SCOT
Mails not send in SOST
Regards
Durga -
Mails are not going from apex application
Hi,
Mails are not going from my apex application. I had done the instance settings by logged in as admin. SMTP port is also connecting. Please help me to solve the issue.Hi,
Mail queue is vacant. I think the problem is with the process. No process or validations are working. Actually, I have copied this application from another schema. Is there is need to set anything?..I had regenerated all the tables,functions,triggers in my schema .Processes and validations are completely inactive -
My messages are not going through or coming in from other iOS devices. Having to send and receive in SMS. What is up? Anyone else having these issues?
There's an article that Apple has acknowledged this issue. They recommend turning off imessages, reset all settings and then reactivate imessages.
If that doesn't work, you may just have to wait until they release an update, which should be pretty soon.
Maybe you are looking for
-
Error message "This program cannot display the webpage when uploading images to Cafe Press
I have had a Café Press shop for five years and except for sometimes being slow, no problems uploading images. Now, suddenly for 3 days I get the message "This program cannot display the webpage Most likely causes: • You are not connected to the Inte
-
Error message the disk could not be written to or read from.
Every time I try to synchronize my shuffle,I get the message that attempting to (I forget what it said exactly) failed, the disk could not be written to or read from. To synchronize it I have to reset the shuffle using the reset utility and then only
-
J2se version="1.6+" in JNLP not working on a client with Java 1.5
Hi all, In my deployment scenario I have two jnlp files, one for the app and one for its installer extension. The deployment process works fine on a client with J2SE 1.6 but there are some problems when the client has an older Java installed. I am tr
-
Display Text in the Second page of the Report.
Dear, I have a Report With Group G_Emp, having Columns Eno, Ename etc. in a Repeating frame R_1 and I have put A frame below this repeating frame R_1 with a Text Item Just for Displaying Comments, so just i want to display this Text Item in the secon
-
Hi @ll, I have the following problem: I set up my iWeb page (materials for a lecture) including a feedback forum page for the students. The forum worked well until the "update" to MobileMe started. Since then it is not possible for the students to se