Hi,
Here clinet system has 2 document types for service orders. In one type of service order I can see the delivery completed indicator checkbox in purchase order screen & in other type of service order I am not able to see the delivery completed indicator chekbox.
I have checked the screen layout for both purchase order types & assignement of layout to both order types. In both screen layout types I found that Delivery Completed Indicator Checkbox as Optional Entry. System should display delivery completed indicator in both type of Purchase Order create/change/display screen. Then why it is showing in one type of service order and not in other type of service order.
Awaiting your reply.
Regards
Pradip

Hi Pradip,
You check the for your document type which field selectio is assigned in config
spro-MM-Purchasing-purchase order- define document types
And then go to
spro-mm-purchase- purchae order-Define Screen Layout at Document Level
select the field slection which is assigned to your document type and then go details and then double click the GR/IR and then select it as optional if it is selected as hidden.
Cheers
Chris

Similar Messages

  • Prevent GR with the delivery complete indicator set in the purchase order

    Dear friends,
    During GR reference to PO, if goods are received partially and the delivery complete indicator is set, the PO line item is deemed to be closed.
    However, if reference is made again to the same PO line item, GR can still be done to the item that delivery complete indicator was set.(due to there is still quantity to be received)
    Is there anyway, we could prevent reference to be made to a PO line item that has delivery complete indicator set?
    Thank you.
    Regards.

    it is by design that you still can receive material.
    See SAPs explanation here:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63343943a211d189410000e829fbbd/frameset.htm
    The delivery complete indicator only reduces the commitment values to zero.
    If you want restrict further good receipts, then you have to reduce PO quantity to equal the received quantity and must not allow overdelvivery. Further you can enter a latest GR date, which will not allow receipt beyond this date.
    Locking the item will as well prevent further actions, but this should only be a short term solution, because the PO will still be considered in MRP runs and will never treated as beeing closed. And you will not be able to archive such POs

  • Delivery completed indicator not working..

    HI SAP expers,
    some purchase orders not getting chick mark of  Delivery completed indicator ater receiving goods
    i have PO with 100 qty .  then GR 100 qty  .  but its not taking in the purchas eorder
    Delivery completed indicator not check automaticalley. i did all the configuration in spro-mm-inventory-GR-indi  extt...
    most of th ePO or  getting but some POs or not getting.. is there any settings behind MATERIAL MASTER or any .?
    Regards,
    Anthyodaya.

    Try the following config..
    1. Set Delivery complete indicator at plat leve
    spro - mm --inventory mgmt -
    Goods receipt -
    Set delivery complete indicator
    2. COntrol field selection for MIGO to disable users from changing it.
    spro --> Materials Mgmt --> Inventory Mgmt --> Settings for enjoy Transaction --> Field Selection for MIGO
    set field : "Del.Completed" Ind.     GOITEM-MIGO_ELIKZ    to Display

  • Not able to do GR  for PO's , Delivery Completion Indicator Not Ticked

    Hi ,
    In SRM 5.0 
    Users Not able to do GR  for PO's eventhough  Delivery Completion Indicator Not Ticked , having Confirmation Roles
    Either the PO is not appearing in the List or when they click the confirmation icon , the screen is not taking to the next screen to enter the quantity.
    What all must be the probable reasons.
    Thanks & Regards,

    Hello,
    You can check following things,
    1. User in the PO should be correctly assigned in org without any sync errors(check users_gen)
    2. Check in PO if the Confirmation/services performed tick is assigned properly.
    3. Check if the PO in SRM and backend is correctly synchorinzed with PO in Ordered status.
    4. Finally if there is any existing confirmation for the PO, then they can create the next confirmation only after the earlier conf is synchronized with backend, which means it would depend upon your schedule of clean_reqreq_up report.
    Regards,
    Sanjeev

  • Delivery completion indicator not getting checked after GR against STO

    Hi All,
    I am facing the following issues while posting GR against the Stock Transport Order -
    Issue No. 1 - While posting GR against Outbound Delivery, I am receiving Error M7865
    Issue No. 2 - While posting GR against Stock Transport Order, the deliver completion indicator is not getting checked in PO even if the GR qty. is same as OBD qty.
    Can someone help me to come across these issues.
    Thanks,
    Pankaj

    Hi,
    Generally, in  case of Stock Transport Order, Goods Receipt is to be done w.r.t. Outbound Delivery only. Otherwise, it will not update Delivery Completion and also will not update the Sales Document Flow as well as Po History properly. So, better try to resolve Error M7 865 and do GR w.r.t. OBD only.
    To rectify error M7 865, check following;
    Diagnosis: -
        The goods receipt for the delivery cannot be posted.
        The error according to the error code:
        1.  The delivery does not exist.
        2.  The delivery type is unknown.
        3.  The delivery is not goods issue posted.
        4.  There are no delivery items.
        5.  The receiving plant could not be determined.
        6.  The delivery items have already been goods receipt posted or contain zero quantities.
        7.  Goods receipt(effect)movement type to goods issue movement type could not be determined.
        8.  It is not currently possible to block the delivery.
    Procedure: -
        Error code 1      : Check your entry.
        Error code 2,3,4,6: Check the delivery and its document flow.
        Error code 5      : The delivery must be related to a purchase order or the customer must be a retail business.
        Error code 7      : Check the settings for your movement types.

  • Delivery completion indicators for Stock transfer Purchase Order

    Hi All,
    We have an issue with delivery completion indicator for item in stock transfer purchase orders. This indicator is not setting even on completion of goods receipts ( complete quantity ).
    Can any one suggest where could be issue or any SAP notes on this. We are on EEC 5.0 verion
    Thanks
    Yogesh

    Hi Yogi
    This could be a bug. If all stock transfer issues have been received and PO qty is completed, it shd set the indicator.
    Guess you have to create a OSS message.
    Best regards
    Ramki

  • Delivery completion indicator not working

    Hi ,
    I am giving delivery completion indicator in the delivery tab of the PO thru ME22N and saving the PO . After that when I am trying to do GR it is allowing me to do GR. It is is not stopping me from doing goods receipt even after giving delivery completion .
    Please help . HOw it can be sorted out.
    Regards
    Nandini

    Hello nandini,
    It is std SAP functionality. The Delivery completed indicator will Indicates that the item is to be regarded as closed.
    The delivery complete indicator will just remove the said PO item from the open PO list. It will not object from further goods receipt if we try to do. The PO - line item whihc is marked as complete will not appear in any std open PO reports (ME2M / ME2L / ME2N with selection parameter as WE101).
    If you dont want the users to make further GR to the PO, what you can do is that, mark the PO - item as delivery completed and also block the PO line item in Me22n. (Select the line item and click the lock icon)
    Regards
    Gregory Mathews

  • Unlimited Indicator not copying to Purchase Order

    Hello experts,
    I'm running ECC 6.0 and am unable to solve this.  I have subcontracting info-records for materials that specify a material to a vendor, pricing, tolerances, etc.
    In the Purch. Org 1 screen of info-record view, I can see the tolerances are maintained (5% under and unlimited over-delivery for example).  The 5% under is copying when a purchase order is created for the material in question, but the unlimited over-delivery indicator is not copying.  If I clear out the indicator and maintain an actual over-delivery tolerance, it copies just fine.  Only the indicator is failing to copy from the info-record.
    Any familiarity with how to solve this issue?
    Kind Regards,
    Kelby

    Hello Kelby,
    Even if nothing is maintained in the material master plant(purchasing view) the unlimited tick should default from the PIR. PIR always has a higher priority than master as it is specific to material+vendor. The help for the 'unlimited' tick in the PIR mentions this.
    You can have a look at this note. It is very old and probably not valid for your release. However this is the only note I could find. You should probably raise an OSS message.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361…

  • BED n other Taxes not Displaying in Purchase Order Printout.

    Hi MM experts........
    I had done the CIN configuration settings, system is calculating the tax correctly, but the problem, If I take a printout of Purchase Order its not displaying any taxes like BED, Ecess and SEcess.
    Can any one tell wht configuration setting I missed in my system.
    Thanks n Regards
    Durga

    Hi.....
    Thanks for your reply.
    Once we hve done CIN config settings it has to display those values, but y its not displaying ? Let me know wht settings abaper has to do ?
    Thanks and Regards
    Durga

  • Basket icon is not displaying for purchase order creation transaction iview

    Hi SDNs,
    I have created a set of purchase related transaction iviews like for example purchase order display.
    there i couldn't find the basket icon to drop the other purchase order number, which we generally choose by using docuement overview on to change the number.
    in WebGUI how do we drop the exisiting documnet into the screen.
    I have activated all icon services in sicf, is there any specific services to be activated to have such kind of icons in webgui.
    Please suggest me to resolve this.
    Your inputs are appreciated.
    Thanks,
    Sireesha.B

    Hi SDN's,
    Can anyone suggest me for the above problem.
    Your inputs will be highly appreciated.
    Regards,
    Sireesha.B

  • VL10B does not display the purchase order

    Hi,
    I have created a stock transport order to transport materials from Plant A to Plant B
    I only enter the purchase order number and plant A in VL10B and no other fields. The delivery creation date defaults to  9/30/2008 to 10/01/2008 with CalcRuleDefltDlvCrDt set to 2 - Today and tomorrow. I have also tried it without specifying a plant.
    Please see the picture below:
    http://i36.tinypic.com/fu7yqa.jpg
    My stock transport order has a document date and delivery date of 9/30/2008. When I click on the execute button in VL10B, the list which comes up is empty.
    What's wrong? Can you please help me out with this issue?
    Sincerely,
    Ketan

    Check your PO?
    you PO should have shipping tab than only you can use VL10B transaction
    please send the screen shot of PO shipping tab
    Or you can try VL10B by just entering the shipping point and see.

  • Delivery completed indicator in PO

    Hi team,
    What's the significance of delvirey completed indiocator in PO. Even if i choose this, able to do GR with MIGO.
    I hope my question is clear. Kindly respond

    Hi Prasad
    When u tick delivery complete indicator system will not consider that Po as Open Qty. which u can check in MMBE stock overview
    Where open Qty is reduced..u can check this
    first try to check stock w/o delivery complete indicator
    And then after ticking Delivery complete indicator
    ( Note that here PO balance qTY SHOULD BE more than 1)
    As the PO is not closed, system allows you to do GR for the rest of the quantity.
    If u don't want system to allow pass GR once indicator is ticked u need to delete line item
    Hope this will clear ur doubt
    revert for any clarification
    Vishal...

  • DELIVERY COMPLETED indicator for Services Purchase Order

    hello experts,
    i'm working in SAP with R3 4.7 for developing funtion / BAPI for a mobile web application for services purchase order.
    i have a big problem:
    is it possibile to set the DELIVERY COMPLETED indicator (<i>ELIKZ</i>) in services purchase order via BAPI or Function Module?
    <i>I'm working with BAPI_PO_CHANGE but and i succeded with material PURCHASE ORDER but not with SERVICES PURCHASE ORDER</i>.
    can anyone help me?
    thanks in advance,
    Eliana

    For material:
    Delivery completion (DCI) tick available at line item level for each material (EKPO- ELIKZ)so you can check for the each material in PO the DCI is available or not.
    For Services:
    As Service code (Service line items) are maintained in details screen of Header line item. So whenever the DCI (Delivery completion indicator) marked for that Header line item it means that all the service line items are marked as DCI for that Header line.
    DCI indicator can mark manually in Change PO mode and automatically when service entry done as final for that Header line.
    So you can check the DCI for service same way as you do for material
    Hope it will help you
    Regards
    Vikrant

  • Delivery completed indicator for Service purchase order item

    Want to check the PO item for services already delivery completed.
    Field EKPO-ELIKZ (delivery completed indicator) is for material line item, is there a equavalent field for Service line item?
    What field /how to to check for a service line item in Purchase order already delivery completed ?

    For material:
    Delivery completion (DCI) tick available at line item level for each material (EKPO- ELIKZ)so you can check for the each material in PO the DCI is available or not.
    For Services:
    As Service code (Service line items) are maintained in details screen of Header line item. So whenever the DCI (Delivery completion indicator) marked for that Header line item it means that all the service line items are marked as DCI for that Header line.
    DCI indicator can mark manually in Change PO mode and automatically when service entry done as final for that Header line.
    So you can check the DCI for service same way as you do for material
    Hope it will help you
    Regards
    Vikrant

  • Delivery completed indicator in purchase order for service item

    How can I make the delivery completed indicator (EKPO-ELIKZ) in a purchase order for a service item ready for direct changes.
    Per default this field is hidden on purpose for service items (according to SAP note 735404). Please inform me of customizing entry where that can be changed!
    Thanks,
    Johnny

    delivery completed indicator only gives information for MRP ( That not consider balance qty as onorder stock), it has no control on GR, so I am not sure what you will achieve to mark it in service PO?

Maybe you are looking for

  • I am experiencing an R6025 pure virtual function call error in Windows 8.1

    Help -- not sure what to do.  Recent update to Windows 8.1 on my computer. Un-installed iTunes because it wasn't working. Re-installed it. Installed Microsoft Visual C ++ updates.  What to do......

  • Can Apple TV stream from TV to Mac?

    Will it be possible to do a reversed job with the new Apple TV? I have a digital sat receiver that records too. I`d like to have a device that streams my recordings to my Mac Pro. Til now I always have to unplug the receiver and drag it through the h

  • DIsplayport crushing blacks w/ panasonic plasma tv

    I'm trying to properly calibrate a panasonic plasma for use with my mbp's displayport output. No matter how many times I run the apple calibration tool and turn up the brightness on the tv, the black levels are absolutely crushed (no detail in blacks

  • Powershell to export all vm's on the vcenter with snapshot created.

    Hi, I have Commvault backup server taking snapshots of 100's of production server and backup server leaving some of the server snapshot unconsolidated after taking a back, So my question or requirement is I need to pull all server with their snapshot

  • Error: Unable to generate addon queue due to missing addons

    Hi Team, We're receiving this message error below in Configuration/BIND_PATCH phase of SAPEHPI when installing a EHP in ERP 6.0. In log "SPDA_PATCHINT.LOG" I see the following entry 3WETN586 There are upgrades to required software component versions