Delivery date confirmation

Hi,
I have created a SO today with Req Delivery date as tommorow i.e 11/08/2011. But system is showing the confirmed Delivery date as 15/08/2011 (that is due to maintaining time GR time as 2days +2days for processing time for purchasing). Assuming all the materials req to produce FG are readily available and In-house prod time is "0". Now Can I able to deliver the order on 11/08/2011..?? If so where should I change the dates and how can the Delivery date be confirmed for 11/08/2011
Waiting for response.
Regard's,
Uday.

Hi uday,
Try to run material availability check in the sale order and it will take you to a screen where your can confirm.
the availability check is done by the inhouse production time in the material master if the material is inhouse manufactured.
If you enter 0 days for inhouse time, then it will confrim accordingly.
also check in VOV8, whether any lead time is maintained for the order type
thanks,
JK

Similar Messages

  • Delivery date sales order / purchase requisition

    Hello,
    I am trying to create a sales order. In my case, the sales order has got two lines for schedule lines:
    -delivery date: 24.03.2009
    -delivery date: 06.04.2009. This line is the one confirmed. This is because on the material master record the field "planned delivery time" (MARC-PLIFZ) is equal to 13 days
    When saving thi sales order, the system automatically creates a purchase requisition with the delivery date confirmed.
    But if planned delivery is equal to blank and we use other lead times like, GR processing time (MARC-WEBAZ) or total replanishment lead time (MARC-WZEIT), the sales order doesn´t take into account these two lead times, I mean the sales order is created with delivery date 24.03.2009 and also the purchase requisition.
    Does anybody know what I have to do in order to take into account one of these two lead tiemes when creating the sales order?
    Best regards

    Thanks, but there is not way to maintain it automatically with lead times from material master apart from the "planned delivery time" (MARC-PLIFZ)??? Thanks a lot.
    Regards

  • Delivery date should be confirmed in third party process

    Dear Experts,
           I have one doubt in third party process i.e., while creating sales order how can we confirm the delivery date because here vendor deliver the goods to customer but if customer is asking for delivery on a particular date then how can we assure him the delivery date is there any tracking in standard or how to solve this requirement.

    Dear Venkatesh
    In the third party Process, the Vendor will deliver the goods. That is correct. so as per my experience the delivery dates will get copied to Sales order ----- PR ----then PO. Then the vendor will also deliver the goods on the date which is mentioned copied into PO only.
    Also refer to the below link to gain complete knowledge to clear your doubt.
    http://help.sap.com/saphelp_scm700_ehp02/helpdata/EN/c1/42c95360267614e10000000a174cb4/frameset.htm
    Thank you
    Srikanth

  • Credit block not allowing delivery dates on the order confirmations

    Hello,
    We are a full module SAP shop on ECC 6.0.
    For one of our businesses, we have credit checking to take place at the time of Sales Order entry.  This is causing an issue for the business because they are using Demand planning and need to have the Delivery Dates on the Order confirmations and they also want to be able to run an ATP check on the Sales Order.  The credit check on sales order entry, prevents them from doing both of these things.
    Does anybody know if there is a way to get the dates to show up on the order confirmations when a sales order is on credit block?   Also, is it possible to run the order through ATP checking with this sales order credit block taking place?
    thanks for your help!

    Dear,
    Ideally this question should have been posted in ERP SD forum.Please check out your credit check settings in OVAK and OVA8. Hopefully it help you.

  • Delivery date in PO schedule lines not equal to delivery date in PO confirm

    Hello expert.,
    I use PO with account assignment E for sales order purchasing coming from a TAB sales order category.  In the PO I have schedule lines define according to the lead time from the materila masetr of the info records.  The schedule lines in the PO update automatically the schedule lnes in the sales order and therefore the planning on the sales and delivery side is done according to the delivery date indiacte in the schedule lines of the PO (table EKET).
    I use also inbound deliveries to indicate when the goods arrive.  At that time, I can realize that the lead time / the quantity delivered by the vendor does not correspond to what was palnned in the schedule lines of the PO.  When I save the inbound delivery, the confirmation is indicated in the PO in the PO confirmation tab with the delivery date equal to today (table EKES).
    The issue I have is that the schedule lines of the PO is not in line with what is in the confirmation tab for both the quantity and the date.  Therefore, even though I have goods arrived that could be delivered to the final customer earlier, the system doesn't recognize it because the schedule lines in the PO remain with the original planned date and quantity and as a consequence also in the sales order schedule line.
    Does anybody can give me a way, a trick or a mechanism to align the delivery date and the qauntity in the PO between the schedules lines tab and the confirmation tab?
    Thanks a lot for your support.
    ALJ
    Edited by: Andre Louis Jadot on Nov 26, 2010 8:15 AM

    Dear,
    This is very intersting.
    Delivery date is come in purchase order from plant delivery time (MRP2) in material master.
    Exa:
    If you enter plant delevery time as 10 days in MRP2 of material master.
    So system calculate delivery date as under.
    Plant delivery time : 10 days.
    PO creation date : 08.05.08.
    System consider delivery date 21.05.08
    System add 3 days in your plant delivery time.
    So 3+10 = 13, Delivery data:- 08.05.08 + 13 = 21.05.08.
    Please check it in your quality client, If it is useful for you please revert back with points.
    Regards,
    Mahesh Wagh.

  • Table where the Delivery date is stored in Confirmation tab on Me23n

    Hello ABAB Gurus,
                               Can anyone give me the table name where the Delivery date is stored in Confirmation tab in Item in ME23n.
                                  If anyone is aware of it then please let me know .
    Sagar

    Hi,
    Check the table EKES and field name is EINDT..
    Thanks,
    Naren

  • PO Confirmation Date (OA) & Inbound Delivery Date  Report

    Dear All,
    Please let me know SAP Standard Report
    PO Confirmation Date (OA) & Inbound Delivery Date  Report
    Regards
    Amey

    Hi,
    I guess ME2A will give u unconfirmed orders that require a confirmation, but have not yet been confirmed according to the dates configured for your monitoring period. First, ensure that you have such an order
    Also, ensure that your confirmation control (OMGZ) has BOTH a value in Monitoring period AND Reference date.
    Pls chk note for more information.    https://service.sap.com/sap/support/notes/500502
    BR,
    Krishna

  • Updation of SO Confirmed Delivery date based on GR date for BANC parts

    Dear All,
    Would appreciate an answer on the following issue:
    For Back to back/Indiv Purchase Order parts(BANC) the confirmed delivery date in the SO is updated based on the Order Acknowledgement date sent by the vendor for the corresponding PO generated for the SO. If the the vendor happens to deliver the parts in advance of the OA date(it happens quite often), the parts wait in stores till the confirmed delivery date is reached on the SO even thugh the original requested date on the Sales order is long past. If there is an order acknowledgement date in the system, at the time of GR, a warning message comes, but as our system is a high volume systme it is not possible to update the date in SO manually. Is there a way we can update the confirmed delivery date in the SO based on the Goods receipt date automaticall through config or a batch job?
    Thanks
    Suman

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • How to change delivery date in confirmation tab in item overview in PO

    Hi,
    I am using ME_CONFIRMATION_UPDATE to add delivery date into the confirmation tab in item level.It is adding new line item.
    It is even updating the table EKES.
    Now my requirement is to change the delivery date from the above PO. Is there any function module for the same.
    PLEASE GUIDE ME.
    Thanks,
    Vengal Rao.

    Hi,
    Our client is into Apparel business and using SAP-AFS.  Some time at the last moment the due to change in customer delivery date there is a requirment to change the delivery date in confirmation tab also..
    Thanks,
    Vengal Rao.

  • Delivery date to be replaced by Confirmation date automatically.

    Hi All MM gurus,,
    I want to do a setting in the Purchase order in such a way that if there is inbound delivery created or say buyer created a confirmation manually in the PO.
    The confirmation tab delivery date should replace the delivery date in the Delivery schedule tab automatically.
    The buyer should not go and change the dates in both the places.
    Is there any standard setting for this or else what all configuration needs to be done.
    Thanks  in advance
    Sagar

    Hi,
    Thanks for the reply.
    No this issue is not MRP revalant,
    When the confimation comes from vendor , we change the confirmation tab as well as the  delivery date in the line item and We send the PO back to vendor again with the new delivery date.
    Now here the buyer has to change the dates twice.
    Is there a std setting by which we can get once the confirmation date is changed it will change the delivery date automatically.
    Thanks again
    Sagar007

  • Confirmed delivery date should be on Monday Only

    Hi All.
    I have a requirement wherein, for a customer the confirmed delivery date should be on monday only.
    We are using APO for GATP.
    Can anyone please guide how to go about this?
    Thanks in advance.

    Hi,
    Create a Separate Factory calendar with only working days on every Monday
    The Factory Calendar will be done either in the OVR3 or SCAL
    And assign this newly defined Factory calendar in the PLANT--Factory Calendar
    Please do this and check
    It will help
    regards,
    santosh

  • Confirmed delivery date should be on Monday

    Hi All.
    I have a requirement wherein, for a customer the confirmed delivery date should be on monday only.
    We are using APO for GATP.
    Can anyone please guide how to go about this?
    Thanks in advance.

    Hi,
    1. For this you need to maintain the Customer Calendar...
    IMG --> SD --> Master data --> Business Partner --> Customer --> Shipping --> Define Customer Calendars....
    Here create a calendar with working day as only on Monday and other days as holiday.
    2. Assign this calendar in the Customer Master --> General data --> Unloading Points....
    create atleast one unloading point and assign the newly created calendar... you can also set this unloading point as default one...
    Now the confirmed delivery date will be only on monday... if the confirmed qty is available on tuesday then it will be confirmed to the customer on next monday....
    Hope this solves your issue.
    Muthu

  • Order confirmation with delivery date in past

    Hello everybody,
    In the SNC portal, we have a lot of old Purchase order which are not confirmed, and when we try to confirmed them, we have the error below :
    Order XXXXXXXX, item 00010, schd. line 0000000002: delivery date lies in past
    My client wish create a super user (admin ?) who can confirmed a Purchase Order item with a delivery date in past (for example 06/08/2011).
    Is it possible to create such profiles? If so how to configure it in SNC.
    Are there other solutions ?
    Thank you very much for your help.
    Stéphane.

    Hi Stéphane,
    Normally in a standard SAP settings Purchase order confirmation in past gives warning message but you can have PO confirmation in past from warning to error or Information.
    Go to SPRO>Supply Network Collaboration>Basic Settings>Validation>Own Settings-->Maintain Settings in Validation Profiles
    Maintained below setting if you want message as information (No error or warning message)
    Profile:POC2
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:I
    Save Mode:Save Message as Valid
    Continuation Mode:Continue checks
    Profile:POC3
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:I
    Save Mode:Save Message as Valid
    Continuation Mode:Continue checks
    Maintained below setting if you want message as error
    Profile:POC2
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:E
    Save Mode:DO not Save Message
    Continuation Mode:Discontinue checks
    Profile:POC3
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:E
    Save Mode:DO not Save Message
    Continuation Mode:Discontinue checks
    Maintained below setting if you want message as warning
    Profile:POC2
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:W
    Save Mode:Save Message as Valid
    Continuation Mode:Continue checks
    Profile:POC3
    Validation check:PO_DELVRY_DATETIME_IN_PAST
    Msg.Type:W
    Save Mode:Save Message as Valid
    Continuation Mode:Continue checks
    Above setting is a generic setting for all user and If you need User specific setting then it is a customization required.
    Regards,
    Nikhil

  • Confirm Goods / Service display delivery date on item level

    Hello all,
    in transaction Confirm Goods / Service user can see creation date of the purchase order. Is it possible to somehow display required delivery date on item level. Field "Required on" which is visible in Basic data of the item.
    Would like to have as minimum modification as possible, maybe through customizing (of course if possible) :o))
    TIA
    Gordan

    Hello all,
    in transaction Confirm Goods / Service user can see creation date of the purchase order. Is it possible to somehow display required delivery date on item level. Field "Required on" which is visible in Basic data of the item.
    Would like to have as minimum modification as possible, maybe through customizing (of course if possible) :o))
    TIA
    Gordan

  • Update PO with Confirmation Control Key,Acknowledged Delivery Date.

    Hi Experts,
    I have a requirement that through a Excel file I have to update a Existing PO with the three fields,
    1.Confirmation Control Key
    2.Acknowledged Delivery Date.
    3.Acknowledged Modified Delivery Date.
    If there will be differ in values in any of the field in the existing PO and the incoming excel file then we need to update the
    fields in the PO.
    So is there any BAPI or FM to update the field value?
    I tried with BAPI_PO_CHANGE it is not working.
    In excel we have only five fields.
    1.PO number
    2.Item
    3.Confirmation Control Key
    4.Acknowledged Delivery Date.
    5.Acknowledged Modified Delivery Date
    Please help.
    Regards,
    Umesh

    you can use BAPI_PO_CHANGE itself, but you need to get the details of the current PO before passing the details to BAPI_PO_CHANGE
    you can use BAPI_PO_GETDETAIL1 by passing ( PURCHASEORDER = <..Your Purchase order Number..> ) and after that you willl
    get all the details of the PO, just change the required data's and pass it to the BAPI_PO_CHANGE. It will be easier.
    after you receive all the data,
    pass the corresponding data from BAPI_PO_GETDETAIL1
    to BAPI_PO_CHANGE.
    1.PO number                    -     PURCHASEORDER (importing)
    2.Item                         -     POITEM (Tables )
    3.Confirmation Control Key          -     POCONFIRMATION (Tables)     
    4.Acknowledged Delivery Date.               
    5.Acknowledged Modified Delivery Date
    I think for 4,5 fields are also in POCONFIRMATION table itself (not sure)

Maybe you are looking for

  • Pre cant display HTML in email?

    We are working with a client that is emailing out documents in HTML format. We can open emails with HTML in the body but no the attachments. We can download the file but we just get a "?". If you close the email and open again, you can click on the d

  • Ipod connection to Mazda 3

    Hi everyone, When I brought my Mazda 3 back in 2009 I got the option of the ipod cord being preinstalled in my glove box. I could plug in my ipod, its showed on the screen as being connected and pressed AUX and away it would play. I had no problems w

  • Final Cut Pro logo wanted for end credits

    Is there somewhere I can download an Apple Final Cut Pro logo for insertion at the end of my project, in the credits... something to the effect of... 'Edited with Final Cut Pro' in the FCP font from Apple ? thanks in advance.

  • Pay Grade Structure

    Hi, I am setting up the pay grade structure. One alternative i have is to use descriptive terms in the PS Grade field and the numeric grades in the level field. For example, PS Grade: Top Mnt Level : 10 - 12 PS Grade: Sen Mnt Level: 7-8 PS Grade: Jun

  • Sender Missing on Several EAS Messages on Palm Pre

    On about 10% (not sure exact ratio) of the messages I get on my Palm Pre from our Zimbra server via EAS are missing the sender on the Palm. I never had this issue on my previous phone: Treo 750 running Win Mob 6.1. With the "From" field apparently mi