Hello Experts,
We are not able to calculate the delivery date in Sales Orders based on the Route transit time.We are using the Transportation group from Material master , Shipping condition from sold to Party , and Receiving issuing plants and zones .
One thing I notices is if we don't use the Transportation group in the material master , then the delivery date calculated based on transit time.Not sure not why its not working with using Trans group in Mat master
Please advise.
Thanks in advance

Hi,
Kindly do not post same questions twice
HI,
For delivery scheduling enter time
IMG >> SD >> Basic functions >> delivery scheduling and transportation >> maintain duration
Maintain here route, pick/pack & loading time
For in house production maintain time in material master in MRP view
Then now system will take in account what is production time + pick/pack + load time and then will schedule
Kapil

Similar Messages

  • Delivery date from PO not updated with inbound delivery (EDI) date

    Dear all,
    The delivery date in the purchase order (as per my understanding) is the purchase order creation date + the planned delivery time.
    We are using EDI and an inbound delivery gets created when the shipping notification is received from the vendor.
    The real inbound delivery (EDI) date is usually different from the planned delivery date of the purchase order. But the problem is that the delivery date from the PO is not getting updated with the EDI delivery date.
    Is it possible to have the delivery date from the PO updated with the real EDI delivery date?
    I need this because I want to calculate planned delivery costs based on the EDI delivery date, and so far when I post the goods receipt (Price Date Category = "Delivery date" in the PO), the system is taking the price valid at the delivery date from the PO instead of taking the price valid at the delivery date of the EDI message.
    Thanks a lot,
    Annabelle R.

    We have applied the note 793478 "Change of the pricing date in EXIT SAPLEINR 003".
    In our process flow, an inbound delivery is created with reference to the PO, then the goods receipt is done with reference to this inbound delivery.
    When the option 5 "Goods receipt date" is selected in the Conditions Control tab of the purchase order, now when the goods receipt is posted, the price is calculated based on the inbound delivery date, which is what we wanted.

  • Getting error when view - Requested data type does not match with existing

    I have the siebel web service
    In the BI publisher as mentioned in the 'Siebel_BI_Publisher_Integration_Concepts.pdf', I have imported the siebel web service
    BI can recognize the 'Web service' and methods.
    I have created the paramters. The data type is 'String'
    When I try to view the report using the BI publisher, I am getting teh following error in th UI
    "Requested data type does not match with existing data type"
    This is the first time I am using BI publisher to call the Siebel web service. I don't know what this error means
    I don't know whether any log file generated wit the details of this erro message
    Any help is much appriciated
    Thanks,
    Kavitha

    Hi all,
    have you find a fix for this issue? Im facing the same situation, using Complex type, and String data type both in the service and Bi publisher. We are consuming CC&B services, and we have noticed this error appears when BIPublisher is running on WebLogic (10.3) but it does not appear when BIPublisher is running on OC4J , of course running the same report on both application servers.
    Any idea?
    Thanks a lot, regards
    Nestor

  • How to put condition for one date range should not interfear with another ?

    hi friends,
    how to put condition for one date range should not interfear with another  date range.
    my data base table has two fields
    from date
    to date.
    when we enter the date range in the data base , new date range means from date and to date should not interfear.
    can  anybody help me.
    thanks &Regards,
    Revanth
    Edited by: rk.kolisetty on Jul 1, 2010 7:18 PM

    Do it the SAP way....
    First entry...from is today, to is 99991231.
    New dates entered, now we have two rows...:
        from is original date  to becomes yesterday.
        From is today          to is 99991231

  • Clean-up all data that did not match with the selection.

    Hi Everyone,
    In my requirement I need to  Clean-up all data that did not match with the selection from my internal table lt_cdpos.....in this case wat can i use like.'Refresh' or ' Clear' or 'DELETE ADJACENT DUPLICATES FROM lt_cdpos'.
    Pls suggest me...

    Hi Meenakshi
    Try  delete lt_cdpos where kunnr  NE KUNNR (from selection screen) .
    Before Checking <condition> make sure both comparing field type match with each other.
    You can use FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT' for append leading zeros in compare condition before comparing kunnr from selection screen
    Regards
    Parveen

  • Route - Transit Time

    According to the business through EDI customer places orders. We maintain two shipping conditions delivery and Pick-up. Based on the customer profile we assigned shipping conditions on the ship to customer master in the shipping tab.
    My query is related to the customers assigned Pick-up as a shipping condition in customer master.
    As we receive orders through EDI sometimes pick-up customer will send in 2 dates on their orders.
    1. Requested delivery date u2013 The date they want the order in their warehouse.
    2. Requested ship date u2013 The date they want to pick up the order.
    In some cases customers will only send one date that is requested delivery date. In this scenario our customer service team is manually back out the date accordingly so it will show the correct u2018material availability dateu2019 and u2018loading dateu2019 on the u2018overviewu2019 of the order under u2018shippingu2019 tab.
    Eg: If customer sends the req delivery date is 05/27/2009 order created for the same. Manually we back out the date to 05/24/2009 so that the material availability date and loading date would also be changed to 05/24/2009 on the overview of the order under shipping dat.
    How to achieve the functionality where the system will back the order up to show the u2018material availability dateu2019 and the u2018loading dateu2019 as the date that the carrier will be coming in to pick up the order ie On 05/24/2009 and material available in the customer warehouse on 05/27/2009.
    If I can maintain the transit time as 2 days for the route determined (t code 0vtc) I can achieve this functionality. However I canu2019t maintain the lead time because we are not arranging the carrier, customer is arranging the carrier and that will be coming in to pick up the order.
    Please advice.
    Thanks.

    Dear Gopi,
    My sincere apologies for the delayed reply. I would like to reiterate my scenario.
    Based on the information enter in the Idoc Sales orders are generated automatically. Let us assume  requester delivery date has entered by the customer u2013 05/27/2009 if material is available, schedule lines are created for the requested delivery date and confirms the delivery date as 05/27/2009
    As the confirmed delivery date is 05/27/2009, Material availability date and Loading date is also 05/27/2009(based on the config settings) u2013 These dates can view sales order overview screen under shipping tab.
    In the scenario where the shipping conditions are PU u2013 Pick up, customer is arranging his own carrier to pick the goods.
    As customer requested delivery date is 05/27/2009 on this date customer wants the goods in his warehouse. According to our system material availability date is 05/27/2009. If goods leave our premises on 05/27/2009 it would take X days more to reach customer. So customer is getting goods on 05/27/2009 + X days of Transit time, ultimately he is not getting goods based on requested delivery date.
    In order to supply the goods on customer requested date, customer service rep has to manually back out the requested delivery date from 05/27/2009 to 05/24/2009 if material available, material availability date and loading date will be 04/27/2009. Customer can pick goods on 05/24/2009 so that goods will be in customer's warehouse based on the requested delivery date 05/27/2009.
    We can achieve this functionality by giving the transit time as 2 days so that through backward scheduling  system would automatically confirm the delivery date on 05/24/2009, material availabity date and loading availability date on 05/24/2009. However it is not advisable to maintain transit time for the route determined because we are not arranging the carrier, customer is arranging on his own.
    Please advice a solution or a user exit to achieve this functionality without maintain the transit time and without manual manipulation how to back out the requested delivery date on the order.
    Thanks.

  • In schedule line before delivery date , grc should not allow

    Hi MM expert,
    i am using schedule line process.
    now i want that i could not do Goods reciept before shedule line.
    kindly help.
    Regards,
    santosh

    Hi 
    Have you gone through entire Cycle process of Sceduleing agreement .
    If you have created Schedule agreement in -ME31L
    Then maitained delivery date [Schedule lines date]-in ME38
    Then SAP-System will not allow you to do the GR till the date as per the Delevery schedule lines date.
    After reaching that date you can do any time GR.
    Try it you will get it
    with regards
    Shrinivas gangoor

  • DAT 12\24 Not working with COMPAQ prosignia 500

    Hi all,
    I have one Compaq Prosignia 500 Server with me.
    OS installed on this is Novell netware 4.12
    earlier we have DAT Drive of Seagate (4\8 GB)
    Now we have to change it with HP (12\24) GB as 4\8 DAT notr wokring & not
    available in Market easily.
    problem we face is that Prosignia server show This DAT Drive
    with SCSI ID 6 .
    But on consol in disk Inforantion , this DAT Drive is missing
    due to this we are not able to take backup
    pl. Give solution if any

    Don't believe this has anything to do with queue based printing ..
    suggest you post to the backup newsgroup instead.
    Peter
    eDirectory Rules!

  • Comcast Cable Internet not working with router (WRT54G), but network is fine?

    My Comcast Cable Internet is not working with my router (WRT54G), but my home network is fine. The internet works without router.
    I have a WRT54G Wireless-G Broadband Router from Linksys.
    I was using Bellsouth DSL Internet up until two weeks ago.
    I had my DSL modem connected to my router, and the router let me use the internet and share some files and printers with my laptop upstairs.
    A few weeks ago we changed to Comcast cable. The technician came in and connected it himself, but only for the desktop. The internet worked perfectly, and still works perfectly on my desktop (the one downstairs). He didn't really give me any instruction or CD-roms for it.
    When I tried connecting my router, the internet stopped working. It was weird because the router worked for the file sharing and printer sharing between both my computers, but the internet didn't work. Although, the light for the internet is lit on the router itself.
    I even have this program called "AOL Network Magic" which shows a map of what is connected to the router, and it shows that the router and my laptop and desktop are connected, but then it has an "X" for the internet connection.
    I have tried everything. I lost all of my CDs and things that came with Linksys, but I downloaded some guides from the Linksys website and it doesn't really help. I tried something called "NetSet", but after I set everything up it says my router is not compatible or something with NetSet. I read a bunch of FAQs, I tried going to comcast and seeing if they had any FAQS about it, but I can't find anything.
    Maybe one of you can help me?
    Also, I don't know my modem's IP address. I had it for Bellsouth, and sometimes when I would lose my connection I would go there and click on "reconnect" or something like that.
    So the only way I can use the internet is to disconnect everything from my router and connect the ethernet cable directly to the modem.

    You may open the web setup utility page of the router by typing its IP address on your browser's address bar. By default, it is 192.168.1.1.  When you're asked for username, you may leave it blank.  For password, its "admin". If in case that does not work, reset your router at the back for 30 secs and do a power cycle again, see if it becomes accessible after that...
    "The war between heaven and hell depends on the choices we make, and those choices require sacrifice. That's the test"

  • Delivery date mandatory and not defulted current date

    Hi all,
      I want to make the delivery date mandatory in the purchase Requisition and currently the current date is defaulted there , i want that nothing should be there initially.
    Please provide the configuration setting.
    Regards,
    Kapil.

    Hi,
    U can make the delivery date field as mandatory in PR , by setting delivery date field as required entry in PR sscreen layout in customization.
    Go to SPRO- MM - Purchasing - PR- Define screen layout at doc level - ME51N - Deadline monitoring - Delivery date ( Make this field as reqd entry ) and save it.
    And regarding ur second question the default date should be blank, the date gets calculated here based on the planned del time maintained in materila master in MRP2 view.
    So if the date showing is todays date when u r creating PR today means, the planned delivery time maintained in MMR is zero days.

  • I had my iphone 3gs unlocked so i could use it in Oz, however although i can phone works ok, i cant get internet, but i the option of Cellular Data Network does not appear with the new sim? Can anyone help pls?

    Hi Just wondered if anyone can help with the above question? I had O2 phone unlocked and bought a local sim card, but although the calls are fine i have no option for internet etc.  I have done searches and got the info details from the sim provider to activate, but  instructions say i go to : Settings; General; Network and then Celluar Data Network, but I dont get that option ?  When i put back my O2 sim card, the option reappears?
    Can anyone help me please? Off to Australia again soon and really could do with it working properly this time.
    Thanks everyone
    Ronnie

    Hi Ronnie, was wondering what brand sim card you bought?
    Was it from Telstra, Optus, Vodafone, Virgin or Mayasim?
    I have a 4 S running iOS 5.01 is there an option in Settings - Network - Carrier? As this should be set to the supplier of the sim card. In my Settings - Network there is no option for Celluar Data Network.
    What version of the iOS are you using?
    Some prepaid sim cards may not have a lot of data, so I suggest searching the companies websites for the best deals before you come here. Telstra usually have good plans. If you take your phone to the shop you purchased the sim card from they will usually set it up for you. 
    Telstra runs on a different frequency to others and offers the best coverage in Australia.
    Just for the record I am not an employee of any mobile company.

  • Excel 2013 Data From Web not working with SharePoint 2013?

    In Excel 2013, on the ribbon select the 'Data' tab and 'From Web' to import data from a web page. Navigate to a SharePoint 2013 site with a table on the home page and you will not see the table import arrow on the table. With SharePoint 2010 you would have.
    Any suggestions on a workaround/fix?
    One thing to note, in SharePoint 2013 be sure to disable the Minimum Download Strategy feature on the site or you will get script errors in the New Web Query dialog.
    Also, I realize this may belong in an Office/Excel forum so I have posted it there also.
    Thanks, Fintan

    Hi Fintan ,
    According to your description, my understanding is that the Excel table import arrow   disappears  in the  SharePoint 2013 page.
    For your issue , I can reproduce your scenario in my SharePoint 2013 environment. It should be caused by the Excel  Data connection from web page feature cannot identify the page layout  which is
    used by SharePoint 2013 . For a workaround, you export the HTML table using jQuery:
    http://social.technet.microsoft.com/Forums/sharepoint/en-US/30fc097f-256c-48d9-8b6c-cb821a504045/problem-while-exporting-html-table-to-excelcsv-in-sharepoint-2010?forum=sharepointgeneralprevious
    http://community.office365.com/en-us/b/office_365_community_blog/archive/2013/07/31/how-to-use-power-query-for-excel-to-query-a-sharepoint-2013-list-grid-user-post.aspx
    Best Regards,
    Eric
    Eric Tao
    TechNet Community Support

  • Date format does not change with the Regional and Language Options in 2008

    I have a one-column report that was created using the SQL "select current_date" in postgres.  (Thinks select getdate() ).
    In Crystal Reports XI when I change the "Standards and Formats" of Regional Options to:
    English (United States)  the date is in the format mm/dd/yy
    English (Canada) the date is in the format dd/mm/yy
    Japan the date is in the format yyyy/mm/dd
    In Crystal Reports 2008 when I change the "Standards and Formats" of Regional Options to:
    English (United States)  the date is in the format mm/dd/yy
    English (Canada) the date is in the format mm/dd/yy
    Japan the date is in the format mm/dd/yy
    It doesn't change.  Is this a bug?
    Thanks in advance,
    J

    hey Jason,
    i am going through some of the old forum posts and saw that no one replied to your language options post.
    for cr 2008, there are language packs for the applicable languages. there are advantages for this as you can save installation space with the option of installing language packs for each language that you want the designer application to be in.
    you have seen the disadvantage as it doesn't work the same as before.
    you do not need the language packs for testing though. in the crystal reports View menu, switch up to the Product Viewing Locale to test objects which are using "system" settings such as dates.
    if you do wish to install any language packs so that you can change up the actual language in the designer, go to your install media. in the install files "\package\langs\" directory, you will see a folder for each language that you need. install the desired language(s).
    once you have installed a language pack and then restart the cr designer, you will now have the additional language in the View > Product Locale.
    so in summary...Product Locale will change the language of the whole designer...language packs are needed for this.
    Preferred System Locale can be used to test languages without having to change your windows system settings.
    i hope that this helps,
    jamie

  • Spry Data Set will not Refresh with New Data?

    I'm using the Dreamweaver CS4 "Spry Data Set" Wizard and created the following layout on one of my pages:
    In the wizard, under "Specify a Data Source", I chose "HTML", and selected my cfm page that has a simple Table with the datasource below:
    <cfparam name="URL.id_com" default="1">
    <cfquery name="rsTickets" datasource="Ctickets">
    SELECT ticketNum, ticketType, ticketDate, acctNum, firstName, lastName, businessName, city, status, owner, ticketDetails
    FROM tickets
    WHERE acctNum = <cfqueryparam value="#URL.id_com#" cfsqltype="cf_sql_numeric">
    </cfquery>
    When I display the page in IE8, The Spry Master/Detail page will not filter my records based on the URL parameter?
    (Note: All my other "Non-Spry" datasets filter fine by the URL)
    Question: How do I make the Spry data "Refresh" or "Re-run the query" so the data filters properly?
    Thanks,
    jlig

    Ben, Thanks for the reply..
    Here is my Source Data page which I created & selected in the Spry Data Wizard: http://cerberus.clearwave.com/jerry/Spry2.jpg
    (this page takes my query, filtered by the URL Acct field and makes a simple table to feed the Spry Wizard)
    - In the Spry Data Wizard, I selected the file and it properly found the table data: http://cerberus.clearwave.com/jerry/Spry3.jpg
    - Then I clicked Next and changed a few of the field types: http://cerberus.clearwave.com/jerry/Spry4.jpg
    - Next I chose Master-Detail and used the Acct field to be the Master : http://cerberus.clearwave.com/jerry/Spry5.jpg
    - Lastly, I open up the webpage, click on the Tickets Spry Tab: http://cerberus.clearwave.com/jerry/Spry6.jpg
    As you can see in the picture on this page: http://cerberus.clearwave.com/jerry/Spry6.jpg, the URL parameter is = 3902 which is the Acct number
    being passed from the previous page in my application. (Ex..http://192.168.1.77/COE/salespipeline_mi.cfm?id_com=3902)
    The first one is correct, but once I move to a different Acct number the Spry data will not update to reflect the correct Tickets?
    Once I move to say, Acct 4413, the Spry Tickets Tab does not change or update to reflect this Acct's tickets?
    (see link--> http://cerberus.clearwave.com/jerry/Spry7.jpg)
    Here is my code listing for the Tabbed Webpage: http://cerberus.clearwave.com/jerry/Spry8.txt (see images 6 & 7)
    It seems like I'm missing some kind of "Trigger" or "Requery" or "Refresh" that "Re-runs" the Source Data page (http://cerberus.clearwave.com/jerry/Spry2.jpg)..?
    Thanks again,
    jlig

  • TS1398 will not join with router

    just got ipad out of box. tried connecting to my router but would not join only says, dismiss. standing next to router so no probs with signal strength. lap top and notepad connect wirelessly okay and i have checked security code stamped on the router. any thoughts for a complete novice?

    Can see network?
    Settings>WiFi>Choose a network

Maybe you are looking for

  • Transport buffer lock file not found.(got the idea  just  want to  check

    Hello All, While importing  request into LEB, I got following error: lebadm> tp import LG2K900499 LEB client002 pf=/usr/sap/trans/LEB/bin/T P_DOMAIN_WGP.PFL This is tp version 370.01.01 (release 700, unicode enabled) Warning: Parameter ICLI_TRUSTED_C

  • Quicktime Player - won't play movie

    I have a movie file which works on my old 10.6 Snow Leopard machine (it's a m4v file), but Quicktime player under 10.8 refuses to play it. Whenever I try to open it, it complains of a missing codec (but doesn't state what). However I can watch the pr

  • Verizon does not care about poor service

    Loyal VZ customer for many years.  Problems with service where I moved to over a year ago. 3 & 4 bars showing on the phone and some days it just doesn't work.  Upgraded plan with promise that it would solve the problems.  Nope, lied to yet again!  Th

  • Use cpu 8 core TO running labview

    Hello, everyone My for loop 5,000 times Using the Parallel For Loop, such as photos The CPU Information.vi to enter the eight core to Parallel For Loop I open the Task Manager, but looks like only four core operation And the utilization rate of only

  • Can't click to call phone number in Calendar subject

    can't click to call phone number was input in iPhone 5S calendar subject, but work in notes field. any idea?