Delivery Date should be blank in ME51N

Hi,
We want Delivery Date as Blank & Mandatory in ME51N - PR Creation.
I have already tried with T.code OMI8, where we removed Processing time required field value as 0 under External Procurement but from this, Delivery Date is showing same date as PR Date. 
Please guide, how to do this field as Blank....

Hi,
   If you want the user to input the delivery date, then you may check the following option.
1. Go to ME51N and go to personal settings and go to default values tab.
2. Maintain the delivery date as any past date as shown below and save.
3. Now, go to the path: OLME - Environment Data - Define Attributes of System Messages - System messages. Here, maintain the message ME 039 as error message E as shown below:
4. Create a new PR in ME51N and check the system behavior.
      System will always propose the delivery date mentioned in the personal settings (even though you maintain different PDT or purchase processing time). Since we maintained a past date as the default date, system will propose the past date and immediately the error message ME039 will be triggered. So the user will be alerted and he has to change the delivery date.
       Please note that the personal settings is at user level and you have to maintain the same settings for all the relevant users.
       If the above option is not suitable, you may go for development. You may check the BAdI: ME_PROCESS_REQ_CUST
Regards,
AKPT

Similar Messages

  • STO delivery date should not be in weekend.

    Hi expert,
    i just want to make sure the STO delivery date should skip weekend or give a warning message in case it is calcuated based on planned delivery time to be the weekend. Now I know that the calendar in receiving plant configuration can reach this request. but what i concern is, if i change this config, the impact is too big. Does any one have better idea?
    also, it looks like that the calendar in unloading point in ship-to master data doesn't work for this.
    Thanks!

    Dear Srinivas,
    Change the check as follows from
    Check: BKPF-BUDAT>SYST-DATUM
    to
    BKPF-BUDAT <= BKPF-CPUDT
    add  BSEG-KOART = 'K' in prerequisite
    Regards,
    NCC  Talluri

  • Delivery Date should propose only working days (Excluding weekends and holidays

    Hello All
    I have one requirement here, where delivery dates should propose only working days and it should not allow to add weekends and holidays during the creation of sales order.
    I would like to know if there are any standard settings to be done in plant or shiping point?
    Kindly need all your input on this
    Thanks
    Naveen

    Hello All
    Same calendar has already been assigned in shipping point,plant and sales org and also in the calendar holidays been maintained, even though when we create a sales order it will accept weekends and holidays
    Thanks

  • Confirmed delivery date should be on Monday Only

    Hi All.
    I have a requirement wherein, for a customer the confirmed delivery date should be on monday only.
    We are using APO for GATP.
    Can anyone please guide how to go about this?
    Thanks in advance.

    Hi,
    Create a Separate Factory calendar with only working days on every Monday
    The Factory Calendar will be done either in the OVR3 or SCAL
    And assign this newly defined Factory calendar in the PLANT--Factory Calendar
    Please do this and check
    It will help
    regards,
    santosh

  • Confirmed delivery date should be on Monday

    Hi All.
    I have a requirement wherein, for a customer the confirmed delivery date should be on monday only.
    We are using APO for GATP.
    Can anyone please guide how to go about this?
    Thanks in advance.

    Hi,
    1. For this you need to maintain the Customer Calendar...
    IMG --> SD --> Master data --> Business Partner --> Customer --> Shipping --> Define Customer Calendars....
    Here create a calendar with working day as only on Monday and other days as holiday.
    2. Assign this calendar in the Customer Master --> General data --> Unloading Points....
    create atleast one unloading point and assign the newly created calendar... you can also set this unloading point as default one...
    Now the confirmed delivery date will be only on monday... if the confirmed qty is available on tuesday then it will be confirmed to the customer on next monday....
    Hope this solves your issue.
    Muthu

  • Req. delivery date and Delivery date should be same in a sales order

    Hi experts,
    We need a customization for getting Requested delivery date, Material Availability date and Delivery date should be same.
    Example if I keep request delivery date as 12/12/2012, system should consider same dates for MAD and Delivery and confirm the requested quantity.
    How to achieve this customization..
    Thanks,
    Bala.

    system should consider same dates for MAD and Delivery and confirm the requested quantity
    What you are going to achieve by this?  Hope you know the concept of MAD and confirmed quantity fields.  Let us assume, if stock is not there for a material for which sale order is created, can you let me know, you want the system still to confirm the quantity? You can post the goods issue only if system confirms the quantity in schedule line which is possible, only if stock is made available.  If client asks something which is not possible in SAP, think in a logical way how SAP works and convince them accordingly. 
    G. Lakshmipathi

  • The delivery date should not flow from PR to PO.

    Dear Gurus,
    While creating a P.O with reference to PR.
    The delivery date should not flow from PR to PO.
    Any settings are there for this

    there is no planning.
    this is a utilites industry.
    if there is any way to do.The delivery date should not flow from PR to PO.
    please share ur  ideas

  • Delivery date should fall on every monday for a PR created by MRP

    Hi Gurus,
    A PR is created by MRP. I need to have delivery date of the PR on every monday. Please let me know , what settings has to be done...
    Regards,
    Vibin

    Friends Thanks for your reply.
    Here is the answer
    1. Set the planning calendar as the period stats with Monday.
    2. Set the weekly lot sizing procedure in such way that the scheduling field as 1 = requirement date = delivery date.
    3. Assign these settings in the MRP view of material master.
    If you run the MD02 then your requirement date will only falls on Monday.
    But since our requirement is delivery date should fall on Monday.
    4. So the GR processing time should be zero in the MRP 2 view of material master.
    Because the delivery date calculated as follows
    Delivery date = Requirement date - GR processing time.
    By this way the delivery date also falls on the same day (Monday ) as the Requirement date.
    Again thanks for your answers and expecting the comments on the same.
    Regards
    Vibin

  • Effective Date should appear Blank by default on SSHR Separation process

    Navigation : Manager Self Service - Separation - Action Page - Termination Effective Date Options.
    On this page the there is an option button "Change should take effect on the effective date as mentioned below".
    Here by default the effective date appears as SYSDATE.
    The requirement is that the effective date should appear blank by default. We tried using personalization, but its not possible.

    By Separation I'm guessing you're referring to the 'Termination' MSS page where it defaults the Effective Date.
    On this page the controller sets the Effective Date to sysdate - I don't know of any way you can blank this out without extending the delivered controller:
    oracle.apps.pqh.selfservice.common.webui.EffectiveDateCO.class

  • Delivery date should be equal to basline date

    Hi,
    I have created PO on 2nd and delivery taken place on 5th , IR is taken place on 7th.  Right now i want my baseline date in inoice is should be 5th as delivery date.  please help me in this.

    The base line date gets defaulted based on the payment terms , this is standard.
    If you want the delivery date as the base line date , then you need to use an Enhancement or BAdi to acheive the same.

  • Proposed delivery date should not get copied to the target document

    Hi gurus,
    I am creating a quotation and it is taking proposed delivery date as creation date and confirming a schedule line. When i create the sales order the same data is coped to the sale order. I have a different delivery date in sales order , but the system dose not allow me to change the date saying that a schedule line already confirmed for this line item.
    I have unticked the copy schedule line the copay control of item category from quotation to order. still the same problem...pls help

    Hi,
    If you carefully look at the problem, the root cause is not at the schedule line but at the document header where the delivery date is given.
    So if you really dont want the delivery date to be copied, you should do that in a new copying routine and in that routine, you should copy all the details except the delivery date. This means that even if you create with reference, system will ask you for requested delivery date. Now you can give the delivery date of your choice and further scheduling will happen automatically.

  • Delivery date should be confirmed in third party process

    Dear Experts,
           I have one doubt in third party process i.e., while creating sales order how can we confirm the delivery date because here vendor deliver the goods to customer but if customer is asking for delivery on a particular date then how can we assure him the delivery date is there any tracking in standard or how to solve this requirement.

    Dear Venkatesh
    In the third party Process, the Vendor will deliver the goods. That is correct. so as per my experience the delivery dates will get copied to Sales order ----- PR ----then PO. Then the vendor will also deliver the goods on the date which is mentioned copied into PO only.
    Also refer to the below link to gain complete knowledge to clear your doubt.
    http://help.sap.com/saphelp_scm700_ehp02/helpdata/EN/c1/42c95360267614e10000000a174cb4/frameset.htm
    Thank you
    Srikanth

  • User exit for vf01 for delivery date should be a current date

    Hi Experts,
                   I won t allow to save vf01 delivery date mismatch with system date. Delivery date must equal with system date. kindly give any userexit for this issue.
    regards
    G.Vendhan

    Hi Vendhan,
    Probably we are waiting for your Reply.......
    You didn't replied to MxG question.....that whether writing VF01 for delivery was a typing mistake or you actually mean it.
    Your reply will help us to answer your thread.......in case you already solved the problem by yourself.....I suggest you to close the Thread......and you may share the solution implemented/used ...so as to avoid a redundant thread creation in the future.

  • Statistics-Relevant Delivery Date is getting blank

    Hi All,
             We recently upgraded SAP from 4.7 to ECC(6.0), Now when are trying to change the delivery date on Purchase order,After the delivery date is changed the statistical delivery date disappears, are we missing any configuration steps , need help
    thanks

    cehck this thread: Statistical delivery date in Purchase Order

  • Delivery date blank in PR (Purchase requisition)

    Dear All,
    I have got a requirement that Delivery Date should be blank instead of sy-datum in Purchase Requisition (ME51N), so that user can enter his date .
    I tried BAPI and user exits for PR, but the structures used there do not contain the Screen field EEIND. So I m unable to handle it.
    Please suggest me what else i can do.
    Thanks
    -Harshita Saxena

    Done same for PO:
    Implemented badi : ME_PROCESS_PO_CUST
    method : OPEN
    METHOD if_ex_me_process_po_cust~open.
       DATA: lv_del TYPE char1 VALUE 'X'.
       lv_del = 'X'.
       EXPORT lv_del = lv_del TO MEMORY ID 'POD'.
       EXPORT lv_itm = '00010' TO MEMORY ID 'ITM'.
    ENDMETHOD.
    Method : Process_item
    METHOD if_ex_me_process_po_cust~process_item.
    DATA: lv_del TYPE char1,
             lv TYPE char1,
             lv_itm TYPE char5,
             lv_ebelp TYPE char5.
       IMPORT lv_del = lv_del FROM MEMORY ID 'POD'.
    ls_mepoitem = im_item->get_data( ).
       ls_mepoitem-eeind = ' '.
       ls_mepoitem-eindt = ' '.
       IMPORT lv_itm = lv_itm FROM MEMORY ID 'ITM'.
       lv_ebelp = ls_mepoitem-ebelp.
       IF lv_del = 'X'
         OR lv_itm NE lv_ebelp.
         CALL METHOD im_item->set_data
           EXPORTING
             im_data = ls_mepoitem.
         lv_del = ' '.
         EXPORT lv_del = lv_del TO MEMORY ID 'POD'.
         EXPORT lv_itm = lv_ebelp TO MEMORY ID 'ITM'.
       ENDIF.

Maybe you are looking for

  • IPhone remote app disconnects, iPad does not

    Environment Info Windows 7 64-bit iTunes 12.1.2.27 Latest update on iPhone and iPad Remote app Single network, single wireless access point I have home sharing turned on in iTunes, I play my music throughout my entire house from my PC and control via

  • Installed the new iTunes and there's no icon

    After I installed the program, the icons for both iTunes (the green musical note) and Quicktime (the shiny blue Q) were replaced with this: http://i41.photobucket.com/albums/e293/gnarlykitty/other/noicon.jpg The icons in Start > Programs menu also di

  • Importing interlaced vs. progressive MTS for FCPX

    I've been doing to jewelry product video with my new Handycam HDR CX-160, and have run into a hurdle with FCPX. For some reason, FCPX won't allow me to import progressive scan MTS files from the camcorder. Why? FCPX has no trouble at all recognizing

  • ITunes 8 / 2.1 upgrade killed my iPhone 3g.

    I have today upgraded my iTunes to v8, then upgraded my iPhone to v2.1, the end result is an iPhone stuck in recovery mode that will not restore (unknown error code 13) plus the loss of my iTunes library (completely empty. I dare not plug in my iPod!

  • Swing Applet Architecture

    Hi. My project just got a 6 month extension so we can change screens from JSP into a Swing applet. The users need really advanced functionality like drag-and-drop and line drawing on top of images. I have been looking at some design patterns like Med