Delivery from Different Plant

Hi Gurus,
We have 2 Plant X & Plant Y. During Sales Order processing it is not confirm from which plant the material will be delivered. So we enter Plant X & start the manufacturing in Plant X. Once the material is ready we decide that the material will be delivered from Plant Y . We do Stock Transfer from X to Y.
But as soon as we prepare the Sales Order the Plant field gets grey out as we are using Statergy 85 & project assembly is trigerred during sales order.So it is not possible to change the plant in sales order.
Is there anyway to change the Plant during creation of delivery.
Also when we do the Availablity Check in VA02 system doen not display the Other Plant option in Availablity Control window. We are using Req Type Class 212 & Req Type KMPN.
Thanks in advance.
Regards,
Mahendra

Hi Bala
According to my knowledge you cant change the plant in delivery or in delivery creation because delivering plant is an important parameter for shipping pt determination along with loading group and shipping conditions and since a delivery is always initiated from a single shipping pt and shipping pt is already determined you dont have any chance
It has to be done in Sales order itself that is in VA02
select the item--item details-shipping tab there you have to change the plant and redo availability check and save
I feel the plant will be editable mode there as long as you have not created the delivery in VA02
According to your statement that at order stage plant X is put in sales order and the manufacturing process starts in plant X
That means it is MTO scenario
You can change the plant in VA02
Regards
Raja
Pls avoid posting the same qn in multiple forums

Similar Messages

  • Delivery from one plant taking order of another plant

    Hi,
    Please share your view that how it is possible to delivery from one plant taking the order from another plant where production is made in later plant and material is moved by STo to the first plant for despatch.
         So stock is ready in first plant but since the order is of second plant , if we bypass the first phase check in shipping point while create delivery by VLO1N , inside the document the second plant is determined. is there any way around?
    Please explore.
    Regards
    Indranil Saha

    Dear Lakhsmipathi,
    Thnaks for your reply . I will Definitely close the open issues later.
       There is no problem about STO. Problem is that we have to issue the sale order in manufacturing plant and with respect to the same order we have to make the delivery by VL01N from another plant. So MRP will run in manufacturinf plant. Stock will built up in manufacturing plant, then it will be transferred to another plant and from there the same material is to be despatched where the delivering plant in sale order is the manufacturing plant.
        SAP does not allow to do it as the delivering plnat specified in the order is different from thye plant from where it is to be despatched.
       We have thought also to create customized routine for it where we may bypass the check of shipping point in copy control as well as the population of the plant which is to be filled up manually by user in delivery document.
       Is there any other alternative . please explore.
    Regards
    Indranil

  • STO from different plants to depot in a single excise invoice

    Hi all,
    We are in exports, and have EOU and NON EOU plants, Now the scenario is we transfer all the goods to depot from Mfg plants. from there we do the single shipment.
    we are implementing SAP. Transfering all the materials from Mfg plants to Depot through STO.
    Form there want to make single shipment, which we received from diffrent palnts, When we are trying to do J1IJ it is taking delivery ref, and with in the J1IJ taking the mother invoice reference. Is it possible to club the all materials from different palnts and make one depot excise inovice.
    2) When I created ARE-1 with ref depot excise invoice it is taking all the details of Mfg plant details but not the depot detail. is it correct,
    for more clarity the depot is issueing a CT2 to Mfg to transfer the material and against that Mfg plant is sending the goods by creating ARE-3, Depot will create ARE-1 while doing export to claim the rebate.
    Thanks in Advance.
    Regards,
    Raghava

    Hi Jeyakanthan,
    Thanks for the reply.
    I have gone thru the "Multiple Goods Receipts for a Single Excise Invoice " in Sap Help Documentation, what I have understood is that we can do multiple Goods Receipt against a Single Invoice. Here in this case we do the Goods Receipt against Purchase Order , do the Invoice Capture for first goods receipt againts Purchase Order and we enter the Invoice Number (say 745, sent by the Vendor) while capturing excise invoice. When the second shipment (against the same PO) comes, we do goods receipt and we refer the "Only Refer Excise Invoice" while doing the goods receipt. Finally after when we have entered all the shipments for the PO, we do the Excise Posting.
    Here in our case we have already posted the Goods Receipt (without entering the Invoice Number in first goods receipt) and now we want to capture & post excise invoice for a Single Excise Invoice (Invoice No. say 745,).
    Please correct me if my understanding is wrong.
    Here we have got two options:
    a. Reverse all the goods receipt & re-enter the goods receipt .
    b. post two separate excise invoice against each goods receipt mentioning dummy excise invoice number like 745-A & 745-B.
    Option a seems difficulty as we will have to reverse all the subsequent goods receipt & transfer posting documents.
    Option b seems legally wrong, as per understanding.
    Request you to please advise.
    Regards
    PK

  • Delivery from different Site (Third Party Order)

    Dear All,
    Sales Order should be created in DC, and Delivery by Different Store Or other DC and billing to customer by supplying site.
    But Price entered in sales order should flow to billing.
    Regards
    Vijai Jain

    Thanks for Reply.
    See we are not transfering stock within plant.
    Articles are deliveried from store but order is received by DC.
    Regards
    Vijai Jain

  • Consumption from different plant

    hello,
    I want to have consumption in different plant than delivery plant.. (depending upon sales org & division) eg: I want to deliver from Plant A but consuption should happen always at Plant B after PGI.. i want to see this in MD62 after PGI.. When i do reverse of PGI, consumption should add back to Plant B (from where it is consumed) ..I have created a table with sales org & division and maintained plant from which you want to consume and made some correction in function module LE_ATP_RV_REQUIREMENT_GENERATE, but it doen't work.. Pl can you suggest the way where I can make it happen..

    Hi Kishore,
    we have many plants under one sale sorg, we want to have consumption happen under one plant whenever sales happens from all these plants.. eg: I have IN01, IN02, IN03 plant for sorg IN00, when I use IN01 as consumption plant then I can put demand on this plant,,

  • PO scenario: Delivery at different plant than the ordering plant

    Dear Experts
    Refer following requirement from a user:-
    I have 2 plants:
    Plant A
    Plant B
    Plant A orders some material from A foreign vendor located overseas. Now my plant B is a Port. I wish to receive the Goods in the plant B.
    Hence many such stocks from different vendors is thus consolidated & send back to Plant A.
    Now how can I simulate this in system, since ordering plant is different than destination plant?
    I don't want to create the PO through plant B, hence the other answer is ruled out.

    Its not possible..
    GR will always done with this plant which you have used in PO.
    Check the similar discussion for more details PLant in PO
    Regards
    Dev

  • STO with delivery from multiple plant

    Hi,
    My client requirement is for many-to-one STO.
    e.g. Some material is sent from Plant A and plant C to plant B. All the plants are in same company code.
    1. I have cretaed vendor VA (and assigned plant A to it in purchasing org data) and VC (and assigned plant C to it).
    2. Also created a customer CB (for plant B) in the sales org of A & C plant
    3. In the vendor master VA and VC I have assigned CA as customer.
    the problem is, what to maintain as the delivery plant in the "delivery plant" field of customer CB ? (There is place for assining only one plant as supplying plant but in my case I have two supplying plants !)
    and in the material master there is only one field for Special Procurement Key for generating PR during MRP run.
    Please help me whether this is possible, if yes how to do it?
    Thanks.
    Varun

    k

  • Delivering Material from different Plants

    Dear All
    I have created sale order with single line item for quantity 25 from plant1.I have delivered 20 quantity from plant1.I need to deliver rest of the quantities from plant2.is it possible?
    Thanks in advance
    Nomi

    HI
                            No once the delivery is made you can not change the plant for that line item what u can do is just make the line item qty 20 in the sales order and add one mor line item with bal qty and change the palnt and deliver the same. This way you can achieve the same.
    Thx.

  • MM- Procurement of Material from Different plant

    Dear  SAP Gurus..,
    There is two plants   PLT1 and PLT2
    Plant  1 is procuring the materials for Plant 2.
    Requirements is generating in Plant 2 and  Goods Reciept and Invoice verification in plant2.
    But only finalisation of the purchase order with the vendor and releasing the Purchase order in plant1.
    How to map the same scenario in SAP..
    Please explain with details by step by step:
    Points wil be awarded.
    As per my Knowlege, I am thinking to do in the following  manner
    Is it can be acheived thorough  Special Procurement process  (Procurement in Another plant ) by MRP settings. or through stock transfer ..
    Please let me know any other ways to do the same.
    In case any thing is please help me , as it is required very urgently for me
    Thanks in Advance
    Rgds
    SAP123

    HI,
    Pl tell where is the actual purchase order generated(created)...
    As far as i could understand plant 1 is just acting like a purchasing organization for your plant 2...
    Where is the actual ownership of the material : plant 1 or plant 2....
    One possibility for you on which i am myself working...
    If plant 1 has the owner ship of the material and plant 2 physical receives the material for doing some services for plant 1
    Define plant 1 as a MM plant (Principal) do all the MM settings for plant 1 only.
    Define plant 2 in the enterprise structure. And treat this plant as a vendor for plant 1 giving some services (eg. manufacturing) to plant 1...
    Revert for further help.
    Regards,
    Prithviraj

  • Copy from different plant - Inspection plan

    Hi,
    May I know which method or tcode that i can use to copy inspection plan for various plant for the same material? Let's say I have material ABC, plant 0002, and I still have 4 other plant 8002,8003 ..
    Please advice. Thanks.

    Hi,
    Check out the Transaction Code QST04 -->Display Inspection Plan
    QSR5 --> Archive inspection plans
    Best Regards,
    Brijesh

  • Singles sales order shipping from  multiple plants in different lega entiti

    We are a global Mfg and distributor of scientific instruments. Due to the complexity and delicate nature of these instruments we may need to ship product from as many a three different shipping points / plants that are each owned by a different legal entity.
    Does SCM have any functionality to automate the co-ordination of the multi-plant shipment so that all the product can be shipped to arrive at the customer site at the same time ?

    Hi,
    How do you plan to make the order entries? What is the criteria to ship the product from different plants?
    Please clarify if you're talking about the same product being shipped from different plants or different products shipped from different plants? I can think of two scenarios because of  some ambibuity in your posting.
    1. Same product from different plants: If this is case, How do you plan to decide to split the order quantities  to be shipped from different plants into multiple lines in the sales order?
    2. Different products from different plants based on some criteria: If this is the case, I understand you will enter multiple order lines.
    In both the cases, there is something called 'Delivery groups' in ECC that is attached to Correlation Profiles in SCM GATP (though delivery groups can be used in ECC stand alone) which will make sure that all the items within the same delivery group have the same delivery date, ultimate delivery date will be the latest delivery date of all the items.
    Hope this is what you're looking for. If not, elaborate your requirement to help you better.
    Regards
    Mohan

  • Is it possible to add item in Outbound delivery from a different STO

    Hi experts
    I have a question regarding adding an item in delivery from different STO.
    we create outbound deliveries from STOs and at times we have all conditions same for shipping and we need to add another item in delivery from a different STO.
    I am not getting an option in VL02 to ad another item with reference to STO, is it possible to create delivery by adding another item from STO?
    Thanks & Regards
    Anand

    You can combine STOS in to one OB delivery if they are all from teh same plant. You could use the customer master >> order combination indicator

  • BAPI_GOODSMVT_CREATE-Goods receipt in with sd-delivery in another plant?

    Hello to all.
    I have a strange situation.
    We use the mentioned bapi to post goods-receipts.
    In this case we use  the movement type 101.
    Inside sap-standard , inside the migo, there is a possibility to do the same, online.
    And also, if a sd-delivery from another plant is present.
    The posting initiated by the migo is more complete as it fills the entire document flow properly.
    I would like to trigger exactly this behaviour in the background, via RFC-call.
    As I now use the BAPI_GOODSMVT_CREATE, the documentary told me, that this is not possible.
    How else can I achieve this ?
    Does anybody know the solution ?
    Will I have to do it via WS_DELIVERY_UPDATE_2 instead ?
    Best regards
    Robert.
    Edited by: Robert Dornfeld on Nov 11, 2011 12:04 PM

    Refer Note 424014 - BAPI: Goods receipt for the outbound delivery
    When you post a goods receipt for an outbound delivery (with reference to a stock transport order) with Bapi BAPI_GOODSMVT_CREATE, you must fill the following fields so that the purchase order as well as the delivery are updated correctly:
        GOODSMVT_ITEM-MOVE_TYPE (Movement type): generally movement type '101'
        GOODSMVT_ITEM-DELIV_NUMB (Delivery)
        GOODSMVT_ITEM-DELIV_ITEM (Delivery item)
        GOODSMVT_ITEM-PLANT      (Plant)
        GOODSMVT_ITEM-STGE_LOC   (Storage location)
        GOODSMVT_ITEM-ENTRY_QNT  (Quantity)
        GOODSMVT_ITEM-ENTRY_UOM  (Unit of measure)
        GOODSMVT_ITEM-PO_NUMBER  (Purchase order)
        GOODSMVT_ITEM-PO_ITEM    (Purch. order item)
        GOODSMVT_ITEM-MVT_IND    (Movement indicator) = 'B'
    Now the order history and the document flow of the delivery are updated. In order to use fields DELIV_NUMB and DELIV_ITEM, you must implement the enhancements of Note 356665.
    If the delivery note number / delivery (field MKPF-XBLNR) is supposed to be updated in the material document header, field GOODSMVT_HEADER-REF_DOC_NO must be filled with the delivery number when you call the Bapi BAPI_GOODSMVT_CREATE.
    The field should only be filled if the delivery number is unique.The delivery is transferred at item level (table GOODSMVT_ITEM, field DELIV_NUMB) so that different delivery numbers can occur in a material document.In this case, there is no unique delivery so that a blank field GOODSMVT_HEADER-REF_DOC_NO would be useful.

  • Selling Material From Multiple Plants

    Hi Experts,
    I have two questions.
    1. Is it possible to have more than one division for a material. If Yes, how we can do this.
    2. How to sell a material from multiple plants. What is the procedure,
    Thanks,
    Shan.

    hello, friend.
    1.  is it possible for a material to have 2 or more divisions?  yes and no.
    yes, if you leave the division in the material master blank.  the material, when processed in the sales order, then copies the division from the sales area of sales document.
    yes, if you configure cross-division, or if you configured the 'check division' options in the sales document type via VOV8.
    no, if you specified the division in the material master and you have made a sales transaction.  (it would still be a yes, if you made the right configurations using VOV8 described above).
    2.  how do you sell material from different plants?  by extending the material to the different sales org-distribution channel-plant using MM01.  be sure to maintain the Sales org 1 & 2, and Sales general/plant views for each combination.
    regards.

  • Planning plant is different from maintenance plant

    Hi,
    For my client, Maintenance planning is done at head office which located at different place and actual maintenance done at another location (maintenance plant).
    What is the effect if planning plant is different from maintenance plant?
    Can somebody help me.
    Thanks in adv.
    R.D.I

    Hi
    As per the feedback given by you no need to create a separate planning plant. You create only one plant & planning plant will be the same plant only. You can differentiate the head office & the local office by different planner groups. If you create a different planning plant(head office) aslo there wont be any problem(if you wont restrict by authorisation). Plannig plant functionality is used in case of multiple plants whose maintenace is carried out by a single plant(plannig plant) so that it can plan the material requirement of all the plants apart from functionality of authorisation control & reporting. I think in your case you can go ahead with single plant.
    shakti

Maybe you are looking for

  • How do I transfer bookmarks from one computer to another using a CD and not get dupulation of bookmarks

    I want to copy my bookmarks to a Cd to take to another computer location and than transfer them to another computer without having duplication of bookmarks and without having to piece-meal look for each bookmark duplicate. How do I find bookmarks on

  • Importing MPEG 2 into iMOvie

    hi folks, I was wondering if anyone has yet imported MPEG2 files from a DVD handycam into iMovie? Is there any noticeable difference in this format than with the old mini-DV format as I am considering upgrading to a 3-chip DVD video camera...and am i

  • How to make as selection variable

    Hi All we have one variable plant. the variable is properties are: genral properties: Type of variable : Characteristic Processing by : Authorization Reference charateristic : plant. Details: Variable represents : Multiple single values variable is :

  • Dektop Manager - Media Manager not showing

    Hi all I have installed the Desktop Manager (v5) and hooked up the BB. Now, how do i get pictures in and out of the BB? isnt there a simple file manager?I've searched everywhere and cant find it!?! Thx Nick

  • Column Heading in BI report

    Hi , I have report and i want to display the column heading for both the key and text column in the report.At present i could see column Heading only for the key column.Kindly advice thanx Sriram