Dear Sir
i created one STO with Qty 100,i got the stock of 10 in my hand when i create delivery with ref to STO through VL10B, delivery created for whole STO qty
is there is any specific setting to control this
my requirement is like delivery qty should not be exceed the available stock qty.
please help in this.
Thanks
Maruthi S

Hi Maruthi,
I don't think so it would be possible as because you can control this check in your availability check by assinging the Document type and Supplying Plant to a checking rule.
But  unfortunately the check will  you a different date ( when the stock is starved ) rather than controlling the quantity of delivery to be made as per the available stock.
The Underdelivery setting is only to close a STO in case if the supplying plant supplies less quantity when compared to the delivery quantity.
But tell me why  you want to restrict the qty of delivery, instead you can keep the Delivery document quantity as per the Stock transport order and doing PGI as per the available stock and closing the STO with the under delivery setting.
T&R

Similar Messages

  • Gr qty booked more than sch.qty in sch.agreement

    Hi All,
    Can  any body help why more qty (GR)  booked against actual Sch.line qty in Scheduling agrrement .
    Ex..Sch.qty - 10
         Gr .qty   - 15
    Lucky.

    Hi,
    There are two possibilities
    Either there is a delivery tolerance set on the Scheduling agreement
    Or (more likely)
    There are future schedules for this item.
    for example if you have 10 scheduled for delivery today and a further 10 scheduled for delivery next week (same SA line) then  you can GR up to 20 (because the system just assumes that the second delivery happened early)
    this is one of the reasons that I don't like scheduling agreements. they are very flexible but sometimes they lack the control that a contract with call-off orders has.
    So I would guess that the system treated the extra 5 as being an early delivery of a future schedule.
    Steve B

  • PO Qty should not be more than PR Qty

    Hi All,
    I am creating a PO from PR.
    I want that the PO qty should never be more than PR qty, and if so it should give an error.
    Can anyone tell me the BADI or exit for this? I have already seen exits for PO and PR, but I am not able to figure out which exit to use.
    Thanks in advance.
    Vinod.

    Hello,
      You can use the function exit EXIT_SAPMM06E_012 to carry out this validation.
    Thanks,
    Venu

  • Scalling in SA - More than target qty

    Hi,
    I am maintaining price scaling in Sch Agt. The steps I have followed.
    1. Created Sch Agt for Mat-vendor. Entered Target quantity say 1000
    2. Entered Net Price- ex-10USD. selected line and went to Item-> conditions. displayed PB00.
    3. double clicked for scaling. entered
    From 1 10 USD , From 5000 9USD, From 10000 8 USD
    4. I have maintained the schedule-ME38 for qty say 8000.
    5. I do GR using MIGO for the 8000 qty.
    6. When I display accounting doc in MIGO I see the amount as 80000. However, it should be 8000*9=72000.
    I understand that " The system only look at the target quantity to determine if the ordered quantity is in excess of this level for scaled price determination".
    But in this case the qty is more than the target qty and should pickup the 9USD.
    Please help.
    Regards,
    AG

    Dear,
    Please check this notes, may be helpful:
    In a scheduling agreement with time-dependent conditions, you maintain condition with scales. Is it deliberate that always the first scale level is used for calculating the net price?
    Answer:
    Price determination in the scheduling agreement cannot be compared to the one in purchase orders, if the scheduling agreement is a document with time-dependent conditions (master conditions). To display the price in the scheduling agreement, always the first scale level is taken into account. On the topic "Goods receipt in scheduling agreements with scales", please
    read Note 401941. 2009.03.11 Page 14 of 15
    SAP Note 456691 - FAQ: Price determination in purchasing
    Regards,
    Syed Hussain.

  • How to restrict the delivery quantity not more than target quantity?

    Dear Gurus,
    How to restrict the delivery quantity not more than target quantity in a scheduling agreement? I think there are 2 methods.
    1. I found that setting 0 in Overdelivery Tolerance Limit in Info Record is not effective. Why?
    2. I want to set E for the message but can't find the place. The message is generated when entering and saving quantity as delivery quantity that is larger than target quantity. How can I set E to a message (067, as I remember)
    Any other effective method? Please advice. Thanks.
    Regards,
    David

    Dear all,
    It is not OK after checking everywhere you mentioned. I tested in 2 clients. In the development enviroment client, it works whatever E or W. In test enviroment, it does not work (meassge is W).
    I think there must be somewhere besides of those you menetioned.
    I notes that SAP help for the overdelivery tollerance setting of scheduling agreement: 
    Overdelivery Tolerance Limit
    Percentage (based on the order quantity) up to which an overdelivery of this item will be accepted.
    Dependencies
    If you have set the indicator in the Partial delivery/Item field to 'D' (partial delivery allowed), this takes priority. It makes no sense to define a tolerance limit for overdelivery in such case.
    Where can I see: 'the indicator in the Partial delivery/Item field to 'D' (partial delivery allowed)'? I want to check it.
    Pls help! Thanks.
    Regards,
    David

  • More than 3 AR for one Sales Order in relationship map

    Hello,
    i would need some advice on the following: If you have more than 3 Invoice for one Sales order these are not shown seperately in the relationship map. SAP could reproduce the issue and refers to it as normal system procedure at the moment. They adviced me to post a thread here.Is there any way you could make the invoices be seen one by one.
    SAP Version 8.81 PL 5
    Thanks a lot for any advices on this topic
    Vanessa
    Edited by: Vanessa Schürer on Jan 16, 2012 2:45 PM

    Welcome to the forum.
    If you have any suggestions you post them on sap's new idea collaboration page. You do bring up a good point and hopefully in 8.82 it will be resolved as the relationship map was not originally on the road map. Hopefully they can develop this feature.

  • Is it posible to determine more than 1 contact person in sales order

    Hi Friends,
    My requirement is to send email to multiple recipeints. So I have created 4 contact persons for each mail id for customer xxx01 in order to send email to multiple recipeints at 1 time. But only one contact person gets determined in sales order. Is it posible to determine more than 1 contact person in sales order if yes can any one help me how it is done?.
    Thanks in advance,
    JM

    Hi,
    Maintain Partner function CP in customer maseter and maintain numbers of CP
    If sytem is not allow to mention four contact person number's then in partner function procedure remove tickmark or UNIK from partner function CP
    kapil

  • QTY in return order more than billed QTY

    hi
    i am trying to rasie an return order with ref to billing doc and copying the quantity.
    Though the qty is getting copied from ref doc,i am able to increase the qty more than billed.
    the system is through an waring msg ,but allowing me raise the return order with greater qty.
    Same is with subsequent delivery free of charge too,i am able to raise order with this doc type w.r.f to return order and giving greater qty than ref doc.
    it is allowing me to go ahead the finish the sales cycle.
    Can any one guide me how to restirct the system from taking qty if it greater than the qty from the ref doc?
    how and the path in spro please.
    thanks
    shashi

    Dear Mr Chavva,
    Trust the message is as follows:-
    Class :V4 and Number: 229.
    Body of the message is:
    Item &1: Order quantity (&2) greater than billed quantity (&3).
    If so kindly attempt the following:-
    using transaction OVAH kindly locate the message and change its settings from W (warning) to E (error).
    Kindly simulate the transaction, expecting it to fail.
    In case of disappointments, kindly explore a setting the user exit MV45AFZZ disabling saving of the document in case the quantity exceeds reference document quantity.
    Trust the reply is useful.
    Regards,
    K Gopidas.

  • BAPI thorwing 3 different message when GR's being more than PO Qty

    I am using  BAPI(Goods_movement_create)
    This BAPI throws 3 different error messages when the scenario is the same.
    I could see all the 3 messages below are the result of GRu2019s being more than the PO qty.
    10128844     30     4     E     No goods receipt possible for purchase order 10128844 00030
    4500121287     10     12     E     PU Ordered quantity exceeded by 12 EA : 17650 0081 0018
    4500104731     10     1     E     Material document data and PO data do not match (Material)
    thanks
    Senthil

    you have referenced 3 different POs, hence you have to get 3 different messages, even they would have the same error reason. but the message has variables, like PO number and item number and even more.
    Do you just want a summary message like: 3 error occured?
    and what does the user then do? posting in SCN forum what the problem is?
    you will get the same messages if you use MIGO to post it online.

  • Qty with more than 3 decimal places in BOM

    HI ALL,
    CAN I PUT QTY IN BOM WITH MORE THAN 3 DECIMAL PLACES ITS VERY URGENT REQUIREMENT.
    THANKS
    R SEHGAL

    Dear Rakesh
    I am not sure, but you can try this
    1. Define one more UOM for example 4dec then in MM02 give the conversion of 4dec to your 3 decimal, give conversion in it. for eg 10*3dec = 4 dec
    2. Now when you define bom enter quantity in 3dec(i,e, multiplying by 10) and then convert the uom in BOM to 4dec
    You can try and let us know your feedback
    Regards
    Jitesh

  • Urgent: Why system allows the scrap confirmation more than PrdOrd Qty.

    Dear All,
    I am facing client sensitive problem regarding scrap confirmation at CO11N.
    As I am having Production Order of 15 qty & having 3 Operation.
    Now I have confirmed the first Operation with 15 qty as Yield.
    for second operation I confirmed 10 qty yield & 5 as scrap.
    for third operation system is allows me to confirmed the 15 qty as a yield.That's should not be allowed logically & practically as well.
    & system is allowing to confirmed 'N' no of qty of scrap.i.e more than Production order qty.
    Please give your valuble suggesting to clear this issue.
    & exact terminology behind the scrap confirmation.
    Your immediate reply is highly appreciated
    Thanks & Regards,
    Vijay Mankar

    Hi vijay,
    please try this
    Quantity Calculation for Milestone/Progress Confirmation
    Specifies that for milestone or progress confirmations, the quantities (yield, scrap) of automatically generated confirmations are calculated without taking into account the scrap percentage rate of each operation.
    If you do not set this indicator, then the planned scrap percentage rate of each operation is taken into account when calculating the confirmed total quantity. In the generated confirmations, the proportional scrap is added to the yield.
    If you set this indicator, then the automatic confirmations are posted with the same total quantities as the the milestone or progress confirmation. Scrap is posted as yield in the automatically generated confirmations.
    Example
    24 pieces of scrap are planned for an order of 124 pieces. The planned operation quantities are:
    Operation 10 124 pieces, 10% scrap (13 pieces)
    Operation 20 111 pieces, 5% scrap (6 pieces)
    Operation 30 105 pieces, 4% scrap (5 pieces)
    You enter a milestone confirmation for operation 30 with 48 pieces for the yield and 2 pieces of scrap. The quantities in the automatically generated confirmations are then calculated as follows:
    Indicator is not set
    Operation 10 59 pieces, 0 pieces scrap - automatic confirmation
    Operation 20 53 pieces, 0 pieces scrap - automatic confirmation
    Operation 30 48 pieces, 2 pieces scrap
    Indicator is set
    Operation 10 50 pieces, 0 scrap - automatic confirmation
    Operation 20 50 pieces, 0 scrap - automatic confirmation
    Operation 30 48 pieces, 2 pieces scrap
    Regards'
    Ramesh

  • Error in VL01N(Delivery qty is greater than target qty while taking return)

    Hi Experts,
    I am facing a problem "Delivery Quantity is greater than the target quantity" while doing the inbound delivery from VL01N t-code for sales returns with reference to return order.
    I am trying to do the inbound delivery for the same Quantity which is in return order but still it is showing error.
    I have checked my configuration and could not find any mistake under this process. I am not able to identify the error. In my delivery item category we have put "B" under over delivery check which is our business requirement.
    If I remove "B" from delivery item category, i am not getting any error in inbound delivery but which is not right way of doing.
    I could not find suitable query in SDN. Can any one please share your expertise to solve this problem?
    Thanks in advance,
    Regards
    Srinivas

    You have to check the following:-
    a)  whether for that return delivery, picking is not activated
    b)  whether customer master or material master is maintained for over delivery tolerance
    c)  whether in VD51, any overdelivery tolerance is maintained
    You can also have a look at the following notes:-
    1)  Note 151901 - Check of delivery quantity is consistent
    2)  Note 322588 - VLSP:incor.checks for qty to be delvrd during split
    thanks
    G. Lakshmipathi

  • Requirement Qty more than BOM Qty

    Hi,
    I have a scenario, in my Component Overview of Prodn Order, Requirement Qty of Components in Prodn Order is Different than BOM Qty.
    I checked the exploded Qty in CS11, CS12 and CS13. But the Reqt Qty vary with BOM Qty.
    Note: No Scrap is maintained
    Please guide.
    Thanks in advance,
    Harris
    Edited by: Harris Panchal on Feb 17, 2010 6:58 PM

    Hi,
    1. surely there is a mistake happening at your end.
    2. System is robustic on this kind of transactions
    Check the below items
    1. if any scrap has been maintained at the assembly level for the header material in the material master
    2. If any scrap has been maintained for the materail at the BOM item level.
    3. check if the unit of measure is same and any relationship is maintained.
    4. Also do re-xplode your CS11 and check if it works fine as per your expectation..if it is giving any issue in the production order , it should also give the same here..
    kindly validate and let me knwo the feedbakc
    reg
    dsk

  • Problem in CRM_ORDER_MAINTAIN for updating qty in more than 1 line item .

    Hi abapers,
    I am using BAPI CRM_ORDER_MAINTAIN to update quantity. Its updating the quantity properly if there is single line item for a transaction .If more than 1 line item is there then its throwing an exception* "Document is being distributed - changes are not possible"*.
    Scenario:
    I have a itab  which is having 2 line items for a transaction. i run a loop pass the pass the required parameters in CRM_ORDER_MAINTAIN ,do CRM_ORDER_SAVE , BAPI_TRANSACTION_COMMIT for the 1st line item. When i run the 2nd loop, in  CRM_ORDER_MAINTAIN it gives an exception saying NO_CHANGE_ALLOWED for the same transactions 2nd line item. leaving the quantity unchanged for both the line items. What may be the problem?
    Note: We cannot say how many line items are there for an transaction. so no chance of grouping all items at a time and saving at a time.
    Regards,
    Navin

    Hi Navin,
    Why its not possible to use CRM_ORDER_SAVE only once. I think its possible. Call CRM_ORDER_MAINTAIN in loop for all the line item in transaction and after that call CRM_ORDER_SAVE once. Pls follow the below sample code.
    loop at it_item.
    call CRM_ORDER_MAINTAIN. (Here append data for all the line items and miantin the transaction).
    emdloop.
    After endloop call CRM_ORDER_SAVE. Also you can add some wait after CRM_ORDER_SAVE, In order to avoid locking issue.
    PLs let me know where you are trying to use CRM_ORDER_MAINATIAN ? In any BADI or Z program ?
    Regards,
    Amol.

  • Returns qty accepting more than the invoice qty

    Hi Experts
    When i am creating a sales order with reference to invoice the system is allowing to enter the quantity more than the invoiced quantity.
    suppose the invoice quantity is 100 when i create a sales returns system is accepting to do returns for 150 also whichshould not be and also it is allowing to do so many times with the same reference document
    i am getting just q warning message that for this invoice reference already returns exists if i bypass the warning message system is allowing to do next time also
    how to do
    any user exits to control which checks the VBRK number and VBRK billed quantity and it should less or equal to VBAK quantity
    regards

    Hi,
    Yes, unfortunately SAP does allow it.
    We are using FORM USEREXIT_MOVE_FIELD_TO_VBKD of MV45AFZZ to have our own validation for the same.
    I hope this helps,
    Regards
    Raju Chitale.

Maybe you are looking for

  • Printing from wireless MacBook to iMac shared printer

    I have an HP PSC 2350 connected to an iMac in my office. I am using my MacBook via a Linksys router, in another room, and would like to print to the PSC 2350. The iMac and printer are turned on - but the printer does not appear on the MacBook. Someth

  • Initial Load Setup...Potential Big Problem

    Hi All, I think we have a big problem.  I have posted a similiar question before, but answers are confusing to me.  Let me explain our current situation and please comment. 1. We are loading billing documents, thus using VDITM. 2. We have 2 number ra

  • Issue on joins and filters

    Hi folks, I have total 20 tables to join in an interface.All are left outer joins on multiple tables.Now when i apply Filter condition with IN or OR it is throwing me an error saying that when ur using outerjoins u cant use the operands IN or OR. 1)w

  • Using Webstart behind a proxy firewall

    Hi, According to http://www.vamphq.com/jwsfaq.html#proxylogin if one uses Webstart behind a proxy firewall and one enters the wrong password, Webstart will not reprompt. Has this changed in Tiger or does this problem still occur? Does Webstart automa

  • Issues with locking up in edit mode

    Does anyone have a solution when the ap locks up in the edit mode? No icons for edit appear and I cannot escape the mode. I have to delete and download again which deletes all of the data... Not good