Hi,
in delivery delivery quantity should not exceed order quantity what should i do
please let me now what should i do it is urgent
Thanks in advance
Srinivas

Hi,
You may consider an enhancement with a user exit:FORM USEREXIT_SAVE_DOCUMENT_PREPARE in include MV50AFZ1.
Here you can put additional conditions to check the delivery qty and also can put a message for the user to correct the delivery qty in case he has manully increased it.
Please reward points if this helps.
Hemant

Similar Messages

  • Delivery quantity should not exceed order or confirm quantity

    Dear Friends,
    How to handle a below scenario,
    Sales order is for 100 Tons.Partial delivery is allowed.
    Now delivery quantity should be equal to 100 Tons.Delivery quantity should not exceed order quantity.
    I mean delivery quantity must be equal to order quantity.
    Thanks in advance.
    Regards,
    Shrikant

    Dear Ram/Ramnath,
    I have maintained the B for Check Overdelivery.Transaction code used is 0vlp.Item catg is TAN
    Check Quantity 0 is A
    Check Minimum Quantity is A
    Now I ahve created a Sales Order for 10 Tons.
    Created two delivery notes of 4 tons and 8 tons respectively.
    While creating second delivery for 8 tons I do not get any error message.
    Transaction code VOV7.Here completion rule is blank as it is relevant for Quotation and contracts.
    Is there anything need to do?
    Thanks in advance.
    Regards,
    Shrikant

  • GR Quantity should not exceed PO Quantity

    Hi All,
         Our client requirement is GR Quantity should not exceed PO Quantity. But when I checked the Purchasing Value Key, Under Delivery Tolerance and Over Delivery Tolerance was given as 10%. So I have removed it from Over Delivery Tol and gave Blank. So in material master it got updated.
        But while creating a PO, in Delivery Tab, Over Delivery Tolerance by default is coming as 10%. How to remove this? They need it to be blank while raising a PO.
    Please suggest.
    Regards,
    Rosh

    Hi
    Check the inforecord for the same (combination of material, vendor, plant).
    And make the purchasing value key in inforecord as blank.
    regards
    prasanna

  • Delivery qty should not exceede Sales order qty

    Dera Friends,
    System is allowing to create delivery for a higher quantity than in sales order. For eg. The sales order is created for 10 pieces and delivery is created for 20 pieces.
    We want to have a check on this. Pls guide where we can configure this. Our requiremnt is that Delivery qty should not exceede the sales order qty.
    points assured
    Krishna>C

    hi,
    Go to VTLA, select your order type and delivery type and select item category and see whether you have maintained the following:-
    Order requirements:::::101
    Item Data:::::::::::::::::::101
    Updata Document flow:::X
    Pos./neg.quantity::::::::::+

  • Delivery Qty. should not Exceed the PO Qty.

    Hi All
    My requirement is that just like Sales Order, incase of STO the delivery Quantity (delivery creayed through VL04) should not exceed the Balance Quantity PO quantity (where PO Quantity less Already delivered Qty = Balance Qty). Is there any standard customisation or Exit is available for this??
    Regards
    AA

    Dear AA
    I have searched in MM forum and found this thread which is relevant to your requirement
    Forum post in ERP - Logistics Materials Management (MM): STO - How to control Over delivery ?
    STO - How to control Over delivery ?
    Hope this helps you
    SAP has a logic for not controlling the over delivery in STO  in standard (unlike sales order  to delivery we have the controls in Zero VLP or 0VLP for this) because STO happens between plants of a same company code or different company codes .The movement of stocks are between plants But in a normal sales the delivery happens to a customer who is actually a third person and hence a user can misuse the delivery quantity
    A plant and an external customer cannot be treated as same
    Hence in SAP standards over delivery is not controlled in standard settings like item category etc
    Regards
    Raja

  • Invoice Value should not exceed Order Value

    Dear All,
    I have a requirement in which whenever a user creates an A/R invoice ( Partial or full ) the total invoice value ( Partial or Full ) should not exceed the total Sales Order Value.
    Scenerio :
    Sales Order No 10001 has 3 line items i.e Item 1, Item 2, Item 3 with line totals of each as 100, 200, 300. Now Invoice is done for Item 1 and Item 2 on 1/1/09 line total 100, 200 which totals to 300. Now again after some days final invoice is done for Item 3 whose line total is 300.
    Now I want a check that the system should check the total sales order value which is 600 with the Invoice Value and it should not allow to add the invoice if 600 is exceeded ( May be Invoice done partially also )
    Also a check is required that the line total value of Sales Order should not get exceeded when making the AR Invoice.
    I think this could be possible using SP. Pls advise how to make this SP.
    Best Regards,
    Depika

    Dear Depika,
    First you need to confirm if you create all invoices based on sales order directly or not.
    Thanks,
    Gordon

  • Srap quantity should reduce planned order quantity

    Hi Gurus,
    I have a scenario here and i wanted to know if this can be technically achieved .
    1.We have IDOC flowing from legacy system and it consists of both good quantities produced and scrap quantities produced .
    2.Good quantity produced must be reported as a reporting point confirmation. Scrap quantity produced must be reported as reporting point scrap.  Scrap quantity produced must also reduce the planned order planned order quantity.
    3.Function module currently calls BAPI 'BAPI_REPMANCONF1_CREATE_MTS’ to post good Pieces Produced, can the same BAPI be used to call the scrap quantity and reduce the planned order ?
    I have tried 'BAPI_PLANNEDORDER_CHANGE’ to achieve this scenario but still the planned order quantity is not getting reduced.
    I want to know the feasibility to achieve this in technical or functional side .
    Kindly help me to solve this problem , rewards would be generous enough for people who solve my problem.
    Regards,
    PKP

    Hi Santosh,
    Yes, it's true, it would simplify a lot. Unfortunately it can't be done.
    These are high-end, high value and small life-cycle components and some packaging materials. Packaging materials are relatively easy to stock for one week or more but the other components should only be stocked to a minimum level.
    Moreover, suppliers of high-end components do not feel the need to respect scheduled delivery dates because they "own" the market, so we can't be sure when stock will be available. The high demand for this components also adds more uncertainty because there might be only (unplanned) partial deliveries during the week as of production is available and distributed for us and other supplier's vendors.
    Oh, and a production lot can really be of as low as 40 units in some cases.
    Well anyway, I've tried the ATP approach but immediately run into a problem. In the morning I might be assembling a component (A) for the afternoon and I have a delivery scheduled for the morning of another component (B). I can't plan the afternoon production of a product with both components. Even being 2-3 days, in some very frequent cases we should immediately start production as soon as components arrive.
    So ATP isn't very adequate even in the shortest time-frame to plan production in this scenario.
    Thanks a lot for your input Santosh, it was worth a shot. Right now I can't see an option other than copy SAP_PP_009 to a new heuristic that reduces planned orders to component availability or to use a very small maximum lot size for these short production runs.
    Regards,
    Edgar

  • Delivery Qty should not cross order Qty

    Hi friends,
    When I am doing delivery for the qty more than the order qty, it is accepting. My scenario is delivery should not allow the qty more than the ordered qty. Delivery should be done only for the ordered qty.         I think it is possible. So can anyone tell me the settings for this?
    Rama rao

    Dear Arul,
    In your sales order, check which is the item category that is getting triggered.
    Can find it in in the item level , near to Customer Material Numb field.
    or double click on the item.
    you can see the item category in the TOP near to your material and sales document item.
    Now go to vov7 and select this item category and change the Completion Rule to B as advised.
    Check and revert back.
    Thanks & Regards,
    Hegal K Charles

  • Purchase Order Quantity should not be more than PR quantity

    Dear all,
    We want to control Purchase Order quantity against Purchase Requisition.
    We have configured message setting 00 076 as  ERROR. when we create Material PR for lets say 100 quantity. When we create single or multiple Material PO against this PR for more than 100 quantity system is giving us error. This is exactly what we needed.
    But due to this message setting when we create Service PR and give service quantity lets say 100. and when we create Service PO and give Service quantity 60. First time system is allowing to save the Service PO.
    When we create another Service PO with reference to same Service PR system is showing error as we have configured. Even though quantity 40 is still available.
    What we want is to have control on quantity of Purchase Order for Material as well as service. Quantity should not be more than PR quantity.
    Is there any other way to have such control? please provide other available options to configure.
    Regards
    Kant

    Hi,
    06 076 is only for applicable only in case of material.
    For Service and material both, use 06 400 as error "Materials/services for requisition & & already ordered with & &"
    NOtes 786736
    This may help u !
    Regards,
    Pardeep malik

  • Zero quantity should not be allowed for STO delivery

    Hi,
         zero quantity should not be allowed for STO delivery.
         when i create a delivery for a STO it should not allow zero quantity
         can someone throw some light.
    Alec

    Hi,
    Please maintain the "B - Create Delivery with qty greater than Zero" in Part.dlv./item  in shipping tab page of the customer of site.
    more briefly: in WB02 --> click on the customer of the site --> Shipping Tab page --> Maintain B (Create Delivery with qty greater than Zero)
    Regards,
    Srini

  • CO-PA: Quantity should not be display in KE30 reports

    Dear All,
    In my system CO-PA is activated 2 years back. Costing based & Accounting based OC.
    My Client requirement is- Recently we developed few CO-PA reports with number of characteristics, Values flow from SD-->CO-PA  is good.
    We have some free products. Free products will flow to CO-PA along with Valuated products. Both Free and valuated sales will happen one sales invoice only.
    In Sales invoice PR00 will be Zero for Free Products but COGM will be there. COGM is updating from VPRS fine.
    Now my requirement is Free products COGM shoud be display in KE30 reports but Quantity should not be Display.
    Reason: When i put a formula per packet COGM is Total COGM value/Number of Packets. In this packets free products also there.
    So. COGM will wrong due to Free samples packets should not be treated as SALES.
    This COGM also add to  the valuated products COGM.
    So, any one help me in this regard: COGM value related to free products should flow to CO-PA but Quanity should not flow.
    And also let me know if Qty flow to CO-PA also no issue but in KE30 Reports,It should not come only COGM value sufficient.
    Thanks in Advance,
    Rgds
    Manoj Kumar Pedada
    SAP CO Consultant

    hi
    check this link regarding free goods delivery, this may help you in some way
    there are different scenarios explained here what you need to follow for free goods sale and how it will update in COPA based on your requirement
    http://help.sap.com/saphelp_46c/helpdata/en/dd/55fa68545a11d1a7020000e829fd11/content.htm
    krishna

  • RESERVATION QUANTITY SHOULD NOT BE CONSIDERED FOR TRANSFER POSTINGS

    Dear Gurus,
    Reservation Quantity should not be considered for Stock Transfers or Transfer postings to Sub contractor.
    movement type : 541 & 641
    Example :  Total Stock = 1200 nos.        Reserved stock for production order = 1000 nos.
    Currently our system allows stock transfers/transfer postings for reserved quantity also.
    But we want the reserved quantity to be blocked and only free stock should be allowed for transfer postings.
    (i.e  1200 - 1000 = 200 nos  .     Only 200 nos should be allowed for transfer postings)
    Please suggest.

    as per standard SAP reservation quantity will not stop the goods issue. resevation has no control on stock issue.
    Try with abap development.

  • Is there a possibility should not consider available quantity at time of MR

    Sir,
    Is there a possibility should not consider available quantity at time of MRP planning?
    Example:
    Available stock: 100
    Planning stock: 100 (MD61)
    Schedule line to be generate: 100 Qty (Exclude the available quantity at time of MRP planning)
    regards,
    sampath

    Dear Sampath/Raj,
    1) Move the stock to particular storage location for which you don't want to be consider by MRP
    2) Now go to OMIR t-code, input value as 1 for that particular storage location
    3) Go to MMSC, input value as 1 for that particular storage location
    4) Go to MRP - 4 view Down you can find field Storage location input value as 1
    5) Now run MRP, system will not consider stock of that particular storage location
    Regards
    Madhu

  • Return/Replacement Confirmation quantity is exceeding order quantity

    Hi All,
    When an R/R is replicated from CRM to ECC in the sales order the confirmation quantity is exceeding order quantity .
    What can be possible reason for this behavior ?
    Kind Regards,
    Naval

    Hi Naval,
    I can think of possible reason is rounding profile is activated on item category to round up based on the product.
    Thanks
    Ajay

  • Delivery Qty should not be greater then po qty

    HI
    SAP Guru's
    Delivery quantity should not greater then po qty.
    my problem is they are rising mulitiple devliveries for one PO
    Code written in MV50AFZ1 is not working because it is checking only if Delivery Qty more then PO qty, I tries to sum qty from LIPS table using VBGLN Cust po no  but VBGLN is non key field in LIPS table. It is giving perfomance problem.
    Please suggest if any other tables to SUM the delivery quantity.
    regards
    ravi N
    9866595994

    Hello Experts..
    Need ur expertise advice on above issue...