Delta-links not updated

Hi
We have created some delta-links between uploaded roles, but the delta-links are not updated when changes are made to the source object.
How are delta-links updated? Is it a service running in intervals? If yes, how can I access the service to see if it is running, restart it or change the interval?
Any help is appreciated
Kind regards
Morten Ellgaard

We are on SPS13, and I think something has changed. The documentation only refers to remote delta-links, but we do not use federated portal. I am pretty shure that I have seen a delta-link update service in a previous version, but now it is gone / I can't find it.

Similar Messages

  • Delta records not updating from DSO to CUBE in BI 7

    Hi Experts,
    Delta records not updating from DSO to CUBE
    in DSO keyfigure value showing '0' but in CUBE same record showing '-I '
    I cheked in Change log table in DSO its have 5 records
    ODSR_4LKIX7QHZX0VQB9IDR9MVQ65M -  -1
    ODSR_4LKIX7QHZX0VQB9IDR9MVQ65M -   0
    ODSR_4LIF02ZV32F1M85DXHUCSH0DL -   0
    ODSR_4LIF02ZV32F1M85DXHUCSH0DL -   1
    ODSR_4LH8CXKUJPW2JDS0LC775N4MH -   0
    but active data table have one record - 0
    how to corrcct the delta load??
    Regards,
    Jai

    Hi,
    I think initially the value was 0 (ODSR_4LH8CXKUJPW2JDS0LC775N4MH - 0, new image in changelog) and this got loaded to the cube.
    Then the value got changed to 1 (ODSR_4LIF02ZV32F1M85DXHUCSH0DL - 0, before image & ODSR_4LIF02ZV32F1M85DXHUCSH0DL - 1, after image). Now this record updates the cube with value 1. The cube has 2 records, one with 0 value and the other with 1.
    The value got changed again to 0 (ODSR_4LKIX7QHZX0VQB9IDR9MVQ65M - (-1), before image &
    ODSR_4LKIX7QHZX0VQB9IDR9MVQ65M - 0, after image). Now these records get aggregated and update the cube with (-1).
    The cube has 3 records, with 0, 1 and -1 values....the effective total is 0 which is correct.
    Is this not what you see in the cube? were the earlier req deleted from the cube?

  • Deltas are not updating to next ODS?

    Hi,
    The deltas are loading from R/3 to Two ODS(O1 and O2) from Two Different data sources(Delta).Again these deltas from O1 and O2 are loaded to ODS O3.The problem is the O2 deltas are upadating to O3 ODS correctly.But the O1 deltas are not being loaded to O3 ODS.All these are loadings are happening through the process chain.Can any one help me to understand why the deltas are not being loaded to O3 ODS from O1 ODS.
    Points will be definitely assigned .
    Thanks,
    Vasu.

    Hi,
    The next delta will all the request data from Source ODS to target ODS which have not yet been pulled.
    You can confirm this by checking the Datamart status (Tick sign) besides each request in the source ODS.
    All those without this tick will be updated in the next delta.
    All those requests that have this tick is already availble or loaded into target ODS.
    So once this delta is loaded things will stabilize.
    Hope this helps.
    Thanks,
    JituK

  • Why are the stand alone installer download links not updated?

    These links are downloading the older 10 version. Why are these not updated???????
    http://www.adobe.com/go/fptroubleshoot
    http://www.adobe.com/go/full_flashplayer_win_ie
    http://www.adobe.com/go/full_flashplayer_win

    I don't know where you got these links from.
    Try using the links in http://forums.adobe.com/thread/909550
    or http://www.adobe.com/special/products/flashplayer/fp_distribution3.html

  • Word Links not updating when row number changes in excel

    Hi,
    I have a huge excel file with employee name,code,dob etc as fields.I linked it to word documents using paste special and macros.Everything works fine and word also updates with changes in excel file, but problem arises when in excel , data is added in the
    middle rather than at the end of the file. This changes the row numbers of all the employees.Hence when I  open corresponding word document, some one else's details open. So now i have to edit links in word...office->prepare->edit links, Here i
    have an option called ITEM IN FILES... this is where the problem occurs...It requires mentioning the row no of the corresponding pasted link...but when i change data in excel and row no changes...this should be automatically detected by Word and row number
    should be updated there.Please help me find a way to resolve this.This is what it looks like....
     Data for VC!R1C2:R2C13
    I want R1 and R2 to change automatically if I change rows in excel file.
    Thank you

    Instead of specifying a cell range in the LINK field, name the range in Excel, then use the range name in the LINK field.
    For example, instead of:
    VC!R1C2:R2C13
    you might have:
    VC!MyRange
    in Word.
    That way, the LINK will point to the named range, regardless of how many rows and/or columns are added/deleted before it. Furthermore, if you expand or contract the range (e.g. by adding/deleting columns between the first & last column), the
    named range and, hence the linked range, will likewise expand/contract.
    Cheers
    Paul Edstein
    [MS MVP - Word]

  • Deltas are not updating to subsequent data targets?

    Hi,
    We are running process chain which loads  delta data to a DSO O1 and then to DSO O2 .Then FULL upload will be done to CUBE by deleting the last request every time.
    Till yesterday the data was loading to O2 DSO properly.But only one load has taken place to O2.As this process chain runs every hour from 4 AM to 7 PM.Can any one help me to resolve this issue.
    It production emergency issue.
    Points will be definitely assigned.
    Thanks
    Vasu.

    Hi,
    Check if any load failed to ODS2 or if the last load did not complete.Fix that and then load.
    Also check if the process chain is stuck and didn't complete loading. Also check if there are any dumps in ST22.
    Cheers,
    Kedar

  • Batch Characteristic not updating with result for linked MIC

    Hi,
    I have created a MIC and linked to a batch characteristic i.e. potency and included the characteristic in a specific batch class. This MIC is part of the inspection plan for a certain material.
    If I generate a lot of origin 01 and 09 for the material and record a result for the MIC and apply a UD, the batch characteristic is not updated with the result recorded in the batch master record..
    If I generate a lot origin 89 for the same material, when the result is recorded for the MIC and apply a UD the batch characteristic is updated with the mic value in the batch master record.
    Can you help regards?

    Ok. I am a little bit further.
    I put a trace (ST05) on the result recording and I find a difference between 4.7 and ECC6.0.
    In ECC6.0 I've an deletion in table "AUSP". This deletion isn't performed in the 4.7 system.
    Hope that this can help to solve my problem.
    Regards,
    René
    @ Mayank
    Above, all the master data and customizing is mentioned to transfer the result to the batch classification
    Edited by: Rene Fuhner on Jul 30, 2010 7:03 PM

  • OLE objects linked to MS Word/MS Excel do not update in InfoView

    I am facing the following problem:
    - Embedded a Word document as linked OLE object into a crystal report and stored it to Enterprise repository.
    - When opening the report with CR Developer from my workstation, links are updated and changes made in the .doc file are reflected, the report is updated
    - However when displaying and refreshing the report in InfoView changes aren't reflected.
    The OLE link (type document) is set to update automatically. I tried to store the report to the enterprise repository with and without data. Yet no difference - no update in either case. Neither scheduling nor opening and refreshing the report in InfoView helps.
    I further inserted an OLE object linked to a bmp image, and for the image refreshing works, even in InfoView
    So am I doing something wrong?
    Some threads in this forum indicate that only OLE linked pictures (bmp, jpg) can be refreshed dynamically, e.g.
    [Dynamically change path to OLE file]
    Others indicate that it is also possible to dynamically refresh OLE objects linked to .doc, e.g.
    [Re: Link to Word document doesn't refresh when running from Infoview]
    - Is it at all possible to dynamically display the contents of .doc or .xls files in a CR when viewing and refreshing the report in InfoView (without the need to reopen and resave the report with CR Developer first) ?
    - We are using BOE XI3.1 SP3 and Crystal Reports 2008 SP3.  On the BOE server Crystal Reports Developer is not installed. Can this be a prerequisite for the OLE links to update in InfoView?
    - Any other suggestions?
    Thanks
    Konrad

    Hi Don,
    Thank you for the quick reply.
    - You say that this works in CR Designer. That's right. As described above, even I can open the report with CR Designer and the links are getting updated.
    - However if I do not reopen and resave the report with Designer ... if I just open and refresh the report in InfoView to get the updated information from the files ... changes are not shown. I face this problem ONLY with ole links to .doc and .exe. OLE links to image formats such as .bmp do work. WHY?
    My files are already stored locally to the BO server and the (changed) image files are read and updated from exactly this directory. But not the linked Excel and Word files...
    Thanks
    Konrad
    Edited by: Konrad Hartl on Jan 25, 2011 8:04 PM

  • New tabs are not updating the names of the sites they have loaded. When I open a new tab and load a site, the tab simply stays named "New Tab". When I open a link in a new window, it shows "Connecting..." even while its fully loaded.

    New tabs are not updating the names of the sites they have loaded. When I open a new tab and load a site, the tab simply stays named "New Tab". When I open a link in a new window, it shows "Connecting..." even while its fully loaded.

    This issue can be caused by an extension that isn't working properly.
    Start Firefox in <u>[[Safe Mode]]</u> to check if one of the extensions is causing the problem (switch to the DEFAULT theme: Firefox (Tools) > Add-ons > Appearance/Themes).
    * Don't make any changes on the Safe mode start window.
    * https://support.mozilla.com/kb/Safe+Mode
    * [[Troubleshooting extensions and themes]]

  • Incopy link will not update in InDesign and XML Story files

    So I have a couple of questions.
    I work for a publisher and we have a standard InDesign to Incopy workflow. Recently we have started having issues with InCopy links. First some basic info would probably be helpful. We use Windows XP =(, and we are using InDesign and Incopy CS3. All of our files are on a server. When I or people on my team sometimes attempt to update Incopy links, they will simply not update. Then when we check the link it says that it is zero k in size and is pretty much fried, cannot open in Icopy or InDesign. Why this is so nasty is because if the file cannot be updated all the work in the story that was done in InCopy is lost. Then to make matters worse, if we unlink the incopy file sometimes when we go to save indesign completely crashes. Is this a permissions issue as our IT department is fairly ignorant about design workflows on servers and has been inconsistent about the permissions. Also these .xml files seem to be populating the folder where we keep our InDesign files, when we open them they have basic information on the story links. I have attempted to find out more info on these files but have had very little luck.
    Any info would be helpful.
    Thanks!

    I cannot import video files.
    Mylenium

  • Parameters on linked report not updating

    Hi,
    I updated a report adding parameter expressions.  A linked report based on the report I updated didn't get the parameter expressions when I deployed the base report.  Anybody else having that issue?  It's not much of a problem.  I just have to recreate the linked report which is a nusance.
    Thanks,
    DD

    I know this question is old, but I had the same problem today, and I think the answer is useful.
    When you deploy a new "main" report, the linked reports are NOT updated automatically, so you need to refresh them. You can do this easily from the Report Manager:
    1 - Update the main report;
    2 - Go to the linked report, use the "Manage" menu, and in the "Properties" tab click in the "Change Link" button:
    3 - In the following screen, select the main report, and click "OK". This will refresh the linked report with the modified main report:
    4 - Once you're back to the previous screen, click the "Apply" button, to really update the linked report.
    5 - VERY IMPORTANT: Since you changed the main report, all the previous adjustments you made in the linked report parameters were lost - like Null, Hide, Prompt User and Display Text, only the Default Value is preserved - so GO TO THE PARAMETERS tab and
    adjust the linked report parameters again!!!

  • Linking Excel to Word - Word doc updates the numbers in a table but the format (font colours) do not update

    I am using Office 2010. I have many graphs and linked tables to a master word document from Excel. The tables contain percentages and are formatted red if under -2.5%, yellow if between -2.5% and +2.5% and green if over +2.5%. The colours are correct
    in Excel but when I refresh the word document, the numbers update but the font colours do not. The purpose of linking was to save time but if the colours do not update then the link is pointless. Is there any way to ensure the colours update as well as the
    values?

    Hi,
    In regarding of the issue, I have a couple of questions:
    Do you mind telling me how do you copy/link between Excel and Word?
    Where did you store the Word and Excel file? Both of local disk or network drive, even website?
    Did you using conditional formatting to display/format percentages?
    Based on my tested, please try the following steps, it would be update all the information after the source was changed.
    Select the table/chart in Excel> Open word >Copy>Paste>Choose Link & Keep Source Formatting.(See image 1)
    If we changed the source data in Excel, then right click the table in Word> Choose update Link. (See image 2)
    Then the data, format, font and color all will be updated.
    Hope this should help you.
    Regards,
    George Zhao
    TechNet Community Support
    It's recommended to download and install
    Configuration Analyzer Tool (OffCAT), which is developed by Microsoft Support teams. Once the tool is installed, you can run it at any time to scan for hundreds of known issues in
    Office programs.

  • HT4623 I am trying to install iOS 5.1 on my iPad, but when I go to 'Settings' and then to 'General' the link 'Software update' is not visible. Any advice welcome.

    I am trying to install iOs 5.1 on myiPad but when I go to 'General' to 'Settings' the link 'Software update' is not visible. Any advice would be welcome.

    This feature is only available on iOS 5 or later.  You must still be running iOS 4.  Connect your iPad to the computer you usually sync with and run iTunes software update.

  • Dreamweaver 8 - not updating links when moving files

    I am still having problems getting Dreamweaver 8 to work the
    same way as my Dreamweaver MX2004. When I use the file panel in
    Dreamweaver 8 to change the name of a file it does not update my
    links throughout out site. I have gone to EDIT > PREFERENCE and
    made sure that update links when moving files and the Prompt box is
    checked.
    I have also tried Site > Advanced > Recreate Site Cache
    but it's not working.
    Can anyone please help. Thank you.

    Give me the code from a link that is not managed by DW,
    please.
    Murray --- ICQ 71997575
    Adobe Community Expert
    (If you *MUST* email me, don't LAUGH when you do so!)
    ==================
    http://www.dreamweavermx-templates.com
    - Template Triage!
    http://www.projectseven.com/go
    - DW FAQs, Tutorials & Resources
    http://www.dwfaq.com - DW FAQs,
    Tutorials & Resources
    http://www.macromedia.com/support/search/
    - Macromedia (MM) Technotes
    ==================
    "Rockysowner" <[email protected]> wrote in
    message
    news:e2eoj3$idn$[email protected]..
    >I am still having problems getting Dreamweaver 8 to work
    the same way as my
    > Dreamweaver MX2004. When I use the file panel in
    Dreamweaver 8 to change
    > the
    > name of a file it does not update my links throughout
    out site. I have
    > gone to
    > EDIT > PREFERENCE and made sure that update links
    when moving files and
    > the
    > Prompt box is checked.
    > I have also tried Site > Advanced > Recreate Site
    Cache but it's not
    > working.
    >
    >
    > Can anyone please help. Thank you.
    >

  • Linked Content Still Not Updating

    I've read posts in regards to Dynamically linked objects not updating and a solution was to revert to original.  However, my issue remains even after I do that.
    I have a project I created in Premiere and I am importing the sequence to Encore so I can create the DVD and the Blu-Ray.  I noticed I had an error in the audio after I finished creating all the elements, menuts, and etc.  Now I need to get that audio to work in the Encore project.  I've tried everything including exporting the audio mixdown and I still have the audio hiccup (even though in Premiere it is fixed).
    Help please, I've been 2 weeks on this problem.

    The project panel where we can see the transcode statuses of both DVD and BD.

Maybe you are looking for