Demand Plan Upload

Hi,
Can you please give me a code so that I could get the output >> Volume Upload Successful with warning message “ Material MA00005TEST is flagged for deletion”
Please help me with this problem.
Thanks...
Carina

Hi.
As said by Madhu - You can use the Badi /Lsmw/BDC
Version:
a.  You can maintain diferent version,
b.  The important thing is only the active version will be used in hte demand planning.
c. The inactive version will not be used and they can be maintianed for the information purposed.
You can use the existing version like 00, 01 etc and nothing new is required for  you
Reg
Dsk

Similar Messages

  • Demand Planning upload and down

    Dear Experts,
    I downloaded data from deman planning planning book
    while downloading  i saved as local
    selected prepare file for upload at later time
    save additional information in the system
    and saved as csv format
    and do some changes to the data and i try to upload
    there is a message file cannot upload,
    can any one tell me what is the procedure to uplaod and download to demand planing
    Thanks & Regards
    Raj

    Hi Raj,
    About upload and downloading CSV files from / into a planning book, SAP help is availble in detail in the URL below for SCM 7.0 version
    http://help.sap.com/saphelp_scm2007/helpdata/en/e2/1e2980c5314ad3aa76be32e7e29696/content.htm
    For SCM 5.0, please refer URL below:
    http://help.sap.com/saphelp_scm50/helpdata/en/e2/1e2980c5314ad3aa76be32e7e29696/content.htm
    Hope this helps.
    With regards,
    Dattasaheb Kadam

  • Not able to Upload data in Demand Planning data view

    Hi
    I am trying to upload a csv  file in to Demand planning interactive planning through " Upload Data " functionality
    First I exported data from interactive planning , updated some data in file and again trying to upload same file.
    I am getting following error
    File cannot be uploaded
    Message no. /SAPAPO/SDP_UPLOAD009
    Diagnosis
    File  has no technical information or incorrect technical information.
    Procedure
    Save the file again locally. Make sure that the file has the technical information.
    Could u please suggest what needs to be done
    Thanks and regards,
    Nitin Lavhe

    Hello,
    For using the upload data functionality from interactive planning grid, you need to first download the data. While downloading the data, please check the check box for "Prepare the file for upload at later time", and then select the option of putting the technical setting into the file or into the system. Either way is okay. Then try uploading the same file.
    This should solve your problem.
    Thank you.
    Regards,
    Jacky Jain.
    SAP APO Architect.

  • Updating data in APO demand planning key figure

    Hi
    We have a key figure in Demand planning which is not present in Info cube, This key figure is just avaialable in SAPAPO  SDP94for manullay key in some data, Now I want to update data in this key figure via extrnal file i.e text file.
    Could u suggest some ways for this, Remember this key figure is not present in Info cube, Hence we can not feed in External file to Info cube, We some other way for updating data in this key figure,
    Thanks and regards,
    Nitin Lavhe

    If your client is not Ok with standard way of flat file upload, Also If you will get a file from external customer on weekly basis then definitely they will put it somewhere either on local server or application server.
    I would suggest, Define the format for the flat file,Ask User to put that file on application server, Write a simple program to get data from that file on application server, Update the KeyFigure using standard BAPIs available,After updation delete that file from server.Schedule this program in background on weekly basis so that every time it will check for new file on server path and update the Keyfigure accordingly.
    I know this is a custom development but this will work.
    Thanks,
    Saurabh

  • APO Demand Planning realignment and BI

    Hi experts,
    I need to handle realignment process done in APO Demand Planning area in order to get data consistency in BW.
    All I can tell you is that my idea was to get data from datasources created on Planning areas but I don't know how that realignment process impacts on information taken to BI.
    As Demand Planning information changes from week to week(as guys in APO side do their forecast) we need to take snapshots to BI. My concern is how to manage realignment in this scenario. should we take a different approach to upload data to BI?.
    Thanks so much!.

    Hi rajib,
        If you are new to APO & want understand Demand Planning steps then you can use SAP Help.
    Pls go through following link. You can find all the steps.
    http://help.sap.com/saphelp_scm50/helpdata/en/8f/9d6937089c2556e10000009b38f889/frameset.htm
    Regards
    Sujay

  • Customer Forecast Management vs. Collaborative Demand  Planning

    Hello,
    Currently my client is trying to replace 40-50 raw excel format forecast which they receive from multiple customers with SAP APO.
    They use a consolidated format and upload it into another 3rd party tool currently.
    My question is which best suits the purpose in short term as they are very limited on resources. I would also like to know the difference between using Customer forecast management vs. Collaborative demand planning in this context.
    Thank you all,
    Sai.

    You can use the GATP functionality known as Product Allocation for this scenario. This will basically mean that you need to maintain product allocations against each customer in your GATP planning book and every time you create a sales order in R/3, the quantity will be checked against the allocated quantity in APO GATP. If the quantity exceeds the allocated quantity for that given month, then sales order cannot be confirmed.
    You will need to explore this funcionality in APO GATP and this should help your requirement.
    Cheers,
    Srinidhi

  • Master data for demand planning

    hi guru's,
    what is the master data for dp, from were we get & how BI is helpful in this.
    BW integration to apo dp.pls help me out
    with regards,
    chinni

    Hi Chinni,
    Data from R/3 to BIW is transfered through LIS, LO-CockPit's Info Structures. 
    This is how the flow goes on....
    The transactions that are executed in R/3 are stored in the background tables.
    Data from these tables will be copied to the info Structures(LIS, Lo-**** Pits).
    A data source is generated basing on the infostructure.
    Data source is then replicated to BI, The Data from the data sources is then copied to Info Cube.
    Once the data is there in your Infocube,
    you create Characteristics value combinations and then transfer the data from the Info Cube into the Planning Area.
    Once you are done with demand planning, you can either transfer the data to SNP or the demand management in R/3.
    If you are not planning to use LIS Structures, then you can download the data from the R/3 Tables to an excel sheet and upload them into BI.
    The transaction code for creation of LIS Structures is: MC21
    If you have a seperate BI server(Apart from one in APO), it is best pratice to load data into the BI server and then transfer the data to APO BI.
    Let me know if you have any more questions regarding this.
    Best Regards
    Raghu Kishore V

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • Error Message When Opening Interactive Demand Planning

    Hello Experts,
    I have one user who is receiving the following error message when trying to open Interactive Demand Planning Workbook.  Only one user is experiencing this issue.  Has anyone run into this before? 
    GP: Graphics product not available in this system; see long text
    Message no. APPLG225
    Diagnosis
    The required graphics product is not available on the current platform. It is either not permitted, or it does not work properly.
    The application does not have a fallback strategy.
    Procedure
    Application/Specialists
    Contact your developers to see if a fallback strategy can be implemented.
    Development
    Check the call method of the graphics proxy. If the graphics product is not mandatory (parameter FORCE_PROD), then the graphics proxy can select a different graphics product that is available on this platform.

    Dear Adam,
    The prerequisite for graphics in planning folders is the SAP Internet Graphics Server. The connection between the SAP Internet Graphics Server and the system in which you operate BPS must take place using an RFC destination of the type TCP/IP with the predefined name IGS_DEST_POFO.                                                          
    Please make sure that your settings are correct and check the online help at:   http://help.sap.com/saphelp_sem320bw/helpdata/en/05/                  
      242537cedf2056e10000009b38f936/frameset.htm                                                                               
    Planning Folder                                                         
      > Editing a Planning Folder: Details                                  
          >Planning Folder: Portfolio Graphic"                                                                               
    Please have a look at the following notes as well that helped to solve problems with the IGS. 454042 IGS: Installing and Configuring the IGS                          
    676532 Dumps in transactions with splitter containers                   
    I hope this helps.
    Regards,
    Tibor

  • Issue in creating Duet  Demand Planning Sheet on the basis of Dataview

    Hi all,
    We are using following landscape
    Landscape Details-
     SAPAPO = SCM 700 0002 - SAPKY7002
     Duet 1.5 - 150.700 SP3
     Duet Demand Planning u2013 1000.150.700.3.0 (Server Component), 1000.150.700.3.0 (Client Component)
    There are 2 ways available to create Duet Demand Planning Sheet
    1. On the basis of existing Demand Planning Scenario
    2. On the basis of existing Data views( with SAP macros)
    We are able to create Duet planning Sheet with 1 option. But we got erro with second Option that is on the basis od Data view(with macros).
    Planning area, Planning Book/Data view and Selection Ids are existing and active.All the Webservices given by SAP are released.
    Duet is able to retrive the list of Dataviews avilable for the Planning Area. But it is failing to retrieve the Data View Details the Error is as follow
    "No view Details were found Please choose another dataview."
    Web Service Call (PlanningViewDetails):
    java.rmi.RemoteException:Service call exception; nested exception is:
    java.rmi.UnmarshalException: Attribute schemeAgencyID is required in element ID !
    Data: TYPEID DUET_JAVA_ADDON
    Data: SEVERITYCODE 2
    Exception of type 'System.Exception' was thrown.
    Is there any SAPNOTE for this ?Any specific configuration requirement from SAPAPO side?
    Any webservices to be applied?
    Please help in this Issue
    Thanks &  Regards
    Rahul

    Hi
    There are couple of OSS  notes, you might have already seen:
    1371328 Internal Error using Planning Book with Aux. KF
    1431661 Duet Demand Planning 1.5 SP4.
    Regards
    Datta

  • Loading Demand plan data from APO to BW

    Hi Gurus,
    We have requirement as below.
    we have to extract two key figures from APO to BW system
    The 2key figures of APO will get data as below:
    First key figure has to hold Yearly snap shot and 2nd Key figure has to hold QTY snapshot.
    we have constrained production plan & sales plan keyfigures in apo demand planning and the requirement is to extract these 2 keyfigure quaintest into BI.
    Data Example as below:
    KF1: Yearly snapshot
    KF2: Quarterly snapshots
    Yearly  data means from   Jan to Dec  and
    Quaterly data is as below
    Qtr1 - Dec       JAN to Dec
    Qtr2 (in FEB) - Mar to Dec
    Qtr3 (in May) - Jun to Dec
    Qtr4 (in Aug) - Sep to Dec
    so please let me know to how to handle or extract these data into BW.
    Thanks,
    Shailaja

    Hi Venkat,
    Yes, both the key figures are ther in the same planning area.
    But my question here is how to get that data into BW? meaning...
    If APO/DP does the planning  in the month of Sep 2010 for Jan to dec 2011 and the
    values are like
    Sep-10   jan      Feb  mar   april  may  june  july  aug  sep  oct   nov  dec
                   15     14     13      11    10     11     12     16    14         15   22     20                                        
    Dec-10   12     14   16        18    29     20    18     15   14    12   17        20
    Mar-11          10  12   13       14     15   16    17  18         20
    Jul-11                                  20       40     30      40       50
    meaning, If the planning is done in the month of Sep 2010 for the yr 2011 as explained above that values should be extracted into BW and the next planning will be done in the month of Dec 2010 again for entire yr of 2011 i.e. Jan 2011 to Dec2011.
    But the values should be captured as they are.. that means if i use DSO the values from request1  to request2 will be over written n if i use the cube they will be added up..
    Request1 will hold data of Sep2010: planning data
    Request2 wil hold Dec 2010 data ....n req3 will hold data of Mar 11...
    but users want to see the values or planning figures as they are.
    Hope i made my requimrent more detailled.
    Please let me know the solution to get the data as it is in BW.
    Thanks,
    Shailaja

  • What is best practice to do APO Demand planning

    Hi,
    My client wants to implement demand planning.
    Client has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow  ( ECC -> BI -> APO-BI) for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    ST

    Hi Sujoy,
    Thanks for reply.
    (1) I have to get Sales Order data from ECC into BI standalone system Cube.
    (2) Then from this cube same data is sent to SCM APO - BI Cube.
    (3) Planning will be done in SCM APO.
    (4) Planned data is again sent to BI standalone system, Using datamart on Planned area.
    (5) In BI we will have reporting on cube, which has ECC sales order data and APO Planned data.
    But in this case, there is always delay between data loads (firstly ECC -> BI, then BI -> APO, then APO -> BI).
    In this case, if a new customer is created, Client wants to see demand planning in  latest data.
    How do we do APO DP generally?
    Do we follow the route from BI, or directly between ECC and APO..
    Hope I am able to explain the scenario..

  • What is the best practice for APO - Demand planning implementation

    Hi,
    M client wants to implement demand planning.
    Cient has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    Saurabh

    Any suggestions !!

  • Syntax error when running GLPLUP - Flex Plan Upload

    HI,
    We want use transaction GLPLUP to perform a Flex Plan Upload, but encounter a syntax error in program RK50003 stating:
    The following syntax error occurred in program "RK500003 " in include
      "PP_FISL_GINC " in
    line 652:
    "The data object "ITDAT1" does not have a component called "XBILK"."
    This program is a local object, and appears to be generated by SAP.  Checking the program attributes the owner and the last person to change this program is a consultant who has rolled off the project, and is not available for help.
    I suspect that there must be some steps to regenerate this code, but I am not certain where to look for this information. 
    I have tried running GLPLDEL and GLPLINSTALL, but this did not change RK500003.
    Any insight you can provide on this is greatky appreciated.
    Thanks,
    Roy

    HI,
    I reported this issue with SAP and the following is what they had me do to resolve the issue:
    1. Run transaction GLPLDEL:
    Deletes all generated reports of the planning processor for
    FI-GL/SL planning (application class GLU1). After a new call of
    the planning, these reports will be generated once again.
    2. Run transaction GLPLINSTALL:
    It regenerates necessary database table entries for FI-G/SL Planning
    (tables t8pl*). Make sure that you will perform this step when no
    posting of FI-SL data is running.
    This resolved the issue for us.
    Good luck,
    Roy

  • Changing the Chart Title in Graphic View in Interactive demand Planning

    Hi All,
    Is it possible to change the Chart title in Graphic View in interactive demand planning screen.
    When we go to interactive planning after loading the data we go to Univariate forecast then switch to graphic, the chart title shows the selection at which the planning is done. For eg; If I plan at die level and i select a particular sap material, the chart title displays Die value and not the material value.
    Is it possible to change the chart title such that it displays all the selections made in selection winodw, like in the above case both Die value as well as SAP Material Number.
    Thanks and Regards,
    Diana

    Dear Diana,
    unfortunately this is not possible.
    The chart title is build from the planning book name + the Show characteristic in the shuffler (+ available nav. attributes of the Show char).                                                           
    The functionality you requested doesn't exist in standard.            
    Regards,
    Tibor

Maybe you are looking for

  • The scroll motion where I set the fill is only scrolling down

    The scroll motion where I set the fill is only scrolling down, even when I set it to go up. Has anyone else expereinced this? Can you help me correct this?

  • Can .air installer some files together with the application?

    I have an installer.air that is created by Adobe Flash. I have another file called settings.cfg which is needed for my application to run. How do let the computer auto install settings.cfg into the installation directory together with the application

  • Jpanel kind of onload event in HTML tag body

    I have a swing app, with many panels in tabbedpanes or in containers with cardlayout, etc... When a panel is active,shown,visible... , I want to catch this event and do something. How can this be done? Thanks in advance Gabi

  • 2 WD Components starts 2 processes in backend - I need to start only one

    Hi WD gurus, I have developped WD Java application with more WD development components, each of them reads data from backend using Adaptive RFC. On backend side I have created application framework, which from first WD component prepares data and in

  • Regarding CAPS

    Hi All, I am presently working in a Software Company in India as a Programmer Analyst. I am presently pursuing my career in Java and J2EE. Recently i heard about Java CAPS. I went through the sun's site to know about it. It is very interesting. I wan