Dependent requirements distribution via Operations time

Good Day SAP expert!
Can we set up the system (Distribution key) so that Dependent requirements distribution will be based on Operations time instead of just Order start date and Order finish date and spread evenly?
For example, my planned order starts at 23:00 on first day and ends on 23:00 the 2nd day, the dependent requirements of the component will be 4% on 1st day and 96% on 2nd day or at least round to 10% increment. Please advise.

Reden Manguerra,
You want system to dynamicaly split the component allocation percentage depend upon the requirement dates and time remaining in shift , its not possible.
if you have fix timings or the splits with fix percentages then you can acchive it by maintaining operation same as number of time you need split and you need to maintain same compoenet on different possitions of BOM so that you can allocate it to respective operations and in item details screen you need to maintain floats between operations.
Check and revert back for further discussion.
regards
Ritesh

Similar Messages

  • Planning of dependant requirements in continuous production

    Hi Experts,
    The scenario is as follows.
    We are producing a bulk material and packing it in to bags. We have orders for bulk material and packaging material. This is a continuous production. i.e. we donu2019t have to wait till the completion of the bulk material production to start the packing.
    Just after the production of 1st batch of bulk, I can start packing. This means the bulk material order and packing material order are overlapped. How can I map this scenario in R/3 MRP so that the overlap appears in the scheduling?
    Thanks & Regards
    Prathib

    Prathib,
    What I am looking for is an overlap when I run MRP.
    I am going to assume that the 'bulk material' is a component of the 'packing material'. I believe you can achieve your requirement through your BOM explosions.  The dates of dependent requirements can easily be offset from the start date of the higher level (packing) order.  
    One method is to assign portions of the Bulk component BOM to different routing operations of the higher level (packing) production order.  For this to work, you obviously must have more than one operation in the higher level (packing) order.  You also must use Lead time scheduling during the MRP run to make this work for the planned orders.
    A second method is to use a fixed offset. In this case, the lower level (bulk) order completion date is offset from the higher level (packing) start date by a fixed duration of days.  This offset can be entered at the detailed item level in the BOM (CS02)
    Finally, you can create a distribution function (OPB3), and a distribution key (OSPA), in which you can fine tune exactly the timing of the dependent requirements, using 'percentage of completion logic'.  This distribution key can then be assigned at the detailed item level of the BOM.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2b2b44af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/ea/e9b42c4c7211d189520000e829fbbd/frameset.htm
    Best Regards,
    DB49

  • Dependent Requirements are falling on Non Working Day

    Hi,
    I have my dependent requirements for my ROH material on 15.05.2011 which is a Sunday, Non Working in my Factory Calendar. How is this possible?
    Details are as follows.
    ROH A MRP type PD is required for FER B MRP Type X0
    ROH for FER as per system reqmtn fall on 15.05.2010 which is Sunday. What is wrong in my settings.

    Nilesh,
    Prasobh has already suggested what you should be investigating. Your finished goods Planned order was (presumably) not generated in ERP.  Dependent requirements come from the Planned order.
    The Planned order for FER is being generated in an external system (presumably APO, yes?).  The start date for this order, and therefore the dependent requirements, are generated somewhere other than ERP.  Unless you schedule/reschedule this planned order in ERP, the date generated in the external system will be the date that drives the dependent requirements for the lower level.  Regardless of any factory calendars.
    I don't know what your external system is. However, before you investigate there, there is one more topic that the other experts haven't asked you, and that is the BOM of your FER material.  Look at the BOM for the parent part that is driving your dependent requirement.  Look at the details of the item that contains the component that is giving you heartburn.  Entries in Lead time offset, Operation LT offset, Distribution key, and Special procurement can have an impact on the dependent requirement date.
    If APO is in fact your external system, you should be aware that virtually all of the items mentioned by JH and other experts should be flawlessly replicated in APO, and they have influence over the scheduling of the start dates of the FGs planned orders.  In addition, the same items in ERP can also have an impact if you have set up scheduling (re-scheduling) in ERP.
    If you are using APO, I suggest a few things to check:
    Transactional Consistency between APO and ERP, and especially any blocked queues
    Resource in APO.  Does it match the ERP info?
    PPM or PDS.  Does it match your BOM and Routing info?
    Factory calendars in APO.  Do they match the ERP calendar?
    Any Calendar timestreams in APO.  Are they up to date?
    Also, if you are using APO for your FGs, you might want to post this question in one of the APO forums instead of a PP forum.
    Best Regards,
    DB49

  • After capacity leveling  dependent requirement s to be adjusted

    hi
    iam planning a fert product on 30 th agust for 100nos
    created md61 -pir for 100 nos
    done mrp run at mdo2 and got scheduled dates for 100nos which has gone beyond the requirement date as i was chhosed leed time scheduling  and made dependent reqirement proposal for the order operation date.
    here the important thing is the work center which i nedd to produce was fully engaged inthe period (schedule period which system proposed)  .hence i made capacity leveling and planned order dates were changed again
    which are actual producion dates
    after capacity leveling my planned order was firmed
    my problem here is  the dependent requirement proposal date also
    need to be changed with respect to firmed planed order.
    how to achive this
    i tried with opu5
    but no changes in dependent reuirement proposal (planned order)
    plz suggest
    sasikanth
    vst-it projects

    hi
    i tried it but unfortunatly it is creating a new planned order and giving exemption messge to the firmed planned oder as cancel the proposal
    which is not at all acceptable
      means for a single PIR
    i made mrp run AND got planned order , after leveling the planned order was firmed
    means my pir was satisfied with this
    i made mrp run without changing PIR dates and quantity by expecting that it should propose a new dependent reqirement 
    but system created a new planed order to  pir date which sholud not happen.
    plz elobrate your view
    sasikanth
    vst-it projects

  • JAN 4, 2012  As of the  Upgrade to   Lion,. and the  Email portion, ..   DOES NOT  allow a Video Clip to be sent via the Email  as the I-Photo is not supported by Video Clips  ( Previous Leopard  No problem  clip and drag  via Quick Time Pro to the email

    JAN 4, 2012 
    As of the  Upgrade to   Lion,.   2007  I-Mac  -   the  Email portion, ..   DOES NOT    allow a Video Clips to be sent via the Email 
    as the I-Photo is not supported by Video Clips  ( Previous Leopard ) 
    No problem  clip and drag  via Quick Time Pro to the email  and select the  Attchment  size to send. .  Depending on the 
    Size of the Video Clip  ..      Now  Lion only  Export's   1 size, .   only  and as a result . . teh  File is  TOO  Large and
    Will NOT  send via  E-Mail    ??? 
    Between the   Issue of   the   Lion,  and  Email  issues ,   and  the   Upgrade  of   I-Touch  to  5.1  from  4.2.1 
    as my  Photo  Size is  Huge ..    70,000  +  photos in the  Computer. .   and was   40,000  in the   I - Touch  .. .  
    The  New I-Touch  too will not Load the  same  as Previously  used  on  either  my  16 GB   or  32 GB   Unit . . 
              No Help . ..   so far, ..  as a Apple user   since   1996 ..    I  have Never  experieanced such  frustration    ??? 
                   (  any one have some help  if similar  experiances    ?     thank you     )

    JAN 4, 2012 
    As of the  Upgrade to   Lion,.   2007  I-Mac  -   the  Email portion, ..   DOES NOT    allow a Video Clips to be sent via the Email 
    as the I-Photo is not supported by Video Clips  ( Previous Leopard ) 
    No problem  clip and drag  via Quick Time Pro to the email  and select the  Attchment  size to send. .  Depending on the 
    Size of the Video Clip  ..      Now  Lion only  Export's   1 size, .   only  and as a result . . teh  File is  TOO  Large and
    Will NOT  send via  E-Mail    ??? 
    Between the   Issue of   the   Lion,  and  Email  issues ,   and  the   Upgrade  of   I-Touch  to  5.1  from  4.2.1 
    as my  Photo  Size is  Huge ..    70,000  +  photos in the  Computer. .   and was   40,000  in the   I - Touch  .. .  
    The  New I-Touch  too will not Load the  same  as Previously  used  on  either  my  16 GB   or  32 GB   Unit . . 
              No Help . ..   so far, ..  as a Apple user   since   1996 ..    I  have Never  experieanced such  frustration    ??? 
                   (  any one have some help  if similar  experiances    ?     thank you     )

  • Planning of Dependent Requirements for BOM Components in Make to Order scen

    Hi Friends - I want to execute a full cycle Make to Stock Scenario with Materials planning using MRP.
    The scenario will include BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    To execute this I have done the following
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - NORM, and General Item Category group as NORM
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6. Now created a standard sales order for the product.
    7. Executed the MD50 for the Sales Order Item.
    Now where do I find the BOM components for this material in the Sales Order?
    After executing the planning Run MD50 I am only getting the requirements for Product only. I can't see any dependent requirements for the BOM components.
    How do I make sure that the BOM components are also planned while the product is planned?
    I have checked the component Stock Requirement List - there are no requirements generated from the Sales Order Product BOM.
    Pls help me on this. How to do this so that the raw material components are also planned?
    Thanks
    Purnendu

    Hi Dhaval, Sandeep, Ashok - Thanks a lot for your replies.
    I have checked the Planned Order Created through Planning Run.
    If I click on the Components Tab I am getting following message
    No material components were determined
    Message no. 61027
    Diagnosis
    Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
    Procedure
    Either explode the bill of material for this material, or
    create the components manually by processing the planned order in change mode.
    If I try to explode the BOM through Header Menu - Edit> Explode BOM
    I am getting the same message.
    If I click on the Bill of Material Tab - I am getting the same above messge.
    Ashok - I have tried both the Selection Method -
    Nil - Selection by Order Quant.
    1 - Selection by Explosion Date
    But with no effect.
    Waiting for your advice.
    Thanks and warm regards
    Purnendu

  • Operating Time Machine over a remote Back to My Mac connection is a challenge -- can I do restores in Terminal?

    When operating Time Machine remotely via Back to My Mac (and by remotely, I mean from Illinois to Ohio ), seeing your remote mouse cursor is largely a no-go, even in Lion. It simply does not get displayed, with very minor, flickering exceptions.  Certainly it becomes impossible to operate the Time Machine's Finder window in any mouse-clicking way.  I can barely operate the CANCEL or RESTORE buttons, and that's if I help myself by mousing over from outside the Screen Sharing Window, and kind of estimating if I am over the button area.  Similarly, I can get the mouse to give me some approximate date in the backups progression.  But the way to select a file, I found, is through arrow-keys.  I can get to the right directory before starting the Time Machine, and I can navigate to the correct file with much delay using the arrow-keys.  In short, it's a major freaking pain, because of all the lag and invisible mouse. 
    But I was able to do what I needed, given enough pain and perseverance.
    Question:  Given the impoverished visuals for mouse operations, is there a way to do this on the command line, not through the moving galaxy syntactic sugar that just gets in the way?  Can I run the whole restore operation in Terminal?  Of course, still via Back to My Mac, because I don't know how to get to the remote iMac in any other way remotely, given that it sits behind a cable modem and a Time Capsule router with NAT.  And I don't want to set up port forwarding, if I don't have to.
    Thanks for reading, and I'll take your considered expert advice.
    -- Marek

    Well, I have now reformatted/partitioned my poor WD Elements 2TB drive about a dozen times as well as restarted my 1TB Time Capsule so many times it's no wonder it's as confused as I am! <G>
    Last night, at your suggestion, William, and in respect for your continued support, I tried creating two 1TB Mac OS Extended (Journaled) partitions on the WD external USB drive, both with GUID partition tables. Both volumes mounted to my laptop's desktop flawlessly and without issue.
    Once the external drive was connected to the Time Capsule, however, it was a crap shoot as to whether or not the drive was recognized at all, reporting a problem with the disk, or, even at one point, mounting one of the two volumes but not both. <sigh>
    I read somewhere on the Internet that you need to restart the Time Capsule for volumes on an external USB drive to be recognized.
    So I tried that. I connected the freshly partitioned/formatted disk to the Time Capsule and restarted it. This succeed in removing the issue of reporting a nameless drive with a capacity of 0MB. It then reported the drive with its correct name but would not recognize whatever volumes in whatever partitions that particular crack at it contained with the exception of the once, as I mentioned above, when only one of two volumes mounted correctly and was listed with the right name and capacity on the Time Capusule's Setup's Disk tab.
    At this point I have given up on my goal to use the external drive with Time Machine to back up my Macs or to hope I will ever be able to see its contents remotely via Back to My Mac. All I would like to do now is simply find a reason why I can't get it successfully connected and playing nice with my Time Capsule in the first place!
    Any further suggestions or advice as to what steps I might take next would be greatly appreciated.
    Thank you all.

  • MRP Planned order generation for Order reservation excluding Dependent Requirements

    In our Project we have a requirement like for FG stage & SFG1 stage are M.T.O So after sales order are punched through  MD50 we have created Planned orders against sales orders,But dependent stages like SFG2 & SFG3 which are pure M.T.S so only Dependent requirements will get generated.Suppose for SFG1 i have partially converted planned order to Production order then for component SFG2 we get Partial Quantity as order reservation.Now requirement is if i run MRP for SFG2 system need to generate demand only for order reservation excluding Dependent requirements.Is there any possibility where we can generate demand only for order reservation.As system will create Planned order for SFG2=Dependent requirement + Order reservation

    Hi Uli,
    Suppose i have Sales order--100 kgs for FG
    B.O.M levels
    1.FG-----M.T.O
    2.SFG1---M.T.O
    3.SFG2---M.T.S
    4.SFG3---M.T.S
    5.ROH
    So if i run MRP via MD50 system would generate planned orders for FG & SFG1 level as they are M.T.O specific
    Now my requirement list would be
    FG-100kg planned order
    SFG1-100kg planned order
    SFG2-100kg dependent requirement.
    Now suppose i have partially converted SFG1 planned order to production order
    SFG1--100kg planned order to 30 kg production order
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-70kg dependent requirement & 30kg order reservation.
    Here my requirement is if i run MRP for SFG2 in MD02 as these stage is M.T.S system should provide 30 kg planned order & if we see down the line it would be like
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-30kg planned order & 70kg dependent requirement.
    SFG3-30kg planned order
    ROH-30kg Purchase req
    Client requirement is like these..

  • Update operation times in routing

    hello all,
    I need to do a mass change on routing in order to update operation times.
    I'm trying to find a BAPI/function to do this but without any success.
    It's not possible to do it with call transaction CA02 because depending on the material I can have one or several operations.
    I'm currently testing function CP_BT_PLPO_READ_WITH_INDEX and CP_DI_OPR_UPDATE but without any success (..and I'm not sure if it will feed my needs).
    Any help/suggestion is welcome !
    Thanks

    If it helps you, here is the code that loads our bdc. it might help you to walk through it.
    PS, we use SM35 as opposed to call transaction for ours as we load the data from excel, and have upwards of 8000 to 10000 routings updated at one time. We let them change only the run and setup times.
    * Initial screen
        perform bdc_screen using 'SAPLCPDI' '1010'.
        perform bdc_field using 'RC271-PLNNR' data_record-plnnr.
        perform bdc_field using 'RC271-PLNAL' data_record-plnal.
        perform bdc_field using 'BDC_OKCODE' 'XALU'.
    * Next screen
        perform bdc_screen using 'SAPLCPDI' '1400'.
        perform bdc_field using 'BDC_OKCODE' 'OSEA'.
    * Next screen
        perform bdc_screen using 'SAPLCP02' '1010'.
        perform bdc_field using 'RC27H-VORNR' data_record-vornr.
        perform bdc_field using 'RC27H-ARBPL' data_record-arbpl.
        perform bdc_field using 'RC27H-WERKS' data_record-werks.
        perform bdc_field using 'BDC_OKCODE' 'ENT1'.
    * Next screen
        perform bdc_screen using 'SAPLCPDI' '1400'.
        perform bdc_field using 'RC27X-FLG_SEL(01)' 'X'.
        perform bdc_field using 'BDC_OKCODE' 'VOD1'.
    * Next screen
        perform bdc_screen using 'SAPLCPDO' '1200'.
        perform bdc_field using 'PLPOD-LAR01' 'SETUP1'.
        write data_record-vgw01 to charquan.
        perform bdc_field using 'PLPOD-VGW01' charquan.
        perform bdc_field using 'PLPOD-VGE01' data_record-vge01.
        perform bdc_field using 'PLPOD-LAR02' 'LABOR1'.
        write data_record-vgw02 to charquan.
        perform bdc_field using 'PLPOD-VGW02' charquan.
        perform bdc_field using 'PLPOD-VGE02' data_record-vge02.
        perform bdc_field using 'BDC_OKCODE' '/3'.
    * Back
        perform bdc_screen using 'SAPLCPDI' '1400'.
        perform bdc_field using 'BDC_OKCODE' '/11'.
        perform insert_bdc.

  • Dependent requirements

    Dear friends,
    For example I am having a Sales order for 20 items. Due to some constrains, at a time I can not produce more than 1 item. So I am creating a production order for 1 item with reference to a sales order (using CO08).
    My problem is while running MRP, system is creating the dependent requirements for all the 20items. So I want to run MRP for the production order (like MD50 for sales order). Otherwise my MRP run should not consider the Sales orders for the dependent requirements calculation.
    Dependent requirements for all the 20 items is creating a big confusion. My scenario is pure MTO. Down the line all the production is for the respective sales order only.
    Please suggest me...
    Regards.

    Hi Kodand Nag,
    Please explain your scenario once again, I get confused little bit, 
    What I understood from your last reply, u have created sale order  with order qty is 20 nos for one material. (I assume).
    Then u have created prod order for one Nos (Partially – since is capacity constraint) with reference to sale order.(CO08).
    In MTO, system consider the sale order to create dependent requirements for dependent  material.
      Here u want system to consider production order not sale order requirements  – This is not possible.
    My solution is since u have converted partially qty as Production order, order reservations should have created for dependent material, if u run the MRP for dependent material (Next one below the header material) , sale order requirements is not taken into the account only production order req. I hope i am not mistaken, else please comeback.
    Regards
    Pradeep

  • Dependent Requirements report required

    Hi All
    I'm searching for transaction which will generate a report with total of dependent requirements for a given FG material list:
    Do you know if there are such type of transactions in SAP?
    Kind Regards
    Andrey

    Hello!
    We had the same problem, and our solution was making this report in ABAB. In ABAB you can call structure MDEZ and filter it by "MRP element"= DepReq.
    Other solution, rather temporary, is report based on table RESB (using e.g. transaction se16/se16n, SQVI, or ABAB). In that table field BDART='SB' means requirements coming from DepReq. The problem is, that RESB table can be huge, and searching in that way can take a lot of time.
    Best Regards,
    Marcin

  • Dependant requirements are to be considered in reorder point planning

    Hi,
    We are currently using safety stock planning with PD.but the problem is that MRP triggers a procuement proposal when ever the availabile quantity(not the stock) falls below safety stock(as it considers MRP elements like DEP REQ etc in the net requirements calculation).
    Now if i propose VB,it does not consider the dependent requirements at all(they are not even displayed)
    Requierment is that the procurement proposals should only be triggered when the safety stock falls below the physical stock and DEPREQ's and all other requirements should still be displayed.
    I appreciate your help in getting me through with this.Thanks.
    Ram

    Dear Ram,
    go to the customizing of MRP type ,
    ther you will find the field 'Reorder point planning with external requirements'
    Indicates whether an external requirement (sales order or manual reservation) is included in the net requirements calculation for reorder point planning.
    If yes, you can decide whether it is to be included:
    -in the complete planning horizon, or
    -only within the replenishment lead time
    I hope the above information will be useful,
    best regards

  • I would like to use my iPhone 6's wifi hotspot to provide Internet at home (I do not have home internet) via a Time Capsule which I currently use the TC simply as a home wifi network without Internet to enable things like printing wirelessly and back

    I would like to use my iPhone 6's wifi hotspot to provide Internet at home (I do not have home internet) via a Time Capsule which I currently use the TC simply as a home wifi network without Internet to enable things like printing wirelessly and backing up data wirelessly via time machine.
    I have a Mac Pro, iPhone 6, iPad, Apple TV and Time Capsule. No home Internet.
    Is is possible to have my iPhone 6's wifi hotspot used to provide Internet to my wifi network on time capsule? Has anyone else had success doing this? I'm not a tech head and really know very little about things like this. Thanks. Jen 

    You can have a go using a wireless bridge.. eg the airport express will do this.. you can join it to the iphone wireless running as a hotspot.. and then plugged into the TC wan port.. the TC has to be setup in router mode.. so this is going to give you double NAT errors.. and of course errors for all the time the hotspot is turned off.. but it can work. However you might find it requires you to manually connect up each time.. If you are really going to try and do this you will manage it.. but how fiddly it becomes might put you off after a week.
    You will chew up your 5GB very fast using any streaming media even radio. So be very careful to track the usage.
    Apple should have built in the TC the ability to plug in a wireless 3G modem.. via the USB but Apple have ceased to do adventurous stuff.
    If you give up the TC as main router there are plenty of better products on the market that will handle multiple wan connections.. !!

  • Dependent Demand Distribution

    Dear PPDS experts,
    I am facing problem with distribution key . I have updated the Distribution key GLEI (Equal distribution) in Production version and the same has been updated in the BOM component. When I run product Heuristics in the PPDS system is creating one planned order in APO and Respective dependent demand. When that Planned order moved to ECC system, because of the Distribution key it is splitting the order quantity in the planned order duration equally, but it is not splitting the dependent demand of the Component.
    I would like to know is there any prerequisites/ settings for the component to the dependent demand split. Your suggestions are highly appreciated.
    Regards
    Prabhakar Reddy

    Hi Tiago,
    Thanks a lot  for your reply ... I tried this but  for one componet dependent requirements are not distributed , but it is working fine with the header material . I will check further and update you ..
    Regards
    Prabhakar

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

Maybe you are looking for

  • Unable to open pdf with embedded flash

    Started with Adobe Reader XI (11.0.0.2) Was running into problems in an app because the new reader version does not work the same way in regards to Find. Downloaded the Adobe SDK (XI) and tried to open some of the documentation. Recieved a message th

  • Getting License Key for NSP (no E-Mail is sent)

    Hello SDN Team, as reported I have successfully installed the NW04 ABAP Sneak Preview. Now I'm trying to get a license for it at http://www.sap.com/solutions/netweaver/minisap.epx. I enter all the data, check the License Agreement, hardware key from 

  • Help.......how do we find the password in the pop3...

    we need to move our e-mails over to windows 7 from our windows xp' we use the outlook express 6 on the xp ' but we need to find out how do we find the password in the pop3 settings' we have forgot wot password we used for all the emails we set up yea

  • Export Layers to Files... tiff transparency in CS5

    Hi Everybody, I have a frustrating situation with the Export Layers to Files... script. When I choose to the output file type to tiff, the transparency is replaced with a opaque white background. Is there a way to modify the script so that it will re

  • Converting footage from 25 fps to 24fps

    Hi I've got a shoot coming up where we will be using a canon 7D at 24fps and a Sony Z5 at 25fps. I want the finished output to be at 24fps so was considering converting the footage from the Z5 to match the 7D. Firstly, is this advisable? are the resu