Depreciation With skiped periods

Dear experts,
I have uploaded assets from legacy system with the depreciation value uptill end of may 2009. Now in running the depreciation AFAB unplanned puting period six (06), the system is calculation depreciation from january and i intend to post depreciation just for June, so how can i skip the periods 01 to 05.

Hi,
Go to Tcode OAYC.
Select your company code and double click on period in which depreciation was posted
So here please mention FY 2009 and period 5 for depreciation area 01.
So with this system will start calculating depreciation from 06th period only.
This will defenitely fix your issue.
Thanks,
Srinu

Similar Messages

  • Depreciation run with special period

    We require 2 set of FS reports:-
    1.) FS as at 14/12/2007
    2.) FS as at 31/12/2007
    We have use the following period to derive the the reports
    1.) Period 12 (Transactions 1st - 14th Dec 2007)
    2.) Period 14 ( Transactions 15th - 31st Dec 2007)
    Q1.)Should Dec depreciation run on period 14?
    Q2.) If yes, will the depreciation run capture the depreciation from 1st - 31st Dec 2007?
    Q3.) We have tried to run Dec depreciation in period 14 but error "According to the posting cycle, you should post period 012 next."
    Pls advise
    1.) Steps to run Dec 2007 depreciation in order to capture the whole month depreciation.
    2.) Which period to open in OB52.
    Kindly assist as this is urgent. Points will be rewarded. Thank you

    Dear Hari,
    Thank you for the helpful points. Rewarded.
    FYI, our cut off date is 14th Dec 2007. Any transactions after this date will go to period 14. In OB52, we set only period 14 open to block user from posting to other periods. Will this affect the depreciation run (given scenario where we run AFAB for period 12)?
    When we run AFAB for period 12, this is the error we get:
    Period 12 is not allowed
    Message no. F5567
    Diagnosis
    The period entered (12) is different from the period calculated (14) and is also not in the interval for special periods (013 to 016).
    System Response
    Error.
    Procedure
    Correct the value entered for the posting period.
    What shoud we do?

  • Catch up depreciation from past period for PPA write-up

    Hi,
    What is the best practice or solution to catch up depreciation from past period for the PPA (purchase price accounting) write-up?
    We need to write up assets for 2/28/2014 now (August). Once the assets are written up and when the depreciation runs - it will be based on the new NBV. But we will be missing depreciation for the amount which the asset was written up by. How do we catch up with this depreciation?
    We tried running unplanned depreciation, but unplanned depreciation runs for the current NBV.

    HI,
    what do you mean with "We tried running unplanned depreciation, but unplanned depreciation runs for the current NBV. "?
    Regards,
    Markus

  • Post manual/unplanned depreciation in previous period

    Dear Experts,
    I really appreciate for your advices on the following issue.
    I have posted depreciation up to period 9, 2010. However, there's an unplanned depreciation journal that was missed to be posted on period 8, 2010. Therefore, I tried to create the unplanned depreciation journal on period 8, 2010 (t-code ABAA).
    When I tried to execute the depreciation (t-code AFAB) on period 8, 2010 with Repeat, Restart, and Unplanned Posting Run, the depreciation could not be posted. Then I tried to execute the depreciation on period 9, 2010 with Repeat Posting Run and the unplanned depreciation posted through ABAA on period 8, 2010 is posted on period 9, 2010.
    I have an objective to post the the unplanned depreciation on period 8, 2010 instead of period 9, 2010 even though the depreciation has been posted up to period 9, 2010.
    I really appreciate for your advices on how to post unplanned/manual depreciation on previous period or if there is any other work around available for this matter.
    Thank you.
    Best regards,
    Frans Sunarja

    Hi Frans
    You have 3 options
    Option 1 SAP recommended, but too cumbersome
    You can reverse the depreciation posting using ABF1
    refer this thread for more details
    Unable to post depreciation- Error AA730
    Option 2
    Else, pass a manual JV to shift the depreciation from current month to previous month.... You can remove the auto posting tick in FS00 for depreciation for the time being
    The JV shall be Dep a/c Dr and a Balance sheet a/c credit in Previous period AND opposite entry in current period... This balance sheet account shall be clubbed with Accum Dep a/c in your FSV (financial statement version)
    Option 3
    Same as option 2.... Use T code OASV to pass this JV
    Use Accum Dep a/c instead of a balance sheet account... OASV will allow you to pass JV into recon account
    Regards
    Ajay M

  • Asset planned Depreciation by each period (Jan -Dec)

    Dear friends,
    Could some one suggest the Report for List of assets by costcenter with planned depreciation for all periods (Jan-Dec) for forthcoming year, in my example for the yaer 2011.
    Thanks in Advnace,
    Ram

    Hi,
    Check - S_ALR_87012018 - Depreciation and Interest
    Best Regards,
    Madhu

  • Planned Depreciation Reports by period

    Hello SAP Experts,
    Currently we use Asset Explorer (AW01N) to see the planned values for an asset by period before depreciation is run.  We need to make many manual depreciation adjustments and would like to know if there is a report that lists all assets in a company code with the planned depreciation value by period.
    I thought this value is calculated real time (ad-hoc) and is not stored anywhere in a table or no such report exists.
    Does anyone know of a report or a table where I could these values?
    Thanks for your help!
    Jessie

    Hi Jessie,
    Try using S_ALR_87012936 - Depreciation on Capitalized Assets (Depreciation Simulation) .
    There are a couple of standard variants - 1_SAP_1_LINE and /SAP_1_LINE - calculating the planned depreciation for 5 respectively for next 12 periods.
    Hope this helps
    Severina

  • Assignment of FSV with 52 periods in OB37 not possible

    Hello SAP Guru,
    I am having this concern of assigning the Fiscal Year Variant WK with 52 periods thru OB37 to company code 1000 but error
    "More than 16 periods can only be used in the Extended General Ledger" appears.
    The management would like to change the current fiscal year from V3 which is from April to March which holds the 16 posting periods including the 4 special periods into a 52 WorkWeek periods.  The purpose of having the 52 WorkWeek is that the Management wanted to see the Financial Statement in a weekly basis.  And this changes should have take effect on April 1, 2014.  I have successfully created the Fiscal Year Variant WK but when I am about to assign it to CoCode 1000,  such error message appears.  The message says that the periods more than 16 period should be used in an Extended General Ledger.  Can someone please guide me on how to do this or is there a simple way on assigning the new Fiscal Year Variant to a CoCode. 
    Appreciate your immediate feedback as I have to report to management on March 14 that the new Fiscal Year with 52 periods is available in the system.
    Thanks,
    Julie

    Hi Sowmya,
    Thanks for the info.  But how can I use the FSV WK with 52 periods as the management want to start using workweek in generating reports effective April 1, 2014?  Can you help me on this as there are only 2 weeks to report to management that the WK is available in the system.
    I read about the Non Leading Ledger and already assigned the Cocode 1000 and the WK as well to this ledger,  how will this work?
    The objective is for reporting purposes only,  to generate the Financial Statement on a weekly basis as well as the GL posted transaction.
    Please guide me.
    Thanks,
    Julie

  • "lock" values of tax depreciation for previous periods

    Hi all,
    is it possible to lock calculated values of depreciation for previous periods? We need it for the case when e.g. depreciation key is changed. Then we want preserve the values for previous periods and change only the future values. But please note that we want this for depreciation area, which does not post values to GL.
    thanks
    Zbynek

    Hi,
    It did not work for me. I changed the useful life from 30 to 20 yrs and then used menu path Edit/Recalculate values. Then I used the Tx S_ALR_87012936 to display the depreciation values for individual months. But all the values were the same, i.e. the values for previous periods were not kept.
    So is there a way to keep these values?
    thanks,
    Zbynek

  • Depreciation repeat run (period 14) - no areas to post to...

    Hi Experts,
    We have problem -  cannot run Repeat run depreciation (posting to period 14 - audit adjustment)
    We did reverse document for fixed asset, therfore we would like to do Repeat run depreciation.
    However while we run, the error showing<i> "there are no areas to post to in company code xxx"</i>
    Kindly advise. Thank you.

    Hi,
    - simulate AFAB for period 15 (if exists) for the specific asset and see if it has any entries
    - try repeat run for period 14 specifying the asset number in the selection screen
    - check for Posted Values tab in AW01N for the asset in question and see if any yellow triangle is seen or any depreciation planned.
    Rgds.

  • In oneasset class i have created 2 assets by using of aso1 after that i acquired one asset for that i run the depreciation for first 5 periods, it has been showing depreciation for those period but if i am trying to run the depreciation for second asset i

    in on asset class i have created 2 assets by using of aso1 after that i acquired one asset for that i run the depreciation for first 5 periods, it has been showing depreciation for those period but if i am trying to run the depreciation for second asset it is not showing first 5 periods why it is not showing? Is there any reason?

    Hi
    Repeat run you can do only for the last depreciation period. For the asset which you are tryin to post depreciation from July to Jan, please check the asset value date which you have given while posting the transactions or in the asset master.
    If the asset value date is in July, then deprecaition from July - Jan will get posted in the current month depreciation in total. You will not be able to post depreciation individually month wise using AFAB.
    REgards
    Malathi

  • AP aging Report with Aging Period as parameter

    HI all ,
    It's required from me to make AP aging period report with parameters including Aging periods as parameter so that the user will have list of value with the aging periods avaialable & he should choose from them .
    Based on that
    the columns with the period starting & ending periods will be varied (dynamic) up on the period chosen .
    The required is to get the invoice amount under each related column ............ is that possible & if yes please just guide me with the idea as the many ideas that i got is calculating the amounts with the period as statically behavior ...
    Thanks alot

    is there something missing in my requirments

  • Load one text file with 12 periods' data into 12 different periods at once?

    Hi guys,
    In one swoop, can we load one .txt file with 12 periods of data into 12 different periods?
    The scenario:
    Budget data is required for monthly comparative reporting with actuals, so we have 12 periods in our Budget version.
    From a non-SAP system we get one .txt file containing 12 periods worth of budget data,
    - it is in the correct format (and we don't want to create risk by opening and editing it) so it is loaded into each period and the other 11 periods of irrelevant data are obviously ignored.
    Some extra tasks (such as validation, cashflow calculations) are then performed per period.
    Because this has to be repeated 12 times, this can be a time consuming process
    We now have multiperiod monitor functionality (from EHP2) and I see how it works for the automatic tasks (very well).
    I'm aware that the guide says that manual tasks will be ignored during the automatic run, this is true.
    However, if I remember correctly EC-CS used to allow it with upoad files, so i was expecting it in BCS 6.02
    - is there anyway to load a file containing 12 periods worth of data into 12 individual periods in all at once?
    (NB we still have an improvement to the previous situation, the user can scroll between periods more quickly and load the file 12 times, then go back to the start and run all auto tasks at once)..
    One thought was to use a file server location with a hardcoded filename but his would require work beyond my expertise.
    All suggestions welcome

    Hi
    I wil suggest mapping the path based on a common location is the best way and then map the same logically in the Upload method
    If you are using Citrix then it becomes all the more easy to have a commmon location
    Rgds
    Dheeraj

  • Planning Layout -KP66 with dynamic period column

    Dear experts,
    I would like to create a planning layout for cost center/ cost elements in which we have the different periods in the columns .The periods in the columns should dynamically select according to the planning cycle selected in the excel file.
    Planning Cycle                           Start Period                                End Period                Total Months
    JAN                                         JAN                                           JUN                            6
    FEB                                         FEB                                            JUN                            5
    MAR                                       MAR                                            JUN                           4
    According to planning cycle my period column should change dynamically.Please let us know how to create planning layout with dynamic period columns. I donot want to create the planning layout with 12 period columns to upload the data.
    Thanks & Regards
    Kumar

    NOT ANSWERED

  • Dax Calculating Same time previous period with nonstandard periods

    I need help dealing with prior period calculations where the periods are not standard.
    In our business we define these time periods based on 8 to 10 week periods that really have no correlation to standard weeks, months or quarters.  Additionally there may be some time between these periods that are not defined. For example:
    Period 1 (p1) = June 18 - Sept 2
    Period 2 (p2) = Sept 17 - Dec 9
    The length of the periods are variable and when one ends another does not necessarily begin.
    I need to figure out how to compare the sum of a metric in Period 2 with the sum of a metric in Period 1.
    I have a standard Date dimension. And I have a period deminsion with the period labels (p1, p2 etc.) the start date, the end date of the periods, and a column called previousPeriod that has the label of the prior period.
    Each Fact has a Period ID so that I can use period as a dimension.One of my measures is Sum(sales).
    I want it so that if I am viewing the Tabular cube by period, I can have the sum of sales for that period, and the prior one. I hope it is clear what I am trying to do.

    You should add to your Date table a column that contains an incremental number for each period, then write something like:
            CALCULATE
                [Sales],
                ALL
    ( 'Date' ),
                FILTER
                    ALL
    ( 'Date'[IncrementalPeriod] ),
                    'Date'[IncrementalPeriod]
                        =
    EARLIER ( 'Date'[IncrementalPeriod]
    ) - 1
    I suggest you this pattern that will be published on March 31 - it contains many more examples, including how to write the make this formula working also with a partial arbitrary selection of days in the selected period:
    http://www.daxpatterns.com/time-patterns
    Marco Russo http://www.sqlbi.com http://www.powerpivotworkshop.com http://sqlblog.com/blogs/marco_russo

  • Problems with the Period Key

    This may be strange, but when I type a period "." strange thins happen in Mail and Safari! It is as if when typing a period it is like hitting the return key! Forinstance, if I'm typing a web address in on Safari, as soon as I type a period in the address bar, Safari goes and tries to look up the address before I finish.
    Or, in Mail, when I type a period in the body of the message, the cursor moves down a line like I hit the return key. It even happens while I type this message and it ONLY happens with the period key. This is fustrating! Does anyone have ideas as to how to fix this? I have all upgrades installed and my powerbook generally is running great except for this. Help?

    Don't you have the year dim joined with the fact?

Maybe you are looking for

  • Maintenance View & Viewcluster & Check Table

    Hi all, I created a Viewcluster which includes three Maintenance Views. As you know after running the Viewcluster and when you enter a value to a field, the program checks the value according to the check table. In my example for REVUS field check ta

  • Using variable in the Like Search

    Hello, I am having some trouble in writing the query for the below requirement. I have a variable @LineName whose value is 'WEP3' and the datatype is varchar(50). I have a table called CacheStore which has the below columns ID            SearchWord  

  • I have purchased my phone from dubai but live in London and cannot locate FaceTime

    how do I download FaceTime ? I have purchased my iPhone 6 from Dubai and live in London  but can't locate FaceTime anyone know how I can install this ? m

  • DB6 - DB13 collector jobs fail

    Hallo, in the DB13 there are DB-collect-jobs red. CLEANUP.... are scheduled two times (repeating every 2 hours). One of the CLEANUP-collector-jobs is green and okay, the other one is red and canceled. Any idea how to get rid of the dupplets? THX Raym

  • Cant sign in

    every timne i try to sign in it says "you've been signed out, please sign in to continue" so i sign in and it says it again. so i repeat, and repeat, and repeat. please help