Design a network construction project of company

design a network construction project of company
Request:
(1) The company has 1000 set PCs
(2) The company has several sections totally, the different section visits to request to have restriction mutually
(3) The company has the own internal web page and the exterior website
(4) The company has an own OA system
(5) The each pedestal function top Internet in the company
Put forward a network design project according to the request elucidation of above 5s

Hello Steven,
Start with listing constraints and requirements. Divide the network into separate functional areas: internet access, campus LAN, internet Server area, intranet server area.
Then look at the requirements for each area, how many ports, security, IP routing, etc.
Once you did this have a look at the hardware: LAN switches, routers, firewall, WAN router to ISP.
Hope this helps! Please rate all posts.
Regards, Martin

Similar Messages

  • Engineering & Construction Project

    Hi,
    I need to give a presentation to my mangement for SAP Implementation for Engineering and Construction Firm.
    kindly provide me with a template for the same if it is available with anyone plz forwrd me to mail address [email protected]
    Thanks in advance,
    Atul R. Rajmane

    Refer media library in the below link
    https://websmp104.sap-ag.de/eco
    You'll find presenttation on below topics:
    Claim and Change Order Management
    PLM for Contractors / Construction
    Project Development with c-Project
    Shipbuiding Positioning (pdf)
    Shipbuilding Positioning
    Solution Positioning - Construction
    Solution Positioning - Contractors
    Solution Positioning: SAP for EC&O - Homebuilding
    Strategic Project Management with SAP SEM
    Utilizing SAP for EC&O for Engineering and Detail Design
    mySAP PLM Project Management for EC&O - Business View
    Regards
    Sreenivas
    Pls close the post if satisfied.

  • Oracle BPM for Network Management Projects

    Has anybody used Oracle BPM for network management projects with millions of events?
    Can Oracle BPM handle it?

    Please follow this step may this solve your problem.
    please modify any thing in process "ExpenseReporting" for example any transition or any activity to place some where else or any other modification and then save that process. Then clean the project and build and deploy it.
    if this also not solve the problem then export that project to and import it again in your workspace (Create new workspace or change the project name in same workspace ) and then again clean, build and deploy the application then test in work space.
    Thanks,
    Brijesh Kumar Singh

  • What is the best app for construction project management

    what is the best app for construction project management

    Probably best to search for "project management" in the App Store, there are a tonne of Apps in there for this. Check out some of the ratings and reviews then you can make a reasonably informed decision.
    Hope this helps?

  • Design a network for voip over wan

    Hi all,
                I need your valuable suggestions how to design a network of voip using voip.
    Suppose there is a Site A and Site B and you are using different service providers and creating different vlans in each site for voice and data.Lets say it like vlan50 for voice and vlan 51 for data and in the other site vlan 100 for voice and vlan101 for data.How do you give the priority for voice packets while sending in the network and basically please explain the needed hardware that you use for this design (like what are the equipments ,media server gateway,dhcp server,ethernet switch , voip phones etc..).
                                             All genius people out there ,kindly help me with this problem.

    Hi Rajendra,
    Very open query but I will see how much I can give inputs.
    Since you have only two site. you can go for CME instead of full CUCM. If you have slightly more sites you can go for CUCUMBE. Or if you have more number of sites you can go for CUCM.
    Giving priority to voice packets is given by QOS and the configuration example is given in QOS SRND.
    http://www.cisco.com/univercd/cc/td/doc/solution/esm/qossrnd.pdf
    Other details will be given in CUCM SRND.
    http://www.cisco.com/en/US/docs/voice_ip_comm/cucm/srnd/8x/uc8x.html
    You can use sizing tool to see what elase is required.
    http://tools.cisco.com/cucst/faces/login.jsp
    Regards
    Ronak Patel
    Please rate helpful posts by clicking stars below the answer.

  • Thank you for your service.   I was most disappointed to find, however, that the letters I really wanted (Adobe Garamond Alternate Caps) is not in this collection and indeed, one now has to use another fancy designing program to construct those letters. I

    Thank you for your service.
    I was most disappointed to find, however, that the letters I really wanted (Adobe Garamond Alternate Caps) is not in this collection and indeed, one now has to use another fancy designing program to construct those letters. I can’t afford to buy Photoshop just to construct two special capital letters. I’ve used the B and M in my logo for Balquhidder Music for years - but from jpgs - and I was hoping to have more flexibility in the future. I spent $169 to make sure I am in compliance. But I didn’t get anything of use to me.
    I can’t understand why those Alternate Caps are not part of this - or any other package. I thought Adobe was capable of amazing things.
    I assume I am whistling in the dark. So have a nice day.

    Actually, when Adobe moved from Type 1 fonts to OpenType CFF fonts, all the so-called “expert typefaces” were consolidated into the base fonts. In other words Adobe Garamond Pro Regular not only has the Western Latin characters of the original Type 1 version of Adobe Garamond, but also has alternate Latin capitals (with titling, titling floating accents, and stylistic alternates), alternate Latin lowercase (swash and superiors), Latin small capitals (alphabetic and floating accents), ligatures, multiple numeric forms (including lining tabular, lining proportional, oldstyle tabular, oldstyle proportional, superscripts, scientific inferior, numerator, denominator forms, fractions, mathematical operators, etc.) plus a raft of other special symbols.
    OpenType fonts are Unicode-based and allow for more than the 256 characters in Type 1 fonts which required multiple typefaces all with mappings to a standard keyboard to accommodate all these glyphs.
    Thus, hopefully your disappointment will turn to joy.
    To assist you in understanding OpenType fonts and to show you what is in the current Adobe Garamond fonts, I have attached a few PDF files for your perusal.
    Let us know if you have any questions.
               - Dov

  • Material Availability check for Networks and Projects

    Hi,
    How do I get the material availability for a Network or Project. I am currently using fm IBAPI_ALM_ORDER_ATP_CHECK but the result are not satisfying.
    Do let me know if there's another way for it.

    The BAPI that I am using .. internally it uses the FM that you have suggested. The issue is that I want to check ATP for a bulk of materials and using this BAPI slows down the execution.

  • Release strategy for PR generated through  network activity (Project)

    *Hi,
    I am facing the problem that  PR generated through  network activity (Project) does not have release strategy attached. For same combination of characteristics value of  PR document type , account assignment, release strategy strategy is attached for PR created manuelly.
    Please suggest
    Regards.*

    What is the account assignment used in Network generated PR, Have included that in your characteristics? Is PR in Your defined document type?

  • Without IM how can i settle construction project to AUC and asset

    Dear all
    without IM, how can i settle construction project to AUC and asset.
    can someone explain it in details?
    thanks a lot.
    Judy

    thanks for all of your answers.
    i create the investment profile and assgin it to the project profile.
    when i release the project, i see the system status changed from crtd to release and AUC.
    when i do cj88, the costs are settled to the AUC No. automatically.
    could you tell me how the AUC No. is created? where does it configure?
    when AUC is settled to FXA, what are the procedures?
    first TECO the project and then do CJ88, am I correct?
    thanks a lot
    Judy

  • Construction  Project

    Dear All.
    In Construction Process our client is building 4 floor in that the main
    Project is L1 WBS and in the
    2nd level WBS will be  Basement , Floor1  Floor 2 Floor 3 and in
    Each Flat will will be separate WBS 
    My question is How to map Activity carried out in Floor level  EG in Basement, Floor 1 2,3.
    Re grads
    raj

    Hi Raj,
    Ref. below blog to create construction project in ps.
    SAP Project System - A ready Reference ( Part 1 )
    Hope this will be useful to you.
    Regards,
    Sandeep

  • Implement SAP in "Construction & Infrastructure Develop company

    When we supposed to implement SAP in "Construction & Infrastructure Development Company"
    can any one give me which module or how we vl do in sap.

    Hi,
    SAp has a industry specific solution for Engineering, Construction, & Operations, please go thru following links.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/d7/1f4b36ea16571be10000009b38f889/frameset.htm
    http://www.sap.com/industries/eng_construct/index.epx
    Regards,
    Abhee.

  • Need help in design/framework of a project requirements

    Hi there.
    I need some input/design suggestion and/or comments regarding 2 projects that I'm undertaking currently. The project duration is 8 weeks starting now.
    Some background information of the current technology we are using right now. We are using weblogic 7.0 SP2 and our database is ms sqlserver 2000 and/or mysql. The persistance layer/framework we are using is a home grown JDBC framework. We are using only stateless session beans and our client which is a swing ui access the servers side thru webservices via a session facade. We use also Transfer objects on the client and our own DataObjects on the server side. Current consideration is that we can not upgrade to the current weblogic version at this time and can only use java 1.4 and use existing persistence framework we have. I've considered using Spring/Hibernate but it will involve major refactoring on our existing system, which we can not afford right now. But we can augment or add new framework to handle this 2 projects.
    1. The first project is a mass update/creation of orders and order items. In our system the update and creation of order and order items are complicated and perform several validations (e.g. vendor/client is valid; item are valid and have enough to on-hand, etc.) and lookups before we can create/update an order and it's order items. We estimated that process to be around 1.5 - 3.0 secs and typically we will be processing between a few hundreds to about 5000. The max ceiling we put is 10,000.
    Now the requirements are:
    a. Ensure that the process will be completed and in the event of failure (physical or network or power) and recovery to start where it failed and start processing from that point of failure.
    b. The transaction should be atomic on per order basis and not on whole process - meaning we will commit all changes for an order and start a new transaction on the next order. This will ensure that we have a complete order committed.
    c. Don't tie the client from this process and when the process is finished give a feedback to the client who invoke the process.
    2. The second project is related to the first, is that before they post the process above, the user will look at the set of data and do some editing and then post the data. So this project is on the UI side and would present the user a table/grid view of the data and since data set could be large, we want our swing ui to fetch only a set of rows/data so that it does not take so long to load all the data or run out of memory. A button or by the user scrolling on the scrollbar would fetch the next succeeding rows/data. The problem we have as stated on the first paragraph is these- we are using webservices and stateless session beans and there is no way that the server can recognized who the user is when that user request the next set of row/data set without querying the database again.
    So your input and help is very much appreciated and if you know an existing framework that would help me is most welcome.
    Have a blessed day.
    Jun Victorio

    Take the statistics of the tables and check again.
    begin
    DBMS_STATS.gather_table_stats(ownname=>'syslog',tabname=>'logs');
    end;
    Regards
    Asif Kabir

  • Designing a network model

    Hi,
    Let me start saying that im pretty newbie still considering networking. I have studied CCNA and CCNP in my school and am now working on my final work which is to design a basic network model that can be applied into small to medium sized companies.
    The network core devices are a Cisco Catalyst 3550 Switch and a Cisco PIX 515E (7.0) The C3550 will handle the traffic inside the network and connection outwards will go trough PIX Firewall.
    In the work im going to divide the ports in the switch to 3 different VLANs that will be for the assumed different departments of the company. (production,offices,administration/servers etc more added if needed)
    Im making Access-lists for every VLAN and I am wondering should I only use these ACLs to set what kind of traffic goes between the VLANs in the companys inside network and let PIX handle the traffic that enters and leaves the network? Should i have an ACL in the switch already preventing somekind of traffic going forward to the PIX?
    I have found it abit hard building access-lists for both inbound and outbound VLAN traffic as i feel i have to open alot of ports to get the most basic traffic flowing without problem in the inside network.(Programs using ports > 1024 in the return traffic getting blocked in the return packets, unless i open alot of those larger port numbers)
    Should i just limit what traffic can exit a VLAN and leave the rest of traffic flow inspection for PIX to handle? Will this provide enough security to the network provided the end stations have proper software protection and the switch is secured to prevent adding of unwanted networking devices. Im kind of unsure of the PIX device itself as my studies never crossed path with it so never got to use it before this point.
    Any views on how to handle the security in different points of the network would be greatly appriciated.
    - Jouni Forss

    Thanks for the fast reply,
    As we havent gone indepth with securing a network in our studies I feel the need to find as much info on the best practices to secure a network. All our studies have given a pretty narrow look into the ways to do that.
    Im pretty sure i will go with applying outbound traffic ACLs to each VLAN and after the switch has been secured will move onto configuring the PIX.
    Basicly the main idea is to have all the different departments connect to the server
    VLAN for resources. Only the office and admin/server VLAN will have connection to outside world. This is ofcourse just a basic idea to start building the configuration on and the ACLs would probably change depending on the real life application situation.
    Also one point was to build a possibility for VPN connections to the server VLAN from outside world which is another thing i need to get into after the switch. These connection would be coming from perhaps home office or such places with DSL connection to perform some remote management on the servers and such.
    The customers using this type of network model would be mostly behind slow connections and there wouldnt be any high load traffic going out or inside the network. (DSL etc connections)
    By reading info on the PIX i presume that in this situation it would be best to use it in Transparent mode between the C3550 and the DSL modem in question. Or maybe use PIX in routed mode and configure the outside interface to get its IP address with DHCP from the DSL modem? Or maybe some static configuration would be better there.
    One thing i would like to know about the PIX is that does it have some basic settings that would make it possible to basicly insert it to the network and it would provide some basic protection already? I guess if theres some good base that i could start building the configuration suited for the network in question.
    I find myself lacking alot of basic information concerning Firewalls/PIX even though it should be really essential in my studies. Thats why i would like to know how much does PIX ability to keep the network secured depend on the the right type of configuration or does it perform most of its measures to intercept harmfull traffic automatically with some built in methods? (Not really sure on my choice of words)
    I guess at this point i would really appriciate any tips that any of you expirienced PIX users could give me to set me on way configuring my firewall to provide sufficient protection for the network.
    - Jouni Forss

  • InfoPath Designer 2013 - Network Path was not found

    Hey,
    I am currently building an InfoPath form (Designer 2013) for a SharePoint Library.
    I am opening and editing the form in 'advanced settings' of the Library.
    From here I can work through some changes and quick publish with no problems.
    At an indeterminable point, my quick publish stops working and says "network path not found". I don't believe its a connectivity issue as it persists.
    I can publish the form to a new library, but then cannot update the new form with another publish as I meet the same error message.
    Does anyone have a similar experience? Am I corrupting the file by messing around with conditional formats etc?
    thanks

    Hi  shanekny,
    According to your description, my understanding is that you cannot republish your  form for updating and receive the error “network
    path not found”. For troubleshooting, please take steps as below:
    How about the library in other site collection? If not , it may be caused by the InfoPath Site Features.
    This is a hidden feature in all site collections and can only be viewed through PowerShell. We can disable and re-enable this feature by using following PowerShell script:
    PS C:\> Disable-SPFeature "IPFSSiteFeatures" -url "http://Server/Sites/SiteCollection"
    PS C:\> Enable-SPFeature "IPFSSiteFeatures" -url "http://Server/Sites/SiteCollection"
    If so, you can refer to the articles:
    http://knowledge.seagate.com/articles/en_US/FAQ/189931en
    In order to solve the problem more efficiently ,could you please check ULS log to find more details about the error?
    Please inform me freely if you have any questions.
    Thanks
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Network infrastructure projects.

    I don't know whether it is appropriate to post in this forum
    Neither i'm a computer nor telecommunication network savy.. before consulting different company marketing executive, i would like to have a glimpse of required latest technology and infrastuctrure in connectivity..
    Here is my point.. A few hundred miles from my province there is international underwater cable landing station.. there is  to a proposed project to connect this landing station with ofc and create regional NOC which will be able to upgrade into future internet exchange and IIG.
         With cisco system what will be the most appropriate require machines and equipments (Router, Switch, firewall etc..) to establish regional core network infrastucture under 1gbps connectivity... i'll be very glad if i could get comment with picuture diagram... thanks..

    Pls contact the respective Cisco AM or your Cisco PAM . They will be more than glad to assist you .
    Thanks.
    Unni

Maybe you are looking for

  • Deploy problem on JDI due to DC that cannot be deleted

    I have a DC that is listed in a Development Compartment that fails to deploy. In fact, this DC a=is dead wood and I would like to remove (delete) it althogether except it doesn't appear in my NWD Development Configuration Perspective and in the DTR p

  • Why can't we call procedure in sql stmt

    Hi, Why can't we call procedure in sql stmt?

  • Show new rows in DataGrid

    Hi. I have dataGrid where i insert rows. For this reason i use this code: public void createLOADetails() OAViewObject vo = (OAViewObject)getLOADetailsVO1(); if (!vo.isPreparedForExecution()) vo.executeQuery(); Row r = vo.createRow(); //вставляем пуст

  • SUIM RSUSR010 does not return completed list of t-code.

    All, I have a problem using SUIM. 1. running for Transactions -> Executable fro role (RSUSR10) The result does not match the list of S_TCODE of PFCG.  I checked the OSS note and applied 1283691.  After that, the result got worse as the result is even

  • My new iMac cannot detect my canon scanner

    I just got a new iMac with the latest Mountain Lion update however, when I tried to install my CanoScan 8800f it cannot be dected in the USB. But when I tried to connect it to my old computer and used scanner sharing, it works well. I tried isolating