Design Diagram in Material Master

Please can any body tell me where we assign the diagram of material designed by design dept in material master....
Thanks
Ramki

Hi Ramki,
Go to MM02 Transaction and select one view in the left side corner services for object icon is there. In that icon u select the create tab and attach ur material foto and drawing. u can see in ur drawing in attachment list.
Regards,
Venkatesh,
MM consultant

Similar Messages

  • Use of field "design documents assigned" in material master

    hi,
    kindly help me to use the field "design documents assigned" in material master. whenever i creat material master (MM01) in basic data2 view this field comes with grey/black No Link indicator. how to use this and for what .
    regards
    roshan s.

    Hi Roshan,
    Insted of using this field u can assign Document directly to the Additional Data tab.
    TO attach the document to Material Master go to Additional data ---> Document data, assign Document.
    You can confirm it by pressing F1 key by selecting that Field.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Jul 10, 2008 3:26 PM

  • View document in material master, Basic data 2 screen?

    Hello gurus,
    How to view a DIR assigned to material master - basic data 2?
    According to help.sap.com:
    Additional Function for Material Master Record:
    In Customizing for the Material Master, you can define a standard document type by choosing Make Global Settings.
    -  Done this: assigned document type needed, created a DIR with that type and assigned it to a given material
    Documents of this standard document type are displayed in the material master record, in the Basic data 2 view (Extras ® Document data).
    - Information of the DIR can be seen in the main screen, no path Extras --> Document data (I know DIRs are shown behind menu path Additional data --> Documents)
    You can display the original application files of a document (for example, an engineering/design drawing) directly from the object (for example, material) using a display application (viewer).
    PROBLEM starts here: no icon or button to click in order to view the document although the help states so.
    Any idea what should be done? Should I install a software of some sort to view? Assign it somehow with SAP? The document type here is doc (MS Word), so nothing special.
    Any advice is highly appreciated.
    BR,
    Pipsa

    Hello Sam,
    Sorry, I think I described the problem inaccurately.
    I could see the document already but for that I must follow the path Additional data --> Document data.
    My core question was: Is there a means to allow a user to display the document directly in the screen Basic data 2 since system creates a new subscreen called Design documents assigned anyway?
    It seems that the design documents assigned is for information purposes only. It would have been far better with usability to have the display icon in the main data.
    BR,
    Pipsa

  • Material Master MATMAS IDOC and base unit of measurement

    Hi
    We are using SAP standard material master IDOC type MATMAS05 to trigger IDOC. Our material master is having base unit of measure as "G". We are not using ISO unit of measurement. But Material master IDOC, segment E1MARM is populating base unit of meaurement (MEINS) as "GRM".
    Any idea why IDOC is picking ISO unit of measurement instead of material master base unit of measurement.
    Any idea how to send base unit of measurememt as "G" instead of "GRM" in DOC segment.
    Thanks
    Nilesh

    There are ISO codes for country keys, currency keys, units of measure and shipping instructions. According to SAP design guidelines, you should use ISO codes for an IDoc if they are available. When you set up the IDoc, the SAP codes have to be replaced by ISO codes.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDALEPRO/BCMIDALEPRO.pdf

  • Updation of Material Master Views

    Dear All,
    I am facing a design problem in creation of Material Master.
    A certain user group creates X,Y,Z views in MM01 , MM02 but the other views data which would be of relevance to other users needs to be updated based on certain conditions like Material Type etc.
    Eg : PLM user making Basic Data view .
           FI views and Sales View to be created automatically for other users.
    The issue is this <b>updation of data in other views</b> which is of two categories :
    i) if material type = 'abc'.
          MRP profile = 'fgh'.
    ii) if material type = literature.
       then plants = '1111', '2222' , '3333' etc....
    Regarding i):-
    This data can being updated in a user exit , eg '<b>MGA00001</b>'  called in MM01.
    But it <b>doesnot allow to change any other structure other than WMARA</b> where as we need to update data for WMARC, WMBEW, WMVKE etc.
    Regarding ii) :-
    How can I create material on <b>many plants while the material is under creation in MM01</b> ?
    How can i) and ii) be cracked ?
    Pls give solutions asap .
    Rewards are sure for helpful answers!!
    Regards,
    Shweta

    >
    zkarnalkar wrote:
    > Hi,
    >  I have a requirement, insted of user authorization conept, we wanrt that the user can view only the assign views of material master to that view
    >
    > e.g  if user is ABC, this user whenever display or chnage matetial master he can only view the screen of basic data nad purchasing,  and if user XYZ login with MM02 or MM03  he can only view the Basic data, work scheduling and accounting view not the remaning can we control this with customizing,  also   How we can  find alll the authorization obejct releated to material master screen,  or related to one transaction.
    >
    > regards,
    >  zafar
    To know the authorization objects of material master screen, check the following link on my blog
    http://aroopsnotepad.wordpress.com/2010/09/09/material-master-authorization/
    To find all authorization objects for a transaction, you can try SU22.
    Hope this helps.
    Regards,
    Aroop

  • Mass update of huge list of Material master records

    Hi dudes,
    I want to update 1 field for the huge list of  material master record, i.e., statistics field in sales org 2 tab.
    please help
    regards,
    madhav

    SAP has designed its system to use the standard transaction way to update any fields, no direct table update should be made.
    I have seen so many direct table updates in my career, and what do you think why I have get knowledge about that?
    Because it was done incorrectly.
    There are that many dependcies in SAP, you never really know them all.
    People changed (or deleted entries) in one table, but forgot the update in a second dependend table.
    You should be a very experience consultant before you may consider direct table updates, and when you became an experience consultant, then you know that you will not do that.

  • Hide foreign trade view in material master

    Hi all,
    Can anyone tell me how may one hide the foreign trade Views (both export & import) within the material master Data?
    Usually the material views for selection are managed Through the material type customization; however I cannot Find these views within the optional views for the material Types.
    I also searched within the foreign trade customization and could not found where it can be managed.
    Thanks a lot for your help,
    Regards
    Ronny

    Hi,
    To restrict the views you have to follow the above explained process. If you want make specific field in material master , you can use following process
    1.Just click the tab ,(Which is u want to be Required entry or Hide )and get the field name
    2.Go to T.Code: OMSR and enter that field name and get Selection Group
    3.1. Use t.Code: OMS2 and click your material type and in next screen check Field reference ( you have assigned for material type){{ ( example :;For ROH material type  the Field reference is ROH)
    3.2. use T.code:OMS9,, Double Click your Field Reference and select field selection Group & select round box of  Required Entry  or hide  as u required and save.
    NOTE
    If you want go for new material type creation, you can design your material views and all steps following with t.codes are
    OMSL,OMS3,OMS9,OMS2,OMT3B,OMT3R,OMT3E,OMSA,OMSF,OME4,OMSR,MMNR
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Apr 16, 2008 1:52 PM

  • Using the APD to update material master in CRM

    Does anybody know if it is possible to update material master records in CRM from BW using the Analyses Process Designer with target CRM?
    I would prefer to know this before creating a custom data target adapter in the CRM SPRO, writing all the required function modules and then finding out that it does not work.
    Thanks,
    József.

    Which direction??
    Inbound/Outbound
    Inbound : IDOC_INPUT_MATMAS01

  • Not able to change UOM in material master for a material

    Hi all ,
    I have a issue with changing of the UOM in the material master , IN MMO2  after changing the UOM , in Display error , its showing the error as : The base unit of
                                         The reasons for
                                         Manual  reservation
                                         Reserv.No   , Item - No data
                                         Purchase order  - 30017056  , Item 1 - 1
    There is no stock in the previous as well as current period , and deleted the PR , still i am not able to change
    Please help urgently
    Thanks in Advance
    Neha

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

  • Material master extension for a particular material

    hi everyone,
    i got a requirement to add a customized screen for a particular material, i designed the screen and added that by going into spro. the screen is viewable now but for all materials. so could anyone tell me how to make it visible only for a particular material type.
    Thanks heaps
    Surya

    Hi mate
    double click the material type in T.code oms2 and higlight the view in user department so it will be displayed in the material master creation,if not deselect the item so it wont be available in MM01 .
    Hope this helps
    cheers
    Chellam

  • Not able to transfer changes in material master (periodic)

    Hi Friends,
    Got an issue here. I am not able to transfer the changes I made in material master. I want this as periodic, Made the specific setting in CFC9. And for your information 'Activate ALE Change Pointers Generally' and for massege type are activated.
    But when I execute CFP1 I got massege: 'No appropriate master data changes: Transfer has not happen'.
    I made changes in material master (global level),..like gross weight changed. Material is in active IM, no duplication.
    Any help Please? We are on SCM 7.0.
    Thanks,
    Satyajit
    Edited by: Satyajit Patra on Mar 20, 2010 9:12 PM
    OK, Guys I think I need to raise an OOS... It was for SCM 7.0, but was basic config....thts why I edited the thread so many times expecting some responce.
    Edited by: Satyajit Patra on Mar 22, 2010 7:41 AM

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

  • Material master codification & inventory mgmt- construction industry

    Hi,
    I am designing the process for a client in the construction industry. The implementation will include integration with PS module. The client is working on different projects and the materials requirement for each project differ from the other.
    Example:
    Though i may have pipe at a broad level, the requirement of pipes is based on the diameter of pipes and this would ideally form multiple material codes.
    I want to know, if any of you have come across such a scenario where creation of material master to the lowest level of specification will be very tedious. And also the same material specification may not be used in more than a project.
    But at the same time, the client wants to track his inventory based on the specifications of pump received and issued / consumed.
    thanks

    hi,
    would appreciate any help on this.
    thanks

  • Organization Level screen on Material Master

    Hi experts,
    I am trying to use User Exit or BADI which runs Organization Level screen on Material Master.
    However, I don't know which one I should use...
    Could someone help me to tell me the User Exit or BADI that I'm searching for?
    Sally
    Edited by: Sally10 on Jan 21, 2011 8:21 AM

    This problem is caused by the program design.
    In the R/3 System the low-level code is only ever increased and never reduced when the product structure is changed.
    The low-level code is not reduced for reasons of performance and is thus greater than absolutely necessary. The larger low-level code does not disrupt the MRP however, that is, the material can be planned correctly.
    please read OSS  Note 494236 - Low-level code not reduced
    for more  detailed info

  • Work Flow Trigering based on Material Master change

    Dear All
    Any suggestion to trigger a work flow when the procuremnt key in the material master is changed.
    We are facing the problem of not informing all the relavent parties when the planner changes the <b>procurement key from F to E or vice versa</b>.
    Also the spec. <b>procurement key changed to 30, 50 etc.,</b>
    Because the information is not flown to other relevant sections, the whole master data in in a mess and MRP proposals are greatly affected.
    On top of that MRP proposal are not used because of this.
    Please reply
    Thanks

    Hi Raj,
    have you looked in the event trace, when this change has been made? It should give you a CHANGED event, that you can start your workflow on. TX for start event trace is SWELS and look into the trace is SWEL.
    When you design your workflow enter a start condition, only to react on a change to the procurement key.
    I think there is an example almost identical to this in the BIT601 material.
    Kind regards
    Mikkel

  • Create Material Master using workflow (urgent)

    Hello all,
    We have an urgent client requirement to create material master using workflow.
    Different views for the material master will be created by the relevant departments.
    ex: Accouting 1, 2 will go to accounts deptt.
    I have studied the workflow tutorial  (20 units) on <b>SAP help</b> for leave of absence and have some understanding of objects, methods, bindings etc
    I am however finding it very difficult to define the steps to create a workflow for material master. Are there any standard steps already defined that i can use.
    Any help/inputs will be greatly appreciated.
    Regards
    S. Datar

    Hi,
    You need to speak to a workflow consultant.
    You can get workflow to do many things (including creating a material master) but it takes a lot of coding and design.
    For those of you who think that workflow is just used for the standard SAP workflow tasks, you have to realise that workflow is far more powerful and far more useful than many people think.
    It is always referred to as "Event triggered messaging" but it is more accurate to call it "Event triggered events".
    Within workflow you can chain together many different transactions and or ABAPS and so you can get it to do virtually anything you want (as long as you know how).
    In this case you need the workflow to trigger an ABAP or BTCI session etc. that works through the MM01 transaction. It is relatively easy to get it to do this, but I am not technical enough to be able to help with the steps involved (sorry)
    Steve B

Maybe you are looking for