Design thoughts: Replacing a L2 aggregation switch

Hi,
I have purchased a 4507R switch to replace a 2924M-XL switch that acts as an aggregation switch in our network. Let me explain further what I plan to do.
I have 20 remote sites connected point to point via 100 Mbps dark fibre to the 2924M-XL. Most of the sites have only a handful of users but 5 of them are bigger (ie. 20-70 users). Some of the larger remote sites (small campuses really) have 2-5 switches in a star topology with the "hub" switch connecting back to the 2924M-XL. Each site has 1 or 2 user VLANs and a management VLAN. The 2924M-XL trunks all VLANs back to a 6513 at the core of our network.
I will be connecting the 4507R along 2 seperate dark fibre runs (for layer 1 redundancy) to 2 6513s in our core. This will give us fault-tolerence should our primary 6513 fail.
My problem is I'm struggling with the decision to go layer 2 or layer 3 between the 4507R and the 6513s. Layer 2 would be alot easier to implement and support (I'm the sole administrator of this rather large network) but then I'd have RSTP to deal with among the 2 6513s and 4507. I'm comfortable with RSTP since I run it between 2950G switches dual connected to the 6513s but my gut feeling is that I should be putting in layer 3 between the 6513s and the 4507.
We will be implementing VoIP is the next 2 years and I'm unsure how that affects my decision.
One last comment. Would layer 2 trunking of VLANs from the 4507 to the 6513s WITHOUT trunking these VLANs between the 6513s be a viable optionand would HSRP between the 2 6513s still work OK for layer 3 redundany? The remotes sites are setup with unique user VLANs but there is a special use VLAN that spans 4 of the sites and my manegement VLAN spans all the sites (I'm planning to change this).
Thanks everyone for your thought/opinions.
Ian.

Hi there Ian,
I'm a big fan of routing over switching, which I read is becoming Cisco's recommended way of doing things.
I would route between the 2 x 6513's and the 4507 as it will not only give you fault tolerance, but also load balancing, plus cutting down on broadcast domains and all those other nice things.
As far as configuration goes, onec you've got it up and running, then it'll just keep running. It seems like you will only need straight forward routing here and nothing too complex. Setting it up would be a simple affair.
VoIP, in my experience, is much better implemented over a routed network than a switched one. There are loads more things that you can do at layer 3 than you can at layer 2. Think about all the QoS that you'll be able to implement, with shaping and policing, etc. Much more security can be built in at layer 3 too. You'll get the likes of NBAR and all other features that you'll be able to (over time) tweak you network with.
As for performance, you'll never spot a difference. The 4507 will be lots faster than the 2924 and using cef, the 4507 will keep a forwarding table for ip's the same way a 2900 keeps a mac table.
You will not regret routing it.
Hope this helps - if so, please give it a rating.
LH

Similar Messages

  • Replacing high density port switch/blade strategy

    Hello,
    I'm looking for strategies in replacing 48 port blades/switches while minimizing downtime. Our management wants to know how long it would take to replace a switch and re-cable it. So I'm trying to find some best practices on replacing switches/blades and how to maintain cable to port integrity when moving between switches/blades. The only thing I've really found comes from data center infrastructure, where they stress the importance of labelling cables.
    I was wondering if anyone else had other strategies they use when replacing high density port switches/blades
    Thanks in advance

    patrickpaez wrote: Leo,Thanks for the response. What about places where your rack or chasis is full and you have to remove the exsisting chasis or blade inorder to add the replacement equipement?
    Label, Label, Label.
    I can't stress it enough, especially if you're trying to do a "mirror" replacement and have everything working exactly the same as it was before. Don't rely on memory, don't rely on out-of-date documentation - label every cable
    If you're talking physical switches, then configure them FIRST to match your existing configuration (VLAN's, SVI's, Trunks etc etc), then label *every* cable plugged into your existing switch, pull the old one out, mount the new one, then put your cables back into place based on the labels.
    If you're talking blades, the process is about the same except you *shouldn't* have to worry about configuring first - if you're doing a slot-for-slot replacement, the port designations should remain the same, and your existing config should just take effect on reboot.
    If it's an additional module in an empty slot, just plug the module in, duplicate the configuration from the existing module, and move your cables one-by-one to matching ports on the new blade.
    Cheers
    Trap for new players in blade/modular environments - make DAMN sure the IOS version you're running actually supports the module you're installing - or you're going to end up in a mess!

  • Can I set port forwarding to replace my D-Link switch?

    I want to replace the D-link switch with Airport express, but I am wondering if I can set port forwarding on the Airport express? If yes, how many entries can I set?

    Is the AX connected via Ethernet to the internet AND is the AX configured to "share as single IP address"? If not, all ports are already forwarded directly through the AX and the port mapping option is not available.
    From Page 54 of Apple's "Designing AirPort Network" (direct PDF download link).

  • What are the major differences between a Access Switch and Aggregation Switch w.r.t Carrier Ethernet domain?

    In a Carrier Ethernet domain,Could someone please help me understand what's the basic difference between Access Switch and Aggregation Switch both in terms of s/w and h/w functionalities. MEF deals OAM,CFM, EVC provisioning only at the access edge switches. Do we need to repeat all these at the aggregation level? or  is it just used for routing purpose? Do we have a separate Fault Management at the aggregation level?

    Duplicate posts.  :P
    Go here:  https://supportforums.cisco.com/discussion/12137156/what-are-major-differences-between-access-switch-and-aggregation-switch-wrt

  • I have CS6 Design & Web Premium, would like to switch from PC to Mac. Can I do this for free?

    I have CS6 Design & Web Premium, would like to switch from PC to Mac. Does anyone know if it's possible to do this for free? I have no interest in upgrading to CC.

    Order an Adobe product platform swap or language swap
    Mylenium

  • 6504E Aggregation Switch (VS-C6504E-S720-10G)

    Hi,
    I am in the process of understanding the 6504E in terms of technically feasible option as a Provider Class Aggregation Switch. (specifically looking at VS-C6504E-S720-10G, which is bundled option)
    This 6504E switch will aggregate our Provider Edge (PE) routers and then connect to Core routers via uplink ports. Multiple PE routers (each via 1G port) would be aggregated to 6504E. The aggregation switch would then connect to core routers via 10G uplink port.
    While short listing the aggregation switch, I come across VS-C6504E-S720-10G which has Catalyst Chassis + Fan Tray+Sup720-10G; IP Base ONLY; NO VSS. Though this looks a better choice for provider class switch .But, I am still not clear if this bundle option can support all the below requirements.
    1. Multiple 1Gig/10Gig for Access/Uplink on aggregation - this is supported.
    2. OIR feature for line card , modules, power supply - this is supported.
    Not sure if VS-C6504E-S720-10G support all the below mandatory requirement
    3. Traffic from PE will be MPLS labelled or non-MPLS labelled traffic so Aggregation Switch must have capable to look MPLS header ( i.e Lable, MPLS EXP bit) and IP header ( dscp, src SA, dst SA etc) when configured as Layer 2 port facing to PE - Not sure if VS-C6504E-S720-10G can support it.
    4. Aggregation switch should support link aggregation for N*10G uplink to Core router with various load-balancing method like MPLS label based, src-IP, dst-IP, src-dst-IP, hashing of layer 3 and layer 4 info , L2 S-mac & d-mac etc - - Not sure if VS-C6504E-S720-10G can support it.
    5. QOS on L2 switches for strict priority queue, WRR/SRR Queue to support policing and shaping with WRED with miinimum 8 egress queue per port.
    6. QoS classification based on 802.1P, MPLS EXP, IP DSCP on layer 2 ports for MPLS and non MPLS traffic.
    7. Multicast - IGMP V1/V2/V3, IGMP Snooping, PIM snooping.

    Pradeep,
    This is a loaded question. I would suggest you get in touch with the system engineer assigned to your company in order for him to run through all these requirements and validate that this piece of equipment meets them all.
    Regards

  • Does ios 7.1 contain a carrier update for Meteor in Ireland? I haven't taken the latest update as I don't want to lose my 3G on/off button (which will be replaced with a 4G switch).

    Does ios 7.1 contain a carrier update for Meteor in Ireland? I haven't taken the latest update as I don't want to lose my 3G on/off button (which will be replaced with a 4G switch).

    Yes, I know... I discovered now that I have saved the photos I wanted from it long time ago (for the same reasons, i didn't wanted to lose them). So I'm kind of saved. Also it has been like crap because the laptop where I had my backups is as dead as can be. That was the moment when I panicked. From now on... I'll back-up it everyday. Thank you a lot!

  • I recently had my iPhone 5c screen replaced. When I switch the phone on all I can see is a dark blue/navy backlight on the screen. The phone powers on although I can't see the apple logo. I can ring the phone a bad Siri is fully functional.

    I recently had my iPhone 5c screen replaced. When I switch the phone on all I can see is a dark blue/navy backlight on the screen. The phone powers on although I can't see the apple logo. I can ring the phone a bad Siri is fully functional. 
    I Have tried to soft rest it but it does not work.
    can anybody help?

    Belly114 wrote:
    Unfortunately because you have violated the warranty - it will cost £216.44. See https://www.apple.com/uk/support/iphone/repair/screen-damage/
    Unfortunately, since an unauthorized party opened it, Apple won't have anything to do with it at all. It's not eligible for an out of warranty replacement.

  • An "openbox --replace" xmonad equivalent, to switch wm w/o logout?

    been searching for a while, man page seemed unhelpful.
    if you're in pretty much any wm, u can do "openbox --replace" and you'll switch window manager to openbox, without closing any of your running apps,
    i'd like to be able to do the same to get back to xmonad...
    anyone know how?
    ~edit
    oh, looks like i need to work on this issue a little more.
    openbox --replace starts openbox, but doesnt actually make it active, and keeps xmonad running.
    .... back to the drawing board.
    Last edited by Digit (2010-10-21 17:31:49)

    FYI: http://hackage.haskell.org/packages/arc … place.html

  • Want to repair/replace 8 port unmanaged switch SD208T.

    Want to repair/replace 8 port unmanaged switch SD208T. material lying with us. where to send the same??
    Sonason Marketing & Services
    [email protected]
    09826024188 (India)

    Hello,
    Give us a call at the SBSC and we can check the warranty and possibly assist with getting a replacement.
    Cisco Small Business Support Center Contact Numbers
    Thank you for choosing Cisco,
    Christopher Ebert - Network Support Engineer
    Cisco Small Business Support Center
    *please rate helpful posts*

  • TestStand Design Search/Replace Functionality

    We are in the process of changing from using Measurement Studio/Visual Basic to using TestStand as the test executor. (We are just learning to use TestStand and LabView.)
    Currently, all testing is done using VB as the low level calls, and VB scripting for the test automation.
    Our plan is to start by putting the VB low level code into an Active-X DLL and as time permits, move the low level code to LabView.
    The question is, as we create replacement functions using LabView, how do we Replace the Active-X DLL calls with the LabView functions?
    My first thought was to use "Search and Replace" (as there is in most other language enviornments) but I can't find such a function in TestStand. IS THERE A WAY TO DO THIS?
    M
    y other thought is to somehow create a subsequence for EACH library call that points to a single block for that function, where that single block can be changed from the Active-X DLL call to a LabView call.
    Examples would be that we have a Read/Write Parameter function as:
    ReturnStatus=DLL_Parameter(Name,Instance,Value,Mode)
    We would eventually create a new function in Labview and would want to replace ALL instances of the DLL call with a similar LabView function.
    How do we design this in?
    Mikef

    Unfortunately a search/replace feature has only been introduced in the new TestStand V3.0. It allows for searching and some replacing of values, properties, etc. however this may not help what you are describing.
    It is possible to write you own custom search/replace code that uses the TestStand API and can scan through a sequence file for particular step names or types and then insert a new LabView Step and remove the old DLL call step.
    If you need to keep the DLL parameters you can access them using the Step.TS.SData cluster. (You may need to set the �Show Hidden Properties� in the Station Options to see this in the Sequence Editor).
    Check out the TestStand API Reference and some of the Examples included in TestStand on how to use it.
    Hope this helps
    Simon Holman
    Simon Holman
    Software Engineer
    Certified LabVIEW Developer
    Certified TestStand Developer
    measX GmbH & Co. KG.
    http://www.measx.com

  • Replacing 2 3750 Core switches

    We have 2 3750 switches in a stack and need to replace both of them. Has anyone done this before? What would be the best way to get the config so that it matches both switches? Should I replace one at a time? I know one will be designated a master, anything to consider on that? Any help would be great.

    Probably the best way is to pre-configure the new switches and then link them to the existing network. This can be done via 100Mb crossover if needed as it will be a temporary situation.
    After this link is established you may start plugging the PC's and server over to the new switches. As a last step you can then remove the old switches. The operation might be a bit more difficult if there is insufficient rack space but that is always a matter of improvisation. Good luck!
    Regards,
    Leo

  • How do I change the phone number associated with my iCloud account after replacing my phone and switching carriers/getting a new phone number?

    I recently replaced my lost iPhone but in the process, had to switch carriers and activate a new phone number. I backed the new phone up from iCloud which was still attached to the old number (for example, when I attempt to sync Keychains, the security code continues to be sent to the old number). I'm looking to update my iCloud account with the new phone number so I can sync my devices and any I might get in the future. Help! Please!
    Thanks

    Do you not set the phone number within Apple ID
    https://appleid.apple.com
    and not iCloud?
    May be wrong here:(

  • Design View Replacement Found

    If like me you want to develop Flex applications with a Design View so you can actually see what you're doing as you code, check out IntelliJ and the Flash Designer UI plugin. It supports Flex 4.8+ and features a design view that runs in an AIR application. For me this is better than Flash Builder's previous design view since it now means I can code on one monitor and see the changes (in real-time too!!) in the design view app on my other monitor - essentially reducing development time.

    We haven't yet made the switch since we have no plans to use the new SDKs just yet. However today I found a way to enable Design View with the new SDKs, fully operational in Flash Builder 4.6. I had to remove the new SDKs from Flash Builder first, then edit the flex-sdk-description.xml file located in the SDK folder, changing the "version" value to "4.6.0". Then I re-added the SDK into Flash Builder and changed my existing project to the new SDK, and hey I had a fully operational Design View. I tried this with Flex SDK 4.9 and it works great. Worth a try if you want to be able to design applications using the latest SDKs.

  • Design help related to ACE to Switch connectivity using Port-Channel

    Hi,
    I have a Cisco ACE 4710 configured in One-Arm mode. This ACE is getting connected with 2 3750 switches. These 2 3750 switches connected in trunk mode.
    ACE is connected to these 3750 switches using Port-channel.
    ACE Config:
    ================================
    interface gigabitEthernet 1/1
      description One-arm mode port to DMZ Switch 1 port 20
      channel-group 1
      no shutdown
    interface gigabitEthernet 1/2
      description One-arm mode port to DMZ Switch 2 port 20
      channel-group 1
      no shutdown
    interface port-channel 1
      switchport access vlan 51
      port-channel load-balance src-dst-ip
      no shutdown
    interface vlan 51
      ip address 10.40.56.131 255.255.255.128
      access-group input everyone
      access-group output everyone
      nat-pool 1 10.40.56.215 10.40.56.215 netmask 255.255.255.255 pat
      service-policy input LB
      service-policy input remote-access
      no shutdown
    ===========================================================
    The problem is that 3750 switches are not stacked.
    Application is working fine. But i am getting a lot of MAC flapping messages..
    kindly suggest whether this design is OK or something needs to be done to rectify it...
    Attached a small diagram..

    Hello acharyr123,
    I don't think this design is ok, and it would cause mac flapping since the two indepedendent 3750 switches will learn the ace mac addresses off of two different interfaces.  The 3750s would have to be stacked so that they would act as one switch then this should work correctly.
    Thanks
    Joel Lamousnery
    TAC CSE

Maybe you are looking for

  • Need help troubleshooting

    Thanks in advance for the help. I've used Photoshop Elements 8 for quite a while now with no problems. I haven't make any changes to my computer or the program recently. Today when I went to drop shadow behind the text I was able to but then when I h

  • Is the macbook air and iPad supposed to sync last page read?

    is my macbook air and iPad2 supposed to sync last book page read?

  • CS5.5, 10 bit, AVCIntra, AJA Kona and GTX580 vs Quadro

    I will be purchasing a new editing computer in june. I'm switching over from Final Cut Pro on a Mac. Why am I switching? For a lot of reasons, but suffice it to say, CS5.5 is really looking like a time saver, and seems to make good business sense ove

  • Cubes in BW

    HI all, It looks silly but its my doubt. we create the cubes in BW.So where these cubes are getting created ? In the application layer or Data base of BW system? Thx in advance

  • No adress or tool bar

    Help!!!! I have no add tool bar, no forward or backwards either. Every suggestion says too click on File or tool but they are not there!!!!