Details of Project Status Inquiry in project module

Hi Dina,
Will you explain in details below PSI column with example.
01) Ovr Bgt
02) YTD - Rev Bgt
03) YTD - Act Rev
04) YTD - Cst Bgt
05) YTD - Act Cost
06) Commit Amt
07) PTD - Act Cost
08) Tot - Rev Bgt
09) Tot - Cst Bgt
10) Tot - Orig Cst Bgt
11) Fin % Cmplt
12) Est to Cmplt
13) Summarization Exception
Thanks
Regards
GSM

Hi
PSI explanation is included in Projects Management User Guide, Chapter 10, page 10-7 (release11.5.10).
You might also want to review the Project Status Inquiry Setup chapter on the Projects User Guide release 11.0, which list the exact definition and formulas.
01) Ovr Bgt - this column will show the character '*' if the inception to date actual amount plus the commitment amount exceed the cost budget amount. You can select the budget type on the tools menu.
02) YTD - Rev Bgt - Year to Date accumulative amount of revenue budget.
03) YTD - Act Rev - Year to Date accumulative amount of actual accrued revenue
04) YTD - Cst Bgt - Year to Date accumulative burdened amount of cost budget.
05) YTD - Act Cost - Year to Date accumulative burdened amount of actual distributed costs
06) Commit Amt - current burdened amount of summarized commitments
07) PTD - Act Cost - Period to Date accumulative burdened amount of actual distributed costs
08) Tot - Rev Bgt - Total revenue budget from the start date till the end date of the project
09) Tot - Cst Bgt - Total burdened amount of cost budget from the start date till the end date of the project
10) Tot - Orig Cst Bgt -Total burdened amount of cost budget from the start date till the end date of the project, based on the budget version, which was flagged as original (usually, the first version of the budget type).
11) Fin % Cmplt - Financial percent of completion. This is a calculated measure based on the formula: Financial percentage complete:
ITD actual burdened cost / total current burdened cost budget amount X100
12) Est to Cmplt - Estimate to Complete. This is a calculated measure based on the formula Estimate to Complete:
Total current burdened cost budget amount – (ITD actual burdened cost + PTD commitment burdened cost)
13) Summarization Exception - list a note if summarization process could not complete successfully.
Dina

Similar Messages

  • Function Module to set project status in CJ02.

    Dear Team,
    Is there any Function Module or BAPI to set project status in CJ02.
    Please Help.
    Thanks in advance,
    Sai

    Thanks a lot.
    This will serve half of my pupose.
    I am looking for setting status of WBS element of aproject definition in CJ02.
    Do we have any BAPI or FM for the same.
    Actually My purpose is to pool the error log as recording a BDC while closing the status of a WBS element.
    Thanks in advance.

  • Gantt Chart in Project Status Report

    Hi Folks,
    We are doing a custom development and creating our own Project Status Report PDF form. Is there a way (standard FM or otherwise) to generate a Gantt chart and show it on the PDF form.
    The Gantt chart itself is not of the whole project structure. It is only the phases. Most projects will have 4-5 phases maximum. The Gantt chart also does not need to be too sophisticated, we just need a high level graphical representation of the phase timelines.
    Let me know if my question is not clear and I can elaborate.
    Thanks
    Lashan

    Hello Lashan,
    Building the Gantt chart in a PDF report is quite tricky. The Gantt chart view you see in cProjects is a different SAP component, JGantt (developed in Java), which is connected to the system.
    Adobe forms don't have a standard Gantt element, so you'll have to render it somewhere else and send it to the form in a binary format.
    For creating and rendering the graphic you can use the SAP IGS (Internet Graphics Service).
    You can find some details here: http://help.sap.com/saphelp_nw04s/helpdata/en/17/86c039c7811f11e10000000a114084/content.htm
    This is a little bit more complicated, you also need to use iXML libraries to transform all the Gantt data into the IGS required format.
    The end result will not really look like the Gantt view, but it will contain all necessary information:
    Is this the kind of graphic you need to develop?
    Cheers,
    Tudor

  • Table for WBS project status and budget.

    hi,
    i am being requested to have a report with project details with the PO and PR.
    but i were unable to find the table for the project status (TECO, REL) for a WBS element. may i know want table and what field they were being link?
    aside, may i know under what table does the "budget assigned" to a WBS element located at?
    thanks

    Hi Ben,
    in order to retrieve the status of a WBS element, please select into table JEST by object number (JEST-OBJNR = PRPS-OBJNR). This will give you an internal status code (JEST-STAT). Then go to table TJ02 with this internal code and select field TJ02-TXT04: this will give you the external status code.
    For the budget, go to tables COSP and COSS, selecting by object number (OBJNR).
    I hope this helps. Best regards,
    Alvaro

  • Cannot save comments in Project Status Report

    Hi,
    I am trying to save comments in Project status report by typing in the comments box and then pressing the save button. The pdf file gets saved successfully, but when I open the saved pdf file the comments I typed before are not there(not saved).
    Please note that I am using the standard project status report.
    Could anybody guide me on this?
    Thanks
    Edited by: hemant vaidya on May 26, 2008 5:26 AM

    Hello,
    is there any error text given by cProjects?
    Have you had a look on the ADS side's logfiles?
    Are you using the right credentials?
    Maybe this could be a good point to start. Otherwise your description is not detailed enough to go on...
    Greetings, Max

  • Project Status Report using CATSPS. Billable/Non-billable Hours?

    I am working on a Project Status Report and am using CATSPS table instead of CATSDB table since thatu2019s the cross-application table for PS module. But I am facing a small problem in using CATSPS table. There is no field in CATSPS table that tells me if the hours are billable or non-billable. Table CATSDB had a field u201CBill Typeu201D (Billable/Non-Billable) but I donu2019t see anything like that in CATSPS. If I use CATSDB table and filter out status "30" for only approved hours, I am getting duplicate entries for actual hours in Crystal Report 2008. What is the correct table to be used in this case and also what is the mapping field(s).
    Also, looking to display the billing type for the document in VBRP table. I am able to display the document type code but not the description itself. Which table will have this mapping?
    Also, in Crystal I have the total Purchased hours at the 3rd level WBS but the total actual hours are coming from the 4th level WBS (Activity level). Each 3rd level WBS can have multiple 4th level WBS (difference networks). How do I know (logic) which 4th level WBS total to pick up and add to which 3rd level WBS total? Also, how do I display the total actual work hours form the 4th level WBS to display at the 3rd level?
    Here is an example:
    WBS ,  Level ,  SKU# , Network# ,  Activity#  ,   Purch. Hours  ,  Act. Bill. Hours ,  Remaining Hours
    EP-2927-AMB-0001 , 3 , 600-310-100000 , N/A , N/A , 100.00 ,  N/A , 55.00 (=100.00 - (30.00+15.00))
    (Purchase Hours from this line) - Total Act. Bill. Hours from level(s) 4 below: A+B)
    EP-2927-AMB-00011 , 4 , N/A , 000004008303 , 10 ,  N/A , 5.00 , N/A
    EP-2927-AMB-00011 , 4 , N/A , 000004008303 , 20 ,  N/A , 6.00 , N/A
    EP-2927-AMB-00011 , 4 , N/A , 000004008303 , 30 ,  N/A , 15.00 , N/A
    EP-2927-AMB-00011 , 4 , N/A , 000004008303 , 40 ,  N/A , 4.00 , N/A
    (A)    Total Billable Hours = 30.00 (5.006.0015.00+4.00)
    EP-2927-AMB-00012 , 4 , N/A , 000004008304 , 10 ,  N/A , 6.00 , N/A
    EP-2927-AMB-00012 , 4 , N/A , 000004008304 , 20 ,  N/A , 4.00 , N/A
    EP-2927-AMB-00012 , 4 , N/A , 000004008304 , 30 ,  N/A , 5.00 , N/A
    (B)    Total Billable Hours = 15.00 (6.004.005.00)
    If you notice there are two level 4 WBS (EP-2927-AMB-00011 & EP-2927-AMB-00012) in this example that are under level 3 WBS (EP-2927-AMB-0001). The Purchased Hours are coming from level 3 which means the hours are assigned per project at the WBS 3 level. Within each project there are different activity levels where actual hours worked by each employee are coming from. I need to sum the actual hours from all the available level 4 WBS and bring them over to the corresponding level 3 WBS in order to calculate the remaining hours. My challenge is how do I know which level 4 WBS belong to which level 3 WBS since there are more than one level 3 WBS in a Project and each level 3 WBS can have multiple level 4 WBS?
    Please advise.
    Regards.
    -Rohit
    Edited by: RohitBora on Feb 27, 2012 8:40 AM
    Edited by: RohitBora on Feb 27, 2012 7:27 PM

    Hi,
    My personal suggestion to you is try to describe problem very crisp and easy to understand so that you will get quick responses. Its very difficult to read and pin point what you are aksing and finally you will miss readers attentions.
    As standard practice, hours planned at indiviudal activity level and actual costs posted on each indiviudal activity will roll up and display the aggregate values at corresponding higher WBS element level. At the same time system will let you know reamining hours at indiviudal level and not higher level as rolled up.
    Your WBS structuure is bit confusing me, in what way you are encoutring problem in identitying level 3 and level 4 WBS elements. Key will clearly denotes which is level 3 and level 4. As cited by you, EP-2927-AMB-0001 this should be level 3 and EP-2927-AMB-00011 is level 4. I am sorry to say that structure key was not maintained proper way and bit confusing.
    Regards,
    PSR
    Edited by: PSR on Feb 27, 2012 11:05 PM

  • Project Status Reports for cProjects 4.0

    Hi Experts,
    Does anyone have a document in which functionalities of <b>Project Status Reports</b> are detailed?
    I would want to know <b>which kind of data can be extracted</b> from projects and if <b>operations</b> like sum, substraction, aggregation, grouping can be made in these reports...
    In addition, if you had some documents about how a Project Status Report looks like it would be also good to have.
    Please send the documents to: [email protected]
    Of course, <b>reward points</b> will be given for all useful answer...
    Thank you all in advance.
    Kind Regards,
    Isabel

    Hi Yasar,
    Thank you very much for your document, although that is not really what I was looking for.
    I need to design a Project Status Report, so I want to know how does it work, which data does it use (which is the data that can be reported and which data can't), if you can select the data to appear or group it by some attributes, if the manual comments can be inserted attached to each of the data reported (comments related to all phases reported).
    So I still need some further details on this (version 4.0 with AIF documents).
    Thank you very much!
    Kind regards,
    Isabel

  • User defined Project Statuses

    Dear Dina,
    Is it possible to have user defined Project statues in the system like failure/Success like this any??
    pls guide me thanks a lot n advance

    Hi
    Go to Setup menu > Projects > Project Statuses
    You can inquiry existing statuses and create user defined new ones.
    Dina

  • CProjects 4.0 - Project Status Report

    Hi All,
    I am using cProjects 4.0
    Under SPRO, I get to "cProjects > Basic Settings > Forms for Printing and Project Status Report".
    Please list out the sequence of activities to enable me get and use Project Status Report from the front end. A detailed response would be highly appreciated.
    I tried a few things which aren't quite working
    Thanks very much.

    Hi Bittu,
    Go to SPRO
    -> cProjects->Basic settings->Templates for Printing and for Project Status->Create Temples and then Activate Templates per Project type
    After the above settings are done, the Project status report from the front end is enabled and you can view them in cProjects.
    Wish you much success.
    Bye Dudle

  • BAPI for modifying project status

    Hello all,
    I have found a function :STATUS_TEXT_EDIT to get the status of a project, but now I want to modify the status of the project. Does anybody know if there is a BAPI to do this?
    Thank you very much.
    Reyes

    Hi Reyes!
    I think that there's no any BAPI to change the Status of the Project or WBS element.
    But you can do the next steps for any <b>OBJNR</b> (Project/WBS):
    1. Set a breakpoint in program LBSVAF12 in the form STATUS_UPDATE. Then go to change the status user/system of the project/WBS using transaction CJ02. Make you updations and save. You should reach your breakpoint.
    2. The function module <b>'STATUS_UPDATE'</b> is triggered using internal table "<u>jest_updt</u>". Copy the records of this table carefully. It is updating the standard table JEST (select the corresponding fields in your program).
    3. Using the function module 'STATUS_OBJECT_READ' with the OBJNR you can obtaing the fields <u>OBTYP</u> and <u>STSMA</u>.
    4. Then you're ready to built your ABAP program to automatize the status updation. Append the corresponding records in  the internal table " jest_update" and just function <b>'STATUS_UPDATE' IN UPDATE TASK</b> with your internal table. Then COMMIT WORK AND WAIT. The status is now changed like manually in step 1.
    5. To make it perfect you should maintain the correct change numbers (<u>CHGNR</u>) in the <b>JEST</b> table.
    Best regards and see you in Madrid next time!
    Roger

  • Searching for a Project status = CLSD and open purchase orders?

    Hi,
    I am searching for a project status (Project Builder CJ20N) which allowed my to set a CLSD or a simillar status for settlement with open purchase orders.
    This staus should allowed to process with open orders BUT  not allowed to add new orders after setting this status.
    Have somebody any idee? Or it is impossible?
    Tahnk you in advanced for your Help.
    Regards Baldy

    Hi TV-kid,
    while I was waiting for an answer I got to the same conclusion, so what you offers me is quite tempting actually.
    I got a look to your website and it seems convincing. Still though, your case studies are in other business area, It's only a mater of good knowledge of File Maker.
    I did download the test-drive last version of File Maker plus their samll Business Solution. I did read most of the documentation and the learning process would be too long to construct ourself a good crossed-data base.
    I'd like to get in contact with you to look for a possible colaboration. to get private, I'd liketo do it through your contact link in your website .
    To whom shall I write?
    Thanks
    Cheers
    Cheers

  • Unable to run bapis for project status update and date update together

    Hi Experts,
    I have a requirement to update the dates and status of a project WBS at level 4. I am trying to do update the CJ02 Transaction using standard BAPI available. I need to do both Date update and status update in the same LOOP PASS   i am using the below mention bapi. when i am doing so i am getting an error Project 'A._____' has been currently processed by ID i.e. my id.
    I have tried putting  a wait for 2 seconds in the code but its still not working. please find the order below in which i am calling the bapi.
    Loop at itab.
    if  date_changed = 'X'.
          CALL FUNCTION 'BAPI_PROJECT_MAINTAIN'
          READ TABLE it_error WITH KEY message_type = c_e.
          IF sy-subrc <> 0.
    Commit
            CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
                 EXPORTING
                      wait   = c_x
                 IMPORTING
                      return = s_ret.
       endif.
    endif.
    if Status_change = 'X'.
          CALL FUNCTION 'BAPI_PS_INITIALIZATION' .
          CALL FUNCTION 'BAPI_BUS2054_SET_STATUS'
          READ TABLE t_result WITH KEY message_type = c_e.
          IF sy-subrc NE 0.
            CALL FUNCTION 'BAPI_PS_PRECOMMIT'
                 TABLES
                      et_return = t_ret.
            CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
                 EXPORTING
                      wait   = c_x
                 IMPORTING
                      return = s_ret.
         ENDIF.
    endif.
        WAIT UP TO 4 SECONDS.
    endloop.

    Try to use
    SET UPDATE TASK LOCAL.
    before each BAPI call.
    Did you try to debug through your code, leaving sufficient time between BAPI calls? If it does work like that, then the above statement might help.

  • Project Status Report in MS Power Point

    Hi Experts!
    I am very new to Project Systems. Our requirement is to create a Project Status Report. This report should be generated in MS Power Point which should be editable.
    Do we have any standard reports or test reports for the same? Can someone give some pointers for the same? Your help is highly appreciable.
    Thanks a lot.

    Try convincing your client saying that this is absolutely not possible in standard SAP. However also let the client know about other alternative stating that standard SAP reports can be downloaded to Excel which then can be used as a reference to create a power point presentation. This, though, can be done manually only.

  • Unable to change the status of a project to approved

    Dear Members,
    I am using the Oracle Vision Instance version 12.1.3 and Database 11.2.0.3.0
    I have created a project. I am unable to change the status of the project to APPROVED. I am getting the below error:-
    Please enter an active project manager for this project in order to change or update this information._
    Can any one please help me in resolving this issue.
    Many thanks in advance.
    Regards.

    R4S wrote:
    Dear Members,
    I am using the Oracle Vision Instance version 12.1.3 and Database 11.2.0.3.0
    I have created a project. I am unable to change the status of the project to APPROVED. I am getting the below error:-
    Please enter an active project manager for this project in order to change or update this information._
    Can any one please help me in resolving this issue.
    Many thanks in advance.
    Regards.Please see these docs.
    CMRO Partially Implemented Visit Errors with "Please enter an active project manager for this project in order to change or update this information" [ID 864812.1]
    Update_Project Erroring With PA_PR_INSUF_PROJ_MGR While Creating Task For Templates [ID 1085068.1
    Thanks,
    Hussein                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

  • Mass change Tcode for  status of multiple projects

    Dear All,
    Any SAP Standard t code for mass Status change for multiple Projects
    (like TECO,AALK).
    Thanks.
    Arun

    Hi
    You dont have this option in any STD SAP t.codes, where you can change the status of the projects/WBSE collectively.
    So use this BAPI to Read  the status of Project/WBSE
    BAPI_BUS2001_GET_STATUS   To get both the active system statuses and the user statuses for a project definition
    use this BAPI to Change  the status of Project/WBSE
    BAPI_BUS2001_SET_STATUS
    one system status and one user status  can be revoked each time, and one system status  and one user status  can be set each time for a project definition 
    For Network order status change
    BAPI_BUS2002_SET_STATUS
    Set/Reset Network Status. At the same time, you can revoke one system status and one user status, or set one system status and one user status in a list of activities for the network.
    Thanks
    S.Murali
    Edited by: S. Murali on Jul 24, 2009 3:43 PM

Maybe you are looking for

  • PO qty is larger than SC quantity

    Hi SAP experts, We are in SRM 7 with ECC 6 (no EHP). We notice something strange in our testing. Let's say we create SC with qty = 10 pcs. Then we create RFx for vendor A and vendor B. We decide that BOTH of them win. Then we create PO from RFx to ve

  • Adobe Creative Cloud Apps Installation Failed

    Everytime I try to download After Effects CC off of the application of Creative cloud, after 25%, the operation breaks and it says "Installation Failed" I re-installed the Creative cloud, restarted my computer, checked my internet connection, I don't

  • Is there a max record size?

    This is probably an easy question for some of the Oracle Gurus out there. :-) While working on other database platforms, I've found that there is a maximum size that a single record in the database can be. This maximum size is usually based on what t

  • Need help with transferring phone files

    So my girlfriend has an audio file on her phone (a Droid RAZR HD) and she needs to upload it to a computer for a class. Her computer is really bad and so she's using mine, a Mac. I downloaded the Backup Assistant program for Mac and when her phone is

  • Issue when update ios for 7206 router

    hi all , the ios on router was 12.4 i put the ios c7200p-adventerprisek9-mz.152-4.M5.bin in disk2  , of router and added boot system flash disk2:/c7200p-adventerprisek9-mz.152-4.M5.bin after that  , i restarted the router i have the followign logs :