Details or summary of transactions posted to secondary cost element

we need the summary/details of cost posted to secondary cost element. From which table we will get this.
Regards
Abhay

HI,
TRY COEP & COSP table
Vijay

Similar Messages

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

  • Secondary cost element actual data not posted

    Hi Gurus,
    Actually we are posting the actual cost elements data into particular cost cenetr through batch job.upto 12/31/2009 the actual data is showing for the particular secondary cost element(overheads).Only after 01/01/2010 the actual data is not posted for this particular cost element inthat particular cost center.For the remining cost elements into that particular cost cnetr the actual data is posted thru batch job.We checked that particularsecondary cost element,the validity period is upto 31/12/9999.Suggest on this one.
    Thanks in advance
    Jana

    Hi,
    Did you execute overhead allocation processes as from 01/01?
    Regards,
    Eli

  • Display of secondary cost elements in KSB1

    Hi
    One of our customers wants to delete the view of Secondary Costs to a particular cost center in Actual View of Cost Line Items (through T Code KSB1). The costs flow to the secondary cost elements based on the activity type carried out. The system is calculating the total cost and then deducting the secondary costs again from the total cost as a result of which the overall costs are in the negative. The customer wants to display the total costs only and not the flow to the secondary cost elements, even, though the data is posted for the current fiscal year for the said cost elements.
    Some transaction data already exists for the secondary cost element. We tried to changed the settings in allocation cost settings to Allocation Type 4, Manual Entry, no allocation for a future date, but still the costs are flowing to the cost element. Pls suggest a way out.
    Would assign points if the problem is sorted.
    regards
    Sanil Bhandari

    Solved

  • Secondary cost element in KB11N

    Hello.
    I'm not allowed to use a secondary cost element in a reposting.
    What do I have to modify?
    Thank You

    Hello,
    You cannot use secondary cost element. You need to use primary only.
    Please go through the following:
    DISTRIBUTION =========== Distribution was created for transfer primary costs from a sender cost center to receiving controlling objects. During distribution, only cost centers or business process can be used as sender. A distribution receiver can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary Postings (such as, energy costs) are collected on a cost center, and allocated at the end of the period by means of the user-defined key. You can only distribute primary costs. During this process, the original cost element remains the same. Line items are posted for the sender as well as for the receiver, enabling the allocation to be recorded exactly. You can reverse distributions as often as required. You use the Cycle-Segment method to define sender-receiver relationships. PERIODIC REPOSTING ================= Differences between periodic reposting and distribution are due to information content and performance. For periodic reposting, no separate credit record is written on the sender for the cost element in the summary report. Instead, the totals record for the cost element is reduced on the debit side, which means that the original debit amount can no longer be checked there (u201Cunclean creditu201D). However, during distribution, the system writes a totals record for the credit (u201Cclean creditu201D). The information on the receiver is the same for periodic reposting and distribution (u201Cclean debitu201D). Compared with periodic reposting, during distribution, the system also updates the partner in the totals record for the sender. This means that the partner can be displayed in the information system on the totals record level. As fewer totals records are written during periodic reposting, performance is better than during distribution. ASSESSMENT =========== Assessment was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects. During assessment, cost center or business processes can be used as senders. The receivers for an assessment can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary and secondary posting are allocated at the end of the period by the user-defined key. During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element category = 42). As the system writes fewer total records, the assessment has a better performance than periodic reposting and distribution. The system does not display the original cost elements in the receivers. Therefore, assessment is useful if the cost drilldown for the receiver is not important. Similar to distribution, the partner is updated in the totals record during distribution You can reverse assessments as often as required. You use the Cycle-Segment method to define sender-receiver relationships. Regards, Ravi

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

  • Secondary Cost Element Values doesn't display in Profit Center Report

    Hi everyone,
    I'm having a problem with our Profit Center plan/actual/variance reports wherein it doesn't display the postings I made to the Secondary cost element when I executed an assessment cycle (KSU5). I already set in the configuration that all postings to be done in the cost centers, should have a parallel posting to the profit center assigned to it. I can see the postings in my cost center reports, but not in my profit center report. Could I have missed out on any procedure to enable the secondary cost element parallel posting in my profit centers? Any help would be appreciated. Thanks!

    it might be the configuration of the library or some parameter in the report (record type should be 0 and 2 for actual values, where 2 stands for distributed values and 1 and 3 for planned values)
    but it also might be that the reconciliation is done between different CC and same PC
    - check your CC organisation asignment
    - if sender cost center and receiver cost center have tha same PC it is probably the reason
    - I had that problem my self and didn't solve it
    cheers
    matej

  • Difference between type of Secondary Cost Element Category?

    Hi,
    I checked the system, and during the secondary cost element (CE) creation, I can select some of the CE category as follows:
    21 Internal settlement
    31 Order/project results analysis
    41 Overheads
    42 Assessment
    43 Internal activity allocation
    50 Project-related incoming orders: Sales
    51 Project-related incoming orders: Other
    52 Project-related incoming orders: Costs
    61 Earned value
    My question, what kind of report that I can read entries with these kind of CE?
    Reason: I want to check what has been posted to these secondary CE.
    Or
    Could anyone explain the use of above-mentioned CE category in brief?
    Thanks.

    Cost element that is used to allocate costs for internal activities.
    Most often used categories are
    21 Internal settlement
    (When ever an order is settled e.g internal order settling to cost center through this type of cost elements)
    31 Order/project results analysis
    (WIP in production orders are calculated and posted using this category)
    41 Overheads
    (Used in costing sheet to do an overhead allocation)
    42 Assessment
    (whenever cost is allocated between cost centers through allocation method - Assessment)
    43 Internal activity allocation
    (found in production orders when a routing activity is confimed the charge goes to the production order through this cost element)

  • Update Functional Area on Secondary Cost Element

    Hi gurus,
    I'm trying to update Functional Area on Secondary Cost Element. I've created a LSMW to make it but when I run the bacthinput the system give me a message in order to inform me that this changes might need a lot of time because there are several internal changes to do.
    The problem is that no functional area is updating, and I'm trying with just an item and the system needs a lot of time to update just one Funcional Area, more than a hour!
    So, I don't know if some of you already had the same problem or is a problem with performance of system, because in Develop System I didn't have any issue to update this information.
    Is there any form to update this information than LSMS or Individual transaction?
    Kr
    Jorge

    Hi Jorge
    I was trying to change it manually in KA02 and there are tasks the systems does before confirming.
    This is the root cause.
    "Field changes to field Functional Area lead to
    complicated tests of the data involved, which
    may take some time. Do you really want to change
    the field online? "
    There is an option to change it in background.
    Regards

  • Report on Secondary cost elements

    Hi all,
    Can any one tell me how to see line item report on the secondary cost element that are used in asessment cyles and also how to display the documents that are generated for these secondary cost elements after running the asessment cycles.
    Thanks

    Hi MKR,
    I am assuming that your assessment cycles are tied to cost center as senders, so even though you don't look by assessment cycle you could use transaction S_ALR_87013611. Set the selection criteria for the Controlling Area, month year/period combination and version you need, leave the cost center fields blank and enter as cost element the secondary cost element(s) of your cycles. After executed, double click on the total actual cost amount associated individually to each cost element and an additional screen would be displayed, from where you can select the option to display actual line items report. The list of line items is displayed. If you have the ALV functionality additional columns can be added in the display to segregate the information based, transaction type, origin, etc.
    Hope it helps , if it does please award points.
    Thanks,
    GG

  • Creation of secondary cost element

    Hai SAP Gurus
    Could any one please let me now how to create secondary cost element in SPRO.
    Thanks.

    You can create secondary cost elements in KA06. There is no pre-requisite of creating GL accounts.
    Cost elements describe the origin of costs. Cost elements are defined as either
    primary and secondary. Primary cost elements arise through the consumption of
    production factors that are sourced externally. Secondary cost elements arise
    through the consumption of production factors that are provided internally.
    The Chart of accounts contains all general ledger (GL) accounts belonging to
    Financial Accounting.
    Expenses and Revenue accounts in Financial Accounting correspond to
    Primary Cost and Revenue Elements respectively.
    Secondary Cost Elements are used exclusively in CO to identify internal cost
    Flows such as assessments or settlements. They do not have corresponding
    General ledger accounts in FI and are defined in CO only.
    When you create a cost element, you must assign a cost element category. This
    Assignment determines the transactions for which you can use the cost element.
    You can create cost elements automatically by making default settings that are used
    To specify the cost element, or cost element interval that you wish to create.
    You can create cost elements manually in bulk with the help of LSMW or BDC.
    Primary Cost Element Categories:
    1 - Primary costs / cost-reducing revenues
    3 - Accrual / deferral per surcharge
    4 - Accrual / deferral per debit = actual
    11 - Revenus
    12 - Sales Discounts
    22 - External Settlement
    Secondary Cost Element Categories:
    21 - Internal Settlement
    31 - Order / Project results analysis
    41 - Overhead Rates
    42 - Assessment
    43 - Internal activity allocation
    50 - Project related incoming orders: Sales
    51 - Project related incoming orders: Others
    52 - Project related incoming orders: Costs
    61 - Earned Value
    Regards,
    Ravi

  • OKB9 for secondary cost element

    Hello all,
    Does anyone know a way to rederive cost center for secondary cost element posting? We have a need to re-derive the cost center of a production order at the time of settlement. I tried OKB9 and OKC9 and it didn't work.
    Any help will be greatly appreciated.
    Thanks,
    Cassandra

    Hi,
    I am not sure if i understand your scenario. However, if you want to control the settlement to Cost Center on Cost Elements, you can use the Source Structure which will be assigned in the settlement parameters for the Production Order.
    Kind Regards
    Umapathi G

  • Secondary cost element........

    Hi,
    Is it necessary to create number of activities = to number of secondary cost element.
    or
    only one cost element is enough for all activities for posting to cost center.
    Regards,
    Imran

    Dear,
    Secondary Cost Element
    When cost element carries cost with in CO, then they are called secondary cost element.
    Example.... - Take Product Costing
    On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
    The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
    Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
    In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
    Operational Cost - Activity (Production Order) Dr Rs.XX
    To Operational Cost - Activity (Cost Centre) Cr Rs.XX
    The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
    In CO the production order and cost centre are co object including but not limited to.
    and further notes and configs see below link.
    http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/301/index.htm
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Secondary Cost Element Setting Criteria

    Hello all SAP usrs
    I am quite green for Controlling.
    I have a question need all your help.
    Could I know what criteria to be used to set secondary cost element? Also I would like to know the usage of the secondary cost element. Please share some knowledge on it. Thanks!
    Best Regards!
    Gavin

    Hi Gavin
    Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO.  These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
    When cost element carries cost with in CO, then they are called secondary cost element.
    Example.... - Take Product Costing
    On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
    The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
    Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
    In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
    Operational Cost - Activity (Production Order) Dr Rs.XX
       To Operational Cost - Activity (Cost Centre) Cr Rs.XX
    The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
    In conclusion there is need to creatre a secondary cost element when when you want to disribute the cost with in CO module not in FI
    Reagrds,
    RKD

  • Tables For Secondary Cost Elements

    Dear Folks,
    Please Help me for getting details (TABLES) of Secondary Cost elements Actual Line items Date wise and Cost Center wise
    Thanks in advance
    Regaards
    ASHOK K

    Hi Ashok,
    some important Costing tables
    COEP  - Line Items (by Period) 
    COEJ  - Line Items (by Fiscal year 
    COKA  - Control Data for Cost center wise
    COEJT - Line Items for Prices  
    COEPT - Line Items for Prices
    CSKA Cost Elements (Data Dependent on Chart of Accounts)
    CSKB Cost Elements (Data Dependent on Controlling Area)
    CSKS - Cost Center Master Data
    CSLA Activity Master
    COBK  - Document Header       
    COEJL - Line Items for Activity 
    COEJR - Line Items for SKF
    COEPL - Line Items for Activity
    COEPR - Line Items for SKF  
    COKL  - Control Data for Activity
    COKP  - Control Data for Primary
    COKR  - Control Data for Statics
    COKS  - Control Data for Secondary 
    AUSP - Characteristic Values       
    A132 - Price per Cost Center             
    A136 - Price per Controlling Area      
    A137 - Price per Country / Region        
    COSC - CO Objects: Assignment of Original 
    CSSK - Cost Center / Cost Element       
    CSSL - Cost Center / Activity Type      
    KAPS - CO Period Locks -  
    regards
    Gokul

Maybe you are looking for

  • How do i get my music from ipod onto new computer when old computer died

    my old computer died unexpectedly and now i have a new one ...how do i get my music from ipod to itunes...i don't want to lose it since i have already paid for it...

  • A stopListener in AS3

    I have AS2 code that listens for the end of an instance of FLVPlayback and a .js file that picks that event up and removes the transparent video from the layer above existing HTML content. (I think.) I've been using the combination for two years succ

  • HT201303 Why do they ask for my credit card info if I'm using a girt card

    I have a gift card and I want to purchase some music for my daughter . I go through all the prompts and it goes to the purchase page I type in my info and it says we have a credit, but it wants me to verify my apple account. I just don't want to pay

  • Saving a file in a specified directory

    I have this network-application where I ask new users to enter their information. I want to be able to store this information in a file under that user's username. I want to make the directory for the user at my server and save the file inside that d

  • ICal - shared calendars not saving settings

    I have a user who says he will turn off (uncheck) certain shared cals in iCal and also check ignore alerts on many of them.  Over time, he says they will revert back to all being checked and ignore alerts is unchecked.  We went in and out of iCal sev