Diff. b/w Activity type and Statistical figures

Hi,
         Could any one explain difference b/w Activity type and Statisfical figures. I observed both usages & purposes r same and not find any difference. If so, why there is need of other.
     Along with i also want to know what's internal orders? Can't we do the same job in Cost Center Accounting.
Thanks in advance.
Krishna.

hi
Even it looks like similar there are some differences and meant for different purposes
pl. go through the following links .
/thread/367171 [original link is broken]
IO/ and Cost Center
best regards

Similar Messages

  • Diff b/w reference type and elementary type

    hi all
    can any one what is the diff b/w reference type and elementary type in data element ....
    thanks
    lokesh

    The data type attributes of a data element can be defined by:
    Specifying a domain whose attributes are copied by the data element.
    Specifying a build-in type where the data type, number of places, and possibly decimal places can be directly specified.
    Specifying a reference type, i.e. reference to a class, an interface, a type defined in the Dictionary, a built-in type, or a generic reference to ANY or DATA.
    In the maintenance screen you can set the option you require by setting the appropriate flag (domain, built-in type, reference type) and filling in the corresponding input fields.
    A reference type is a reference to another type. There are the following kinds of reference types:
    Reference to a class or an interface
    Reference to a type defined in the Dictionary
    Generic reference to ANY, OBJECT, or DATA
    Reference to a built-in Dictionary type with specification of the length and possibly also the decimal places
    You can use a reference type to define the data type properties for a data element, or for typing the component of a structure or the line type of a table type.
    In the field Referenced type, enter the name of a class, an interface, the generic references DATA, OBJECT, ANY, or the name of a type defined in the Dictionary. If the reference type is to be a predefined Dictionary type, choose the reference to the predefined type. Enter the number of characters and, if required, the number of decimal places.
    where as
    The data class describes the data format at the user interface.
    If a table field or structure field or a data element is used in an ABAP program, the data class is converted to a format used by the ABAP processor. When a table is created in the database, the data class of a table field is converted to a corresponding data format of the database system used.
    You can find a detailed description of the data classes allowed in the ABAP Dictionary in Overview of the Data Classes.

  • URGENT........ACTIVITY TYPE AND THEIR ASSIGNEMENT TO WORK CENTER!!!!!!!!!!!

    Hi Friends,
    I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
    I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing.  However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
    I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
    And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
    can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
    regards
    sandhya

    Hi,
    You need to do the following:
    1) Create an Activity type for the Assembly activity.
    2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
    3) Define a Cost Centre corresponding to the above Work Centre.
    4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
    5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
    6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
    7) Execute the Plan price calculation (T-code KSPI)
    After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
    Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
    Regards,
    Assign points if useful

  • Maintenance activity type  and order type  for plant maintenance order

    How can i get the maintenance activity type  and order type  for a given plant maintenance order. Please let me know the table where i can get these two fields
    In AFIH i can only get the MAT for an order number

    Maintenance activity type -
    AFIH - ILART
    Order Category Indicator Plant Maintenance -
    AFIH - AKKNZ
    reward if heplful

  • About value type and key figure type

    Hello Gurus,
              please explan the different usage of about value type and key figure type.  what is the typical values for both infoobjects ?
    Many thanks,
    Frank

    Hi,
    0METYPE is a key figure-specific info object usually used to define semantics of the individual business key figures in BW (for example, actual, commitment, plan, target values).
    Its a bi specific field which is filled from extract structure field named MEASTYPE table COSR
    Refer to OSS Note 523742 for how it is filled and the following link for additiona information.
    http://help.sap.com/saphelp_nw70/helpdata/en/91/ddd52b9ef30645a338e28aae443807/frameset.htm
    Note 523742 - BCT-CO: BW key figure model and R/3 tables for trans. data
    This note provides information on the key figure model in the area of BW Content CO-OM. It also gives an overview of the DataSources for transaction data and the corresponding source tables and value fields in the R/3 System.
    The key figure model for currency fields in the area of CO-OM contents affects the following info object of type key figure:
    0AMOUNT Amount
    The key figure itself does have any business semantics.
    The semantics of the individual business key figures in BW (for example, actual, commitment, plan, target values) is determined using combinations of values for the following key figure-specific info objects (see also the account model in SEM-BPS, note 407563):
    0METYPE Key figure type
    0VTYPE Value type for reporting
    --> 0VTDETL Details of the value type
    --> 0VTSTAT Statistics indicator for the value type.
    For example, using transaction SE16, the possible characteristics of the values of this InfoObject can be taken from the above-mentioned master data tables in R/3.
    The business key figures on the InfoCubes of the standard BW content were defined as restricted key figures using this semantics of the key-figure-specific characteristics.
    The conversion of the R/3 transaction data in the BW key figure model is carried out in the extractors using the ROMI_GET_VTYPE_AND_DETAIL function module. It primarily happens using the specified conversion tables.
    The following dependencies exist for the source tables of the DataSources:
    COSP_VTYPE for COSS, COSP, COVP,
    COSB_VTYPE for COSB,
    BPXX_VTYPE for BPGE, BPJA, BPEE
    If an R/3 source record cannot be converted using these tables, it may not be extracted to BW.The application log of the R/3 DataSource transaction RSA3 contains entries for the unconverted values after the test run.(The log function for the CO-OM DataSources was considerably improved by the correction for note 523655).
    The application log for the extraction runs from BW can be evaluated using transaction SLG1 (Object: RSAP, object information: RSAP_INFO)
    Furthermore, the semantics of a key figure are still determined by the time characteristics and the following key-figure-specific info objects:
    0CURTYPE Currency type (for more information, see note 517909),
    0DB_CR_IND Debit/credit indicator (for more information, see note 065075),
    0VERSION CO version
    -Vikram

  • Use of activity types and cost splitting

    Hi All,
    We would like to track activities for cost centers, but don't necessarily have the need for a sending cost center/object.  I understand in a traditional manufacturing set-up, you have sending and receiving cost objects that incorporate the use of activities.  Our business is a service that we provide, not a tangible product that we produce.
    Here is the scenario.  We have activities that a cost center performs.  Cost center 1 will perform 2 types of "pick-up" activities, so this would require two activity types.  Throughout the course of the month, the activity quantities would get posted to the cost center.  So my first question is how can you post only quantities to a cost center--what is the t-code?  We're not concerned with incorporating an activity price, we just want quantities.
    Second, as primary costs get posted to the cost center in FI, we want to split the costs onto the activities.  I have researched t-code KSS2 and can't seem to split the primary costs based on the activity quantities.  It keeps refering to target costs, which I don't really want to have to worry about.
    What we're trying to do is a makeshift ABC scenario.  Since the use of true abc seems almost non-existent, there's not much info out there on it.  Does anybody have any good docs on abc in SAP?
    Thanks
    Kory Squire

    Hi,
    1. I understood your case in this way .
    Cost Center A performs 2 activities . The cost center collects cost by Fi posting through out the month.
    Now you want the activity type should nt have price , only it should have quantities.
    And now you want to allocate the cost of the cost center to other object by activity types.
    If i am right..
    then instead of activity types why not create SKF(statistical key figures) . At the month end by t.code Kb31n post the activity qts. for combination of cost center and SKFs.
    Then as per your requirement run allocation cycle.
    The kind of you are planning , in that case activity types to be converted as cost object ( it can be done in control area setting) and then you want to allocate.. seems to be little complicated..
    Hope i understood and in turn i conveyed the message properly..
    Assign points if found helpful
    Regards
    Prabhat

  • Field Activity Type and Service Point Type from CC&B

    Our customer is migrating their CIS to CC&B. It is my understanding that the CC&B Field Activity Type is similar to CIS Service Order without the Service Point Type. (Service Point Type is Water or Electricity)
    The two valuescome from CC&B in their own fields.
    QUESTION: Does MWM 1.5.0.8.1 and ORS need these fields to be concatenated from CC&B or are these fields automatically concatenated via the router before the field order is created in MWM and then sent to ORS?

    Almost forgot - by default, it's one-to-one....but you can change this behavior.
    In the direct integration from CCB to MWM, the MWM Field Order Type is actually CCB's "JOB_CD" (which is a characteristic on the Field Activity Type). You could set the same value for "JOB_CD" for numerous Field Activity Types in CCB.

  • Activity Types and Allocation Cost Element

    Hi
    What are the impact of having same Allocation Cost Element for different Activity Types. Is there any where we use this condition. SAP allows to have same allocation Cost Elements to different Activity Types, but i did not understand where we can utilizes this feature.
    Thanks
    Sivaram

    Hi Sivaram,
    in WIP customizing OKG5 you can assign specific cost center/activitity type combinations to different line-IDs, even though the same cost element is used. By this you can e.g. differentiate the value flow of one cost element in 2: one for capitalization, the other for non-capitalization.
    Personally I would not recommend to use this and stick to the rule "one activity type - one cost element" - makes it easier for IT and controlling departments.
    Regards
    Harald

  • Activity Types and Cost Centres

    Our PP is not yet live now.
    While going through the system settings, it is found that many activities (approx. 15 for indirect expenses also) are planned in the Production Cost Centres.
    However, these activities are not included in the master data of the Work Centre. Only one activity type is mentioned there for machining.
    Then, what is the purpose of other activity types planned if they are not mentioned in the Work Centre ?
    Is there any other way these activity costs will appear in the Cost report ?

    Hi,
    You are almost on the right line, activity quantities will be triggered in the  cost center report based on the routing master and through  the confirmation from the production orders.
    For the creation of the  work center - Activity Planning KP26 is required. Cost center/Activity
    where we can plan the activity quantities.
    Prior to that KP06 is required to plan the  primary cost combination of (Cost Element/Cost center/Activity Type) where we can plan the cost.
    Based on the above information we can calculate the plan price - KSPI
    Based on the confirmation from the production orders activity quantities will be updated in the center report. cost will be updated with actual postings in the cost center.
    So that you can calculate the actual activity price.
    Please look into the blog for better understanding:
    Expenses Analysis and Its splitting  - Part 1
    Regards,
    Pavan Kumar Arvapally

  • Maintenance Activity Type and Service cost

    Hello friends,
    Is there any relationship between Maintenance Activity Type[MAT] and Service Cost ?
    Actually all the PM02 - Preventive Maintenance Order with MAT as Cost collector are actually accounted under service cost unlike other MATs.
    Please let me know more information regarding the above.
    Rgds
    Prasad

    Scenario in our company is something like below:-
    1.All the maintenance activity is done internally and no Serivces involved in the order
    2.Some of the Non-codified materials for order consumption are Purchased.
    With above, When I do the Cost Analysis MCI8 for all PM02 - Preventive Maintenance Orders for last year I could make the below observations:-
    1. Till Jun08 there is no service cost [which is normal]
    2. From Jul08 there is Service Cost involved , which am not able to understand.
    Could you please help me out?

  • Activity type and CAT2

    Hi friends,
    my client have employee who had activity type for 2009 (ACS001) and we planned this activity type with cost center(2114200001) in kp26.
    Belong 2010 year this person should not post in this activity type(ACS001), but other person with different cost centers can post in this activity type. So we not planning there cost center in kp26.
    But the problem is when person create mistake and post in cat2 for this activity type(ACS001) some hours for 2010.
    The system create only warn messages  'No activity prices exist for 2114200001/ACS001'.
    When employee push enter the system  accept record.
    So i think that we have several decision:
    1.With user rights to  restrict activity type(ACS001).
    2. Create new analysis period for ACS001. Now this period is from 01.2005 to 12.2999year.
    and split in to periods 1 period  01.2005 - 12.2009 and 2 period from 01.2010 to 12.2999.
    3.Create validation in HR
    4.Change messages type BK - 057 from warn to error. Here i think that is impossible.
    So how what type of decisions is better, and flexible?

    HI,
    2 possibilities:
    1: OBA5 change message control, you can set this message to "ERROR" on SAP-user level.
    2: If the combination of cost center 2114200001 and act. typa ACS001should not be used anymore in FY 2010 create a new validity interval for both masterdata and use the field "cost center category" in cost center master data / activity type master data to "unlink" cost center / act. type.
    best regards, Christian

  • Activity Type and Cost Element Assignment wrong

    The cost element appearing in Transaction code KP26
    ( Activity type planning), should come through the master data of the activity type.
    What I am observing in my system, that for the combination of the Cost center and Actvity type , in KP26 the same cost element is not appearing as per the master data of Activity type. And also the cost element filed is gray. It is happening for 2008 financial year only.
    How to correct this problem?
    Is there ant note to be applied.?
    Kamlesh

    This is normally a result of changing the CE while the Activity Type was active and in use (planned against and/or activity confirmed for some production orders).
    One solution is to curtail the activity to the end of the period you are in and create a new one from the following period. Just beware that you may need to change the routings, splitting rules, etc. as well.
    Cheers.

  • Activity type and skf calculation

    Dear Forum,
    I would like to seek advice of the difference of both calculation. 
    1 skf - 1 big amount allocated to all cost center. if the skf measurement is number of employee, then the cycle will apportion the amount according to the number of employee. correct?
    2 activity type - if the measurement is hour, then base on amount per hour defined in kp26 to get the total amount. correct?
    3 kp26 only can be used by activity type. not applicable to skf. correct?
    please advise me.
    Thanks

    hi,
    1 . As long as you have the Variable portion type as SKF defined in your Allocation cycle you can distribute the cost according to the SKF defined for each cost center.  hence you are correct.
    2. yes based on the per unit price of the activity type defined in the KP26 the total amount of the activity is calculated.
    (FOR ACTUAL the tcode is  KBK6)
    3. absolutely its only for activity types.
    Hope this helps.
    regards
    sayeed

  • Activity Type and Cost Relationship Configuration

    Hi SAP Gurus,
    In ERP, the recipe of Material  GN2425A1H, the activity is ZDL - Labour.  When the activity time is increased, the material cost does not change, e.g., if labour hour is changed from 1.52HR to 3.4HR, the cost remains unchanged.  In case of other materials, if the time of activity ZDL is changed, then the material cost changes accordingly.
    Please help me understand the configuration that needs to be checked for activity labour hours with cost associated.
    Thanks.

    Dear Samir,
    I am not sure if such a relation ship exists between Material and Labor.
    Normally, the costs are charged independently based on the valuation variant used for the Actual costs in the Process Order (defaulted from order type) ex:Material costs are picked as per the valuation indicator (V/S) from the Material Master when the goods issue is posted to the Process Order.
    Labor costs are picked when confirmations are done from the Transaction KP26 (planned prices for activitites) as per the valuation variant.
    Kind Regards
    Umapathi G

  • Difference between Activity Types & SKFs

    Hi SAP Gurus,
    Could someone tell me the difference between Activity Types & Statistical Key Figures (with examples).
    Thanks in advance.
    Regards,
    Sangeeta

    Dear all,
    Please let me rephrase/extend a bit what was stated so far:
    Statistical key figures can be also understood as properties/attributes of a cost center being an "object": area, number of cars, headcount,... They can be used for descriptive/statistical purposes but mostly they act as indexes in cost center allocations. For example, an invoice for energy consumption is booked on one "collective" cost center and then alocated to other CCs e.g. by number of employees.
    Activity types are used to valuate typical cost center activities. Amongst other purposes, they are used for direct activity allocations to PP orders where indirect overheads are not suitable. Another purpose is to reallocate internal activities between cost centers to avoid intracompany invoicing. As example, Engineering supports sales dept. with some special drawings. This activity is valuated per hour and used to debit the receiving CC via TC KB21N.
    Result of both SKF and AT postings is in crediting the sender -> cost center over/underabsorption.
    Kindly check also http://scn.sap.com/thread/1067453 and http://www.erpgreat.com/financial/what-is-activity-type-and-statistical-key-figure.htm
    please rate as helpful if really helpful

Maybe you are looking for

  • How to forward a message in Mail without attachments?

    Hey there, I'd like to be able to forward messages which had an attachment without the attachment. I've been looking through the settings, but couldn't find anything. I'd like to set it up in a way that it deletes the attachment, but that a notice st

  • How do you show the number of days per month?

    How do you show the number of days per month? I am working on a budget.  I want to know how much to amortize each month to fund an investment.  Income comes monthly, but expenses leave in days, or weeks.  The number of days and weeks in months vary. 

  • 'Message error' in Invoice

    Hi Guys, I have got a different kind of error at the time of tacking Invoice. It says "Message Error". Before that I never faced this kind of errorr. What could be the possible reasons for that? Kindly help me out. Thanks to u in advance

  • Adobe Media Player doesn't download and save movies properly!

    This program seriously sucks as for some reason, it won't let me save the rest of the movies from the Learn Dreamweaver CS4 channel, the Layers.TV channel and the MAX 2008 Design channel after downloading them. Why can't they have a option on their r

  • Interface StreamConnexion not find

    Hi all, In order to communicate with a bluetooth device, I've installed on my PC (OS : Ubuntu 8.04) the WTK 2.5. I would like to create a SPP Server. I find a lot of example on the web which use the StreamConnection interface of the mdi api. But I ca