Difference between Oracle Projects (EBS) and Oracle Primavera
What is the difference between Oracle Projects (EBS) or Oracle Primavera? what is Oracle’s direction on Project portfolio management solution.
TIA
BluShadow wrote:
3360 wrote:
Yes it is. The Oracle database wasn't initially designed to be ANSI compliant. As you correctly state the ANSI standards weren't around when it was initially designed, so the statement is perfectly correct. ;)Ok, in one sense it may be correct but it is a completely misleading statement. Not sure why you think it's misleading.Because there was no ANSI standard, so making it sound like a design choice The Oracle database wasn't initially designed to be ANSI compliant. would suggest to most readers that there was a standard to be compliant to.
Like saying Ford originally did not design their cars to incorporate safety features such as ABS, seat belts and air bags.
The OP asked "why oracle is having different syntaxes for joins than ANSI syntaxes ?" and the answer is that Oracle wasn't initially designed with ANSI compliance, so it has it's old non-ANSI syntax,As shown above, the old syntax was ANSI compliant at the time and to call it non-ANSI is either incorrect or misleading dependent on your point of view.
and since ANSI syntax became the standard it now supports that. And since ANSI switched to a new standard, Oracle had to implement the new standard as well as the previous ANSI standard would be more accurate in my opinion.
Nothing misleading as far as I'm aware in that.I find the whole discussion about ANSI and Oracle's supposed non-compliance, reads like it was Oracle's choice to deviate from the standards, when it was ANSI's bullheaded decisions to pointlessly change standards that left Oracle and other vendors out of compliance, and that was a decision made solely by ANSI.
This is probably the reason ANSI no longer produces SQL standards, the endless syntax fiddling would eventually have made forward left under outer joins a reality.
{message:id=1785128}
Similar Messages
-
What is the difference between Oracle and MySQL
Hi,
I would like to know the major difference between Oracle and MySQL. I have a project to generate XML files from database tables, i have used oracle's built XML functions XMLELEMENT, XMLATTRIBUTES, XMLFOREST, XMLAGG. I really want to know if these functions (or) similar functions are supported/availabe in MySQL.
I am having a hard time to find out best linux distro for installing Oracle11g, so i am planning to switch to MySQL. Please help, Thanks in advance.Oracle_Walker wrote:
Hi,
<snip>>
I am having a hard time to find out best linux distro for installing Oracle11g, Then you must be "looking for love in all the wrong places."
What's so hard about finding a "best linux distro for installing Oracle11g"? The supported distros are listed in the fine Installation Guide for Linux. At the top of the list is Oracle's own Oracle Linux, which is in the same family as Red Hat.
so i am planning to switch to MySQL. Please help, Thanks in advance. -
Differences between Oracle Discoverer 10g and 11g .
we would like to know if they are any differences between Oracle Discoverer 10g and 11g and any issues with 10g that are overcome in 11g.
Please make us aware of any merits in going for 11g over 10g.
apps version 11.5.10.2
RegardsPlease see these links for the list of new features, bug fixes, certification, and installation of Discoverer 11g on 11i instance.
Discoverer 11.1.1.4 Certified with E-Business Suite
http://blogs.oracle.com/stevenChan/2011/02/discoverer_11114_ebs.html
EBS Sysadmin Primer: Oracle BI Discoverer 11gR1
http://blogs.oracle.com/stevenChan/2010/08/discoverer_11gr1_primer.html
Oracle Business Intelligence Discoverer 11g
http://www.oracle.com/technetwork/developer-tools/discoverer/overview/index.html
Oracle Business Intelligence Discoverer 11g documentation
http://www.oracle.com/technetwork/developer-tools/discoverer/documentation/index.html
Thanks,
Hussein -
Differences between Oracle BPM and Aqualogic BPM 6.0
Hello,
Does anyone know where I can find information that spells out the differences between Aqualogic 6.0 and Oracle BPM (if there are any)? I've searched the Oracle sites, documentation sections, etc. and I cannot find a datasheet that spells out anything related to the differences between the two aside from the name change.
Thank you.I thought that there no major differences between the versions, only changes in the skin, logo and an improvement in the engine, but I was wrong.
My production enviroment runs BPM Enterprise in version 6, in other words runs Aqualogic BPM Enterprise, not Oracle BPM Enterprise, but in the development enviroment I made the decision to use the version 10 (Oracle BPM Studio 10g), because I thought there were no considerable changes between versions.
So I could not make the deployment of the project in the enterprise version, the log reported that many processes and screenflows of the project were not found, then I tried to open the project that was done in version 10 in version 6 of the BPM Studio and then try to export the ".exp" to try to do the deployment again. When I opened the project in BPM Studio 6 some errors occurred, but no significant errors. I fixed the errors, export the project again and try to do the deployment in the enterprise version and the same problems as before still occurring.
The only solution I found was to make the project in BPM Studio 6.04 (Aqualogic). Now I can make the deployment of the project in the production environment.
Conclusion: always use the same version in BPM studio/enterprise. If you use Oracle BPM Studio in development enviroment, use Oracle BPM Enterprise for production enviroment. The same way if you use Aqualogic BPM Studio in development enviroment, use Aqualogic BPM Enterprise in the production enviroment. -
What are the differences between oracle adf 10g and adf 11g
Could you please let me know what are the diff b/w oracle adf 10g and 11g, i tried in many user guides but i could not find it.
Thanks in advance,
Poli Reddy P893771 wrote:
Hi all,
I would like to know what the differences between Oracle and other NoSQL database are.
When and why should we use Oracle?I suggest that you start here:
http://www.oracle.com/technetwork/database/nosqldb/overview/index.html
Is Oracle NoSQL database link with Big Data Appliance?Yes, Oracle NoSQL Database will be a component of the Big Data Appliance.
Can we use map-reduce on a single personal computer? How should we install Oracle NoSQL database to use map reduce on a single personal computer?Yes, I believe you can run M/R on a single computer. Consult the various pieces of documentation available on the web. You may run Oracle NoSQL Database on the same computer that you are running M/R on, but it is likely that they will compete for CPU and IO resources and therefore performance may suffer.
Do we also have eventual consistency with Oracle NoSQL database? Yes.
Can we lose data if master node fails?If you run Oracle NoSQL Database with the default (recommended) durability settings, then if the master fails, a new one will be elected and data is not lost.
Are transactions ACID with Oracle NoSQL database? How can we prove it?Yes, each operation is executed in an ACID transaction. The API has the concept of "multi" operations which allow the caller to perform multiple operations on sets of records with the same major key, but different minor keys. Those operations are also performed within a transaction.
Charles Lamb -
Differences between Oracle Forms 11.1.1.6 and 11.1.2
Hello !
Which version should I choose 11.1.2 or 11.1.1.6
11.1.2 must me the latest one aka 11gR2
11.1.1.6 must be 11gR1 PS5
Am i right ?
but in the forms home page it seems that the 11.1.1.6 is the latest version ??
Oracle Forms 11.1.1.6 Released
The latest version of Oracle Forms (11.1.1.6) has been released.
This can be downloaded from My Oracle Support (MOS)
23-Feb-2012
Oracle Forms 11g Release 2 has been released. Read about the new features.
Oct-2011
I suppose that in a MiddleWare stack : SOA suite + BI publisher + Forms, the 11.1.1.6 (11gR1 PS5) is the best choice.
Can somebody explain me the differences between Oracle Forms 11.1.1.6 and 11.1.2 ?
Thanks
Regards
Jean-YvesMichael Ferrante (Oracle) wrote:
There are many new features in 11.1.2.0 that do not exist in 11.1.1. Some of the most significant new features are listed in the 11gR2 New Features documentation found on this page:
http://www.oracle.com/technetwork/developer-tools/forms
Additional information about new features and changes can be found in the product documentation for 11gR2, which is here:
http://docs.oracle.com/cd/E24269_01/index.htm
One important thing to note is that FMw 11.1.2 (11gR2) does not include Portal or Discover. So if you need either or both of these you will need to stick with 11.1.1.Hi Michael,
One of the features which is very very important in my point of view is
Reduced Installation Footprint
In order to reduce the resource requirements on development machines, you can perform an
installation specifically tailored for development. This will limit the number of software products
and servers installed on the machine whilst still allowing a developer to build, run and test their
Forms application.
If this feature is only available for the 11.1.2 release then the choice is made !
Thanks !
Jean-Yves
ps : and we don't use any portal or discoverer :-)
Edited by: JeanYves Bernier on 30 nov. 2012 23:54 -
Differences between Oracle 8i for a UNIX Platform and Oracle 8i for a Linux Platform
Hello,
J would like to know if there are some differences between Oracle 8i for a UNIX Platform and Oracle 8i for a Linux Platform.
I know that there are some differences on Oracle 8i Parallel Server and i know that some products are not include like precompiler (Mod*Ada, Pro*FORTRAN) on a Linux Platform.
Thank you.We have installed Oracle 8i on Solaris 8 and it had a great performance, of course that the hardware and licence invested here was costed my the office where i work. Personaly i'd installed linux reh hat 8 and oracle 8i, imagine that, it could be implemented by any individual that has the time to do so.
By buyinng from a company that has a good background you could be sure that you will have support.
Bottom line, if you have the $ to buy great hardware go for a unix platform. But if you don't a Red Hat Linux Server Licence with a 1 year sopport and Oracle data base is about 3500Dls.
Visit www.red-hat.com
Rewards... Bye -
Differences between Oracle 8i for a UNIX Platform and a Linux Platform
I want to know the differences between Oracle 8i for a UNIX Platform and Oracle 8i for a Linux Platform. And which platform is better?
ThanksWe have installed Oracle 8i on Solaris 8 and it had a great performance, of course that the hardware and licence invested here was costed my the office where i work. Personaly i'd installed linux reh hat 8 and oracle 8i, imagine that, it could be implemented by any individual that has the time to do so.
By buyinng from a company that has a good background you could be sure that you will have support.
Bottom line, if you have the $ to buy great hardware go for a unix platform. But if you don't a Red Hat Linux Server Licence with a 1 year sopport and Oracle data base is about 3500Dls.
Visit www.red-hat.com
Rewards... Bye -
Differences between Oracle Real Application Cluster 11gR1 and 11gR2
Hi Experts,
Please provide me differences between Oracle RAC 11gR1 and 11gR2.
Thanks in Advance,
Jeeshan.Hi,
You can also refer below Oracle notes :
11gR2 Clusterware and Grid Home - What You Need to Know (Doc ID 1053147.1)
Important Changes to Oracle Database Patch Sets Starting With 11.2.0.2 (Doc ID 1189783.1)
Regards,
Neha -
Differences between oracle text in enterprise and express editions
are there any differences between oracle text features found in express edition and ent. edition. if so what are they?
There is a list of features available in the online documentation. The only thing that it mentions as being missing from Oracle Text are the english and french knowledge bases. There isn't any Intermedia or Ultra Search or Data Mining. Here is a link to the 10g Express Edition features guide:
http://download-west.oracle.com/docs/cd/B25329_01/doc/license.102/b25456/toc.htm#BABDDIAE
There is a separate discussion group for 10g Express Edition, that requires a separate free registration:
Oracle Database Express Edition (XE)
There is a thread on this subject in the 10g Express discussion group:
Oracle Text
The above thread includes the following quick comparison:
If it's not in Standard Edition One, it is not in Express Edition. (Therefore everything that is in Enterprise but not in Standard Edition, is also not in Express Edition. That includes all EE-only options.)
If it requires Java in the database, it is not in Express Edition.
Other than that, it's mainly the size limits: 1 CPU (no parallel processing), 1 GB RAM, and 4 GB user-related tablespaces. -
At least 6 differences between Oracle 9i and 10g with complete understan
Hi 2.
At least 6 differences between Oracle 9i and 10g with complete understanding of each difference .
cheersHi,
Forum thread already opened by you
check what is the major difference between 9i and 10g
regards,
kaushal -
Searching for differences between oracle 8i and 9i
hello
can somebody help me please. i am searching for the difference between oracle 8i and 9i, and specially the differences in the DDL between 8i and 9i. may someone can help me!
thanks
Message was edited by:
Da Rookeei need some expamples to show the difference....for
example how it is written in 8i without joins and inNow you are talking about DML not DDL
For some examples showing the differences between the "traditional" Oracle join syntax and the ANSI join syntax see this article on oracle-base
http://www.oracle-base.com/articles/9i/ANSIISOSQLSupport.php -
Important differences between oracle 10g and 11g
Hi friends, can anyone tell me (pointwise) what are the major (and minor) differences between Oracle 10g and 11g.
Please point me to some documents if possible.
Thanks in advanceThe name of the link says it all: "top_features."
In short it is Oracle's list of what they have for marketing and sales reasons designated "top features."
It is not intended to be, and is not, a complete list of features. Often the features Oracle does not
talk about are the most important.
Let me give you some examples. I have never seen Oracle announce DBMS_XPLAN as a new feature
yet you should not run an explain plan without it. Neither have I ever seen Oracle announce the new
NO_DATA_NEEDED predefined exception. I have listed literally hundreds of new features you will not
find in Oracle's new features docs.
I did a presentation at OpenWorld this year as part of the unconference titled "New Features in
Database 11gR2 that Oracle will not announce." It was easy to prepare a one hour presentation with
little fear of being proved incorrect. As I turned out only one of the features I presented was mentioned
by Oracle.
You can find the presentation slides here:
http://www.morganslibrary.org/pres/oow09_ucnf.pdf -
Differences between oracle 10gr2 and 11gr2 warehouse bulider
Hi All,
Could you please let me know the main differences between Oracle 10gr2 and Oracle 11gR2 warehouse builder.
Also , it would be great if anyone point me to the document where i can see the major differences.
Thanks,
Naveen.Hi Naveen,
The major difference between OWB10gR2 and 11gR2 is the target RDBMS.
In 10gR2 you have to use ORACLE as your target RDBMS (unless you are going for DB Gateways, that is a complete different story).
Where as in 11gR2 allows you to use any RDBMS as your target system . This is achieved by Code-Template mapping.
All is needed is that proper jdbc driver for the target system.
Also 11gR2 supports OBIEE RPD creation and etc.
http://blogs.oracle.com/warehousebuilder/2009/09/oracle_warehouse_builder_11gr2.html
http://www.rittmanmead.com/2009/09/a-look-at-the-new-features-in-owb11gr2/
http://www.oracle.com/technetwork/developer-tools/warehouse/owb-11gr2-new-features-summary-129693.pdf
Thanks,
Sutirtha -
Differences between Oracle BAM and Oracle BI and Question BAM Data Objects
Hi,
I have two questions.
1. Can someone tell me differences between Oracle BAM and Oracle BI?
My understanding about Oracle BAM is, we use BAM to build Dashboards or Reports.
We can also build DashBoards or reports using Oracle BI.
I am not able to understand why Oracle has two tools for same purpose?
Which tool is more powerful and user friendly(Oracle BI or Oracle BAM)?
2. Every time we plan to develop Dashboard or report in BAM, we need to create BAM ADC Data Object to store Data (i.e first step is to get data from external database or application and second step is to store data in BAM ADC data object).
My understanding is we have an extra step(i.e creating Data Object) in Oracle BAM to develop a report or DashBoard
I am wrong pl correct me?
Regards,
Shanti Nagulapalli.Oracle 11g has many advanced features in PL/SQL over Oracle 9i.
refer here,
http://www.oracle.com/technetwork/database/features/manageability/9i-to-11g-real-world-customer-exper-133754.pdf
http://www.oracle.com/global/de/upgradecommunity/artikel/upgrade11gr2_workshop2.pdf
http://www.compuworks.com/events/view/233.pdf
http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getCourseDesc?dc=D52601GC10&p_org_id=15942&lang=US
Thanks
Maybe you are looking for
-
A second issue - no free space on server, possibly hacked?
On Monday morning, 4/30/2007, I came in to discover the last 80 GB left on our server was filled with 0 GB of free space. All the space had been taken up by a file/directory somewhere in one of the root folders (/etc, /var, etc). I never found out wh
-
Can Quicktime 7.6 record internet audio?
I need a software that can record any audio sound includes internet radio and stuff. and must capable of converting file directly into MP3 or AAC during or after recording. Can Quicktime pro do that? I'm just about to buy it, but I won't if it can't
-
OBIEE 11.1.1.7 Installation Issue
Hi, I am facing probem in installing OBIEE 11.1.1.7 on windows 7. It always fails on Instance Creation step. I think many have faced this problem ,but I am not able to fix it. Any response would be appreciated. Thanks, Krishna
-
Error in shortlisting candidate -- E-Recruitment
I am seeing a new error , while executing an activity to shortlist candidates Customizing table T77RCF_QACAT2ACT contains no corresponding entry for [1315] Would you know, where I can config this table?
-
BEFORE I ASK MY FAMILY TO BUY A MAC...
Hi: I'm a Mac owner in Spain. My family are in the US and are all PC users. I've had the same problems ("xxx not responding") with AIM that everyone else is having. It's a pity because I bought a Mac and iSight based on the claim that I could still v