Differenent Material in the DMR depending on the Customer

Hi All,
I have a requirement to run DIP profile based on Customer. I'm  trying to find a way to derive different materials in the DMR depending on customer, but if there is any other way to identify that an order is for a certain customer without introducing a new characteristic in the dip profile.
We tried adding Customer as Independent Characteristics in the DIP profile but while runing dip we are getting an error.
So I'm looking at is to have something unique per custome together with activity type should derive a material.
Do you have any good idea on what we could use whiteout introducing customer?
Thanks,
Jagan

It's possible to create a form in Acrobat that will do this, but if it needs to work with Reader, it can only work with Reader 11 (Win/Mac) unless the document is enabled with LiveCycle Reader Extensions ($$$$). You can use templates to spawn new pages at run-time and this requires a bit of JavaScript programming.
An alternative is to use LiveCycle Designer to create a dynamic XFA form.  Here is a link to the Desginer forum if you want to go this route: http://forums.adobe.com/community/livecycle/livecycle_modules_and_development_tools/livecy cle_designer_es?view=discussions

Similar Messages

  • How to issue the non stock material to the customer place through delivery?

    Dear All,
                I have created a service order with one operation,and for executing the operation i need one spares material which should be sent to the customer place.So i put that as non stock item in the line item of the order.
    Result : It Creates PR with account assignment and with reference to the PR i craeate a PO with the same account assignment order.
    Now when i take MIGO against the PO,it is directly consumed to the order,wherein i have to send that material to the customer place and then consume.
    How can i handle this process.
    Regards,
    Venugopal

    Hi,
    The material which u sending to Customer place mark those item as return in Purchase order and then do Goods movement by 161. If that material is non val. then No Accounting will generate.
    Vikramraj

  • How to trace Returnable packaging material pending with the Customer.

    Hello Everyone,
    In case of Returnable packaging,
    Is there any standard procedure, by which system can give you number of returnable packaging material with the custome.
    Client's requirement is to have number of pallets with the customer on the Invoice.
    Regards
    Trupti Deulkar

    hi,
    1.Returnable packging issue has a special stock indicator which will show in the Inventor stock with whom the returnable packging material lies in MMBE.
    Follow the link
    http://help.sap.com/saphelp_46c/helpdata/en/dd/560051545a11d1a7020000e829fd11/content.htm
    Thanks
    Shekar

  • Material can only be sold to one customer

    Hi,
    We have a material that is only allowed to be sold to one customer. How can this be handled in SAP?
    Thanks in advance.
    Mike

    Dear Mike,
    By the question it is not clear whether you want to sell only one particular material to the customer. That material to only one particular customer
    If you want to sell only one particular material to the customer, then use VB01 listing / exclusion
    Use Condition type A001, enter the customer to whome you want to sell that material and
    enter material. Only these materials would be sold to that particular customer.
    If you want to configure this you can go through
    SPRO - Sales and Distribution - Basic Funtions - Listing / Exclusions
    Then in sales order if you try to enter other material than the one entered in VB01, system will give you error.
    Hope you would understand by this
    regards,
    sagar

  • Batch Traceability for Sugar as raw material during the production process

    Dear Colleague ,
    I need your support for a traceability issue in a customer on beverage sector
    See the case below:
    Batch Traceability for Sugar as raw material during the production process
    In AMSB the batch traceability in some production processes is very difficult, especially in case of sugar where tanks wherein more than one batches of the same material can be mixed. For example, in a single day almost 17-20 batches of the same material can be mixed and as the result is a composition of water and sugar the normal FIFO rule strategy cannot be applied during the component consumption.
    The raw material (sugar) is received in tank S5 at different points of time, and its content is transferred to tank B1 for storage purposes as well as for mix the sugar with other material such as water.
    At a specific moment the S5 tank contains only a single batch, while the tank B1 contains more than one batch. Tank B1 is used in order to supply the production line and the corresponding material consumption is triggered in backflush as soon as the production activity is declared (production confirmation). Along with the material consumption the batch determination takes place and a complex algorithm is applied: at a very high level, the single batch is consumed depending on its percentage inside the mix of composition and in case the this
    percentage is under a threshold level the current batch should be full used in order to avoid that it will exist for ever.
    Moreover, the good movement reversal (reversal of material consumption) and its correction lead to a complete new calculation of all the batches consumed after the original movement date/time. This means that the algorithm for batch determination should be reapplied for all the consumptions subsequent to the original movement.
    On the other hand it’s not possible to identify the mix of batches at the exit point of silos B1 because the total consumption of the material in the tank will never happen. As long as the tank level decreases it will be filled up from the tank used for receiving of sugar (S5).
    As requirement AMSB needs to post the material consumption starting from EWM, this means that EWM should be the master system in this case and the correspondingmovements have to be  transferred to ECC afterwards. This mainly because EWM  should guarantee the business continuity in case the ERP system is not available.
    AMSB asked if the scenario depicted has been implemented in some customer, in EWM system or in any other SAP solution.

    Hi ,
    At the time of consumption you can put ' * ' aestrix sign in the batch field.
    You will get list of batches of that material.select ur batch and consume the quantity.
    Regards
    Piyush

  • Error :Maintain pricing conditions for the material for the excise invoice

    Hi
    i have maintained excise data for material, after that i have created scheduled agreement with lp and with 0 value private and dummy tax code  and delivery schedule is released. Now when i do the goods receipt i am getting error " Maintain pricing conditions for the material for the excise invoice date
    Message no. 8I629" can some body can help me.
    with regards
    Narendra kumar

    Hi,
    goto tcode fv11 u have to maintained the condition.
    first enter the condition type like jmop -
    then enter, next screen u have the select the below comination.
    select the plant/vendor/material base u have to maintain the conditions.
    Thank's
    MVS

  • Problem in creating a material in the plant

    Hello,
    I have set up a complete warehouse in a Plant & SLOC combination, I am creating a material in the same plant but it gives me the error that " Tables TCURM and T001W inconsistent; notify your system administrator"
    Please help me with solution.
    Thanks. Nitin

    Hi,
    Refer the SAP Note – 137601
    Or,
    You have to upgrade the Kernel. Check the old patch number in ur system, upload the latest patches & down load from Market Place. Consult your Basis Consultant
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Mar 27, 2008 8:25 AM

  • Sample Material in the 3rd Line item of the Sales Order

    Hi,
    We have configured the system in the sales order as follows.
    1. Commercial Material
    2. Bonus Material.(ie Free Material)
    Now, i want to add the 3rd line item in the sales order as Sample with different Material number. How go about this. kindly let me.
    Regards
    Ravi

    Hi there,
    Enter the material in the sales order & change the item catg manually in VA02.
    But free goods & sample materials are dealt differently..
    Freegoods is entered as TANN item catg along with nornam TAN item in standard order OR.
    But sample materials or free of charge items are processed through different order type FD for eg.
    Even thought the item catg proposed in FD is TANN,, the whole process will not have pricing as TANN items arenot relevant for pricing.
    Regards,
    Sivanand

  • Problem in creating and updating of  material by the use of bapi and bdc

    Hello All,
    I am using bapi (BAPI_MATERIAL_SAVEDATA ) and than bdc to create and update classification data of material.
    I am facing a problem.
    1) firstly I am creating material by the use of bapi and than after creation i want to update classification data for taht perticular material .
    2) To update classification data i am using bdc . while at the time of updating material through bdc system showing me error that material is currently locked by user (my login name ).
    Please suggest what to do.
    Tkank you
    With Regards
    Shantanu Modi

    When u update/create data it takes sometime to commit. So after using BAPI
    give 10 minutes wait in ur program before updating classification data.
    you can write like
    wait up to 20 seconds.
    and update the classification.

  • Subcontracting with the finished material to be given to the customer

    dear all,
    I want to implement a scenario, in which i want do subcontracting. the material shall not be given by me but shall be ordered to another vendor who shall give it to the subcontractor, the subcontractor shall give the finished product to the customer. I would like to do the goods receipt and receive the invoice from the sub contractor.
    Please tell the procedure if any one has implemented this scenario.
    regards

    Hi,
    1) For bought out material (to be given by your vendor to Sub-Contractor) - Preferably this PO should be generated from MRP generated PR (requirement coming from the sale order). You can change the delivery address (in Delivery Address tab at Item Details level). In the bought out material PO, you can maintain the vendor number (of your sub-contractor) & put tick at SC Vend. This will change the delivery address to the sub-contractors address. When you post GRN the material stock will be shown as material provided to sub-contractor.
    2) For Sub-Contractor Vendor (material directly to be given to the customer) - The condition you maintained is of the Third Party Supply.The PR for this PO must be generated from the sale order you booked in the system (for the customer to which you want to deliver the material). Maintain the procurement key as F (External procurement) & special procurement key in the material master as 30 (Sub-Contracting) for this material. Using this PR, raise the sub-contracting PO. When you post the GRN for this material the material will be posted to the material supplied to customer & the account hitting at GRN will be COGS (Cost of Goods Sold). The material provided to the sub-contractor (directly from the bought out material vendor) will be consumed at this GRN.
    Hope this helps.
    Regards,
    Prashant
    - Reward points if answer is helpful

  • How to including the finished goods as raw material to the other FG?

    Hi Gurus,
    Have a nice day!
    We would like to create production order for our semi finished goods and then we will doing confirmation. After we have produced our semi finished goods, we would like to include it in the bom as raw materials for our final FG. But how to handle this situation? Any suggestion on how the procedure to do it that the cost will not be double..when confirming the semi FG production it will generate cost for the usages of it raw materials. The semi FG is valuated then when i included it as raw material into Final FG it will generate cost for consumption in doing confirmation. I dont know the correct term for this scenario. In other word or semi FG will be part as a raw material to the next production.
    Please advise if you have been encountered the same scenario with me.
    Thanks ,
    Weldin

    Hello Gurus,
    Thanks julian for contributing your idea. I really appreciated it.
    Right now all activity in manufacturing FG is combine in one production order. Let say we have two activity one is the extrusion and the other one is bagging and printing. From our current set up, we would like to separate the activity. The idea is one production order for extrusion serve as semi-finished good. Then this semi-FG will be added in the component of our final FG which is the bagging and printing because in actual transaction that would be the procedure. Theoritically, we would like to separate the cost of extrusion activity to bagging activity. That is why we will be trying to figure out how to do it right for the analysis purposes.
    Other of my idea is when  i will set the semi FG to non valuated material. So that when i add  the semi FG as component to our Final FG no double costing happen. But when we will run the costing run it will compute low cost in terms of standard price for our final product.
    Thanks and best regards,
    Weldin angelo

  • How to save the material of MM01 into MARA table with customer Distribution

    Hi to everyone.
    This is first project of mine.
    There is some modification in TC VA01.
    We should write a code in standard program. I'll show the Enhancement below.
    Our Client wants to move the material distribution channel (M.DC) to customer's distribution channel (C.DC) if Customer Sales Organization and Material Sales Organization are equal.
    IF ( Customer Sales Organization and Material Sales Organization are equal)
    check for there distribution channel whether its equal.
    If ( C. Dc and M.Dc) are equal.
    some process.
    else (c.Dc not equal to m. Dc)
    Move (M.Dc to C. Dc)
    follow the same process.
    Where do we have to  add this enhancement in the program.
    Please help me out, its very urgent.
    Thanks and Regards in advance.
    A.Rafique

    i think u have to check customer+material table that is MVKE .
    Regards
    prabhu

  • When am creating the material using the transaction MM01 getting the error

    Hi all,
      Could you please help me to solve this issue, When I am creating the material using the transaction MM01, am receiving the error message "Express document "Update was terminated" received from author "XXXXXXXX", I checked the in SM13 found error message showing in Z_LGPLA_BIN_POSTING.
    Regards,
    Muralikrsihna.

    ST22 Error is : SAPSQL_ARRAY_INSERT_DUPREC, below is full error message
    An exception occurred. This exception is dealt with in more detail below
    . The exception, which is assigned to the class 'CX_SY_OPEN_SQL_DB', was
    neither
    caught nor passed along using a RAISING clause, in the procedure
    "Z_LGPLA_BIN_POSTING" "(FUNCTION)"
    Since the caller of the procedure could not have expected this exception
    to occur, the running program was terminated.
    The reason for the exception is:
    If you use an ABAP/4 Open SQL array insert to insert a record in
    the database and that record already exists with the same key,
    this results in a termination.
    (With an ABAP/4 Open SQL single record insert in the same error
    situation, processing does not terminate, but SY-SUBRC is set to 4.)
    Regards,
    Muralikrishna

  • Block a vendor from supplying a specific material to the company

    Hi
    Can anyone let me know how to block a vendor from supplying a specific material to the company.The PO must not go through for that specific combination of Material and vendor.The vendor is allowed to supply all other material except that.The PO must give a response that this material for this vendor is blocked.
    Sundarachellam

    Hi
    When You want to block aspecific Vendor material Combination ...
    There sis provision of Quality infor record where you can block the materila from speific Vendor for PO or GR or RFQ
    For this you have to maintain QI through Tcode: QI01
    Enter Material -vendor-Plant
    In release tab Enter date till which this vendor material combination is valid.
    Bellow that there is block condition
    Here you can totally block or block for a PO.
    Regards
    Sujit

  • Reg: material needs the batch management

    Hi All,
    The material needs the batch management. We have created without the batch
    first and the few movements were done, then tried to put the flag after the
    stock remove and sales order deletion, however could not process. System
    messaged as below in italic. Please let me know how we could change the MM
    date for the batch. The sales order alive now.
    The batch management requirement cannot
    be changed for the following reasons:
    SD documents exist (orders or deliveries) that have not yet been
    processed or that have been processed only in part.
    Thanks & Regards
    Siva

    Hi,
    This was asked in LE forum also, please read this thread:
    reg. activating batch management for existing materials
    You should fully process the sales documents (sales order - delivery - invoice) or you should delete them and after setting batch requirement for your material master you could recreate the them (SO, delivery).
    Regards,
    Csaba

Maybe you are looking for

  • Premiere and Media Encoder Crashing During Export of Quicktime Files

    Premiere CC and Media Encoder CC crashes when exporting Quicktime H.264 files. Sometimes the export will work, sometimes it crashes the app. After crashing, the app will freeze while loading "ExporterQuictimeHost.bundle" and requires a hard re-boot o

  • Date Popup Calendar With Time

    Apex 3.2 I have an updateable report that requires one of the columns to have a pop up calendar, displaying date and time. My sql for the column is currently APEX_ITEM.DATE_POPUP(7,null,a.export_time,'dd.mm.yyyy hh:mi:ss') I have also tried APEX_ITEM

  • PKGBUILD won't build on my system [RESOLVED]

    I've read the guidelines on the wiki but - for the life of me - I can't get my first attempt at a PKGBUILD to work.  I keep on getting the same error no matter what I do: # makepkg : command not found : command not found : command not found 'KGBUILD:

  • Unable to allocate port for repository while installing JCAPS 6

    Hi, I am interested in learning JCAPS. I have run into the roadblock while trying to install JCAPS 6. In the step where I needed to choose the port for the repository to communicate, JCAPS couldn't use any ports. It first said port (default) 12000 wa

  • Power book will not charge, battery just replaced.

    Recently the power adapter or the power connector on my computer would easily disconnect from each other. This morning I noticed that it was not charging at all, played around with it trying to jiggle it into place yet it does not have any connection