Different Vendors for one RM

Dear gurus,
I need your help for below requirement, 1)How to carry out vendor approval in Qinfo record - of a Vendor for Raw Material with respect to specific FG. (Requirement is a raw material that can be used in multiple FG but use should be restricted based on this approval.For manufacturing FG RM should be from approved vendor for it's FG.)
E.g.
FG1 & FG2 Requires RM1
RM1 can be purchased from Vendor 1
Vendor 1 is approved for RM1 and FG1 combination.
Vendor 1is not approved for RM1 and FG2 combination.
How to do this inQ Info Record (QI01).
Regards,
S.Sakthivel

Dear,
You need to go gor Quata arragment define the Quota arr. usage in mrp 2 view and Lot size with Quota split and define the quata arragment in MEQI.
Yes you can maintain 2 different vendors for raw materials
Regards,
R.Brahmankar

Similar Messages

  • STO with 2 vendors for one plant

    Hello!
    We are facing problems with stock transfer using transport order (STO). We want to use 2 different vendors for the same plant  (MK02 > Purchasing Data > Extras > Add.purchasing data). Some countries in our company should purchase from vendor X and others from vendor Y (X and Y is the same plant). The vendors have different settings.
    Our problem is that SAP allows only one plant as vendor (table T001W-LIFNR). When we try to create a source list (ME01) for the vendor not in T001W-LIFNR we get the error message:
    Vendor X and supplying plant PPPP incompatible
    Message no. 06732
    Diagnosis
    You have entered vendor X and supplying plant PPPP in the source list. However, a different supplying plant has been assigned to vendor X in the master record.
    Procedure
    Enter either the vendor or the desired supplying plant.
    Is works fine with the other vendor (the one defined for plant as vendor).
    Has anybody an idea how we can solve this issue?
    Thanks in advance and best regards
      Reinhard

    Reinhard,
    I think you may be confusing the purpose of a stock transport order.
    The vendor assigned to the supplying plant is just another way to represent that plant.  Since there is only one plant, there can ONLY be one vendor.  In effect, plant = vendor.  One plant in your organization is 'buying' product from another plant in your organization.  One plant represents the 'customer', and one plant represents the 'vendor'. 
    The vendor in the STO is totally unrelated to the vendor from which you originally bought the product.
    Can you describe the business requirement which makes you think you need more than one vendor per supplying plant?
    Rgds,
    DB49

  • Multiple Vendors for one Purchase order in delta load

    Hello,
    While Extracing data from 2LIS_02_SCL we are getting 2 vendors for a singe purchase order , as we know that for a purchase order we cannot have multiple vendors.
    When i checked data in deta queue (RSA7) we are able to see only single vendor for 1PO, but when we load to bw and checked data in PSA we are getting 2 different vendors for same PO.
    Regards,
    Vasu.

    Hello,
    As per my understanding you are getting data upto delat queue (RSA7) Correctly and you are getting incorrect data at PSA level In bw.
    i think you must have some customer exit in ECC for the datsource 2lis_02_scl. so i would say that there may be some problem in the code since the customer exit code will get triggered after RSA7 and before PSA in BW..
    Additionally you can cross check in RSA3 with update mode as 'D' which gives  delta before loading to BW.
    Debugging option :
    Load data to BW and pick the PO having multiple vendors and in ECC dubug using RSA3 with update mode as "R" inorder to fing the problem in customer exit code.
    Hope this helps you..
    Regards,
    Srikanth.

  • Multiple Vendors for one Document Number in BW

    Hello All,
    We are getting Multiple Vendors for one document in BW. In R/3, standard table and RSA3, we are able to see correct vendor where as when it is coming into BW it is showing incorrect vendor in PSA and Data Target.
    All issues are coming for Process Key 1 only.
    *For Example:*
    Document: 9400000007
    Schedule Line:1
    Doc Item: 1
    Vendor:
    0010019229 - Incorrect Vendor
    0010018962 - Correct Vendor
    Committed Quantity: 0
    Doc Type:
    ZNB
    ZNPP
    Process Key: 1
    Not sure how to upload screen shot.
    Please suggest.
    Thanks,
    Vijay

    Hi ,
    Are you loading for the first time ? If yes have you checked Transaction BF11 settings.
    Regards
    Rahul Bindroo

  • More contracts (with different suppliers) for one item

    Dear MDM Experts,
    is it possible to make more contracts (with different suppliers) for one item?
    Thanks and regards,
    Ádá

    Hi,
    Thanks for your answer. If I set my shopping cart for a contract with a supplier A, and I select an item with a supplier B, then after pushing button Transport to SRM on the shopping cart webdynpro UI, I would get the an error message, and the item wouldn't come to the SRM.
    If the item doesn't have any supplier, and I make a contract with it, the supplier of the contract goes to the item, and after that I can't make a contract with an other supplier for this item, because of the uppers.
    The type of field Supplier in table Catalog Items is Lookup field, and it can't be modified.
    Could you please write to me which can I set our system to be able to make contracts with many suppliers?
    Thanks and regards,
    Ádám Horváth

  • One MIRO document with two different vendors for two different line items

    Can it possible to make MIRO for a PO which is having two conditions(Basic price+Freight) with two different vendors.
    MIRO document needs:
    GR/IR Clearing    Dr.
    Freight Clearing  Dr.
    Vendor RM(X)         Cr.
    Vendor Freight(Y)   Cr.
    Is it possible to post the above document at a time not individually for each condition.

    Hi,
    Yes, It is possible to post Material and delivery cost in one document.where in material supplier is different than the Frieght vendor.
    Itm PK  BusA Acct no.   Description                    Tx     Amount in   USD   
    001 89       130001     Stock-Ingredients               244 0            880.00 
    002 96       320001     GR/IR Account - Ing.            244 0          1,200.00-
    003 86       520002     Ingredients - PPV               244 0          3,297.87 
    004 50       320008     GR/IR Account - Duty            244 0            797.87-
    005 50       320009     GR/IR Account - Fre.            244 0          2,180.00-
    Thanks
    Dinabandhu

  • Hi different vendor for goods supplier and main vendor

    There are two vendors one is main vendor and second vendor is goods supplier.How to use these two vendor when ordering material.
    Whether we have to create two purchase orders one for the main vendor and one for the goods supplier?
    What is process the process to be followed in this scenerio?
    and what are teh settings required?
    Thank you.

    the question is: do you really need to mention the good supplier in your PO?
    The partner role GS good supplier is used in European Trade reporting like INTRASTAT, because there you have to report the goods movement, dispatch and arrival country. The dispatch country is then determined based on GS partner and not from VN partner.
    if vendor is different from good supplier, then you need an extra vendor master for the good supplier,  then you need to allow this GS role in your partner schema.
    Then you need to maintain the GS partner in the vendor master partner view of your main vendor.
    From there is will default to your POs .

  • Liability on two transport vendors for one shipment

    I am in the process of configuring transportation with two level leg determination.  That is from parent plant to one destination, it would be in main leg and from that destination to final destination in subsequent leg.
    The purpose of doing is that liability should be created on two transport vendors while creating shipment document.  I have done almost all configuration settings related to this in IMG > Logistics Execution > Transportation and Routes.   But I am unable to create second shipment document via VT01N.  First of all, my doubt is, is it possible to create a shipment document without considering the parent delivery document since it has already been assigned to first shipment.
    Have searched the forum but I am unable to find a solution.  Need experts help.
    Kaushal

    hi kushal,
    this is to inform you that,
    ok you are doing transportation chain concept and in that you are using two TCP one is main leg for one destination and second destination for subsequent leg.
    here i have a doubt, you are processing one single delivery with two different vendors, please correct me if am wrong.
    if you are using one single delivery for two shipments creation it is not possible, because the delivery is already assigned to frist shipment.  so please create a shipment document with collective shipment but dont take individual shipment and try.
    regards,
    balajia

  • How can I create more than one different signatures for one account or for one address?

    I want to vreate 2 jr more signatures for one account. For example, in different languages, with different text, etc.

    Take a look at this add-on.
    https://addons.mozilla.org/en-US/thunderbird/addon/signature-switch/

  • Can I use 2 different cards for one purchase

    i need to pay for a song and I have enough on 2 different prepaid credit cards added up and I wanted to know if there is a way to use both for one purchase?

    No. By design, an iPhone will sync or manually manage iTunes content with ONE computer at a time. Any attempt to sync or manually manage such content with a second computer will result in ALL iTunes content being first erased from your phone, then replaced with the content from the second computer.

  • I am getting different Names for one Shift_ID...

    Hi Gurus,
    I am new to Oracle report and trying to fix one bug.When I run a report with a particular Shift_ID , I am getting different Customer_Service_Representatives Name in the report.
    I checked the sources of each columns in the Layout.
    I have also gone through the tables used in the report(actual datas are in Prod for which I have no access) :((
    I am Stuck and its not working...
    PLease Help!!
    THanks

    Hi
    the thing is the shift ID where they are having problem is in the production Another choice pls define the problem if u can't define (but u didn't mention it)and suppose a solution for it to guarantee a valid data output.
    I have to modify the package associated with the Report.if they depends on shift ID that have problem is in the production and needs to modify modify it temporary with a static test data purposes.
    and if i got ur point clearly and if i were u i would ask for any hard copies or documents related to this report that would match with the production if it is necessary to have a specific shift ID and i had a limited access to DEV and TEST access.
    make sure that u r having a valid data in TEST or dev user otherwise pls try to invent a use case or test data with a new shift_ids and new Customer_Service_Representatives Name and try to test .
    Hope this helps...
    Regards,
    Abdetu...

  • Different vendor for po and gr

    user requirement is that material purchase from X vendor but the goods receipt against Y vendor.
    Purchase order raised against X vendor and GR against Y vendor.  how should in maintained in sap

    Hi,
    As replied in above posts, you can use Partner Functionality of Vendor Master data. If you display Vendor master data, click on Goto --> Purchasing Org Data --> Partner Functions. You can maintain different partner function like goods supplier in that screen.
    Thanks,
    SG.

  • Different results for one query

    Hi,
    Today i got a very surprising issue with SQL 2008, my one team member inform that a single query is resulting two different data set from two diff-diff SSMS's query windows.
    Query is like this,
    Select * from table1 where trandate between '2014-08-02 00:00:00.000' and '2014-08-03 23:59:59.999' and status='S'
    in one query window its showing 295 records while on same desktop in second query window its showing 602 records.
    Please let me know where is problem. [:)] 
    Thanking you.
    Virendra Yaduvanshi
    Principal DBA, 
    MCTS, MCITP
    http://wikidba.wordpress.com
    Virendra Yaduvanshi http://wikidba.wordpress.com/

    Are updates occurring that are modifying the data or do you get the same results in each window multiple times?
    One thing to do is look at the actual execution plans and see if they are identical.
    If parallelism is involved, try disabling it and see if the results change (I've seen some twitchy things happen with it)
    If all of that checks out it may be some implicit conversion is happing to the date or there is  a case sensitivity issue with the 'S'

  • Set different color for one JTree node

    hello,
    I managed to find how to set a color for Jtree nodes but the problem is that with my method all the nodes will b the same color whereas i'm looking to have nodes of different color depending on the situation.
    the method for setting all Jtree nodes the same color(other than black):
    tree.setCellRenderer(
    new DefaultTreeCellRenderer() {
       public Color getTextNonSelectionColor() {
         return Color.lightGray; } });I WANT TO CHOSSE EACH COLOR FOR EACH NODE
    help plz
    thanks

    You need to implement TreeCellRenderer interface
    public Component getTreeCellRendererComponent(JTree tree,
                                                  Object value,
                                                  boolean sel,
                                                  boolean expanded,
                                                  boolean leaf,
                                                  int row,
                                                  boolean hasFocus)You can know which node is rendering by check value argument. Please read DefaultTreeCellRenderer's code.

  • I have a two different charges for one album. How can I figure out what each charge is?

    I purchased an album and got charged two different prices. How can I figure this out?

    As has already been said,  The onboard ethernet is 10/100/1000 and capable of autosensing which speed it's connected at.  
    What is more in question is the service you have.  I don't remember if cable is the same, but with DSL, there are two connection methods.
    1.  IP Based.  A static IP internet connection that is always on.  Usually three things are required information that can be given via your ISP.
    A) IP Address
    B) Gateway
    C) DNS Servers (Without these the PC cannot resolve DNS names so it doesn't know that http://www.website.com = xxx.xxx.xxx.xxx IP address.
    You can get there by right clicking Network Neighborhood, and click PROPERTIES.  Then right lick Local Area Connection and click PROPERTIES.  You can click the TCP/IP setting and click the properties button and enter the proper information to get you online.
    2.  PPPoE (Point to Point Protocol Over Ethernet).  PPPoE requires software from the ISP and usually all that is required is installation of the software and a USER NAME AND PASSWORD.  IP, DNS, and Gateway are all auto-determined by the remote server that the PPPoE software connects to.
    Does yours use one of these?  Most people use a combination router/firewall and plug in either settings.  If you've already configured your settings and are still getting no access, suggest the following:
    a) Reset your cable-modem, then your PC and try again.
    b) Check your cable connections.  You may have an intermittent connection on your net card/wire.  check the pins and look to make sure they make clean contact.  Try another cable to make sure there are no broken/intermittent conductors in the cable.

Maybe you are looking for

  • Adobe programs don't work on Win7 x64 with IE8 x32

    I have been working for the last 2 hours trying to get adobe flash 10.1 downloaded and installed on Win7 x64 and IE8 x32.  It downloads and crashes and never finishes the install, even though sometimes the adobe site tells me it's installed.  when I

  • How to print the HEX values of non-displayable characters!

    I am trying to tokenize a string that contains non-displayable characters i.e. EBCDIC or ASCII. How can I print the HEX values of the non-displayable characters. e.g. "StartTEST1TEST2TEST3TEST4TEST5TEST6TEST7TEST812END" How can print the HEX values o

  • Install Windows Server 2012 R2 VM on Storage Spaces with Storage Tiers

    Hey guys In my small/medium sized company we will soon update to Windows Server 2012 R2. I would like to implement virtual servers using Hyper-V. I didn't find a lot of information about Hyper-V in combination with storages spaces and autoamted stora

  • 2012 Virtual Machine Black Screens Whenever Promoting to Domain Controller

    I have a brand new 2012 cluster with 2 hyper-v host nodes running Server 2012 (not R2). I have successfully spun up several virtual machines from templates via VMM 2012R2.  I added the AD DS role today to my DC01 server running server 2012 (not R2).

  • Process in SM66

    Hi, I see BW process chain showing a process node in Yellow, SM37 for the same says job is finished. I want to see corresponding job in R/3. How to find the corresponding job in tcode SM66.