DIP Profile for N N

Hi all,
I need configure Sales Pricing Scenario for a manufacturing company to generate quotation and then sales order. I am using Detail Cost Planning in CJ40.
I am able to configure a DIP profile which is working and determining a material which I have defined in Material Determination node.
Since being a manufacturing industry I am having N number of FG items for which we are making quotation and Sales Order.  I want to now How should I configure a DIP Profile to determine such material after creating a project for some specific material in order to do Sales Pricing and get quotation for same.
Regards,
Atul Rajmane

Hi,
I am putting my question again!!
In compnay if we are having more than one materials for which we are making Sales Order i.e. Item A, Item B, Item C....so on and also, as & when required we are making these new codes for making qutation and sales order.
In such cases how should I determine material in DIP profile so that I can get that material in quatation after sales pricing.
regards,
Atul

Similar Messages

  • DIP profile

    Hi
    I want to configure the DIP profile for project system - costumer order project
    so please send the details
    I have tried to create the DIP profile and assigned to doc. type IN in sales B and also assigned WBS in acct. assignment tab
    when i run DP81 T.code the systems give the error meassage that
    No pricing procedure could be determined : Message no. V1212
    Diagnosis
    The appropriate pricing procedure could not be determined because no entry with keys '50CC    5C' 'P' '1' exists in table 683V.
    System response
    The system does not allow further processing of the document.
    Procedure
    If necessary and if you have the authorization to do so, add the missing entry using the Customizing tool for determining pricing procedures.
    <b>As per this message i have maintain same in OVKK</b>
    but still same message is issued
    Please suggest check pionts and what should be checked
    Regards
    Suresh

    Hi
    I think u r say about types of Billing Actual Costs viz:
    1. Periodic Billing
    2. Flat Rate Billing
    4. resource-related billing
            4.a.   Static Resource-Related Billing
            4.b    Flexible Resource-Related Billing
    if i am on right track, plz explain the difference between then and what are the std cond. type and prcg prod in SAP
    In present client remt. senc. there are both material and service in project system
    so plz specify suitable  cond. type and pricing prod.and while custmz what should be considered
    Thanks
    Suresh

  • DIP Profile & result analysis

    Hi GURUS,
    Can anyone explain me in detail, how to create DIP Profile for Biliing and result analysis?
    Regards,
    Partha
    [email protected]

    T.Code: ODP1
    Link: http://help.sap.com/
    Path: SAP Best Practices --> Baseline Packages --> Based on SAP ECC 5.00 --> Select Country: for eg, Localized for India --> Technical Information --> Building Blocks --> Select Country for eg, India -->
    <b>J46 - Fixed Price and Time and Material Billing Project</b>
    In above scerario, in configuration guide, you will get a good understanding on DIP Profile.
    Regards,
    Rajesh Banka
    Reward suitable points.
    How to give points: Mark your thread as a question while creating it. In the answers you get, you can assign the points by clicking on the stars to the left. You also get a point yourself for rewarding (one per thread).

  • DIP profile setting

    Hi, gud morning, eveybody.
    I m working on construction project which requires me tointegrate DIP with PS. i have made the setting as explained in SAP-help and documents provided in BB46, but somehow, i have failed to understand if it is really meeting my requirement. basically i m trying to say, i m not getting the concept of DIP.
    1) what do i need to do to make DIP work with planned total records ?
    2)where does planned DIP pick up the cost or resorces from and where does it plug it in quotaion if im working with resource related quotation?
    3) when i run 'check prifile setting under ' DIP status it says 'not ok' what does it mean how do i turn this arround?
    does someone have any really useful document on DIP settings other than help file or can someone explain DIP with setting.
    you could mail the doc on <b><REMOVED BY MODERATOR></b>.
    Thankyou for reading my query.
    gud day all..

    Maintaining Profiles for Sales Order and Billing Request
    Use
    The Dynamic Item Processor (DIP) profile defines and controls resource-related quotation and billing for service orders and sales documents. It may be maintained in either the Customer Service or the Sales and Distribution section of the IMG. The DIP profile allows flexible determination and translation of actual labor, material and other costs into sales materials for appropriate pricing and billing.
    DIP profiles BC10 is used exclusively in the value chain for time and material project.
    Integration
    The DIP profile functionality is closely integrated with the controlling module for the processing of cost objects into sales materials.
    Prerequisites
    Relevant sales document types, condition records, sales materials have been created.
    Procedure
    Access the activity using one of the following navigation options:
    IMG Menu Project System ® Revenues and Earnings ® Integration with SD documents ® Creating Quotations and Project Billing ® Maintain Profiles for Quotations and Billing
    Transaction Code ODP12.
    Activities:•      In the configuration item Profiles for Sales Order, Billing, Results Analysis, choose profiles BC12.
    •     The DIP profile can be used for processing resource-related billing and results analysis, as well as for generating resource-related quotations. To do so, sales document types must be defined for each usage. Access the Usage section of the profile and maintain the following entries:
    DI Usage     SD Ty BC12
    1 Billing & Results Analysis     Z2TC
    all other fields leave blank     
    •     Access the characteristics section of each profile. The characteristics are the objects which the system will take into consideration when processing and displaying resource-related billing. For both billing and order usages, set the characteristics as follows (note that other settings are automatically defaulted in by the system):
    Characteristic     Charact
    Relevant     Material Determ     NoSummarizat.     Structuring     Sequence
    Z2TC                             
    Accounting Indicator     X                    
    Activity Type     X     X     X          
    Object number     X                      
    Period     X                       
    Transaction Currency     X          X          
    Unit of Measure     X            X           
    all other fields leave blank                             
    •     The sources section determines what type of costs will be selected by the DIP profile for each usage. More detailed selection criteria are available, but not maintained in this setting. Access the sources section of each profile and maintain the following entries:
    Line     Source     Percentage
    1     0001 Actual Cost - Line     100
    •     Access the material determination and criteria sections of the profile. Material determination defines the sales materials that costs will be converted into. The criteria defines cost element groups (cost elements are determined from the labor activity type or the component account assignment) that correspond to each material. For both billing and quotation usages, define material determination as follows:
    Material/Service     Material Determination:
    Transfer Quantity/Costs     Material Determination:
    Conversion Quantity     Criteria:
    Activity Type
    Z2TC                 
    I00342     X (Transfer Cost & Qty)     Checked     
    I00984     X     Checked     
    all other fields leave blank                
    •     To confirm that all entries and settings in the DIP profiles are consistent, go to the configuration item check profile settings. Enter the DIP profile and execute. Green traffic lights should be displayed next to all items for both usages. Otherwise, determine the inconsistency and make the necessary correction.
    Regds,
    Rajesh Banka
    If you give your email ID, i can forward a document to you.

  • DIP Profile assignment for item category

    Hi Gurus,
    I  know at item category Level  we can see "DIP Profile" .  but i want to now whether any assignment any where in IMG?
    Regards,
    Seegal

    Hello Seegal
    You asked about assignment right? At least that's what I understood it as.
    If you are asking about where to set up the profile itself, then here is the answer  for that:
    T Code: ODP1
    Menu path: From SD: SPRO/IMG/Sales and Distribution/Sales/Sales Documents/Customer Service/Service Quotation/Resource-Related Billing/Profiles For Resource-Related Billing/Quotation Creation
    Does that help you?

  • DIP profile settings for quotaion creation?

    Hi experts
    I have to create quotation with reference to Plan cost thru ECP.For the same i have to assign DIP profile. So, i need to know what are the settings should be done in DIP profile steps (like in Usage , charaterstics,Sorces, selection criteria etc..) so that i can use it for quotion creation.
    your early replies may help me a lot.
    Thanks in advance

    i am closing this thread

  • Assigning DIP profile in Sales order

    Hi all,
    Here I had a strange issue. I want to assign DIP profile in my Sales order to create DP91. The box for assigning DIP profile ( Control of Resource-related Billing and Creation of Quotations) under SalesB tab of item data is disappearing in specific case.
    Sometimes it is appearing and some other times it is not. I am not able to catch the difference. Can anyone please suggest me on this.
    Ratna

    Hi Prakash,
    Thank you for your answer. My item cat is TAO and schedule line is CD. By default I am not using any requirement type (leaving the field as blank) as my case is service related. In that case I am not getting the above said box. But when I attach KE or any other requirement type manually in sales order under procurement tab, then that box is coming where I can attach my DIP. But why should I give requirement type as I am using material type as DIEN (service)? Where is the linke between requirement type and that box? This is just my analysis. May be I am going in wrong way (but my foundings are correct).
    Can you suggest me please.
    Ratna

  • Billing Based on DIP Profile - PS - SD Line Items Structure

    Hi,
    I have created a sales order with 1 line item which is linked with a WBS Element via account assignment.
    Based on the line item and WBS structure & Activities. I am billing the customer by creating a debit memo from DP91.
    The billing is POC basis and is done on monthly basis. Thus at the end of each month the customer is billed according to quantities confirmed in DP91. Ultimately the complete project is done and all billing is completed as well.
    Now the problem is: sales order line item had 1 quantity, however debit memo created via DP91 had more than 1 quantities and we have created multiple debit memo request w.r.t. a sales order. now the project is completed, but the status of the sales order is stilll "open". what should be the structure of sales order line items so that order is also set as completed when all quantities in PS are billed.
    waiting for any kind of supportive information.
    thanks.

    Hi Robert,
    You have 2 questions
    1. On DIP
    DIP has nothing to do with WBS, though you use WBS as one of teh characteristics in DIP. As per your DIP, many sales orders are created and they are enabled with different material (material determination in DIP). In order to analyse this further, you have to analyse the DIP, which is linked to your item category in VOV7. If not in VOV7, you can see the DIP name in the item level in the sales order. Using this, you can go to PS and there you can see the characteristics, usage and materials configured for this profile. This will give you a lead to find out why multiple items are coming. As per DIP profile, having multiple materials while creating documents in DP91 is expected behaviour.
    2. For sales order update, you have to invoice all your billing plans, if your order items are billing plans enabled, (may be MS billing as your system has PS also). If you check this, and invoice all the milestones, then the status will be updated automatically. Before updating the sales order status, you should also close all the WBS elements and the project, which are linked to the sales order (I am not sure about this point, but you can try it in the test system, be have the system of one project per salesorder, may not be the case for you)
    If you have any specific questions, pls lemme know.

  • DIP profile, simple question, no solution?

    Hi all,
    I have to create a quotation from a service order, and it looks like simple because I have 2 or 3 internal operations everytime and they have to be reported in quotation (DP80).
    Work Center for operations is the same, activity type the same... but I have to report exactly the same NUMBER of entry in quotation.
    Example:
    CS Order:
    Operation 10: Internal work center A: TEXT01, activity A, duration 1 hr. cost = 10
    Operation 10: Internal work center A: TEXT02, activity A, duration 2 hr. cost = 20
    Result in DP80 is:
    Item 1: Service material AAA price 30
    Requirement is:
    Item 1: Service material AAA price 10
    Item 2: Service material AAA price 20
    Is it possible?
    Thanks.

    Hi Frederico,
    yes this is possible. In the settings of the DIP profile you can go to: Characteristics, after selecting the Usage: Quotation creation and sales pricing. In the characteristics list you mark the Activity Type in the field: NoSummarization. If you choose F1 in this checkbox you get this explanation:
    No summarization
    Controls the second summarization level for dynamic items, meaning from dynamic items to items of the billing request. The indicator defines whether the characteristic is taken into consideration during summarization of the items.
    Use
    If you do not set the indicator, the system summarizes into an item all dynamic items in the billing request for which the same material was found during quotation or billing creation. This also applies even if, for example, the assigned activity type is different for both materials (see Case 1).
    If, for example, you do set this indicator (for example, for the activity type) the system does not summarize into an item the dynamic items for which the same material was found during quotation or billing creation if the activity types are different (see Case 2).
    Examples
    Case 1:
    The indicator No summarization is not set for the activity type.
    Dynamic item Activity type Material found
    12 h Activity 1 Mat 1
    5 h Activity 2 Mat 2
    1 h Activity 3 Mat 2
    When creating a billing request, the system creates the following items:
    Item Material Qty/Unit
    10 Mat 1 12 h
    20 Mat 2 6 h
    Because the indicator is not set for the activity type, the material "Mat 2" is summarized in the item of the billing request.
    Case 2:
    The indicator No summarization is set for the activity type.
    The system does not perform summarization in the item of the billing request, but instead lists the items separately by activity type.
    Item Actvy type Material Qty/Unit
    10 Activity 1 Mat 1 12 h
    20 Activity 2 Mat 2 5 h
    30 Activity 3 Mat 2 1 h
    Best regards
    Lars

  • Tax setting in DIP profile

    How to assign service tax and VAT to dip profile.

    Hi
    <b>Configuarion is missing in this case.</b>
    Please maintain data in the following tables in SRM side, similar to what is maintained in R/3.. In order to go ahead further.
    <b>The main tables are as follows ->
    BBP_TAX              Tax Codes for Enterprise Buyer                   
    BBP_TAXT             Enterprise Buyer: Tax Code Description
    BBP_MAP_TAX_CODE ( Assign Enterprise Buyer Tax Code to FI System )  
    BBP_DET_TAX_CODE  (    Tax Code Determination  )</b>
    Hope this will help.
    Pls reward suitable points.
    Regards
    - Atul

  • WBS IN DIP PROFILE-Reg

    Hi,
    This is an requirement.
    In odp1,under characteristics we can find WBS ELEMENT.
    My requirement is,In Project System,client wants to bill the customer based on WBS element(as we do with Activity type normally).
    The issue is WBS is not a predefined one as like ACTIVITY TYPE.COST CENTER,COST ELEMENT etc.It will get generated whenever project is created.In that case how can I build the profile.
    Pl share your views in which scenario we use the WBS element in DIP.
    Regards
    Arunachalam Sureshbabu.

    In DIP profile
    To use RRB between company codes, you have to adjust the DIP profile. Make sure that Intercompany Line Items are selected as a source for dynamic items of the dynamic item processor.
    1. The Characteristic relevant indicator is set for the cost element characteristic.
    A dynamic item is created on the basis of sales price for each cost element (planned or actual costs)
    2.  The Material determination indicator is set for the Cost element characteristic.
    The cost element is made available as a characteristic for material determination using sets. If this indicator is set, you can enter only a set for the characteristic in the Material determination table.
    3. The No summarization indicator is not set for the cost element characteristic.
    Several dynamic items with the same material number and cost element in the sales price basis lead to the item in the sales document.
    4. The Structuring indicator is set for the cost element characteristic. The set name PS-ALL or OAS is preset with levels from 1 to 2.
    Dynamic items are structured hierarchically using the cost element group.
    Do all this setting in DIP profile.& use the DIP to perform thsi billing reqmt.
    Assignment to the DIP profile is performed in the service order header or the sales order itmes.
    Regards,
    ANSAR

  • Work center in material determination of DIP profile

    Hello,
    the source of our DIP-Profile is 0001 Acutal costs - line items.
    We have the requirement to use the work center in material determination as criteria.
    But in DP90 we get material determination error.
    The issue is that in the failed combination no work center is available.
    Why can´t the DIP find the workcenter we used in the service confirmation?
    Thank you
    Kind regards
    Manfred

    Hello,
    after above setting have tried this in ODP1
    select The Work Center in Chr.then >select Source on left hand side  ->Select the Actual cost Line Item>select Material determination-->Select Material for which Transfer Cost and Quantity -->Marked the Check Box Material determination and Individual
    Also please let me know Which Control Key you are using in service order??????
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Sep 9, 2010 3:16 PM

  • Link Between DIP Profile and RA Key

    Hi All,
    As per Result Analysis calculation Method-15 "Revenue from Resource-Related Billing and Simulation of Dynamic Items", the "Cost of Sales" is calculated on the amount of actual cost incurred according to DIP Profile.
    Can anybody tell me How the RA Key and DIP Profile are linked to each other? What is the configuration for this?
    Thanks in advance.
    Regds,
    Bijay

    Hi Kedar,
    I checked it and it's defined as optional.
    The field "payment terms" is alreday displayed for all posting key.
    The problem is that the "payment terms" that is defined in the customer master record is fulfilled per default in F-36 (bill of exchange payment) with posting key 14 and not with posting key 16.
    Thanks in advance
    Tarek

  • DIP Profile and Resource Related Billing

    Can anyone please explian how DIP profiles are defined and assigned ?
    How does this concept work in resource related billing?
    Can 'resource related billing' be used in case of SD orders - but the orders which are generated for services only?
    If the answer to these questions is long and instead of that, you want to share any document that you may have - please mail it to [email protected]

    Hi,
    Check transaction ODP1 for configuration related to Resource related billing.
    Refer to following for further information.
    http://help.sap.com/saphelp_46c/helpdata/en/fa/e42c7dd435d1118b3f0060b03ca329/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/35/a7b5489af50d14e10000009b38f9b9/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/59/54fc37004d0a1ee10000009b38f8cf/frameset.htm
    Also, there are various customer-exits available in resource related process. Refer to following like for information related to various available customer-exit.
    http://help.sap.com/saphelp_46c/helpdata/en/35/b0e86887a62488e10000009b38f9b7/frameset.htm
    Let me know if you need further information.
    Regards,
    RS

  • DIP Prfile for invoicing ofSM02 order type by Resource Related Billing DP90

    Dear Guru,
    I have configured the complete DIP profile. But the only thning left is "blank-entry for material determination in the DIP profile is the last entry". I don't know about this.
    Can you please explain what is blank-entry for material determination in the DIP profile is the last entry.
    Many thanks

    Dear,
    IN RRB by using SM02 .
    The line item created due to the withdrawal of material contains, for example, information about the cost element and the material number. The characteristic "Cost element" and "Material" are relevant for the creation of dynamic items and are therefore copied to the dynamic item. The characteristic "Cost element" is used for material determination. On the level "Material determination" you will find an entry without a material number where the indicator "Direct material" is set. This indicator ensures that the System assigns the material contained in the line item to the dynamic item. On the level "Criteria", it is defined that this type of assignment only occurs if the line item was posted to the cost element in the set CO-PC-MAT. This set comprises the cost elements used to post material consumption. the withdrawal of material was posted under cost element . This cost element belongs to the cost element set CO-PC-MAT. This means that the criteria for the material determination have been fulfilled, and that the material contained in the line item is transferred to the dynamic item.
    Regards,
    Rambabu

Maybe you are looking for

  • Error while creating new release groups in PO release strategy

    Hi All I was creating a release procedure for PO and after completing steps, Create Characteristic and Create class & while creating new release grp with the class created i am not able to save it and the error message is (ME492) is" Only one release

  • Relative hyperlinks in pdf documents printed from visio 2007

    Hello to all. The problem we are trying to solve is to maintain relative hyperlinks that were created in visio 2007 when we publish or print a pdf document. The pdf document that we printed is written in adobe reader 9, and it maintains the hyperlink

  • Where has the 'help' icon gone on the IO7 update?

    where is the 'help' icon on the new IOS7 and how does one disable the annoying passcode necessity everytime you open the flap

  • EDI 824 mapping

    Dear SAP Friends, I am creating the specifications for EDI 824 Application Advice - Integrated Payables against our EDI 820 flat file send to bank for making payments through Checks, ACH and Wires. Against our EDI 820 flat file bank will send us back

  • Object Required

    I did this page so family and friends can see our trip http://www.michaelsondesign.com/camp/camp.html - I am getting an Object Required error message - says line 59 I can't seem to find what its looking for the script came from this page: http://www.