Hi gurus,
please tell me what is direct third party sales and what is indirect third party sales?
Hi,
As far as my understanding
Direct third party sales
Meaning is that your vendor directly ship goods to your cutomer,here no delivery takeplace from your company
Process :
Sales order >> Purchase requisition >> P.O >> Invoice reciept from vendor >>> Invoice to customer woth refrance to sales order
Indirect Third party sales
Meaning is that here vendor ship material to your company and then from your company you ship to customer
Process :
Sales order >> Purchase requisition >> P.O >> Goods Reciepts >> Outbound delivery with refrance to order >> invoice with refrance to delivery
Hope you understand
Kapil
Similar Messages
-
I have to send 1 material to 10 customers, out of 10 customers for 3 customers have to send direct from vendor(third party sales). How to customize this scenario ?.
Use Customer Material Info Record(CMIR) for these 3 customers. Create new usage ( eg; Z3rd) . Assign this usage in CMIR.
Now, in VOV4- Item category Determination
Sales Doc type + Item Cat group + Item Usage = Item Category
SONORMZ3rd= TAS
So, whenever these customers place order for this material, this will be routed for procurement( third party sales) for rest of the customers will be normal sales -
Plz requesting kindly for screen shots of intercompany and third party sale
Hi btothers,
Am into new project where we have intercompany sales and third party sales ,can any one plz send me with step by step screen shots to my mail id [email protected]
Thanks & regards,
srinivasHi Srinu,
Please find below the complete Documentation on Third Party Sales and Intercompany Process.
THIRD PARTY SCENARIO:
In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
Process Flow
The processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally, can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
Processing Third-Party Orders in Sales
Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
Automatic third-party order processing
If a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
Manual third-party order processing
In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
Processing Third-Party Orders in Purchasing
When you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
You process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
Billing Third-Party Orders
If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
Process Flow
During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
Process Flow for 3rd Party Sales
Customize the third party sales in summary:
Prerequisites for 3rd party sales,
Purchasing org,
purchasing group,
assign the Purchase org to company code
assign Purchase org to plant,
should not maintain the stock in material, it should be trading goods,
1. Create Vendor XK01
2. Create Material Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *--
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Click on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
Third party order processing is as follows:
Assume three companies X, Y and Z
X - The company,
y - The customer
Z - Vendor
When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
If he is procuring the goods, there are two methods that are generally followed:
Method 1) After receiving the PO from Y, X creates a sales order against Y.
Now at the same time he also creates a PO to a vendor Z to produce the goods
Z produces the goods and supplies to X
X receives the goods from Z
Then X delivers the same goods to Y.
After that X invoices Y and Z invoices X.
Note : Here there is no direct/ Indirect relation between Z and Y.
This process is known as Trading Process. and the Material here is created with Material type HAWA.
The other method is a Third party order processing method:
Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
Now Z supplies the material to Y and acknowledges the same to X.
Z will send a copy of delivery acknowledgement and invoice to X.
After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
The next step for X is to create an invoice and submit to Y
Only after the invoice verification document is posted then only X can create an invoice for Y.
This is the business flow that is followed for third party order configuration.
There are few steps that have to be configured to enable the system to function as mentioned above.
Step1)
If you are always following a third party process for a material then you have to create the material using item category group BANS.
The procurement type should be marked as External procurement (F) in MRP 2 view of the material master record.
if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurement ( in house manufacturing and external procurement).
Step 2)
the item category in the order should be manually changed as TAS.
For that you need to configure the item category determination
Order type + item cat Group + Usage + High level = Item cat + Manual item cat
OR + NORM + + = TAN + TAS
OR + BANS + + = TAS
Step 3)
make sure that during the item category configuration for TAS you need to mark relevant for billing indicator as F
step 4)
The schedule line category for this type should be CS.
make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requisition order immediately after the creation of the sales order and the PO to vendor is created against this purchase requisition.
Intercompany Process:
Go through the explanation given below with test cases.
Business case: -
Customer orders goods to company code/Sales organization A (Eg.4211/4211).Sales org 4211 will accept and punch the order in the system with sold to party as end customer code in the system. Company code/sales org B (Eg.4436) will deliver the goods to end customer and raise an intercom any billing on 4211 with reference to delivery. This can happen only after 4211 raises invoice to his end customer to whom the material has been delivered by 4436.
SPRO Customization required:-
1. Assign plant of delivering company code (Eg.SI81) to sales org/distribution channel combination of ordering company code (Eg.4211/RT)
2. Maintain intercom any billing type as IV for sales document type OR
3. Assign Organizational Units By Plant (Eg.SI81/4211/RT/11)
4.Define Internal Customer Number By Sales Organization (Eg.4436 will create customer master for 4211 company code and that number will be maintained in this relationship:-4211/231)
5. Automatic posting to vendor account (Optional)
6. Maintain pricing procedure determination for 4211/RT/A/1/RVAA01-For customer sales and billing
Maintain pricing procedure determination for 4436/RT/A/1/ICAA01-For intercompony billing
Master data to be maintained:-
1. Create end customer master in company code/sales org 4211/RT/11
2. Create customer master for 4211 company code/sales org in 4436/RT/11
3. Maintain PR00 as price for end customer-Active in RVAA01
4. Maintain PI01 as price which has to be paid to 4436-Statistical in RVAA01
5. Maintain IV01 as inter-company Price-Active in ICAA01
Process:-
1. Create OR with sold to party as end customer.
2. Plant to be selected is delivering plant belonging to different company code. With this selection system will treat this order as intercomany sales.
3. Pricing procedure is RVAA01
4. With reference to this order delivery will be created from the delivering plant and post the goods issue for this delivery.
5. Ordering sales org will create billing document F2 with reference to delivery for end customer.
6. Delivering sales org will create intercompany billing IV with reference to delivery document.
Please Reward If Really Helpful,
Thanks and Regards,
Sateesh.Kandula -
Third party sale and stockable item
Hi all , We have some products . For example "A " . We buy it from one vendor and maintain its stock and sale it as and when order comes . Same product when there is demand we sale it by third party process instead of holding the stocks we instruct vendor to send the delivery directly to customer . Process is similar to third party process in SAP . For such material how can I make material master.
1>> which Material type I have to maintain on first screen ?
2>> what will be the other configuration or values in other fields of masterHi,
Please search for the SAP building blocks for Third party sale with Shipping and Third party sale W/O shipping
U can use FERT as material type only
regards,
sujit -
Third party sales and individual purchase order MIGO DIFFERENCE?
Hi experts,
any difference between third party sales and individual purchase orders goods receipt(MIGO). What's the stock levels chages after goods receipt in both cases? How the system knows that its third party migo and individual purchase order MIGO? Can anybody clarify my question?
regards,
rajuHi
In third party you will not be able to create automatic PO
The schedule line category CS settings in VOV6 order type NB, MM item category 5 and account assignment category settings as X and in VOV7 for TAS create automatic PO ticked will ensure PR creation only and not PO
As suggested by the other friend you need to run t code ME59N or ME59 for automatic PO creation but certain condition to be met
1) In the Purchasing View of the material master data, the "Autom. PO" field must be clicked;
2) In the Purchasing View of the Vendor Master Data, the "Automatic Purchase Order" field must be clicked;
3) The Outline Agreement or Purchasing Info Record shall be maintained which will allow the automatic copying of unit price and other conditions into PO;
4) The Source List shall be maintained for the nominated vendor which was shown in either the Outline Agreement or Purchasing Info Record.
You have to run ME59N transaction manually or schedule this as a background job
Regards
Raja -
Third Party Sales - Bus process and Config
Friends,
Kindly explain 3rd party sales business process and its configuration settings.
I am not able to locate the full configurations using Search. If any one knows the exact link which clearly states this issue.
Thanks,
MaheHi,
please see this notes
Process Flow for 3rd Party Sales
Customize the third party sales in summary:
1. Create Vendor XK01
2. Create Material u2013 Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing
- 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Clilck on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
business process.....
please see the link...........
http://help.sap.com/bp_pharmav1600/Pharma_US/index.htm
Regrds,
venkataswamy.y
Edited by: yanamadala venkataswamy on Sep 11, 2009 11:09 AM
Edited by: yanamadala venkataswamy on Sep 11, 2009 1:26 PM
Edited by: yanamadala venkataswamy on Sep 11, 2009 1:27 PM -
Intercompany sales and third party sales
Dear folks
can any one of you tell me the process or
what are the steps in intercompany sales and
third party sales on very very high priority
regards
ramaraoHi
Steps
Intercompany Sales
Sales Order(OR)
Delivery Document(LF) movement type(601)
Invoice(F2) with reference to Delivery Document
Intercompany Invoice( IV ) with reference to Delivery Document
Third Party Orders
Sales Order(OR) Item category (TAS)
Purchase Order(NB) with reference to purchase requsition
MIGO movement type 101 with reference to purchase Order
MIRO with reference to Purchase Order
Invoice(F2) with reference to sales order
ramesh -
How to create third-party sales and delivery
please provide tcode of third-party sales Sales and delivery
Hi,
There is no Tcode for Third Party Sales.
You need to configure the scenario for the same. Following link will help you to do the necessary configuration settings.
http://help.sap.com/bp_bblibrary/600/html/J54_EN_DE.htm
I hope this will be helpful to you.
Regards,
Shailendra -
Create one invoice document for factory sales and third party sales
Hi All,
I want to create one single invoice document for material sold from factory and from third party.
I have checked the copy controls for order to billing but the system is still spliting the invoice.
Please share your expertise.Hello,
Can you please provide the details from the "Split Analysis", when you are trying to combine the 2 documents.
Regards,
Raghavendra -
Third party sales configuration
Dear
I needed your guidance for third party sales when vendor supply the material to the customer we keep item category group BANS and stock entered virtually in our stock and then vendor invoice generated and received by the company through MIGO and MIRO.
My question is that when vendor supply to the company and company supply to the client or other wise I can say our item category is HAWA in that case what will be process can you elaborate the process and configuration of the scenario.
Thanks
RitiHi Riti,
Just adding to Kapil's input,
hope below input will helpyou
An Example Of Third Party Sales
Scenario:
2 companies are created in system - India & Singapore Customer places sales order for particular material on Singapore. Singapore is not able to produce the same. They pass on the order to India for processing. After processing India ships the material directly to the customer along with necessary documentation. Invoice copy is passed on to Singapore. Final Commercial Invoice will be raised by Singapore. How can the above scenario handled?
By: Balaji
You can do this using third party sales.
The third party sales process is as under.
1) Singapore company creates an order for the singapore customer.
2) Because of the configuration settings of the sales document type, item category & schedule line category, as soon as the order is saved a PR (purchase requisition) is automatically generated. This is converted into PO (purchase order) and sent to the Indian company.
3) Indian company supplies the material directly to the Singapore customer.
4) Indian company sends the invoice to the Singapore Company.
5) Singapore company does the invoice verification in MM using tcode MIRO.
6) Singapore company raises the invoice to the singapore customer.
In standard SAP, item category TAS is used for this. The schedule line category is CS. Here you can see a field 'order type' with value 'NB'. This triggers the automatic creation of the PR.
Plus in the material master also you need to do certain settings.
1) If you are always following a third party process for a material then you have to create the material using item category group BANS. The procurement type should be marked as external procurement (F) in MRP 2 view of the material master record.
2) If you are not always allowing third party order processing then you can create a material master record with item category group as NORM and the procurement type should be marked as (X) meaning both types of procurement (in house manufacturing and external procurement).
In the item category the billing relevance should be 'F'.
Third party order processing is as follows:
Assume three companies X, Y and Z
X - The company,
y - The customer
Z - Vendor
When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
If he is procuring the goods, there are two methods that are generally followed:
Method 1)
After receiving the PO from Y, X creates a sales order against Y.
Now at the same time he also creates a PO to a vendor Z to produce the goods
Z produces the goods and supplies to X
X receives the goods from Z
Then X delivers the same goods to Y.
After that X invoices Y and Z invoices X.
Note : Here there is no direct/ Indirect relation between Z and Y.
This process is known as Trading Process. and the Material here is created with Material type HAWA.
The other method is a Third party order processing method:
Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
Now Z supplies the material to Y and acknowledges the same to X.
Z will send a copy of delivery acknowledgement and invoice to X.
After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
The next step for X is to create an invoice and submit to Y
Only after the invoice verification document is posted then only X can create an invoice for Y.
This is the business flow that is followed for third party order configuration.
There are few steps that have to be configured to enable the system to function as mentioned above.
Step1)
If you are always followwing a third party process for a material then you have to create the material using item category group BANS.
The procument type should be marked as External procurement (F) in MRP 2 view of the material master record.
if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurment ( in house manufacturing and external procurement).
step 2)
the item category in the order should be manually changed as TAS.
For that you need to confugure the item category determination
ord type + item cat grp + usge + Hiv level = Item cat + Manual item cat
OR + NORM + + = TAN . + TAS
OR + BANS + + = TAS
Step 3)
make sure that during the item category configuration for TAS you need to mark relevnat for billing indicator as F
step 4)
The schedule line cateogry for this type should be CS.
make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requision order immediately after the creation of the sales order and the PO to vendor is created against this purchase requiesion.
Regads Siva -
Problem related to Third Party Sales
Dear All,
The problem as per the company's requirement are as follows -
There are two different Companies X & Y having Company Codes 1000 & 1020 respectively where Company Y is a FZE ( free zone enterprise). Now Company X is selling goods to Company Y where the ship to party is customer 2 under Company Y while the payer is Company Y.In short Company X will not raise any invoice against customer 2 of company Y , it will only send an invoice to Company Y which in turn will raise an invoice immediately against it's customer 2.No GR (Goods Receipt) will take place between the two companies as it will get generated when it is received by customer 2.How to configure this with the help of Third Party Sales in SD Module ?
Please suggest.
Thanks & Regards
Priyanka MitraHi Priyanka,
Please go through below step by step procedure...c it might help u to solve your problem
please let me know ,if u didnt get solution
Third party order processing is as follows:
Assume three companies X, Y and Z
X - The company,
y - The customer
Z - Vendor
When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
If he is procuring the goods, there are two methods that are generally followed:
Method 1) After receiving the PO from Y, X creates a sales order against Y.
Now at the same time he also creates a PO to a vendor Z to produce the goods
Z produces the goods and supplies to X
X receives the goods from Z
Then X delivers the same goods to Y.
After that X invoices Y and Z invoices X.
Note : Here there is no direct/ Indirect relation between Z and Y.
This process is known as Trading Process. and the Material here is created with Material type HAWA.
The other method is a Third party order processing method:
Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
Now Z supplies the material to Y and acknowledges the same to X.
Z will send a copy of delivery acknowledgement and invoice to X.
After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
The next step for X is to create an invoice and submit to Y
Only after the invoice verification document is posted then only X can create an invoice for Y.
This is the business flow that is followed for third party order configuration.
There are few steps that have to be configured to enable the system to function as mentioned above.
Step1)
If you are always followwing a third party process for a material then you have to create the material using item category group BANS.
The procument type should be marked as External procurement (F) in MRP 2 view of the material master record.
if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurment ( in house manufacturing and external procurement).
step 2)
the item category in the order should be manually changed as TAS.
For that you need to confugure the item category determination
ord type + item cat grp + usge + Hiv level = Item cat + Manual item cat
OR + NORM + + = TAN . + TAS
OR + BANS + + = TAS
Step 3)
make sure that during the item category configuration for TAS you need to mark relevnat for billing indicator as F
step 4)
The schedule line cateogry for this type should be CS.
make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requision order immediately after the creation of the sales order and the PO to vendor is created against this purchase requiesion
Accordingly you can create documents related to 3rd party sales.
Please reward with points if it really helps you
With best regards
Abhi
Moderator message:
LWarning. Plagiarism.
Source:
https://forums.sdn.sap.com/admin/moderation.jspa?forumID=0&enableApproved=false#
Edited by: Csaba Szommer on Dec 24, 2011 10:44 PM -
In Third party sales, Part of MM..?
Hi guru's
Can explain about third party sales and what is major part of work for MM in that.
1.Please send me the overall flow in Third party sales process with Transaction codes.
thanks
sap-mmTHIRD PARTY SCENARIO
in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
Process Flow
the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
Processing Third-Party Orders in Sales
Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
Automatic third-party order processing:-
if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
Manual third-party order processing
In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
Processing Third-Party Orders in Purchasing
when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
Billing Third-Party Orders
If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
Process Flow
During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
Process Flow for 3rd Party Sales
Customize the third party sales in summary:
Prerequisites for 3rd party sales,
Purchasing org,
purchasing group,
assign the Purchase org to company code
assign Purchase org to plant,
should not maintain the stock in material, it should be trading goods,
1. Create Vendor XK01
2. Create Material Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *--
i think this will be helpful to you -
Excise configuration in case of Third party sales
In case of third party sales of a excisable material, where the goods are supplied directly to customer by the vendor.
However the customer invoice is sent to the customer my organization
How will the excise entries take place?
Because in this case goods are not supplied from my depot, Also i need to charge the customer for excise, since the goods are excisable.
Can I claim the excise benefit for the above sale process?
Please revert
Regards
Sudhir ChavanAs the goods are not delivered from your factory premise and are delivered for vendor.
Means in system there is no outward goods movement from your plant.
So, logically you should not create Excise invoice for this.
But, you may need to consider VAT/CST based on the sales.
And that doesn't require any excise invoice.
Thus, no requirement of Excise configuration in case of Third party sales.
Yes, from procurement point of view, you would be paying excise to the vendor for this purchase.
Regards
JP -
Generate PO from third party sale order
Hi expert,
When we save a Third Party sale order, it will generate a purchase requisition to buy items for us. I wonder if there are any methods to generate Purchase Order directly (Not via PR) from sales order ?
Thanks so much.
Edited by: Truong Tran on Feb 26, 2009 12:30 PMHi,
As you know - only PR will be automatically getting genreated in case of third party sale order or individual purchase order.
This is because of the schedule line category - CB and CS.
When the item category is TAB/TAS - it will determine the schdule line categor CB/CS which leads to generate PR automatically.
There is an item category 'ALES' (Create PO Automatic - check box in VOV7 - will be checked) - which will create both PR and PO.
I have not used that item category yet.. I think - though we use ALES item category - it won't create automatic PO.
Except ALES item category.. - I do not have idea on ALES item category..
(i.e., PO will never be automatically created without using the transaction.)
Thanks,
Venkatesh.S.P -
PO Creation for third party sales
Hi
We have the scenario Third party sales and High sea sales which is already in use (already configured) , where PR getting generated automatically .
But client requirement is they want the PO to generate automatically by the system the moment i save the sales order .
Where is the setting in the SAP , where system will generate the PO automatically instead of PR
Please suggestHi,
Go to VOV7
Select third party item category which u r using in sales order >>> Deatils >>> under transaction flow >>> Tickmark to CREATE PO AUTOMATIC.
If you activate this field, the system automatically generates both a purchase order requisition for third-party schedule lines as well as a purchase order in the background when you save the sales order.
However u can not create PO directly.
Kapil
Maybe you are looking for
-
Can I get Photo Booth on my iPod touch by updating to iOS 4.3?
Hi Will i get photo booth if i update my ipod touch 4rth gnereation to ios 4.3? or is it only for ipad? Thanks
-
Can you help with error message on installing itunes on Windows XP: error message MSVCR80.dll not found. Apple Mobile Device failed to start. Error 7 Windows error 126. Deleting itunes and reinstalling does not fix it.
-
How can I get max, min & average (hours with minutes) of fast 30 days data
Table name: run_log TYPE VARCHAR2(10), SUBTYPE VARCHAR2(10), PROGRAM VARCHAR2(100), STATUS VARCHAR2(20), START_TIME DATE, END_TIME DATE How can I get max, min & average (hours with minutes) of fast 30 days data ?
-
Certified Operating Systems for use with Oracle Designer Repository
Hi all, We have Oracle Designer Repository version 10g(9.0.4.3.14) installed on Microsoft Windows 2000. As our OS and Network team is going to migrate the OS from Windows 2000 to Windows 2003, I want to know if Windows 2003 is certified for our Desig
-
Due to a virus I had to wipe my hard drive. But I saved the photos to a separate drive. After reinstalling Window 8.1 on PC, I loaded the trial version of Elements 13 ()had been using Elements 9). However as I get the old photos, the tags are gon