Disabling Report Job (Scheduling) for User

Hi all,
Is it possible to disable the ability to schedule report job for certain user?
I tried setting the permission on the reports, unchecking the "Schedule Report" option. But the user (under BI Consumer role) are still able to run scheduler for all report.
Thanks a lot!

Hi,
Is this a Z Report that your are using?
You can setup a background job in SM36 specifying the calendar and variant, you can take help from BASIS in setting up a spool recipient, I.D  This person will get the output in his/her mail.
Regards
Shailesh

Similar Messages

  • Background job scheduling for report

    Hi can any one explain me how to do background job scheduling for report periodically for every 15 min.

    Hi Rajesh thanks for your brief explanation.
    but I am new to abap so I can't understand exactly will you please make it clear for the below program
    REPORT  zklj.
    data: begin of itab occurs 0,
          partner  type but000-partner,
          type     type but000-type,
          BU_SORT1 type but000-BU_SORT1,
          end of itab.
    select partner type from but000 into table itab.
    CALL FUNCTION 'GUI_DOWNLOAD'
      EXPORTING
      BIN_FILESIZE                    =
        FILENAME                        = 'd:\al1\ahaj.xls'
        FILETYPE                        = 'DAT'
      APPEND                          = ' '
      WRITE_FIELD_SEPARATOR           = ' '
      HEADER                          = '00'
      TRUNC_TRAILING_BLANKS           = ' '
      WRITE_LF                        = 'X'
      COL_SELECT                      = ' '
      COL_SELECT_MASK                 = ' '
      DAT_MODE                        = ' '
      CONFIRM_OVERWRITE               = ' '
      NO_AUTH_CHECK                   = ' '
      CODEPAGE                        = '400'
      IGNORE_CERR                     = ABAP_TRUE
      REPLACEMENT                     = '#'
      WRITE_BOM                       = ' '
      TRUNC_TRAILING_BLANKS_EOL       = 'X'
      WK1_N_FORMAT                    = ' '
      WK1_N_SIZE                      = ' '
      WK1_T_FORMAT                    = ' '
      WK1_T_SIZE                      = ' '
      WRITE_LF_AFTER_LAST_LINE        = ABAP_TRUE
      SHOW_TRANSFER_STATUS            = ABAP_TRUE
    IMPORTING
      FILELENGTH                      =
      TABLES
        DATA_TAB                        = itab.

  • Reports-Job-Scheduler: create job with startoption later: wrong date-format

    Hi,
    I test reports 11.1.1.2.0 (weblogic11 g) and try to start a report job with Reports-Job-Scheduler.
    Startoption: later and date = 09:48 Jan 12, 2010
    When I submit the job I get following Error:
    REP-50006: Das Argument SCHEDULE ist in der Befehlszeile ungültig: 09:48 Jän 12, 2010
    in english:
    Rep-50006: argument Schedule is wrong in command line: 09:48 Jän 12, 2010
    Why is Jän instead of Jan.
    When I start the report in February then it works.
    I defined also environment variables in basic configuration for the report server:
    NLS_DATE_FORMAT DD.MM.YYYY
    NLS_DATE_LANGUAGE GERMAN
    NLS_LANG GERMAN_GERMANY.WE8ISO8859P1
    I would be very pleased to get support.
    Many thanks
    Alois

    I created a SR and oracle support found a bug in EM.

  • Regarding Background Job scheduling for file to file scenario

    Hi Guru's
    Good morining all of u
    I have one doubt on ...
    can we do background job scheduling for file to file scenario?
    Please give me response as early as possible.
    thanks and regards
    sai

    background jobscheduling for file adapter...
    you can schedule the file adapter according to your requirement as follows:
    In the  Communication Channel Monitoring Locate the link Availability Time Planning,  In Availability Time Planning, choose the Availability time as daily and say create, give the time details, select the communication channel in your case file adapter , goto the Communication Channels tab and filter and add the respective channel, save it
    /people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

  • Error occured while posting the job schedule for JDBCAdapter

    Hi Experts,
    In Application Log in Path: "/usr/sap/<SID>/DVExxxx/j2ee/cluster/server1/log", I see the error:
    #/Applications/ExchangeInfrastructure/AdapterFramework/Services/Util
    ##com.sap.aii.af.service.scheduler.SchedulerManagerImpl.postJobScheduleOthers(String, int)
    #J2EE_GUEST#0##n/a##f7956e1f6b4711e0b851001e0b5d3ac8#SAPEngine_Application_Thread[impl:3]_23##0#0
    #Error#1#com.sap.aii.af.service.scheduler.SchedulerManagerImpl#Plain
    ###error occured while posting the job schedule for JDBCAdapter_9f0584b1bcb33b94b67ada456233bcb8 with 2#
    Frequently are created Lock's and I need remove them in Visual Admin.
    Any idea about this error?
    Tks in advance.

    Hi,
    After applying the SP 23 Patch Level 08, LOCK JDBC problems stopped.
    But now when a network error or database error, the JDBC Sender Communication channels that were open to connection, are blocked.
    Even following the instructions in [SAP Note 1083488 - XI FTP_JDBC sender channel stop polling indefinitely (04_04S)|https://websmp230.sap-ag.de/sap(bD1wdCZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1083488] the problem continues.
    I've already set the parameter "taskTimeout" and selected the option "Disconnect from Database After Each Message Processing" but not resolved.
    Any ideas?
    Thanks in advance.

  • ORA-31637: cannot create job SYS_IMPORT_SCHEMA_01 for user SYSTEM in impdp

    Hi All,
    During impdp i am getting this below error:
    ORA-31626: job does not exist
    ORA-31637: cannot create job SYS_IMPORT_SCHEMA_01 for user SYSTEM
    ORA-06512: at "SYS.DBMS_SYS_ERROR", line 95
    ORA-06512: at "SYS.KUPV$FT_INT", line 600
    ORA-39080: failed to create queues "KUPC$C_1_20090507123340" and "KUPC$S_1_20090507123340" for Data Pump job
    ORA-06512: at "SYS.DBMS_SYS_ERROR", line 95
    ORA-06512: at "SYS.KUPC$QUE_INT", line 1606
    ORA-04031: unable to allocate 56 bytes of shared memory ("streams pool","unknown object","streams pool","fixed allocation callback")
    Also increase shared memory hence creating the same problem.
    Can anyone sujjest me what would be the cause?
    Thanks in advance...

    Increase parameter streams_pool.
    Set it for example to 100MB
    Then try again.

  • Job scheduling for different slection criteria

    Hi,
    I have a selection screen where user can select eg. say operation 700 or 800 (radiobuttons).
    Now user want to schedule the report as background job.
    Is that I need to create two jobs with two variants ( i.e for two operations 700 & 800)? So that user executes job with respective variant for the operation.
    Pl. clarify whether above steps are of right approach. Also any alternative ways to achieve the same.
    Thanks.
    From
    Reddy

    Hi,
    If user wants to run it as a background job as & when required( The program doesnt have any specific schedule for background execution), then use FM JOB_OPEN, JOB_SUBMIT, JOB_CLOSE to schedule it as a background job.
    If its a periodic job then you will have to create 2 variants & create 2 jobs in SM36.
    Best regards,
    Prashant

  • KRONOS - EJB Job scheduler for Weblogic

    Paramus, NJ - February 22, 2002 - Indus Consultancy Services (ICS) today
    announced the latest in a series of improvements to Kronos Enterprise
    Scheduler, a full-featured job scheduling system written for the
    Enterprise Java (J2EE) environment.
    This version fixes some minor bugs reported by customers, and adds a new
    security feature to control user visibility to jobs, tasks, and
    schedules. A new environment setting allows the Kronos Enterprise
    Scheduler administrator to restrict users to seeing only those items
    which they have created. Administrators still have full visibility to
    all items.
    ICS is also proud to have Kronos Enterprise Scheduler competing in the
    Java Developer's Journal 2002 Readers' Choice Awards. Every year, Java
    Developer's Journal holds voting for products in a variety of
    categories. This year, Kronos Enterprise Scheduler is nominated in
    three of those categories:
    · Best Java Application (Standing as of 2/22/02 : 16th out of 69
    products with votes.)
    · Best Java Component (Standing as of 2/22/02 : 10th out of 26 products
    with votes.)
    · Most Innovative Java Product (Standing as of 2/22/02 : 21st out of 63
    products with votes.)
    To vote, visit the Java Developer's Journal website at
    <http://www.sys-con.com/java/readerschoice2002>
    To find out more about Kronos Enterprise Scheduler, and learn why
    companies around globe are selecting this powerful product to handle
    their scheduling needs, visit the ICS website at <http://www.indcon.com>
    and request a FREE 30-day evaluation.
    © 2002 Indus Consultancy Services, Inc. All rights reserved. Java and
    all Java-based marks are trademarks or registered trademarks of Sun
    Microsystems, Inc. in the U.S. and other countries. All other product
    and company names are trademarks of their respective owners.

    I would hope that BEA will step up and develop a replacement for their
    deprecated APIs. It is unfair to ask their customers to buy something they
    got previously for free. I also understand that the future EJB spec will
    contain scheduling features.

  • ANNOUNCE:::::::: EJB job scheduler for Weblogic

    Paramus, NJ - June 26, 2001 - Indus Consultancy Services today announced
    an upgrade release of its Java scheduling product. Kronos Enterprise
    Scheduler is a full-featured job scheduling system written for the
    Enterprise Java (J2EE) environment.
    As a J2EE application, Kronos Enterprise Scheduler is able to achieve a
    high degree of portability, scalability, and reliability, features which
    are critical to an enterprise system.
    Additionally, Kronos Enterprise Scheduler provides a comprehensive set
    of scheduling options, powerful holiday definitions, job dependencies,
    administrative alerts, J2EE security integration, monitoring
    capabilities, Web and "rich client" user interfaces, and an open
    developer API. The combination of these features make Kronos Enterprise
    Scheduler one of the most complete solutions on the market today.
    Version 2.10 contains a number of minor enhancements and bug fixes and
    is a free upgrade for current customers.
    For more information on Kronos, please visit our products page at
    www.indcon.com

    I would hope that BEA will step up and develop a replacement for their
    deprecated APIs. It is unfair to ask their customers to buy something they
    got previously for free. I also understand that the future EJB spec will
    contain scheduling features.

  • KRONOS JOB Scheduler For WEBLOGIC CUSTOMERS

    Paramus, NJ - June 26, 2001 - Indus Consultancy Services today announced
    an upgrade release of its Java scheduling product. Kronos Enterprise
    Scheduler is a full-featured job scheduling system written for the
    Enterprise Java (J2EE) environment.
    As a J2EE application, Kronos Enterprise Scheduler is able to achieve a
    high degree of portability, scalability, and reliability, features which
    are critical to an enterprise system.
    Additionally, Kronos Enterprise Scheduler provides a comprehensive set
    of scheduling options, powerful holiday definitions, job dependencies,
    administrative alerts, J2EE security integration, monitoring
    capabilities, Web and "rich client" user interfaces, and an open
    developer API. The combination of these features make Kronos Enterprise
    Scheduler one of the most complete solutions on the market today.
    Version 2.10 contains a number of minor enhancements and bug fixes and
    is a free upgrade for current customers.
    For more information on Kronos, please visit our products page at
    www.indcon.com

    Paramus, NJ - June 26, 2001 - Indus Consultancy Services today announced
    an upgrade release of its Java scheduling product. Kronos Enterprise
    Scheduler is a full-featured job scheduling system written for the
    Enterprise Java (J2EE) environment.
    As a J2EE application, Kronos Enterprise Scheduler is able to achieve a
    high degree of portability, scalability, and reliability, features which
    are critical to an enterprise system.
    Additionally, Kronos Enterprise Scheduler provides a comprehensive set
    of scheduling options, powerful holiday definitions, job dependencies,
    administrative alerts, J2EE security integration, monitoring
    capabilities, Web and "rich client" user interfaces, and an open
    developer API. The combination of these features make Kronos Enterprise
    Scheduler one of the most complete solutions on the market today.
    Version 2.10 contains a number of minor enhancements and bug fixes and
    is a free upgrade for current customers.
    For more information on Kronos, please visit our products page at
    www.indcon.com

  • Unable to open a report and asking for user credentials

    Hi,
    when i am trying to open a crystal report, i am asking for user credentials and my URL is directed to the below URL
    http://hostname/PlatformServices/service/app/logon.do?appKind=InfoView&service=%2FOpenDocument%2FappService.do&backContext=%2FOpenDocument&backUrl=%2Fopendoc%2FopenDocument.jsp%3FSERVICE%3D%252FOpenDocument%252FappService.do%26OBJIDS%3D20016421%26backUrl%3D%252Fcontent%252Fview.do%26PREF%3DmaxOpageUt%253D200%253BmaxOpageC%253D10%253Btz%253DUS%252FPacific%253BmUnit%253Dinch%253BshowFilters%253Dtrue%253BsmtpFrom%253Dtrue%253BpromptForUnsavedData%253Dtrue%253B%26CONTAINERID%3D6424083%26backContext%3D%252FPlatformServices%26LOC%3Den%26APPKIND%3DInfoView%26PVL%3Den%26ACTID%3D280%26service%3Dtimeout&backUrlParents=1&appName=OpenDocument&prodName=BusinessObjects+Enterprise&cmsVisible=false&cms=servername%3A6600&authenticationVisible=false&authType=secEnterprise&sso=false&sm=true&smAuth=secLDAP&persistCookies=true&sessionCookie=true&useLogonToken=true
    Please help me on this

    Hi,
            This is happening to all of the users. And this kind of behaviour is happening frequently to most of the users but as for me and some of us this is not happening frequently.
    And we are using Crystal Reports 2008 ie. CR12.
    -VinodC

  • Reports not visible for users

    HI,
    I had designed few reports in SD and MM. how do i link those reports for users. and generally what is the path for the users to see the reports in BEX.
    Thanks in advance
    Ravi

    Hi Ravi,
    Create a role (PFCG) for your users and provide them access to view and run the reports and then you save the reports to that role. Then the users will be able to view and run the reports.
    If you save the reports to favourite, only you will bve abel to see them as it is specific to you.
    Hope this helps,
    ***Assign points if helpful***
    Regards,
    Kalyan

  • ICal server set auto schedule for users

    Does anyone know how or if it's possible to set the auto accept state for a user?
    Using calendarservermanageprincipals you can do it for locations for example and you can --get-auto-schedule for a user, but when you try to --set-auto-schedule for a user it says it's not allowed. Anyone know of a workaround or if it's possible?
    --sysdev

    Nevermind, figured it out. you can manually edit the database these values are set in. /CalendarServer/Data/resourceinfo.sqlite

  • Oracle job scheduling for 2 different timezones

    I have a procedure which needs to be scheduled for different timezones based on one of the column in the table (ex: region).
    If region is California, it needs to be scheduled at 8:00am, if Newyork at 6:00am.
    Any ideas much appreciated!

    user497841 wrote:
    In my procedure, I populate a snapshot table for all regions.
    The procedure includes different inserts into the table per region.
    But insert for california should be scheduled at 8:00 and insert for newyork should be scheduled at 6:00am.
    Also, the job needs to take care of daylight savings.
    So i got to schedule the same procedure to run at 8:00am and 6:00 am.Assuming that you use DBMS_SCHEDULER then if you take a look at the definition of create schedule (or create job etc) then you will find that the scheduled time is timezone aware. eg
    DBMS_SCHEDULER.CREATE_SCHEDULE (
       schedule_name          IN VARCHAR2,
       start_date             IN TIMESTAMP WITH TIMEZONE DEFAULT NULL,
       repeat_interval        IN VARCHAR2,
       end_date               IN TIMESTAMP WITH TIMEZONE DEFAULT NULL,
       comments               IN VARCHAR2 DEFAULT NULL);This should then make your jobs timezone (and hence dst) aware.
    Niall Litchfield
    http://www.orawin.info/

  • Job failure ( report RFFDKU00 scheduled for background job)

    Hi Experts,
        When iam scheduling the report RFFDKU00 for background job. Job is getting cancelled with status "ABAP/4 processor: DBIF_RSQL_SQL_ERROR" . when iam obesrving this job it is going to dump at this select query
    "     select ausbk belnr gjahr bzkey buzei
    033370                  from vbsegs into table t_vbsegsfields
    033380            where bukrs in r_bukrs
    033390            and not ( fdlev = space
    033400                  and fdgrp = space
    033410                  and fdtag = init_date
    033420                  and fdwbt = 0 )
    033430            and not saknr in r_cm_sk   "
    Can anyone helpme to deal with this issues ,
    thanks in advance,
    Kranthi

    note 167301 might help.

Maybe you are looking for

  • ICal won't print to-do list

    I'm using ICal 3.0.8. I'm trying to print a daily calendar and include my to-do list. I go to File-Print, Change it to daily calendar print, Make sure the "To-do with due dates" is checked, but it is not printing the to-do list. Any suggestions?

  • Message Mapping Error : "already dropped from buffer"

    Hi, today we have a new strange error in a simple message mapping File2IDoc thats results in SYSFAIL. Maybe a buffer or memory error? In short: +/ARTMAS05/IDOC/E1BPE1MARART[2]/DELN_DATE(suppressed field); root message: Index 2147483647 is already dro

  • Cannot resolve symbol: class EJBObject

    Using javac I get this compile error on this file Calculator.java Calculator.java:1: cannot resolve symbol symbol : class EJBObject location: package ejb import javax.ejb.EJBObject; ^ Calculator.java:5: cannot resolve symbol symbol : class EJBObject

  • Migration Assistant stalls: Solutions and tips

    As a long-time Mac user and fairly competent OS X guru, I was not a happy camper when I found myself floundering through the process of migrating my 2007 MacBook Pro with OS X 10.7 to a brand-new MacBook Pro with OS X 10.8 this weekend.  What was eve

  • Copy Text from Flash player 9

    I have come across a adobe flash information site, I need a bundle of the information that is on these slides for my paper. Is there a way to copy and paste the text from these flash slides. thanks