Discrete Manufacturing Purging data

Anyone experience or have knowledge that can help us in the area of Discrete Manufacturing Purging data?
Is someone done it already and can assist us?
Where can we find more detailed technic information than in the user guides about the frame and scope of each purging program, her data integrity, limits, limits on run time, runing times ect?
Any help would assit us.
Thanks in advance.
Yaniv Snir
Oracle Application Consultant
Oracle Israel

You might review the following guides;
11i (11.5.10.2)
Discrete Manufacturing
http://download.oracle.com/docs/cd/B25516_18/current/html/docset.html
Release12
Discrete Manufacturing
http://download.oracle.com/docs/cd/B40089_08/current/html/docset.html
Adith

Similar Messages

  • The SAP Best Practices for Discrete Manufacturing V1.603

    Hai All,
    We are implementing SAP A1 for manufacturing company, so We selected SAP Best Practices for Discrete Manufacturing V1.603. Hear my question is after ecc 6.0 installation what level i need to update  the patches, because if i update all patches(up to date) it will give problem while building block updating.
    Thanks in Advance...
    Sushma Tatineni

    Dear,
    For detail information please refer the OSS notes,
    1040010 and 1223033 - SAP Best Practices for Discrete Manufacturing V1.603 CN
    Ensure that exactly the support package levels mentioned in the Quick Guide are implemented (not below and NOT HIGHER).
    Regards,
    R.rahmankar

  • SAP Best Practices for Discrete Manufacturing

    Hai All,
    We are implementing SAP A1 for manufacturing company, so We selected SAP Best Practices for Discrete Manufacturing V1.603. Hear my question is after ecc 6.0 installation what level i need to update the patches, because if i update all patches(up to date) it will give problem while building block updating.
    Thanks in Advance...
    Sushma Tatineni

    Dear,
    For detail information please refer the OSS notes,
    1040010 and 1223033 - SAP Best Practices for Discrete Manufacturing V1.603 CN
    Ensure that exactly the support package levels mentioned in the Quick Guide are implemented (not below and NOT HIGHER).
    Regards,
    R.rahmankar

  • Discrete manufacturing Resource Charge Type manual Versus Automatic

    We are implementing Oracle Discrete manufacturing, we want to know the pros and cons for using manual versus WIP move resource charge type and what is the best practice in this regards.
    Thanks
    Mohamed Abo Zekry

    <u><i><b>Steps for SD Variant Configuration</b></i></u>
    Some light on Variant Configuration in Detail.
    The procedure is as follows:
    1. Create a Material - KMAT type with Item category (002)
    2. Create Charateristics in CT04 - Zbike, where in values mention the Color of the bile like Red, Blue etc
    3. Create another characteristics in CT04 - ZPrice, where directly go the additional data tab and maintain the table SDCOM and field VKOND (ABAP Dictionary it will ask for)
    4. Assign these two characteristics to a Class in CL01 - ZBikeclass ( Type 300) in characteristics tab page.
    5. Then go to CU41 Configuration profile select the material and enter the description click on the class assignment ie assign Zbikclass.
    Now go back to CT04 - enter Zbike -go to values- select Red- go to extras - Other Dependencies - Select Procedure enter in front 10 write - $self.ZPrice='Red' and save
    6. Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)
    7. Now select Blue- go to extras - Other Dependencies - Editor - Select Procedure enter in front of 10 write - $self.ZPrice='Blue' and save
    8. Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)
    9. Now go to VK11 - Enter VA00 (Condition)(For Std RVA001 Pricing Procedure) - enter variant Red and Blue give the rates accordingly and create the sales order.
    Reward if it helps
    Regards,
    Anbu

  • Kanban for finished goods (discrete manufacturing)

    Hi gurus,
    I am using kanban for finished goods(with MRP) to triggers production order(discrete manufacturing). If i set the status "empty" system is creating a planned order directly. It is not coming for MRP run. I suppose, that planned order should be created through MRP run(since i am using kanban with MRP). Can you please tell what settings i need to be checked?
    Regards
    Rajib Pathak

    Hi,
    Pls. find details about settings for KANBAN With MRP:
    KANBAN With MRP
    Prerequisites
    In this process, the storage location assigned to the supply area is not excluded from MRP.
    If a material is planned and procured with MRP, you must make the following settings:
    You must maintain a valid MRP type for the material. This means, the setting "ND" (No planning) is not allowed.
    You must maintain all other control parameters required for MRP for the material.
    You must maintain a repetitive manufacturing profile (in the MRP data screen) for replenishment strategies with a cost collector (in-house production with run schedule quantities, manual KANBAN). In the SAP standard system, a profile is available that is specially intended for KANBAN, that is, using this profile, the system creates a cost collector without a run schedule header.
    Features
    Here, the total production quantity or the procurement quantities of a certain period are planned in the planning run and the replenishment elements are also created in the planning run. For in-house production, you can use either Repetitive Manufacturing or production orders to plan the production quantities per period. For external procurement, all the standard replenishment elements are available. The replenishment elements created in the planning run, however, are not intended to trigger production or replenishment directly. Instead, they exist to provide the supply source with a preview. Actual production and material flow are controlled and triggered by setting the kanban to FULL and EMPTY. Backflushes and goods receipts are posted with no reference to the kanban. This means that you can backflush daily quantities, for example.
    In this procedure, the following is valid for materials with BOMs:
    Components that are used in KANBAN materials can be planned using any one of the MRP procedures. However, the system has to be organized so that the supply source does not produce the material for the replenishment element created in MRP immediately but awaits the kanban request.
    As the system creates preview data in the procedure with MRP, it is particularly useful for replenishment with run schedule quantities (Repetitive Manufacturing) and scheduling agreement releases.
    HOpe this helps.
    Regards,
    Tejas

  • Oracle 11i - Collection Plans (Discrete Manufacturing)

    In Oracle Quality, Collection Elements can use SQL validation code to provide a LOV for data entry into a Collection Plan.
    Collection Element values can also be determined using SQL code that includes using Token field values for data already entered into the current Collection Plan (e.g. JOB) as part of the query. However, the result of this query must be a unique value.
    Can anyone tell me if its possible to use Token fields from Collection Elements already entered into a Collection Plan as part of the validation code to display a LOV?
    I cannot see any way to do this.
    Thanks
    Edited by: user11340385 on Dec 17, 2012 11:29 AM

    Thanks Peter,
    I'm a newbie and it got posted there by accident.
    I did notice this afterwards but then couldn't find somewhere for "EBS Discrete Manufacturing".
    What's the best place for it and can it be moved there without me resending it?

  • Discrete job completion date on Sunday

    Hi All,
    I wanted to know how the discrete jobs completion date can be on Sunday when the manufacturing calendar days showing the Sunday as non-working days.
    When calculating the completion date for those discrete jobs, it actually considering the item/part lead times.
    As for example, an item # ABC has processing lead time as 2 days and the discrete job start time is on 29-JAN-2015 18:34:00 and has the completion date as 01-FEB-2015 19:35:00 (Sunday).
    let me know if there any issue with any setup or profile options.
    regards,
    Subhasish

    Hi,
    We also had the same issue, the Workorder completion date and start date were including Non-working days.
    "Why Discrete Jobs Form Is Not Computing Completion Date Based On Workday Calendar? [ID 1450120.1]"
    The above metalink note might help you. All the resource on the assembly must be "Available 24 hrs" and make sure you have not inculded Saturdays and Sundays as a working day in you Manufacturing calendar (Assigned at org parameter).
    Thanks, Sameet
    Edited by: Sameet on Mar 11, 2013 11:58 AM

  • OSFM  & Discrete Manufacturing Patch G Issues

    Hello Community!!
    Would like to know whether anyone had issue when applying discrete mfg patch G (DM_PF_G : Patch 2133107) which we applied to get upto current version for OSFM.
    I faced these specific problems and would like to know if anyone faced this issue.
    1) While applying the Patch, adadmin failed in between due to following error:
    -------------- E R R O R L O G I N F O -----------------
    ATTENTION: All workers either have failed or are waiting:
    FAILED: file WFRESGEN on worker 1.
    FAILED: file WFRESGEN on worker 2.
    FAILED: file WFRESGEN on worker 3.
    FAILED: file WFRESGEN on worker 4.
    FAILED: file WFRESGEN on worker 5.
    ATTENTION: Please fix the above failed worker(s) so the manager can continue.
    Start time for file is: Wed Feb 06 2002 18:45:42
    /oradev/test/testappl/fnd/11.5.0/bin/WFRESGEN APPS/APPS 0 Y DATABASE @FND:resource/wfver.msg
    Logfilename : /oradev/test/testappl/admin/TEST/log/l1117586.req
    Report filename : /oradev/test/testappl/admin/TEST/out/o1117586.out
    wferr:
    - WFRESGEN_FAILED
    - WFUPI_FAIL MESSAGE=ORA-04068: existing state of packages has been discarded
    ORA-04063: package body "APPS.WF_CORE" has errors
    ORA-06508: PL/SQL: could not find program unit being called
    ORA-06512: at line 1
    STATEMENT=BEGIN WF_CORE.SESSION_LEVEL:=0; WF_CORE.UPLOAD_MODE:='FORCE'; END;
    AD Worker error:
    The above program failed with error code 1.
    See the AD Worker log file and/or the program log file for details.
    work02.log
    Start time for file is: Wed Feb 06 2002 18:45:42
    ------------------ E N D O F E R R O R L O G I N F O -----
    I had TAR with Metalink and we did go back and forth and could not resolve this issue till i found that the patch zip file p2133107_11i_SOLARIS.zip had the wfcoreb.sql and wfcores.sql script files for package spec and body which caused the problem.
    Analyzing both spec and body, i found that the body had 4 parameters
    procedure Get_Error(err_name out varchar2,
    err_message out varchar2,
    err_stack out varchar2,
    maxErrStackLength in number default 4000);
    whereas the spec had only 3 parameters.
    procedure Get_Error(err_name out varchar2,
    err_message out varchar2,
    err_stack out varchar2)
    Discrepancy between spec and body was the cause of the worker to fail. By adding the missing parameter i was finally able to continue with the install.
    I even checked the latest update to this patch at Metalink and still find that the above error is not fixed.
    ID:1235184 Patchset::2133107 README
    Patch 11i.DMF_PF.G
    Product:Discrete Manufacturing
    Platform:Sun SPARC Solaris
    Language:American English
    Translations Required
    Version:11i
    Last updated:01-MAR-2002
    Size:137M (144628287 bytes
    Would like to know if anyone else had a similar issue while applying this patch.
    Thanks
    Gaja

    Hello Community!!
    Would like to know whether anyone had issue when applying discrete mfg patch G (DM_PF_G : Patch 2133107) which we applied to get upto current version for OSFM.
    I faced these specific problems and would like to know if anyone faced this issue.
    1) While applying the Patch, adadmin failed in between due to following error:
    -------------- E R R O R L O G I N F O -----------------
    ATTENTION: All workers either have failed or are waiting:
    FAILED: file WFRESGEN on worker 1.
    FAILED: file WFRESGEN on worker 2.
    FAILED: file WFRESGEN on worker 3.
    FAILED: file WFRESGEN on worker 4.
    FAILED: file WFRESGEN on worker 5.
    ATTENTION: Please fix the above failed worker(s) so the manager can continue.
    Start time for file is: Wed Feb 06 2002 18:45:42
    /oradev/test/testappl/fnd/11.5.0/bin/WFRESGEN APPS/APPS 0 Y DATABASE @FND:resource/wfver.msg
    Logfilename : /oradev/test/testappl/admin/TEST/log/l1117586.req
    Report filename : /oradev/test/testappl/admin/TEST/out/o1117586.out
    wferr:
    - WFRESGEN_FAILED
    - WFUPI_FAIL MESSAGE=ORA-04068: existing state of packages has been discarded
    ORA-04063: package body "APPS.WF_CORE" has errors
    ORA-06508: PL/SQL: could not find program unit being called
    ORA-06512: at line 1
    STATEMENT=BEGIN WF_CORE.SESSION_LEVEL:=0; WF_CORE.UPLOAD_MODE:='FORCE'; END;
    AD Worker error:
    The above program failed with error code 1.
    See the AD Worker log file and/or the program log file for details.
    work02.log
    Start time for file is: Wed Feb 06 2002 18:45:42
    ------------------ E N D O F E R R O R L O G I N F O -----
    I had TAR with Metalink and we did go back and forth and could not resolve this issue till i found that the patch zip file p2133107_11i_SOLARIS.zip had the wfcoreb.sql and wfcores.sql script files for package spec and body which caused the problem.
    Analyzing both spec and body, i found that the body had 4 parameters
    procedure Get_Error(err_name out varchar2,
    err_message out varchar2,
    err_stack out varchar2,
    maxErrStackLength in number default 4000);
    whereas the spec had only 3 parameters.
    procedure Get_Error(err_name out varchar2,
    err_message out varchar2,
    err_stack out varchar2)
    Discrepancy between spec and body was the cause of the worker to fail. By adding the missing parameter i was finally able to continue with the install.
    I even checked the latest update to this patch at Metalink and still find that the above error is not fixed.
    ID:1235184 Patchset::2133107 README
    Patch 11i.DMF_PF.G
    Product:Discrete Manufacturing
    Platform:Sun SPARC Solaris
    Language:American English
    Translations Required
    Version:11i
    Last updated:01-MAR-2002
    Size:137M (144628287 bytes
    Would like to know if anyone else had a similar issue while applying this patch.
    Thanks
    Gaja

  • MTO Discrete Manufacturing with multiple plants and sub-contracting

    Dear PP Gurus,
                           I am facing a problem, pl. help me out.
    My Scenario is as follows:
    I am having 4 plants with Make-To-Order Discrete Manufacturing scenarieo .
    Suppose to manufacture a particular Product , there are 10 operations.The first 4 operations are carried out in Plant A, 5th and 6th carried out in Plant B, Operations 7 is Sub-contracted to a Vendor. After the job-work from Vendor, the job returns back to Plant A and the remaining operations are carried out in Plant A.
    The whole scenario has to be mapped into SAP. Please guide me from the very beginning( Masterdata maintenance). Also, what shud be the MRP( Single-item multilevel or anything else)
    Your help is highly required by me.
    Thanks in advance,
    Soumyendu

    Hi Sadhukhan,
    For external processing in different company code, u need to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn. Before that create purchase info record. Enter subcontract info record in routing. After running MRP , convert the PR to PO. Send the material by MB1B by 541 mvt. Receive the material by MIGO by 101 mvt.
    Reward if useful.
    Keerthi

  • Archive - Purge data from F1 and U1 clusters

    Hello Experts,
    I have been given the task of purging data from the F1 cluster, Remuneration Statement forms, and the U1 cluster, Tax Reporter forms, in PCL4.  I was hoping to accomplish this by using an archive function to delete the data but not store the archived files.  I have not been successful in finding much information about purging from these clusters.  I am looking for any advice anyone can provide or a direction to take to reduce this data.   Thank you in advance for your assistance.

    Martin,
    which would help keep everything intact
    I don't know what that means.  The whole purpose of archiving is to remove data from the 'ready' database and place it somewhere else.  Leaving it intact means not archiving at all.
    In the archiving process, data is selected and copied into some sort of storage medium that typically has a lower state of availability than un-archived data.  The business decides what level of availability is acceptable, and the archiving policy (e.g., how long should the data remain archived before it is finally physically deleted forever).
    So 'intact' is a bit vague.  All the bits of data that the business decide are important are replicated 100% in the archive medium, validated, and then the source records that were archived are physically deleted from the ready database.  Functionally, all archived data is intact, it just may be in another format.
    I have never heard of a major ERP system that did not offer archiving in some form.  There are also many third party vendors who offer archiving for the major ERP packages.
    Level of success is hard to predict.  There are tools available as standard in SAP that monitor critical factors:  memory access, disk access, response times, etc etc etc.  Here too there are third party tools that measure critical factors.  You can run these before and after the archiving process to measure what success you have had.
    I have never seen anyone who will stand up and say "if you archive x million records from your ready database, you will see a performance increase of y percent."  There are too many variables.  As they say in the MPG ads, "Your results may vary". You usually can get some qualitative numbers by testing your archiving process in a test or dev system.
    Best Regards,
    DB49

  • Procure to pay Purging data

    Anyone experience or have knowledge that can help us in the area of Procure to pay Purging data?
    Is someone done it already and can assist us?
    Where can we find more detailed technic information than in the user guides about the frame and scope of each purging program, her data integrity, limits, limits on run time, runing times ect?
    Any help would assit us.
    Thanks in advance.
    Yaniv Snir
    Oracle Application Consultant
    Oracle Israel

    Follow the Note:139316.1.
    Srini C

  • Purge Data?

    Dear all,
    I am going to purge data in EBS (including different modules) like PO, AP, AR & GL. Does anyone encounter this process? I found that I cannot purge all purchase requisitions no matter what status before year 2006.
    Any functions available in EBS?
    Thanks,
    Amy

    Hi,
    Please see if these documents helps.
    Note: 139316.1 - AP Purging
    Note: 422449.1 - How to Purge Old Obsolete POs
    Note: 205362.1 - How Does Archive & Purge functionality works in 11i AP?
    Regards,
    Hussein

  • Purged Data in SAP

    How does SAP manage the purged data in SAP databse.
    Lets sa i have deleted a Business Partner or any transaion in SAP.
    what happens to it.
    I guess it resides somewhere in archive mode or format or files.
    WHere does it store all the purge data.
    Does it a physical delete, move to history tables... or set a flag etc.

    Deleted and Archived data is going to be stored in the below tables:-
    TXW_C_BUKRS                    Settings for company codes
    TXW_C_GLO                      Global settings (fields from structure TXW
    TXW_C_REF                      Reference for currency/amount fields
    TXW_C_RELA                     Relations of tables and domains
    TXW_C_SOEX                     Source tables and export structures
    TXW_C_STRC                     Segment structures
    TXW_C_V0                       Data view: Header
    TXW_C_V0T                      Data view: Description
    TXW_C_V1                       Data view: Data segments
    TXW_C_V2                       Data view: Join conditions
    TXW_C_V2S                      Data view: Standard join conditions
    TXW_C_V3                       Data view: View fields
    TXW_C_V4                       Data view: Selection conditions
    TXW_C_VOL                      Data file directory sets
    TXW_C_VOLD                     Data file directories
    TXW_C_VOLT                     Data file directory set descriptions
    TXW_DIR                        Data file log (replaced by txw_dir2, use o
    TXW_DIR2                       Data file log
    TXW_DIRAL                      Data file log - ArchiveLink (obsolete afte
    TXW_DIRAL2                     Data file log - ArchiveLink
    TXW_DIRSEG                     Data file segment directory (replaced by t
    TXW_DIRSG2                     Data file segment directory
    TXW_FSZH                       DART: file size settings header
    TXW_FSZR                       DART: file size estimator settings records
    TXW_FSZT                       DART: file size settings description
    TXW_IBU                        DART: IBU add-on extraction function modul
    TXW_INDEX                      Temporary table for data segment index
    TXW_INDEX_01                   Temporary table for data segment index
    TXW_INDEX_02                   Temporary table for data segment index
    TXW_INDEX_03                   Temporary table for data segment index
    TXW_INDEX_04                   Temporary table for data segment index
    TXW_INDEX_05                   Temporary table for data segment index
    TXW_LOCK1                      Lock object for INDX (Tax Data retention)
    TXW_LOCK2                      Lock object for data file
    TXW_R_STAT                     Status/Trace for TXW-data retrieval from a
    TXW_S_ANEA                     Retrieve ANEA from archive
    TXW_S_ANEK                     Retrieve ANEP from archive
    TXW_S_ANEP                     Retrieve ANEP from archive
    TXW_S_BKPF                     Retrieve BKPF from archive
    TXW_S_BSEG                     Retrieve BSEG from archive
    TXW_S_COBK                     Retrieve COBK from archive
    TXW_S_COEP                     Retrieve COEP from archive
    TXW_S_COFI                     Retrieve COFIS from archive
    TXW_S_EKKO                     Retrieve EKKO from archive
    TXW_S_EKPO                     Retrieve EKPO from archive
    TXW_S_GLT0                     Retrieve archived GLT0 data
    TXW_S_KNC1                     Retrieve archived Customer master data
    TXW_S_LFC1                     Retrieve archived Vendor master (transacti
    TXW_S_LIKP                     Retrieve LIKP from archive
    TXW_S_LIPS                     Retrieve LIPS from archive
    TXW_S_MKPF                     Retrieve MKPF from archive
    TXW_S_MSEG                     Retrieve MSEG from archive
    TXW_S_VBAK                     Retrieve VBAK from archive
    TXW_S_VBAP                     Retrieve VBAP from archive
    TXW_S_VBPA                     Retrieve VBPA from archive
    TXW_S_VBRK                     Retrieve VBRK from archive
    TXW_S_VBRP                     Retrieve VBRP from archive
    TXW_VARIA                      Contents of Variant of TXW-archive retriev
    TXW_VWLOG                      View query log (replaced by txw_vwlog2: uu
    TXW_VWLOG2                     View query log
    TXW_VWLOG2_U                   Data view query log
    Data will be stored in different tables depending upon the document.
    Thanks,
    Mahesh.

  • Need to purge data in sysutility_mdw database

    Hi All,
    I am using SQL Server 2008 R2 and  I need to purge the data in the database sysutility_mdw, please let me know how to do do, also let me know if there is any microsoft recommended T-SQL to purge data in database sysutility_mdw.
    Thanks,
    ATRSAMS

    can gives you an hint-
    http://social.msdn.microsoft.com/Forums/sqlserver/en-US/ab6936b9-0cc3-4763-99fd-05d51eb8afdc/sizing-sysutilitymdw?forum=sqlkjappmsmgmt
    Thanks, Rama Udaya.K (http://rama38udaya.wordpress.com) ---------------------------------------- Please remember to mark the replies as answers if they help and UN-mark them if they provide no help,Vote if they gives you information.

  • SAP Best Practice for Discrete Manufacturing

    Hi colleagues,
    We are installing SAP BP for Discrete Manufacturing based on ECC 6.00. We have already installed the Baseline Layer 0. The problem we face now is that some of the building blocks required for Layer1 activation are not present amongst the ones already installed.
    How does one get these missing building blocks?
    Thank you.

    Dear,
    For detail information please refer the OSS notes,
    1040010 and 1223033 - SAP Best Practices for Discrete Manufacturing V1.603 CN
    Ensure that exactly the support package levels mentioned in the Quick Guide are implemented (not below and NOT HIGHER).
    Regards,
    R.rahmankar

Maybe you are looking for

  • æ ligature will not display in song name.

    I keep trying to rename a song with its proper æ ligature in the title, but when I click OK, the ligature reverts to separate letters ae. Is there any way to fix this?

  • My 890FXA-GD70 FF story

    890FXA-GD70 (used via eBay; unboxing seemed as if new) all new: AMD Sempron 145 CPU Corsair AX1200 PSU Corsair CMX4GX3M1A1333C9 1x4G DDR3 1333MHz PC3-10666 ATI Radeon HD 5970 GDU Seagate Barracuda 7200 500 GB SATA ST500DM002 The board came with BIOS

  • Updating .xml files through JAVA?

    Hi all,   I am Krishna.. I need to basically parse the content of the XML form and do a text replace. The Promotions that are created by the users will also reference images. These references are stored in the XMLforms (which are basically XML files)

  • Ilife 6.

    I just bought ilife 8 and discovered imovie does not install on my imac g4 powerPC. I need to do widescreen? Does anyone know where I go to get the previous release that will work on the ibook? Thanks Michael

  • Unable to connect to flash debugger

    I just installed Flex 3, and I am unable to connect to the flash debugger using firefox or IE on vista x64. This worked with all the betas. Anyone have this problem?