Dismantle date in future

CAN i Have the dismantle date in future?is it possible for me to allow dismantling date to be in future .

There was a similar post some time back
Someone suggested a batch program to update the structure for a future date.
I guess it could work something like this:
1. Enter the data in a customer-specific table
2. Run customer-specific batch program each day
3. Program looks into the "Z" table to see if there is anything to dismantle today
4. If a records is found, then the structure is updated accordingly
PeteA

Similar Messages

  • Material Confirmation date in future though the material is in stock

    Dear Gurus,
    Please tell me why the system is giving the material confirmation date in future though the matl is  available in stock.
    System creating two schedule lines one for 15/10 (15 oct) and the second one with the confirmation of quantity on 22/11 (22 Nov) as I have enough stock than the required for this order. In MRP1 view of same  matl Master of same material delivery planning time is 28 days. and in MRP3 view the Replenishment lead time is 20 days.  please tell me what date system considering to shift  the confirmation date in future. the factory calender has Sat-sunday off.
    please tell me the possible reasons for confirmation date change.
    regards,
    Sandesh

    Hi ,
    Please check the  value at MM03-> Sales: General plant Tab ->Availability Check is '02'.
    u201802u2019 will consider all the u2018Individual Requirementsu2019 done before and during the creation of Sales order for the combination of respective Material & Plant.
    Even though Material stock will be visible for you at MMBe for respective plant double click on the Quantity, it will show you multiple Row with one of it will be " On Order Stock" these are the other orders for which Quantity is already confirmed but respective PGI is not yet done.
    The next schedule line date always generated based on the Factory calendar (based on Holidays/Weekly Offs if any).
    AT MD04 Tcode, based on the selection made at Material master for Availability Check you could see all the requirements related to Goods Issue Sales Orders , STO & Production Orders for Goods receipts.
    Hope this will solve your query.
    With Best Regards,
    RB.

  • When putting in "time/date" of future events, does not accept?

    When putting in "time/date" of future events, does not accept?

    I'd also like to ask if it's really necessary that the statuses within the status profile and date profile should maintained in the same positions.
    No

  • Function module to calculate date in future

    Hi,
    I am looking for a function module in SAP CRM 2007 that calculates and returns date 'n' days in future of the entered date. This is like the DATE_IN_FUTURE function modules present in SAP.
    Please let me know if any one has come across such FM.
    Regards,
    Saumya

    Thanks for the replies.
    The issue has been resolved.
    We can directly add the number of days in future to be calculated in the current date. In SAP, it directly converts number to date type and calculated date in future.

  • Delivery date in future

    Hello!
    I want to send a message to a queue with a delivery date in future.
    A message driven bean shall consume this message, when this delivery date is reached.
    Is there a way to do this with JBossMQ?
    Thanks,
    Bernhard.

    Hi Bernhard,
    there is no requirement to make this server specific by using this kind of feature(i.e. some kind of timer service) even if it exist. you can rather put the logic in MDB.
    if the MDB is not in your hand(i.e. some prewritten code which you can't to modify), then you can have another MDB which accepts the message(on some other destination), waits till the future time and then resends the message to the destination on which your original MDB is listening to.
    hope this helps,
    cheers and regards
    Anurag Parashar
    Pramati Technologies

  • Usage lines got expired even end date is future date

    Hi ,
    We have Service Contract which Usage Line has been expired(status is in EXPIRED) even its end date is future date.
    Other Usage lines and Service Lines are in Active status.
    When I checked the lines through backend,we identified that it was updated by program
    Contract Status Change by Range..
    But as per program logic,it should not update the status of Usage line which end date is future date.
    Is there any way to update the end date of the Usage line to date which is less than sysdate then make it expire and then update it back to original end date of usage line(future date)
    Could anyone let me know if there is any provision or possibility.
    Thanks in advance
    Satya340

    YOu can not create data that does not exist.
    You will need to add in a table which has all dates and make that you first table with all other data joined with a left out from this date table.
    Ian

  • File Modifications Date as Future date

    Hi Guys ,
    I am creating Installer from PackageMaker for java Application. Windows Installer is done. "LOCALES.jar " file holding future date in 2040 .You can see it from the screen shot. But same file when i transfer to mac it doesnt stay that date. is there any way assign the future date for perticuler file. I tried to change the computer date and do the modifications . But seems like it does not correct way. in windows the developer changed the computer date and it holding the that date in future "2040".
    Thanks in Advance
    Lakshan

    Seen these?
    Applet Caching problem (Applets forum at JavaRanch)
    Java Applet not caching - Stack Overflow

  • Dismantling date for Equipments

    Hi Experts,
    How to capture dismantling date for an Equipment under a given functional location.I want to get the history of equipment for a given functional location ie when the equipment is assigned to that functional location.
    Can any one help me?
    Regards,
    Sibinraj

    Hi,
    Valid from date & Valid to date will get changed once you change your installation location.
    For example, equipment 1 has been created on 16.02.2003.
    So Valid from date would be 16.02.2003 & Valid to Date would be 31.12.9999.
    it has been installed in FL1 on 23.05.2005.
    So Valid from date would be 23.05.2005 & Valid to Date would be 31.12.9999.
    Then Equipment 1 has been dismantled from FL 1 & installed in FL 2 on 12.08.2008, then Valid from date will get changed to 12.08.2008 & valid to date will be same (31.12.9999).
    If you see in Usage list, you can see 3 rows.
    First row: FL 2 with 12.08.2008 & 31.12.9999
    2nd Row: FL 1 with 23.05.2005 & 12.08.2008
    3rd Row: Empty FL with 16.02.2003 & 23.05.2005.
    Valid from date will not be same if you change your installation location. Only start up date can be same till the equipment is getting scrapped.
    Regards,
    Maheswaran.

  • FileModification date as Future dates

    Hi Guys ,
    I am creating Installer from PackageMaker for java Application. Windows Installer is done. "LOCALES.jar " file holding future date in 2040 .You can see it from the screen shot. But same file when i transfer to mac it doesnt stay that date. is there any way assign the future date for perticuler file. I tried to change the computer date and do the modifications . But seems like it does not correct way. in windows the developer changed the computer date and it holding the that date in future "2040".
    Thanks in Advance
    Lakshan

    https://discussions.apple.com/community/developer_forums?view=discussions

  • Error message -Invoice date is future

    Hi,
    when entering the invoices, some users enter the invoice for future date. The system is giving a information message for this....i want to make it a error or stop users entering invoices for future date. how can i do it?
    Gayani

    Hi,
    What is the code of the message that you receive? You can try to change the control for it in IMG: Controlling - General Controlling - Change Message Control
    Regards,
    Eli

  • Delivery schedules delivery date in future-GR

    Hi all,
    For the Me38 Maintain delivery schedules, we will maintain delivery date and schedule details.
    We can make GR for the current and past date through MIGO. But when we try for future delivery date, it will show no selectable items in MIGO with reference to the scheduling agreement. I guess this is std behavior. So they have the option for changing the schedule to the current date and then post MIGO again. The user feels it to be time consuming. So want to have a message just a warning while Migo and then proceed GR.
    Is it possible to meet?
    Rgds

    it is the nature of a delivery schedule to have accurate timing.
    However for all that do not like that .........you can achieve what you want with an user exit.
    For details see OSS  Note 741385 - Goods receipts up to current date for scheduling agreements

  • Error when posting date in future in MFBF of REM

    Good day,
    System should give an error when the posting date is in future while doing Backflush thru MFBF in REM(repetitive mfg)
    Suggest...............

    HI
    Also check this BAdi. WORKORDER_GOODSMVT
    i have implemented the  same with one of these two BAdi but sorry not remember which one i have used. but sure with one of these two can solve your issue both in MFBF and MF42N.
    code goes some thing  like sys-date>posting date BUDAT system gives error posting in future is not possible
    Regards
    Anuapam Sharma

  • Release Date in Future for PR

    When MRP is run for MIN MAX Items the Release date in the PR  shows the future date
    suppose if PR is created thru MRP today its release date is shown in future some 2-3 days in future.
    the release date shub be same when PR is created for Min Max items when MRP is run.
    why it is so ????

    Hi ABhishek
    Release date is the date on which procurement should have started acting on the PR i.e by this date PR should be released (approved) and handed over to purchasing dept for necessary action. It is based on the lead times of the material and delivery date.
    The F1 help for this field is very good. Pl go through it once.
    Example:
    Date required:                     01.Oct.96
    GR processing time:                 2 days (working days)
    Planned delivery time:             10 days (calendar days)
    Purchasing dept processing time:    2 days (working days)
    For the material to be available on the date it is needed, the purchase requisition must be released on 11.Sept.96 (requirement date less GR processing time, planned delivery time, and purchasing department processing time).
    Best regards
    Ramki

  • Preventive Maintenance Planning - change call date of future calls

    Hello,
    we are using time based maintenance plans to schedule our maintenance obligations towards customers. After creating the plan and scheduling (IP10) we get the scheduled calls proposed by the system.
    Now we want to use IP10 or IP19 to move those planned call dates that are in the future without releasing the predecssor calls but it gives us an error: "Maintenance plan 16.04.2009: Predecessor to still on hold".
    Does anyone know if there is a way around this?
    Thanks,
    Tobias

    Hi Tobias
    As per your query... you cannot move the call dates which are in the future. First you have to skip the cal which are before the future cal date. then only you can do...
    - Pithan

  • Trying to install Thunderbird on new computer. Get OCSP response that is not yet valid (contains date in future).

    Error code: sec_error_ocsp_future_response obtained when trying to connect on new computer to www.mozilla.org.

    Heh that was my thought when I saw your post on the index. Glad you figured it out.
    Whenever there is a error that involves date or time in past or future one should check the date and time on computer.

Maybe you are looking for

  • Me21n Enhancement

    Dear All , I want to do an enhancement using the ME21n transaction user Exit , where i want to check the Plant Entered by the user & profit center in the PO item at the Time of saving the Me21n transaction that is Purchase order . Which user exit i n

  • Any fix for iSO6.0.2 battery problem?

    Any Fix yet?

  • Very low screen resolution, following work done by McAffee to ensure Firefox can receive McAffee updates

    2 weeks ago when I switched on my pc (Windows XP) I had very poor screen resolution, which I was unable to fix other than by resetting to an earlier day. I also was having problems with McAffee saying that it couldn't access my pc to upload files. Ev

  • Touch won't update

    I've tried to download 1.1.1 update a few times now, and it always gets to 150.6 MB and then says I have problem with my internet connection (I don't), anyone know a workaround?

  • DNS in DMZ

    I have created an Active Directory setup for our DMZ. I would like to make it so users can still call those DMZ servers by name in the internal network, just with the fqdn. So if they want test server a in the dmz they can rdp to say testservera.dmzn