Dispatch planned orders CM25

Dear experts,
Is it possible to dispatch planned orders in the capacity planning board CM25?
In which profile do I change the settings to make this happen?
Many thanks,
Tim
PS: will award points!

the following  profiles can be used for viewing capacity over load
SAPSFCG001     SFC: View work center/capacity (2 graf.)
SAPSFCG002     SFC: View work cntr./capacity (tabular)
SAPSFCG003     SFC: View order/capacity      (tabular)
SAPSFCG004     SFC: View order/capacity     (graphical)
SAPSFCG005     SFC: View Individual cap.    (graphical)
SAPSFCG006     SFC: View work cntr/ind.cap.  (tabular)
SAPSFCG007     SFC: View order/individual cap. (graph.)
SAPSFCG008     SFC: View order/individual cap. (tabul.)
SAPSFCG009     SFC: View line               (graphical)
SAPSFCG010     SFC: View setup optimize     (graphical)
SAPSFCG011     SFC: View work center/capacity (3 graf.)
SAPSFCG014     SFC: GANTT view wkcntr/capacity (3 grph)
SAPSFCG015     SFC: Evaluation, standard overview
SAPSFCG016     SFC: WC/Capa (2 temp.save graphical)
SAPSFCG020     SFC: Standard overview in work cntr view
SAPSFCG021     SFC: Standard overview in order view
SAPSFCG022     SFC: Standard overview in indiv.cap.view
SAPSFCG023     SFC: Standard overview + actual cap.rqts
Usually the following std profiles are used.
SAPSFCG021     SFC: Standard overview in order view
SAPSFCG022     SFC: Standard overview in indiv.cap.view
<b>Dispatch of capacity is carried out in the following transaction</b>
CM21, CM22
CM27, CM28
CM31, CM32

Similar Messages

  • BAPI or FM to DISPATCH PLANNED ORDERS

    HI Gurus,
    We have a requirement to automatically dispatch planned orders instead of manually going to CM25/CM21 screen to manually do it.
    Is anybody aware of any BAPIs, FMs or anything to be able to dispatch planned orders.
    I was going to use BDC but the table control has restricted me to do this.
    Thanks for you help.

    Hello Basil,
    I am looking for the same solution, can u plz update if u hav some information how to approch for the requirement.
    Thanks in Advance.
    Adar

  • CM40 dispatch planned order among different work centers

    Hi
       we have a finish material ,which can be manufactured using 3 different work centers.Then I create 3 production versions to link each work center .
    PV1   Routing 1(work center1)   BOM 1    production line:work center1
    PV2   Routing 1(work center2)   BOM 1    production line:work center2
    PV3   Routing 1(work center3)   BOM 1    production line:work center3
       Is it possible to create a batch job to dispatch planned order between work centers in CM40?I am able to manually dispatch planned orders between different work centers in CM22..
       CM40 use the same selection/strategy profile as CM22 and the planned orders are dispatched to other period if current period get overload..But I expect CM40 to dispatch the planned orders to other available work centers..Anyone has any suggestions?
       thanks very much..
    Edited by: Monst Yang on Jan 10, 2012 9:59 PM

    Hello,
    With CM40 also you can dispatch planned orders as like CM22
    Please look into the below link for more functions performed with the transaction:
    http://help.sap.com/saphelp_46c/helpdata/en/f3/0869a3a6ae11d183d00000e83235ee/content.htm
    Hope the information was useful
    Regards,

  • Can't dispatch planned order (LA), but can dispatch production order

    Hello,
       I'm new to capacity planning and all of the related configuration screens.  I'm probably missing something simple.  We've configured our work centers and routings.  We've configured our production order types (tcode OPU3, type US01) and planned order types (tcode OPU5, type LA) so that all create capacity requirements and are relevant to 'detailed scheduling'.  Requirements are being generated for production orders and planned orders.  We can see correct setup and production times in the graphical planning table CM21.
       Here's the problem: When we try to dispatch a planned order, nothing happens.  There is no error, but the order is not dispatched.  If we convert the planned order into a production order, accepting all SAP proposed defaults, and then try to dispatch the production order, it works fine.
       What configuration are we missing?  My first thought was to look in OPU5 for order type LA.  In the detailed scheduling section, scheduling horizon is zero (is this Ok?), SelID: Detailed is 01, 'scheduled' and 'generate capacity reqs' are checked.
    Thanks,
    Randy

    Randy ,
    Please analyse the below note related to your issue.Hope this will help you to sort out the problem.I have cheked the configuration area.I hope u are correct .In fact , it may related to your production version if you do automatic dipatch.Please reade the note and come back.
    If an error arises when automatically dispatching planned orders (for example, a capacity overload at a work center) then the system schedules the affected planned orders to another production line.This function is available in both types of planning table. It is of interest for all areas that use planned orders, for example in repetitive manufacturing or in MRP/MPS. It can also be used in production control when later converting planned orders to production orders.
    this function the following conditions must be met:
    The dispatching function Change production version on error must be set in the strategy profile.
    The original work center
    must be entered in the production version of the material as the production line (not necessarily in the current production version).
    can only be assigned to one operation in the routing for this production version
    The alternative work center can only be assigned to one operation in the routing for the alternative production version
    If an error arises the system copies the production version with the version key that is next alphanumerically into the planned order. The planned order is rescheduled with this production version. However, it is not dispatched to the new production line but remains in the pool. In this way you can dispatch the rescheduled planned orders together with other planned orders in the pool to the new production line.
    To give you a better overview and to improve handling you should choose a sort key with which the planned orders in the pool are sorted according to work center and, for example, latest start date. All orders that are to be dispatched to a production line are then placed next to one another in the pool. If an error arises during automatic dispatching to the new line every planned order affected is rescheduled with the next production version
    . If the conditions are not met then the following occurs depending on your settings in the strategy profile:
    Dispatching is terminated
    Dispatching to the same work center is continued and error messages are written to the planning log
    You can only dispatch main operations with this function, but not sub-operations. Operations are always dispatched with the full quantity to the new work center
    Reward point if useful
    Regards
    Jia

  • Tcode CM25:BDC or function module to dispatch planned orders

    Hi all,
    Could you please suggest a BAPI/FM for CM25 -dispatching the planned orders.
    While i try BDC, it requires the line selection for dispatch,which does not get captured in recording.
    Can anyone throw light on this or suggest any alternative.
    thanks
    kiran
    Moderator message - Cross post locked
    Edited by: Rob Burbank on Oct 23, 2009 11:28 AM

    reposting it

  • BDC for CM25 tcode or a function module to dispatch planned orders

    Please suggest a way for BDC of CM25 tcode as the selection of planned/process order in the tcode is not captured in recording.
    or provide FM/BAPI for dispatch of planned orders.
    Moderator message - Cross post locked
    Edited by: Rob Burbank on Oct 23, 2009 11:27 AM

    reposting it

  • Capacity Leveling in CM25 by Sequence Number in Planned Order

    Hello Gurus,
    I am having an issue with dispatching planned orders using tabular form.  We have to use the tabular form in order to be able to have our program select all planned orders.
    I have been testing and testing this trying to get it to work.  We have sequence numbers defined for our planned orders in the PLAF-SEQNR field.  When entering CM25, we are wanting to dispatch all of our planned orders at once and have them dispatched in the correct order by sequence number.  I have the Strategy Profile defined for Finite Scheduling, Plan. direction forwards, and no closing of gaps.  and I have my Dispatch Sequence layout key defined to only use the Sequence Number in the Planned Orders.
    We need to use the tabular form so we can select all planned orders.  I set up the requirements grouping to only include planned orders that are not yet dispatched.
    When I use the graphical form instead of tabular and I manually highlight all of the planned orders and dispatch then they are all in the correct order with all of the gaps are closed...which is what i want.
    However, I need to be able to do this using the tablular form.  No matter how I try to set up the strategy profile, it doesnt seem to work using tabular form.  They are dispatched according to start date with gaps in between the orders.
    Any help is greatly appreciated.
    I also have the following defined in Strategy Profile for Dispatching Control:
    Sort operation to be dispatched
    Consider operation sequence in the order
    Midpoint scheduling
    Thank you.
    Edited by: Kevin Gorman on Jan 14, 2009 8:19 PM
    Edited by: Kevin Gorman on Jan 15, 2009 3:26 AM

    Hi Vishal,
    I hope the below link will provide you need full information:
    http://help.sap.com/saphelp_470/helpdata/en/8a/a5a7674adc11d189740000e8322d00/content.htm
    Hope it clears your doubt.
    Regards,
    Madhu.G

  • Planned order and Production order Not appearing cm21 transaction code

    Hi
    I have created a planned order for a material through MRP run
    As soon as the planned order is created its available in the cm21 transaction code . But once i dispatch the planed orders , the planned orders can be seen only as a BAR in the upper right side of the screen .
    1.Can any body please let me know how i can view the details of this dispatched planned orders in the same way when the planned orders were un dispatched ?
    2.If i create a production order manually or convert a planned order to production order i cannot see these production orders in cm21 neither on cm22 , can any body please let me know what i have to do so that i can view these production orders as well in cm21 or cm22 transaction code.
    Thanks and regards
    Sankar N

    Hi Pradeep
    I have checked the generate capacity requirements and it worked ,Thank you
    Presently i can view only the work centre details in cm21 screen extreme left , how can i see the details of the orders that are dispatched at this work centre ,in the similar way we see in the order pool, bottom left of cm21 screen .
    Thanks
    Sankar

  • Dispatching of Orders same as in CM25

    Hi ,
    I have a requirement to develop a custom report to DISPATCH the prod/planned orders same as it is done in CM25. Can anybody please let me know the logic behind the same or any FM or BAPIs or any related information .
    I did Debugging but could not understand the logic.
    Thanks in advance.
    Adar.

    You can change the details of operation by using table parameter 'CLOI_ORD_OPRU_IMP'. you will put data as
    DATA: li_ord_opru_imp TYPE TABLE OF CLOIOPERU WITH HEADER LINE.
    ** if you want to change execution start date
        li_ord_opru_imp-aufnr = orderid.
        li_ord_opru_imp-aplfl = sequence.
        li_ord_opru_imp-vornr = operation.
        li_ord_opru_imp-field = 'SSAVD'.
        li_ord_opru_imp-value = EXEC_START_DATE.
        APPEND li_ord_opru_imp.
    ** if you want to change execution start time
        li_ord_opru_imp-aufnr = orderid.
        li_ord_opru_imp-aplfl = sequence.
        li_ord_opru_imp-vornr = operation.
        li_ord_opru_imp-field = 'SSAVZ'.
        li_ord_opru_imp-value = EXEC_START_TIME.
        APPEND li_ord_opru_imp.
    ** if you want to change work center
        li_ord_opru_imp-aufnr = orderid.
        li_ord_opru_imp-aplfl = sequence.
        li_ord_opru_imp-vornr = operation.
        li_ord_opru_imp-field = 'ARBPL'.
        li_ord_opru_imp-value = WORK_CENTER.
        APPEND li_ord_opru_imp.
    ** if you want to dispatch this operation
      li_ord_opru_imp-aufnr = orderid.
      li_ord_opru_imp-aplfl = sequence.
      li_ord_opru_imp-vornr = operation.
      li_ord_opru_imp-field = 'METHOD'.
      li_ord_opru_imp-value = 'DISPATCH'.
      APPEND li_ord_opru_imp.
    ** Please specify data in CLOI_IF_PAR [Interface Parameters]
    DATA: lv_cloi_if_par LIKE CLOIIFPAR.
    lv_cloi_if_par-commitflg  = 'C'.
    lv_cloi_if_par-r3_version = '46'.
    lv_cloi_if_par-metlog_req = 'X'.
    lv_cloi_if_par-msglog_req = 'X'.
    lv_cloi_if_par-msgobj_req = 'X'.
    lv_cloi_if_par-ord_req    = 'X'.
    lv_cloi_if_par-ordseq_req = 'X'.
    lv_cloi_if_par-ordopr_req = 'X'.
    lv_cloi_if_par-plord_req  = 'X'.
    ** in this example, i call this function by pattern.
      data: lv_ret_val LIKE CLOIRETVAL.
      CALL FUNCTION 'CLOI_CHANGES_UPL_31'
        EXPORTING
          CLOI_IF_PAR                = lv_cloi_if_par
        IMPORTING
          CLOI_RET_VAL               = CLOI_RET_VAL
        TABLES
          CLOI_ORD_OPRU_IMP          = li_ord_opru_imp
          CLOI_MAP_EXP               = CLOI_MAP_EXP
          CLOI_METHOD_LOG_EXP        = CLOI_METHOD_LOG_EXP
          CLOI_MESSAGE_LOG_EXP       = CLOI_MESSAGE_LOG_EXP
          CLOI_MSG_OBJ_LOG_EXP       = CLOI_MSG_OBJ_LOG_EXP
          CLOI_PLORD_EXP             = CLOI_PLORD_EXP
          CLOI_ORD_EXP               = CLOI_ORD_EXP
          CLOI_PLORD_OPR_EXP         = CLOI_PLORD_OPR_EXP
          CLOI_ORD_OPR_EXP           = CLOI_ORD_OPR_EXP
          CLOI_ORD_SEQ_EXP           = CLOI_ORD_SEQ_EXP
    Regards,
    Thitima

  • Automatic dispatch of Planned Order - Reg.,

    Hi
    Here i'm trying to dispatch a planning order automatically, when a work center capacity got fully loaded. What is the necessary settings has to be done?
    Kindly explain clearly
    Regards,
    Gopi

    Dear ,
    When you are dispatching the operation for Planned Order /Production order in that day , system checks the availble capacity load in that work centre .If required capacity is not avalaible based on the work centre available capacity (Capacity Tab-Available capacity -Check overload CM05 for workcentre in that week) , operation will not be dipatched and Scheduling logg will be created
    .I suggest that you need to check the Available Capacity (can be viewed weekly /monthly -Select the weekly grid -double click -system will dipaly the daily load in a week ) of the work centre and then go back to CM25 with your work centre -select Overall Profile -Enter Work centre -Strategy -Mark "Date Entry while dispatching " which will hel you to dipatch the date based available capacity CM05.Or else try to use CM21-Graphical view (goto -settings-scale-daily split -chek the available capacity date -dispatch.
    In CM01/CM05 , please enter Plant /Work Centre in CM05-Hit DETAIL Capacit list or Varibale View -it will display with weekly bais capcity set up based on the .Select the week where this date fall on or If you want to look the daily baisi load , then goto Planning tab-Profile-Option Profile -select as appropirate to analysis the load daily /weekly
    Setting Required :
    1. Settings for Available Capacity
    2. Setting for Capacity requirements
    3. Settings for Capacity evaluation and leveling
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    4.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling. what is the settings in OPPQ and OPPR for the "Start in Past" parameter, you need to keep them consistent with the OPU5 settings.
    Capacity Setup :
    Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In the order control OPJK I have maintained check capacity with SAPSFCG013 profile.
    Define Scheduling parameters for Production orders-OPKP-Maintain Capacity Checked /Finite Scheduling Cheked /Scheduing Type -BW/FW .
    Hope this will help u in analysis the set up.Revert if u need any help
    Regards
    JH
    Edited by: Jiaul Haque on Apr 28, 2010 2:04 PM

  • Dispatched Planned REM orders deleted by system

    Hi,
    Is there any scenario where dispatched Planned REM orders (CM25) gets deleted and is there any way to track this?
    Thanks,
    Radhakrishnan

    Dear,
    As I am aware it is nothing to do with the setting what you are talking about.
    It depends on the following table,
    T460C...it cannot be changed.
    In this just give Procurement type,special procurement type and account assignment...system will give the order type what getting defaulted during MRP.
    Check and come back

  • How to bring material description in case of planned order in CM25 trnx?

    Hi All,
    On CM25 for Process Orders, the material description is what is displayed on the bars of work.  For Planned orders it displays the planned order number and material desciption filed remains empty. Is this SAP standard behaviour when it comes to planned order in CM25? How do I bring the description as well to Planned Order number#s?
    Any pointers would be a great help!!
    Thanks,
    Nitin

    Hi,
    Thanks for your reply. My requirement is to display "material description text" in the "Mat description field". This field is already exits in planning table. However i cannot see material description in case of planned order and just see planned order number, material no etx ;but in case of process order, i can see material description text in the same field...
    Thanks,
    Nitin

  • No Automatic Dispatching Of Planned Order to new Production Version

    Dear Sir,
    When rescheduling an operation from one line to another, the system
    checks whether a production version exists for the material to be
    produced that contains the new production line as the preferred work
    center. If such a production version is found, this version is taken
    over into the planned order. The planned order is scheduled again based
    on the production version.
    The second function allows you to automatically search for an
    alternative work center in the case of a capacity overload of a work
    center, and to dispatch the operations to it. The predefined
    prioritization of the alternative work centers is considered in this
    case.
    The indicator Reschedule with production version must be set in the
    strategy profile.
    My issue is sytem does not making automatic Dispatch to the second
    Production version for the material at the time of insufficient capacity
    Best Regards
    Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
    Consultant

    In the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
    "if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
    Please check if it works now.
    thanks

  • Dispatch production orders/planned orders

    Hello:
    Is there a standatard function module available to dispatch production orders/planned orers? Equivalent to MF50, where an order is dispatched.
    Sarita.

    HI Saritha,
    I have teh same requirement , can you please share how did u met the requirement.
    Thanks & regards,
    Adr

  • Dispatching of Planned Order in Planning Table

    Hi Gurus,
    What do we understand by dispatching of planned orders?
    When the orders are need to be dispatched?
    Is it after firming of order?
    What impact it will have on the system after we dispatch the planned order?
    I observe that after dispatching the planned order, we have tick on capacity dispatched. In MD04, for the planned order there are double stars for dispatched orders?
    Can anyone explain the this functionality in simple way.
    Points will be rewarded.
    Srini

    Hi,
    Normally we can do the capacity leveling  for Plannend order and Production Order. In R/3 , MRP run dosenot consider  Capacity Over load, Capacity leveling is required to for Planned order.
    U reserve the Capacity  on particular date by despatching the planned order at Planning Table. Which results in Capacity is scheduled on that Particular date & time for  that Planned order.System will not allow to despatch another order  in the same date.
    Firm & Capacity scheduled check box is activated when u despatch the Order.  MRP will not reshedule that Planned order.
    when u convert that Planned order to production order, system will schedule the order with  same date  & set the despatch status for Each opeartion.No need to despatch the Prod order Again.
    Pradeep

Maybe you are looking for

  • IDOC Failed - Error massage  Deficit of PU GR quantity

    Hi All Trying to post 102 (reversal) goods movement. The idocs are created on 8th June. On this date, the PO I504800-02 has deficit quantity of 16 units trying to post, however there is a 101 movement posted on 15th June for quantity 36. Currently th

  • How many RAID 0's can I support?

    Hi All, I've got an ASUS Sabertooth MB, Core i7 950, 12gb Tri Channel 1600 mhz ram, 850 watt corsair power supply,a nd GTX 470. My boot drive is a 300gb Velociraptor, and I have 2 Samsung 1 TB in a RAID 0. Question:  Can my setup support another RAID

  • Deadlock in a report

    Hi all, my knowledge of obiee is very low... When I run a report, I get this error: ORA-00060: deadlock detected while waiting for resource at OCI call OCIStmtExecute. [nQSError: 17010] SQL statement preparation failed. (HY000) I can't imagine why a

  • What data do DDIC tables have ?

    Hi One and All, In the IDES R/3 system i use, in the sap data tables in any application component, there are default values.. In any enterprise that is implementing SAP..What data do these sap standard tables contain? Are they blank tables when the c

  • Role for bw consultant during upgradation

    Hello All,    Recently my client has plan to upgrade from BW 3.0B to BI 7. I need to know what will be the role while doing upgradation for BW consultant, I think major part will be done from the Basis side, Please let me know the role of BW consulta