Display Material provided by a vendor in Purchasing doc Component Overview.

Hello Gurus,
Is there a way to dsiplay the material which is set as, "Material provided by a vendor" in BOM,  in purchasing document
Item->Component->Overview?
I know that matreial provided by a vendor doesn't create requirement so thats why. Is there a way to just display that material when exploded in pruchase order?
Any help would be really appreciated.
thank you!
Khan.

Thank you Eduardo for the response.
You are right we want to have both B and C to show up in the component overview.
Even though B is provided by Vendor and we dont generate requirements for it.
Is it possible?
thank you!
Khan.

Similar Messages

  • 'Preferred Vendor' and 'Vendor' in Purchase Order Partner Overview screen

    Hello All,
    Please can you provide me with some assistance to the following issue we have on our SRM 5.0 system......here goes.....
    In 'Define Sourcing for Product Categories config' , we have set the value to 'Sourcing is never carried out'.  Now, when we manually assign a Supplier to the Cart and have it automatically converted to a Purchase Order, the Purchase Order is created but only in Held Status as only the 'Preferred Vendor' in the PO Partner Overview screen is populated with the other 'Vendor' field remaining blank and requiring manual intervention by our users
    Please can someone explain how we are able make the system to always have the 'Vendor' field populated, therefore not needing any manual intervention.
    Your help would be appreciated,
    Thanks
    Steve Walsh Jnr

    Hi
    Implement the following method , in which you will force prefer vendor
    to fixed vendor for all applicable sc.
    IF_EX_BBP_DOC_CHANGE_BADI~BBP_SC_change.
    You will have to work with partner function 00000039 which is the
    prefered vendor to move into the partner function 00000019.
    In the BBP_DOC_CHANGE_BADI we provide the business partner data
    through the IT_PARTNER interface table. the prefered vendor or desired
    vendor has partner type 39, the regular supplier will have partner
    type 19. a switch from 39 to 19 should create a po instead of
    incomplete po.
    BR
    Muthu

  • Field fixed vendor for purchase requisition (component of project)

    Dear all,
    Could you please indicate us how we can automatic fill the field "Fixed Vendor" (FLIEF) in a purchase requisition comming from a component of an activity (of a project)?
    The field "Desired Vendor" (LIFNR) is filled automatic in the purchase requisition, based on the vendor given on the activity (field: RESBD-LIFNR)...
    We want that both fields (fixed and desired vendor) are filled automatic in the purchase order...
    Thank you.
    Best regards,
    Thomas

    If you have maintained source list(ME01) and "info record"(ME11) for the desired vendor and material combination. It will default as "fixed vendor" in PR. Of course when you copy PR into PO, it is going ot copy the same.
    Regards,
    Mahendra

  • GR to "Material provided to vendor" stock from PO

    Hi
    I need to Post stock directly to "Material provided to vendor"
    Stock while doing GR with reference to Purchase order and
    I activated QM view for the material. So, I entered vendor no in the PO and select SC indicator also. While doing GR with
    reference to PO, stock also increased in Quality inspection stock of Material provided to vendor. Now my problem is
    there is no inspection lot was generated. I want to create
    inspection lot. Is it Possible ? if no, pl clarify.
    Thanx in advance,
    Regards,
    RRS.

    Hi,
    Try with following,
    Assign QM Active to movenent Type 101- O, then maintain Quality infor record- Insp. Control- Source inspection Key ( Take help frm u r QM Consultant)
    Rgds,
    Vikas

  • Display Field "Purchasing Doc No" & "Vendor" in GL Line item of FAGL003 rep

    Dear Experts,
    To display of Purchasing Doc No (EBELN) & Vendor(LIFNR) in GL line item of FAGLL03 report we have added both the field in the customization setting of Special Fields in GL Line Item using the following path:-
      Financial Accounting(New)
         General Ledger Accounting(New)
            Master Data 
               G/L Accounts
                  Line Items
                    Define Special Fields for Line Item Display
    After the request got transported to quality client the fields Purchasing Doc No (EBELN) & Vendor(LIFNR) disappears from the lay out list of FAGLL03 report.
    All the screen shots are furnished in the attached file.
    Please advise.
    Regards,
    Alok Parida
    FI Core Team

    Hi Seetaramaiah,
    Please regenerate structure according to following steps.
    Call transaction SE37, enter the function module ITEM_STRUC_EXTENSION and
    execute it with the following parameters:
    BASIC_STRUCNAME: FAGLPOSY
    EXT_STRUCNAME: FAGLPOSYEXT
    EXT_FIELDS_TABNAME: T021S
    I_LSTCL: D
    X_TRANSPORT: ' '
    Regards,
    Joseph

  • How to clear the stock of material provided to vendor(subcontracting stock)

    Hi SAP Gurus,
    Please let me know how to clear the stock of material provided to vendor(subcontracting stock) and need your help in what senario this stock will show in " Matl prov. to vendor "
    Thanks and Regards,
    SHARAN.

    Hi Sharan,
    Matl Povided to Vendor stock will appear in Subcontracting scenario.
    If at all you have given some material to a subcontractor , this will be consumed automaticaly when you will recieve the ordered material from subcontractor.that is 543 movement will take place in the backgroung when u do the GR.
    In case if u need to clear the stock u can do 542 and take the stock back to unrestricted.
    Edited by: Donsandy on Jan 21, 2009 6:19 PM

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • Setting rquired for material and vendor to purchase excisable goods

    Hi,
    I want to know if we create new material and a new vendor, what are the setting needed like in J1ID etc. to purchase that new material from new vendor as a exciseble goods, if all the settings at plant and company code level have been made.
    regards,
    zafar

    Hello,
    for new material and vendor -
    1) maitain excise details in J1ID.
    2) maitain master record for excise codnition if ur using TAXINN.
    no addintional settings required.
    regards,
    sujit

  • MB1B Transfer posting 311Q ( Material provided to vendor ) ......

    Hello
    Subcontracting process useing movement type (311 Q)
    in the trasaction MB1B. i wold like to fetch the components from the PO , like 541.
    error "Combination of movement type 311 Q and function selected not possible "
    please help me

    you cannot consume with 543 if you have not move any stock with 541, even you created a storage location.
    The storage location is useless for the consumption, except you use the PP subcontracting process instead of the MM subcontracting process.
    A storage location for the subcontractor is usually on created for the case that you send materials directly from subcontractor to customer. in this case you receive the finished material into that location, but for consumption in MM subcontracting process no storage location is involved. the material has to be in special stock O and is only monitored at plant level, instead of storage location the vendor is shon in stock overview MMBE.
    In PP subcontracting process, you create a production order yourself to consume the materials, only the service fee is ordered via a PO that is linked to this production order. the calculation of the finished material is made from the production order. you then have to receive twice, you do MIGO to confirm that you got the service, and you receive the quantity to the production order.

  • Provide stock to Vendor via 541 with reference to an Order

    Dear Experts,
    Kindly advise on the solution, not too familiar with MM.
    We have a requirement where we provide stocks to vendor under normal Subcon PO.  The movement type we use is 541 for material transfers from our company to the vendor.  But the standard is using 541 MB1B.
    Is there a standard way where the stock transfers to vendor can use an Order for reference?  This is because we want this order for use as a "delivery note" for vehicle/truck dispatching.
    Thank you all!

    Hi,
    If you are using active MRP for creation of Production Orders and PRs, then while system creates the production orders and when you maintain the routing data, there's an option to Outsource the operation to the subcontractor wherein the materials involved in the particular opearion can be used to create a PO with a PR reference which inturn has a order reference.
    Check with your PP consultant to help you set this.
    Regards
    Shiva

  • Subcontracting Vendor and Purchase Vendor

    Dear All,
    I have created separate Pricing Procedure for Subcontracting PO, since the requirement is to calculate the price on issuing qty. I have put Formula Based Condition type.
    We issue 100 KG of material and receive less than 10 KG (say 90-95 KG) but the vendor charges for issuing qty (100 KG)...so I created a new condition type which calculates for total price for 100 KG and calculates for receiving qty...Suppose Rs. 10/KG then in this case its Rs.1000/- but system should calculate unit price for 90 KG i.e. 1000/90 = 11.11 ...this is working fine as long as Iam calling Subcontract Vendor where this Schema Group is assigned in the Vendor Master..
    My problem is, for some Vendors, he is both Subcontracting Vendor and Purchase Vendor...so Iam not able to calculate for Subcontracting calculation with this requirement...where as I have separate calculation schema for Purchase Vendors...
    How to meet this..
    Kindly Suggest
    Regards,
    Gopala.S

    Hi
    Thanks for your quick reply, please give me some brief info on routine, how and where we need to do settings.
    Regards,
    Gopala.s

  • Material Procurement from many vendors

    Hi friends,
    I am working in a process industry where raw material is supplied from nearly two thousand vendors.I put all vendors in a source list. I want to create purchase requisitions at a time for all vendors for same material. How can I create it?
    Please guide me.

    Hi,
    For this you need to follow the "Quota Arrangement" Process.
    Go to MM02 - In "Purchasing" view, enter "Quota arr. usage" as '4" and save.
    Also maintain MRP views of the material master.
    Now go to OMI4 - here for MRP Lot Size (For e.g. EX), activate "Splitting Quota" for Short-term as well as Long-term planning both and save.
    Now go to MEQ1 - here for material master and plant and press enter, here maintain valid to date and pres enter and double click on this
    Here enter Procurement as "F" (External Procurement), also enter all the vendors and enter Quota as "1" for all the vendors.
    Prerequisite for Quota Arrangement is Purchase Info Record and Source List must exist for the material.
    Now maintain Planned independent requirement for material in MD61 and then run MRP for the material in MD02 and check system will generate the PRs for the material for all the vendors maintained in MEQ1.

  • Vendors per purchasing group

    Hello
    How can I get a list over vendors per purchasing group in SAP?
    The solutions I've read about here in the past does not work.
    regards
    André

    assignment of purchasing group to vendors is not best practice and never saw it anywhere
    the field in LFM1 (vendor master purchasing data view) is only taken into account if you did not assign a purchasing group to the material master.
    the process of procurement is starting with demand for a material, the requisition has already to go to a purchasing group before the purchasing group does the source determination.
    It could only be different if you have fixed sources per material and purchasing groups in the vendor master instead of the material master, then the source determination could happen in the MRP run.
    If you never maintained in purchasing group in a vendor master, then you can only analyze existing PO to find a link between purchasing group and vendor.
    One way to analyze this in SAP would be transaction TAANA.
    Just click the execute button in TAANA, enter EKKO table and click the multiple selection for the variant field. In next screen click the ad-hoc variant button.
    In the next screen select the fields purchasing group and vendor number and purchasing group, then click continue and execute your selection.
    You will get a list with any vendor/purchasing group combination you ever had in a PO

  • Displaying Material Characteristic data in MD04

    Hi there,
    I have a requirement to display Material Characteristic information in the "Additional Data" tab for a given material in transaction MD04. (Screen 100 of Function Group M61K in se80)
    What is the best approach to doing this? Can this be configured (without programming), or if not, is it possible to use a BADI such as
    MD_ADD_COL_EZPS to achieve this? (from looking in forum, this appears to be an option)
    Will I need to modify the screen? - hoping to achieve this without modification...
    Any responses are appreciated.
    Thanks,
    David.

    Explore the methods ACTIVATE_ADD_COLUMNS and FILL_ADD_COLUMNS of this BADI.
    Example: This code adds a button on tool bar of MD04 and when clicked populates delivery column
    Method - ACTIVATE_ADD_COLUMNS
      button1_ez = "DELIVERY".
      ez1_mode = '2'.
    Method - FILL_ADD_COLUMNS
    Populate the column
      DATA: lv_column1    TYPE mdez-usex1,
            lv_ebeln      TYPE ekbe-ebeln,
            lv_ebelp      TYPE ekbe-ebelp.
    Get Delivery Doc# for corresponding PO/STO
      lv_ebeln = ie3mdpslx-delnr.
      lv_ebelp = ie3mdpslx-delps.
      SELECT SINGLE belnr
             FROM ekbe
             INTO lv_column1
             WHERE ebeln = ie3mdpslx-delnr
             AND   ebelp = ie3mdpslx-delps.
      IF sy-subrc EQ 0.
        MOVE lv_column1 TO emdezx_usex1.
      ENDIF.
    Thanks,
    SKJ

  • Display Material |Attachment File in ALV report

    Dear All,
    I have to make ALV report for mutliple material attachment file.I want to display material wise attachment where user can see in report. We can see attachment list in Service For Object button in MM03 tcode for single material. And i also i do not want attachement list on tool bar where like MM03 is dispalying.
    I need ALV report for materialcodewise image/attachment file like,
    MaterialCode    File
    A101                any filename
    B101                 any filename
    So user can click on file base on material, then file will open and he can see image/attachment.
    Please guide me for above mentioned query.
    Regards,
    Shivam.

    Dear Shivam,
    You can have multiple attachments for a sinlge material. You need to consider that in your report.
    for getting the list of attachments using the static method CL_BINARY_RELATION=>READ_LINKS.
      DATA: lw_BOR TYPE sibflporb.
      DATA: lt_rel TYPE OBL_T_RELT,
                 lw_rel type OBL_S_RELT.
      DATA: lt_links TYPE obl_t_link,
                 lw_links type OBL_S_LINK.
      DATA: lo_root TYPE REF TO cx_root.
      lw_bor-instid = <Materail no.>   "<------- Materail No.
      lw_bor-typeid = 'BUS1001006'.
      lw_bor-catid  = 'BO'.
      lw_rel-sign = 'I'.
      lw_rel-option = 'EQ'.
      lw_rel-low = 'ATTA'.           "<----------Attachments
      APPEND lw_relt TO lt_rel.
      TRY.
          CALL METHOD cl_binary_relation=>read_links
            EXPORTING
              is_object           = lw_bor
              it_relation_options = lt_rel
            IMPORTING
              et_links            = lt_links.
        CATCH cx_root INTO lo_root.
      ENDTRY.
    Once you get the list of attachment populate your output table using the same.
    you can use FM SO_OBJECT_READ to get details of attachment.
    Make the column with attachment as hotspot, so that ALV take action in sinlge user click.
    In the user-command of ALV write the code to open the attachment.
    you can use the FM SO_DOCUMENTS_MANAGER
    Hope this helps you.
    Regards,
    Sachinkumar Mehta

Maybe you are looking for

  • Font Problem in SmartForm

    Hi, We have developed an Invoice in SmartForm which will display data in English and Thai Language. We have seperate Paragraph and Character Formats for them defined in one SmartStyle. Now depending on the language some free text are maintained we ha

  • Open Hub, Delta Transformation

    Hi All, Thanks in advance for your help.  I am extracting data from a DSO to a flat file using an Open hub and a delta DTP.  The problem I have is that if there is no delta (i.e. zero new/changed records) since the last time the open hub ran, my file

  • SQL*Loader-925: Error while uldlfca: OCIStmtExecute (ptc_hp)

    Hi my table loading is failing with the floowing error. But same table is loading daily without any problem. I tried again but failed with the same message. SQL*Loader-2026: the load was aborted because SQL Loader cannot continue. SQL*Loader-925: Err

  • HTML HEADER - SIZE

    Is there a limit on javascript you can put in html header? This is what I am doing. I write code in textpad and then copy into html header (for alignment... that way its easy to debug). I added some code and try to save but its not allowing me to sav

  • How to get 10.4 on my new 10.5 macBook Pro

    I need to install OSX 10.4 on my new MacBook Pro 2.44gHz which came with 10.5 (which I cannot use and really don't like much) and when I try to install 10.4 it won't allow it. It says can't install on this Mac. What can I do?? Maybe it's my older 10.