Display problem in capacity levelling table-CM27

Hi folks,
i am facing a typical problem & let me explain briefly.
some T.Code like ( CM27 ) where the end user is not able to see the capacity load in the capacity table and the order,operation details
it's happening with few system in the client site. I am not able to trace out the exact root cause.
What need to be done?

Dear Mr.Vijay,
You can take this issue to the technical people,also get some inputs from ABAP
& BASIS consultants.
They can analyse the issue in a better way.
Regards
Mangal

Similar Messages

  • Work schedule display in capacity leveling cm25

    Hello,
    In our company we have created a work schedule (tcode OP4A) and have associated to a work center (tcode IR02).
    However, capacity leveling (tcode CM25) doesn't display the work schedule associated to our workers in the graphical planning table.
    Do you have any idea how to solve this problem?
    Thank you very much,
    Óscar

    It could be issue with your over all profile..
    Use - Over all profile SAPPM_G001  
    Overall prof: SAPPM_G001           PM: Ind.cap/tab/day/avail.lab./norm.schd
           Select.profile:                     SAPPM_S001      PM: Tab/work center/lab/
           Control profile:                    SAPPM_C004      PM: Capacity planning table individual
           Time prof:                          SAPPM_Z0T1      PM: Tab. short-term (1 month)
           Evaluation prof.:                   SAPPM_A001      PM: Plant maintenance
           Strategy prof.:                     SAPPM_T002      Lead time sched. backwards
           Capacity planning table (tab.form): SAPPM_R001      PM: Plant maintenance/Individual caps.
    Note: Don't modify the Standard profile .

  • Display the PO in the capacity leveling

    Hi,
    in the capacity leveling CM21 there is a table section.
    In the table section I get Production order and planned order.
    I just want to display the production order in this sections or in the oders pools.
    How can I customize the system.
    Thanks
    Dede

    Hi
    Use CM25 and the selection profile you can select order.
    Thanks
    S.Murali

  • Use of Planning Table (MF50) in Capacity Levelling with Production Order

    Hello Experts
    I wish to know that is it possible to perform Capacity Levelling in planning table (tcode MF50) with respect to a Production Order ? It is known that MF50 is used in Repetitive manufacuring to do the capacity levelling with respect to Planned orders. But in our discrete manufacturing scenario we want to use planning table to the capacity levelling with respect toa Production order.
    Any clue or help pertaining to this will be highly appreciated.
    Thanks in advance
    Regards
    Jayanta

    Dear ,
    MF50 is does the cacapcity leveling based on mateail -run schedule order (planned order ) where as in discrete manufacturing , when you run the MRP ,  MRP system assume Infinite Capacity  and schedule the order as per your selection in MD02(2,1,3,3,2)  and then you convert those planned order to Production order .Here you checkied the Capacity in Production Order level .
    In stanadrd SAP  , it is not possible to use MF50 for discrete production order.
    In discrete order or process order ,  do the caapcity leveling , there are seperate planning table available based on Over all Capacity Profile and Schedule type .This can be done  in following way :
    1.CM31-Production Order Wise -Tabular
    2.CM23-PO wise -Graphical
    3.MC88: Ruf Cut Planning
    Work Centre Wise : CM21 -Graphical , CM22-Tabular Planning Table .
    Make sure the below set up before  you carry on the Capacity leveling :
    .Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In OPJK  maintained check capacity with SAPSFCG013 profile for your production order type
    In OPU3 , scheduleing parametre s: Generate Capacity , Scheduling Type , Automatic Log ,Start date in Past as per your req.
    In OPJU , chekc the contol tab of the scheduleing as per OPU3
    In OPKP- Production scheduling paranmeters assing the overall capacity profile -SAPSFCG013  with finte scheduling tick.
    Master Data :
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    Hope this will help you .
    Regards
    JH

  • Capacity Leveling Problem

    If I have an order that requires 85 hours of production, and the work center responsible only has available capacity of 14 hours per day, how can I divide up the order in a Capacity Leveling Planning Table (CM22)? When I dispatch the order, it automatically overloads the work center instead of spreading itself out over several days. When I created the production order I gave it a start date 2 weeks away from the finish date. Yet in capacity leveling, when I dispatch the order, it only goes to one day and overloads the work center by several hundred percent?
    Basically, how can I take this single order and divide it up over 7 days in Capacity Planning?

    In both the "strategy" box of CM22 and the "capacity" tab of CR02, I have made sure that the relevant boxes for finite scheduling were checked.  However, the system still overloads the work centers.  This would mean that there is a 'finite' capacity in each work center and that each center cannot be overloaded, but my work centers still load themselves to nearly 1000% capacity!  Why is this?  How can I make sure that when a work center reaches capacity, it's quantities flow into the next available slot?  
    How can I spread the requirements over a period of several dates and not just one?
    Edited by: Cameron on Sep 21, 2009 3:08 PM

  • Capacity leveling problems

    I have some troubles with implementing capacity leveling. I cannot level with planned orders (cable solution), so it is only possible to plan production orders.
    The setup matrix is used (because setup times can be greatly reduced, depending on the succesor).
    For some operations, simular machines can be used. CM21 (work center view) is used. Version: R/3 release 4.6C.
    Now a couple of problems rise.
    Problem 1:
    Since there are simular machines, normally production versions are used for capacity leveling. However, we have to level with production orders, so production versions are not applicable.
    Making one workcenter with different individual capacities is also no solution, since SAP messes up with setup times then (i.e. two operations of different production orders have to leveled onto the work center. Normally, the setup is 20h, but if it is a right succesor, it has to be 0h. This is mentionned in the setup matrix. If we dispatch now with a specific strategy for setup time optimization, only one operation will have setup time and the other operation will be schedule from the start on of the other operation's setup... In reality, two setups has to be done, since there are two machines!).
    Alternative sequences is also no solution. While leveling, the alternative sequence will never be used by SAP, in my view.
    Problem 2:
    The strange logic of SAP: setup of the next work center can only be done if the production on the previous work center has finished. In reality, the setup of the next work center can overlap with the production of the previous workcenter.
    Besides these two problems, there are some more troubles with capacity planning in SAP. SAP messes up sometimes by putting the setup time before the wrong operation (sometimes, the first operation has no setup time and the second does. However, this should be the other way around.).
    If you plan an operation manually, SAP doesn't take into account the setup matrix.
    Does anyone has a solution?

    Hi  Walravens,
    What i have understood is, u have the avilability of multiple resouces to produce same material, if any capacity bottle neck, u level the different production order of same material from "one work center" to "another workcenter".
    At  cm21, select the mutiple workcenters (selection criteria) and dispatch the operation as need.
    For setup time overlap, how to system know ur producing two operations (from two different orders) with same setup.
    Even the operations from same production order, system consider the set up time of the second operations unless u define overlap function. . Am I understood your problem in correct way.
    So remove the set up time for second operation and dispatch. 
    Regards
    Pradeep

  • SWT Virtual Tables display problem.

    Hi all,
    I have a display problem with virtual tables.
    In an Eclipse RCP application, I have a view that shows two tables, T1 (showing users) and T2 (showing the roles).
    I also use a content provider and a label provider for each table.
    When I debug, I can see that both tables are filled correctly.
    But when the application comes up, T1 is empty and T2 is filled. I am missing the users in the table T1.
    The interesting thing is, that the table do not very differ much from each other, T1 has one column more and of course IUser object as data per tableitem, whereas T2 has IRole objects as tableitems.
    Even when I debug on event listening in T2, I can get the T1 data of each tableitem, but it doesn't show?!
    My question is, where can I look at to solve this problem?
    Just theoretically, without posting source code.
    Thanks and regards,
    Tom

    Hi,
    I found out that the table T1 seems to miss the user object in each of the tableitems data fields.
    Now I am confused.
    According to the model, when does it get filled with it?
    Because the Labelprovider
         public String getColumnText(Object element, int columnIndex) {
              String result = null;
              if(element instanceof IUser) {
                   IUser user = (IUser) element;
                   if(columnIndex == 0) {
                        result = user.getName();
                   } else if(columnIndex == 1) {
                        result = user.getUserId();
                   } else if(columnIndex == 2) {
                        //This is a checkbox Member
                   } else if(columnIndex == 3) {
                        //This is a checkbox Manager
              return result;
         }gets all the correct data.
    Is it removed afterwards?
    Thanks and regards,
    Tom

  • Capacity Leveling error CM22

    Hi,
       I get a problem when I do capacity leveling in CM22..I can perform the leveling in CM21 successfully while I get error msg in CM22..I search this forum but no answer for this similar question..
    error msg:
       I try CM21 and it works..I didn't save the leveling result in CM21 and switch to CM22,but I get this error msg..
    Capacity not availableMessage no. C7056
    Diagnosis
    The system could not find any remaining available capacity within the planning period.
    things checked:
        I checked CM01 and I am sure there are enough capacity available ,the planning period in CM21 is also correct (2011/7/1 to 2012/3/31).I also check the strategy(finite schedule and planning direction checked)..

    Hi,
    Overall prof: SAPSFCG006           SFC: View work cntr/ind.cap.  (tabular)
           Select.profile:                     SAPSFCS006      SFC: View center  -> ind.cap. (tabular)
           Control profile:                    SAP___C001      Gen: Planning table (tabular form)
           Time prof:                          SAP___Z002      Gen: short-term (3 month)
           Evaluation prof.:                   SAP___A001      Gen: Standard evaluation profile
           Strategy prof.:                     SAP___T012      Gen: Finite sched.backw./alloc.& dispat.
           Capacity planning table (tab.form): SAPSFCR002      SFC: with indiv. capacities
               Layout ID                           SAPSFCLA04      SFC: Individual capacities (tabular)
               Ind. width
               FormulaRem.avail.capacity           2               Remaining av. cap. = Av. cap. - dispatch
               Dispatch time                       08:00:00
               Rqts to be displayed                3
    I use CMCH to check the overall profile and I don't get any error msg..But I still get error msg"no available capacity" when do leveling in CM22/CM25...Pls help...thanks..
    already fix it..it is due to the evaluation profile problem..
         still not fix..anyone can hep on it?thanks..
    Edited by: Monst Yang on Nov 29, 2011 9:05 PM
    Edited by: Monst Yang on Nov 30, 2011 8:00 PM

  • How to do capacity levelling

    Dear Frndz,
    Pls help me how to do capacity levelling.....
    Scenario:
    I have created two production orders for the same finish date as a result the work center is overloaded.Now I want to do capacity levelling.Tell me the step by step procedure to do capacity levelling, so that the capacity problem is solved.
    Regards,
    Srini.

    HI,
    Capacity leveling after order creation
    This process covers capacity leveling of requirements from the production process, monitoring the capacity after different periods, and how the system determines the new values for the current order after changes are made to the quantities, times, and dates.
    1) T Code CM21
    2) Enter the field Plant & work Center
    3) Choose Enter.
    The current orders whose operations result in capacity loads at the selected work center are displayed. By scrolling through the different charts in the planning table, you can analyze the information provided.
    4)For a better view, choose Settings ® Scale ® Monthly period split.
    5) To automatically dispatch one or several operations of an order, click the red rectangle in the order's diagram section to select the order and choose .
    The order disappears from the order pool and reserves a time segment in the work center section.
    6) To manually dispatch one or more operations of an order, select the order in the diagram section, drag it to the work center section with the mouse, and place it in a time period that you select.
    7) To deallocate an order, select it in the work center's diagram section and choose .
    The order is again displayed in the order pool.
    8) To analyze the changes made in scheduling, select an order in the order's diagram section and choose Order.
    9) Choose Item and write down the start and finish dates of the operation you selected.
    10) Choose Enter until the Planning Table: SAPSFCG001 Finite Scheduling Forw./All Functs.Active screen appears.
    11) Drag the order to a valid section in the work center's diagram section. Make sure that you move the order to a valid and defined start and finish date.
    13) Select the order in the work center's diagram section and choose Order.
    14) Choose Item and compare the new start and finish date.
    15) Choose Enter until the overview tree appears.
    Regards,
    srivas

  • Capacity Planning vs. Capacity Leveling

    My production facility is looking to divide up our shop floor by work centers.  There are about 20 individual work centers that are composed of 10 people each.  Each material we make is divided up into 3 operations which go through 3 separate work centers.  Each operation has a corresponding work center that it goes through.
    Right now we are unsure which program suits our needs better, Capacity Planning or Capacity Leveling.
    Our goal is to measure each individual work center (not the workers that make up the work center).  Each work center has a specific goal involving the number of materials they can produce, whether or not they reached that goal and by how many.
    In a nutshell, we want to be able to measure how long it took each work center to reach their individual goals by the materials they produce.
    This is all about measuring the individual work centers and how efficient they are.  Our goal is to be able to utilize this data within SAP.
    What is the difference between Capacity Planning and Capacity Leveling, and which would better suit our goals?
    Our production facility is not very complicated and we're looking for something simple and basic within SAP to accomplish these goals.
    All help is appreciated.  What would be your recommendations for this type of situation?

    HI
    Capacity evaluation
    In the capacity evaluation, available capacity and capacity requirements are determined and compared with each other in lists or graphics.
    Capacity leveling
    The objectives of capacity leveling are:
    Optimal capacity commitment
    Selection of appropriate resources
    In most applications, you can use two types of planning table (graphical and tabular versions) to display the capacity situation and to carry out capacity leveling.
    In some applications such as Repetitive Manufacturing (PP-REM) or Sales and Operations Planning (PP-SOP), there are application-specific planning tables for capacity leveling.
    T codes for Capacity Planning
    Work Center view - Capacity Evaluation
    CM01 - Load
    CM02 - Orders
    CM03 - Pool
    CM04 - Backlog
    CM05 - Overload
    Capacity Leveling
    CM21,CM22, CM27,CM28.
    Hope it will help u
    Regards
    Anupam Sharma

  • Operations are not getting despatched in capacity planning table

    Hi Experts,
    I am using capacity planning table (Graphical) to level the capacities and sequence the process orders. The start date of my orders are very well in future and sufficient capacities also is available in resources. But when I go to CM25 and select one order and click on despatch, system is not despatching it. This is the case for almost all the overall profiles.
    The surprising factor is, this function was working fine earlier without any issues. I havent done any changes in configs which will affect capacity planning.
    What can be the reason for this? Any thoughts please?.
    One more thing. Is there any option to avoid the capacity planning step if Iam using R/3 and manage it by some other way?
    Appreciate your earlier reply
    Thanks & Regards
    Prathib

    Most likely you didnt define the rowsource key properly. Please look under <install>/errors folder for any file there.
    Also, please read the documentation. There is information there about how to troubleshoot a loading problem. Please always read the documentation and we would appreciate feedback on the documentation.
    http://download.oracle.com/docs/cd/E17236_01/epm.1112/iop_user_guide/frameset.htm?launch.html

  • Routing update in capacity leveling CM21

    Hi Collogues,
    We have simple production type. Production order with production versions.
    16 production lines (work centers) with different rates.  1 operation per routing.
    I want to use in capacity leveling CM21 to dispatch planned/production orders on these 16 lines.
    The problem is that when I dispatch a pln/prd order in CM21 on a work center nether routing nor production version gets updated.
    Your suggestion are welcome.

    Solution found.
    Set for each production version "Production line".
    Then go Mf50 switch to graphical planning table. It updates routing when I move planned order over work centers.

  • Capacity leveling procedure

    Hi pp friends,
    I have done all required settings and i can see periodrequirements in CM22 but don't know how to carryout lelling execution steps and how will it benefit in case of production order.
    If possible send screen shots.
    Thanks in advance

    Hi,
    Capacity levelling can be performed more easily from transaction CM21(graphical) rather than CM22(Tabular).
    CM21 displays planning table with 4 separate parts. upper left part gives details of work center, lower left part gives corresponding planned order./production orders(you can restrict in selection screen only production orders/planned orders). lower right part gives Orders pool and load will be shown in red colour. Upper right part gives any changes mode to capaciry requirements.
    Please go through Standard SAP documentation related to Capacity levelling for more details.
    http://help.sap.com/saphelp_47x200/helpdata/en/49/e6f3340cdb8c44e10000009b38f844/frameset.htm
    From this transaction you can see capacity Overlappings on each work centers clearly. By levelling the capacity of production orders from here will change the scheduling of the operations.
    Regards,
    Krishna Mohan

  • CM21 capacity leveling settings

    Hi,
    In CM21, is it possible to setup different colors for released  orders and created orders.
    Thanks in advance.

    Dear,
    Some settings in Customizing have to made to change the colors of operations or order depending on the status. Create a new object representation that must be entered in a new object representation selection via a modified decision table. Execute the query of the system status or the user status at order header level in the decision table using field AFKO-OBJNR. Field KBED-OBSTA can be used at operation level. The changes result in a new representation profile.
    Proceed as follows:
          1. Analyzing the used profile
                a) Go to the IMG structure for capacity requirements planning. Call your profile of the capacity planning table and note the following settings.
              o Choose 'Capacity leveling -> Capacity planning table -> Define profile for capacity planning table'.
              o Display your profile and take note of the following:
              o GraphObjectSele (Diagram section):
              o Repr.profile (Diagram section):
              o Group (Graphics profile):
              o Name (Graphics profile):
                  An overview of the used settings is displayed when you press the 'Check' pushbutton where you can execute the further analysis easily.
                b) Finding the graphic object type in question
                Double-click on the 'Graph.object.select.' area and take the graphic object type in question from the decision table:
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your graphical object type selection and choose 'Decision steps'.
              o Find out which graphical object type is affected by double-clicking on the relevant table line.
                c) Select the required graphical element type
                An overview of the available graphical element types is displayed when you do the following:
                In the overview, double-click on the area 'Group, Name' and there on the used graphical element group.
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphics profile'.
              o Mark the line with the corresponding group and name and choose 'Goto -> Details'.
              o Note the used graphical element group:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphical element'.
              o Position the cursor on the used graphical element group.
              o Here you will find the available graphic element types.
          2. Create a new graphical object representation
                a) Create a new representation profile in the used graphical object type selection based on the used representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GrapObjSele' and choose 'Representation profile - overview'.
              o Select your representation profile and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Stay in the overview of the representation profiles.
                b) Define a new object representation selection for the respective graphical object type based on the types used there.
              o Select the representation profile created by you and choose 'Representation profile'.
              o Note the object representation selection for the required graphical object type:
              o Now choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object'.
              o Select the required 'Gr.obj.'
              o Call 'Object representation' in the Navigation window.
              o Select the 'Object repr.' you have noted before and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
                c) Define a new object representation based on the object representation to be changed in the required graphical object type.
              o Select 'Object representation' in the Navigation window.
              o Select the 'Object repr.' to be changed and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Select your newly created 'Object repr.' and choose 'Graphical element type'.
              o Select 'New entries' and enter the respective graphic element type (see 1. c).
              o Delete the graphic element type to be replaced.
              o Save your entries.
                d) Insert a query for the respective graphic object type in the newly created object representation selection in the decision table so that the new object representation is displayed by the conditions specified through the system status or user status.
              o Select 'Object representation' in the Navigation window.
              o Select the new object representation selection and choose 'Decision steps' in the Navigation window.
              o Insert a line for the query of the status at a suitable position in the sequence 'Decision status, Sequence'. To execute this at order header level, you must specify a status comparison for structure AFKO, field OBJNR for which the new object representation can then be entered. Use field KBED-OBSTA if you want to evaluate the status at operation level.
              o Save your entries.
                e) Enter the new object representation selection in the new representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GraObjSele' and choose 'Representation profile - overview'.
              o Select the representation profile you have created and choose 'Representation profile'.
              o Replace the object representation selection by the newly created selection for the required graphical object type and save it.
                f) Replace the available representation profile by the newly created one in your profile for the capacity planning table.
    You can refer the OSS note 71014 for details.

  • Wierd lines on my display and frequent lock-ups w/ and w/o display problems

    When booting I sometimes get weird lines and blocks on my display (the GRAY Apple screen) and then it hangs, other times the computer will boot and run fine for 20-30 minutes and then the display goes wonkers with blocks and lines and the computer does not respond. The only way I can get it to boot is to reset the PRAM by letting it CHIME 3x and then occasionally it will boot without issue and run, while other times I still get the blocks and lines on the display.
    When I am able to get it to recover and re-boot after the lock-up and display problems and occasionally the box in the middle asking me to re-boot similar to a kernel panic the OPS gives me the option to REPORT the error and here is the error for others who would know more...
    Thank you in advance,
    Darren
    Interval Since Last Panic Report: 104960 sec
    Panics Since Last Report: 5
    Anonymous UUID: 7D1AEF43-7E19-4F58-A1E0-48FA992A2814
    Wed Nov 18 15:49:50 2009
    panic(cpu 0 caller 0x9cdb10): NVRM[0/1:0:0]: Read Error 0x00009410: CFG 0xffffffff 0xffffffff 0xd2000000, BAR0 0xd2000000 0x5d3e2000 0x084700a2, D0, P1/4
    Backtrace (CPU 0), Frame : Return Address (4 potential args on stack)
    0x5c99b7d8 : 0x21b2bd (0x5cf868 0x5c99b80c 0x223719 0x0)
    0x5c99b828 : 0x9cdb10 (0xbb7fec 0xc209c0 0xbc3660 0x0)
    0x5c99b8c8 : 0x147690d (0x8b5ac04 0x7edf004 0x9410 0xabd962)
    0x5c99b908 : 0x1534e6a (0x7edf004 0x9410 0x5c99b968 0x9)
    0x5c99b948 : 0xb51ca5 (0x7edf004 0x91ed004 0x0 0x0)
    0x5c99b968 : 0xac155b (0x91ed004 0x5c99baa4 0x0 0x0)
    0x5c99b9b8 : 0x145f290 (0x7edf004 0x3d0900 0x5c99baa4 0x0)
    0x5c99bad8 : 0xab2821 (0x7edf004 0x91cf004 0x815200c 0x200)
    0x5c99bb18 : 0xb1f172 (0x7edf004 0x91cf004 0xeb9bcc0 0xeb9bc04)
    0x5c99bbc8 : 0xb202db (0x7edf004 0x91f0404 0x0 0x0)
    0x5c99bc58 : 0x14bb7a3 (0x7edf004 0x91f0404 0x9 0x2)
    0x5c99bd68 : 0x14ed407 (0x7edf004 0x91cf404 0x0 0x0)
    0x5c99be98 : 0xad3934 (0x7edf004 0x91ca404 0x0 0x0)
    0x5c99bec8 : 0x9d61fb (0x7edf004 0x91ca404 0x0 0x0)
    0x5c99bf08 : 0x5491b5 (0x0 0x9499680 0x1 0x29c50a)
    0x5c99bf58 : 0x5481e6 (0x9499680 0x1 0x5c99bf88 0x547d9d)
    0x5c99bf88 : 0x548640 (0x8abaf00 0x7e9ecc0 0xe780850c 0x2a6e5f)
    0x5c99bfc8 : 0x29d68c (0x8abaf00 0x0 0x10 0x88bbfc4)
    Kernel Extensions in backtrace (with dependencies):
    com.apple.nvidia.nv50hal(6.0.6)@0x136b000->0x17f1fff
    dependency: com.apple.NVDAResman(6.0.6)@0x96f000
    com.apple.NVDAResman(6.0.6)@0x96f000->0xc21fff
    dependency: com.apple.iokit.IOPCIFamily(2.6)@0x932000
    dependency: com.apple.iokit.IONDRVSupport(2.0)@0x961000
    dependency: com.apple.iokit.IOGraphicsFamily(2.0)@0x943000
    BSD process name corresponding to current thread: kernel_task
    Mac OS version:
    10C540
    Kernel version:
    Darwin Kernel Version 10.2.0: Tue Nov 3 10:37:10 PST 2009; root:xnu-1486.2.11~1/RELEASE_I386
    System model name: MacBookPro3,1 (Mac-F4238BC8)
    System uptime in nanoseconds: 3788331456483
    unloaded kexts:
    com.apple.driver.AppleFileSystemDriver 2.0 (addr 0xf02000, size 0x12288) - last unloaded 94521475551
    loaded kexts:
    org.virtualbox.kext.VBoxNetAdp 2.2.2
    org.virtualbox.kext.VBoxNetFlt 2.2.2
    org.virtualbox.kext.VBoxUSB 2.2.2
    org.virtualbox.kext.VBoxDrv 2.2.2
    com.bresink.driver.BRESINKx86Monitoring 5.0
    com.pctools.iantivirus.kfs 1.0.1
    com.apple.driver.AppleHWSensor 1.9.2d0 - last loaded 31800108689
    com.apple.filesystems.ntfs 3.1
    com.apple.filesystems.autofs 2.1.0
    com.apple.driver.AppleHDA 1.7.9a4
    com.apple.driver.AirPort.Atheros 412.19.4
    com.apple.kext.AppleSMCLMU 1.4.5d1
    com.apple.driver.SMCMotionSensor 3.0.0d4
    com.apple.DontSteal_Mac_OSX 7.0.0
    com.apple.driver.AudioIPCDriver 1.1.2
    com.apple.driver.AppleIntelMeromProfile 19
    com.apple.driver.ACPISMCPlatformPlugin 4.0.1d0
    com.apple.driver.AppleLPC 1.4.9
    com.apple.driver.AppleBacklight 170.0.14
    com.apple.driver.AppleUpstreamUserClient 3.1.0
    com.apple.GeForce 6.0.6
    com.apple.driver.AppleUSBTrackpad 1.8.0b4
    com.apple.driver.AppleUSBTCKeyEventDriver 1.8.0b4
    com.apple.driver.AppleUSBTCKeyboard 1.8.0b4
    com.apple.iokit.SCSITaskUserClient 2.6.0
    com.apple.BootCache 31
    com.apple.AppleFSCompression.AppleFSCompressionTypeZlib 1.0.0d1
    com.apple.iokit.IOAHCIBlockStorage 1.6.0
    com.apple.iokit.AppleYukon2 3.1.14b1
    com.apple.driver.AppleAHCIPort 2.0.1
    com.apple.driver.AppleSmartBatteryManager 160.0.0
    com.apple.driver.AppleIntelPIIXATA 2.5.0
    com.apple.driver.AppleUSBHub 3.8.4
    com.apple.driver.AppleFWOHCI 4.4.0
    com.apple.driver.AppleUSBEHCI 3.7.5
    com.apple.driver.AppleUSBUHCI 3.7.5
    com.apple.driver.AppleEFINVRAM 1.3.0
    com.apple.driver.AppleRTC 1.3
    com.apple.driver.AppleHPET 1.4
    com.apple.driver.AppleACPIButtons 1.3
    com.apple.driver.AppleSMBIOS 1.4
    com.apple.driver.AppleACPIEC 1.3
    com.apple.driver.AppleAPIC 1.4
    com.apple.security.sandbox 0
    com.apple.security.quarantine 0
    com.apple.nke.applicationfirewall 2.1.11
    com.apple.driver.AppleIntelCPUPowerManagementClient 96.0.0
    com.apple.driver.AppleIntelCPUPowerManagement 96.0.0
    com.apple.driver.DspFuncLib 1.7.9a4
    com.apple.driver.AppleProfileReadCounterAction 17
    com.apple.driver.AppleProfileTimestampAction 10
    com.apple.driver.AppleProfileThreadInfoAction 14
    com.apple.driver.AppleProfileRegisterStateAction 10
    com.apple.driver.AppleProfileKEventAction 10
    com.apple.driver.AppleProfileCallstackAction 20
    com.apple.iokit.IOFireWireIP 2.0.3
    com.apple.iokit.IO80211Family 310.6
    com.apple.iokit.IOSurface 73.0
    com.apple.iokit.IOBluetoothSerialManager 2.2.4f3
    com.apple.iokit.IOSerialFamily 10.0.3
    com.apple.iokit.IOAudioFamily 1.7.2fc1
    com.apple.kext.OSvKernDSPLib 1.3
    com.apple.driver.AppleHDAController 1.7.9a4
    com.apple.iokit.IOHDAFamily 1.7.9a4
    com.apple.iokit.AppleProfileFamily 41
    com.apple.driver.AppleSMC 3.0.1d2
    com.apple.driver.IOPlatformPluginFamily 4.0.1d0
    com.apple.nvidia.nv50hal 6.0.6
    com.apple.NVDAResman 6.0.6
    com.apple.iokit.IONDRVSupport 2.0
    com.apple.iokit.IOGraphicsFamily 2.0
    com.apple.driver.CSRUSBBluetoothHCIController 2.2.4f3
    com.apple.driver.AppleUSBBluetoothHCIController 2.2.4f3
    com.apple.iokit.IOBluetoothFamily 2.2.4f3
    com.apple.iokit.IOUSBHIDDriver 3.8.4
    com.apple.driver.AppleUSBMergeNub 3.8.5
    com.apple.driver.AppleUSBComposite 3.7.5
    com.apple.iokit.IOSCSIMultimediaCommandsDevice 2.6.0
    com.apple.iokit.IOBDStorageFamily 1.6
    com.apple.iokit.IODVDStorageFamily 1.6
    com.apple.iokit.IOCDStorageFamily 1.6
    com.apple.driver.XsanFilter 402.1
    com.apple.iokit.IONetworkingFamily 1.9
    com.apple.iokit.IOATAPIProtocolTransport 2.5.0
    com.apple.iokit.IOSCSIArchitectureModelFamily 2.6.0
    com.apple.iokit.IOAHCIFamily 2.0.2
    com.apple.iokit.IOATAFamily 2.5.0
    com.apple.iokit.IOUSBUserClient 3.8.5
    com.apple.iokit.IOFireWireFamily 4.1.7
    com.apple.iokit.IOUSBFamily 3.8.5
    com.apple.driver.AppleEFIRuntime 1.3.0
    com.apple.iokit.IOHIDFamily 1.6.1
    com.apple.iokit.IOSMBusFamily 1.1
    com.apple.kext.AppleMatch 1.0.0d1
    com.apple.security.TMSafetyNet 6
    com.apple.driver.DiskImages 281
    com.apple.iokit.IOStorageFamily 1.6
    com.apple.driver.AppleACPIPlatform 1.3
    com.apple.iokit.IOPCIFamily 2.6
    com.apple.iokit.IOACPIFamily 1.3.0
    Model: MacBookPro3,1, BootROM MBP31.0070.B07, 2 processors, Intel Core 2 Duo, 2.2 GHz, 4 GB, SMC 1.16f11
    Graphics: NVIDIA GeForce 8600M GT, GeForce 8600M GT, PCIe, 128 MB
    Memory Module: global_name
    AirPort: spairportwireless_card_type_airportextreme (0x168C, 0x87), Atheros 5416: 2.0.19.4
    Bluetooth: Version 2.2.4f3, 2 service, 0 devices, 1 incoming serial ports
    Network Service: AirPort, AirPort, en1
    PCI Card: pci168c,24, sppci_othernetwork, PCI Slot 5
    Serial ATA Device: ST9320421ASG, 298.09 GB
    Parallel ATA Device: MATSHITADVD-R UJ-857E
    USB Device: Built-in iSight, 0x05ac (Apple Inc.), 0x8502, 0xfd400000
    USB Device: Apple Internal Keyboard / Trackpad, 0x05ac (Apple Inc.), 0x021a, 0x5d200000
    USB Device: Bluetooth USB Host Controller, 0x05ac (Apple Inc.), 0x8205, 0x1a100000
    Anyone know what is causing my problems? I thought it was heat so I downloaded a CPU and FAN temperature monitor and the CPU was getting VERY HOT at first so I then ramped-up the CPU FAN SPEED to maximum - it turns out the CPU FAN was not rotating well at low speed - since then I have cleaned and checked the fans and they all work as they should and blow on high(er) when the CPU temperature is above a certain level.

    S.U.
    Is there a kb article or something that would illuminate what to look for in these logs, or is it a matter of learning by osmosis?
    Both. I am not skilled in reading logs. It is a very technical and time consuming task for the uninitiated (me!) In scanning a log I look for the backtrace and loading dependencies. The first item in the backtrace is usually the roadblock.
    Beyond that you can look at the Technical Note TN2063: Understanding and Debugging Kernel Panics
    Should make for good bedtime reading. Puts you right to sleep.
    c

Maybe you are looking for

  • Sales order comes in 1 plant and get dispatch in other plant

    Hi Guru's we've a scenario where we've one company and 2 plants located in 2 diffrnt states, here we r working on MTO scenario, where lets say we hv 2 plants name 101 n 102. sales order comes for FG in 101 plant it triggers the initial production n r

  • Oracle 8i Replication

    I've got an Oracle 8i server running well under Linux, and I'm looking to do a realtime update of a backup server, such that if a meteor hits the main server, I have a database ready to go. The backup server would not have to send any changes to the

  • Why are my batteries dying so quickly?

    I've only had 5 battery load cycles but my battery capacity is at 49% of the original? What the heck? After reading a few threads on these forums about this, I was seeing numbers like 500 load cycles in 12 months, etc. with 25% or so original battery

  • Backing up iPhoto Library to multiple DVDs

    I'm pretty sure that iPhoto does not have built-in backup capability like iTunes, but is there an easy way to do this with another application? I do own a copy of Toast 8 Titanium which I believe will allow me to span a large file across multiple DVD

  • Install 8.20, Remove 8.01

    Currently using 8.01 LV Professional Devel System with some toolkits installed. Should be recieving SSP CD's with 8.20 on them shortly. Would like to completely remove 8.01 and all NI SW, then install 8.20. Has anyone tried this yet? Any tips or trap