Distribution of Costs from CCA to CO-PA

Hi All,
Can someone please help me find a solution to the following scenario?
There is a requirement to distribute costs from CCA to Cust/Prod level in CO-PA.
*The cost allocations factors can only be provided at the Customer Group/Product level.
*Using regular assessment cycles in CO-PA it is possible to distribute these costs to Customer Group/Product level.
*However these costs are to be distributed further to the Customer/Product level in CO-PA based on the revenue value field.
Any suggestions on how this can be done? Can I use top down distribution?
Regards,
KK

Option 1:
Step 1 - create assessment to COPA (KEU1). Ensure that you enter customer group and product in the receiver characteristics (second tab)
Step 2- use top down distribution to distribute from customer group to customer.
Please refer to SAP help on top down distribution to see how top-down distribution works if you want to retain 'product' characteristics. They have given examples.
http://help.sap.com/saphelp_erp2004/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
Second option:
Step 1 - Carry out top down distribution of the cost allocation factors from customer group/product to customer/group.
Step 2 - Create assessment cycles at customer/product level.
Second option may be a better solution from data volume point of view beacsue top-down-distribution creates two records for sender and receiver in COPA. I am assuming that number of records for top down distribution of cost allocation factors will be less as compared to top down distribution of actual costs from multiple cost centers.
Hope it helps.
Regards,

Similar Messages

  • Viewing original cost in PCA after the Distribution cycle run in CCA

    Hi,
    We have allocated costs from common cost centers to product cost centers using Distribution Cycles in Cost Center Accounting (CCA). If we want to only view the original costs before distribution in a Cost center report, we use the filter & exclude distributed costs based on type of Business Transaction.
    We have not executed any cycles in Profit Center Accounting (PCA). The distributed costs automatically hit the new profit centers because of assignment in the cost center master data. Now if we want to see the original costs before distribution in a Profit center report KE5Z, what filter should we use? There is no Business Transaction as a parameter to filter. Even reord type does not work since the distribution has been done in CCA.
    Regards,
    Sangeeta

    Hi,
    After distribution of the cost from service costcenter to production costcenter,The PCA will hit automatically because of the assignment of profitcenter in the cost center master.
    When you see the CCA report the system will display the cost based on the costelement,same as for the Profitcenter also.
    So make the filter crieteria in Cost element & find out the distribution cost in profitcenter & costcenter,
    Regards,
    Raj

  • Distribution of cost over periods in detailed planning in CCA KP06

    Good Day everyone
    Please advice how to control distribution of cost over periods in Detailed planning in Cost center accounting. KP06.
    When detailed planning is carried out which is integrated with MM, distribution of cost over periods is automatically set (02 distribution as before) and i cannot manually set the distribution key to 0 or 1
    We are using ECC6
    How can i control manual distribution of plan cost while remaining in Detailed planning.

    Hi,
    You can distribute your planned costs at activity level based on the distributionkey you specified. The distribution is done for the entire duration of activity depending on the Dist key you select. If you do not put any Dist key, then the costs would be distributed equally across the entire duration of activity. If you want to have equal distribution of costs, you can use DK- SAP020 which distributes on earliest dates of activity using Factory calender. If you want you can also define your own DK in SPRO under: Production->capacity requirements planning->operations->capacity requirements->distribution.
    Hope this clarifies..
    Best regards..

  • How to Allocate Costs from One Dimension to Another

    I am attempting allocate costs from the department to the Production line within a location.
    I have 8 dimensions in my BSO Essbase cube.
    The dimensions are as follows.
    Accounts
    Period
    Scenario
    Version
    Years
    Location
    Department
    Product
    What I need to do is as follows.
    i.e.
    Department 100 = $1,000 UDA = Variable Expense
    Department 100 = $2,000 UDA = Fixed Expense
    Line 1 = 30% of Dept 100 Costs where UDA = Variable Expense = $300
    Line 2 = 25% of Dept 100 Costs where UDA = Variable Expense = $250
    Line 3 = 45% of Dept 100 Costs where UDA = Variable Expense = $450
    Sum of Lines = $1,000 where UDA = Variable Expense
    Line 1 = 10% of Dept 100 Costs where UDA = Fixed Expense = $200
    Line 2 = 15% of Dept 100 Costs where UDA = Fixed Expense = $300
    Line 3 = 75% of Dept 100 Costs where UDA = Fixed Expense = $1,500
    Sum of Lines = $2,000 where UDA = Fixed Expense
    And of course my situation is much more complex as the % will change with each scenario, period, versions, department combination.
    I have created distribution % accounts within the accounts dimension to distribute between my 3 main production lines. Which is within the alternate dimension of the Location dimension.
    I am on Essbase 9.2.0.3, Win 32 bit.
    Can someone suggest how to do this?
    Thank you in advance for your help.
    Dan

    Allow me to further explain my needs.
    I have the following Input.
    Version = Current
    Scenario = Actuals
    Year = FY12
    Location = L_01
    Product = No_Product
    Dept     Acct     Jan      Feb      Mar      
    D_100     A_6001     100      110      120      UDA = Var Spend from Accounts dimension
    D_100     A_6002     200      210      220      UDA = Fix Spend from Accounts dimension
    D_100     A_6003     300      310      320      UDA = Var Spend from Accounts dimension
    D_101     A_6004     400      410      420      UDA = Fix Spend from Accounts dimension
    D_101     A_6005     500      510      520      UDA = Var Spend from Accounts dimension
    D_101     A_6006     600      610      620      UDA = Fix Spend from Accounts dimension
    Totals          2,100      2,160      2,220      
    The calculated totals for Dept/UDA for Fix,Var would be as follows based on above inputs.
    Dept Jan Feb Mar
    D_100 400 420 440 UDA = Var Spend from Accounts dimension
    D_100 200 210 220 UDA = Fix Spend from Accounts dimension
    D_101 500 510 520 UDA = Var Spend from Accounts dimension
    D_101 1,000 1,020 1,040 UDA = Fix Spend from Accounts dimension
    I need to allocate the above using % per Department -> Location -> UDA(Account) -> Period
    Dept Line Jan Feb Mar
    D_100 Line 1 10% 15% 20% Var Spend
    D_100 Line 2 20% 25% 30% Var Spend
    D_100 Line 3 70% 60% 50% Var Spend
    Allocation % 100% 100% 100%
    D_101 Line 1 15% 25% 35% Var Spend
    D_101 Line 2 20% 30% 40% Var Spend
    D_101 Line 3 65% 45% 25% Var Spend
    Allocation % 100% 100% 100%
    D_100 Line 1 40% 30% 20% Fix Spend
    D_100 Line 2 30% 20% 10% Fix Spend
    D_100 Line 3 30% 50% 70% Fix Spend
    Allocation % 100% 100% 100%
    D_101 Line 1 100% 0% 0% Fix Spend
    D_101 Line 2 0% 100% 0% Fix Spend
    D_101 Line 3 0% 0% 100% Fix Spend
    Allocation % 100% 100% 100%
    I have created a statistical accounts for these % named as follows.
    Alloc_Fix_D100_Line1 Alloc_Fix_D101_Line1
    Alloc_Fix_D100_Line2 Alloc_Fix_D101_Line2
    Alloc_Fix_D100_Line3 Alloc_Fix_D101_Line2
    Alloc_Var_D100_Line1 Alloc_Var_D101_Line1
    Alloc_Var_D100_Line2 Alloc_Var_D101_Line2
    Alloc_Var_D100_Line3 Alloc_Var_D101_Line2
    The Line 1, Line 2, and Line 3 are alternate hierarchies within the Location dimension.
    The needed script is to produce the output below.
    Line UDA Dept Jan Feb Mar
    Line 1 Var Spend D_100 40 (400 * 10%) 63 (420 * 15%) 88 (440 * 20%)
    Line 2 Var Spend D_100 80 (400 * 20%) 105 (420 * 25%) 132 (440 * 30%)
    Line 3 Var Spend D_100 280 (400 * 70%) 252 (420 * 60%) 220 (440 * 50%)
    Total Total 400 (40+80+280) 420 (63+105+252) 440 (88+132+220)
    Line 1 Var Spend D_101 75 (500 * 15%) 128 (510 * 25%) 182 (520 * 35%)
    Line 2 Var Spend D_101 100 (500 * 20%) 153 (510 * 30%) 208 (520 * 40%)
    Line 3 Var Spend D_101 325 (500 * 65%) 230 (510 * 45%) 130 (520 * 25%)
    Allocation % 500 (75+100+325) 510 (128+153+230)520 (182+208+130)
    Line 1 Fix Spend D_100 80 (200 * 40%) 63 (210 * 30%) 44 (220 * 20%)
    Line 2 Fix Spend D_100 60 (200 * 30%) 42 (210 * 20%) 22 (220 * 10%)
    Line 3 Fix Spend D_100 60 (200 * 30%) 105 (210 * 50%) 154 (220 * 70%)
    Allocation % 200 (80+60+60) 210 (63+42+105) 220 (44+22+154)
    Line 1 Fix Spend D_101 1000 (1000*100%) 0 (1020* 0%) 0 (1040* 0%)
    Line 2 Fix Spend D_101 0 (1000* 0%) 1020 (1020*100%) 0 (1040* 0%)
    Line 3 Fix Spend D_101 0 (1000* 0%) 0 (1020* 0%) 1040 (1040*100%)
    Allocation % 1,000 (1,000+0+0 1,020 (0+1,020+0) 1,040 (0+0+1,040)
    The ultimate goal is to see the same departmental expenses by Variable/Fixed Spendings for each Line.
    Thank you,
    Dan

  • Allocation of cost  from one profit center group to various profit centr gr

    Hi Experts,
    Here we  created one profit center as group function having various cost centers like common function Admin,Accounts,Legal,HR etc. Now we want to allocate the the cost from group function to various profit center group.
    Kindly give your valuable solution.
    J.Francis

    Hi,
    The allocation can be done through Distribution either in a fixed value or in percentages.  You can define a planning
    cycle for a sender profit center group and define the amount to be allocated to receiver profit center group.
    Define Actual cycle in the same way.  In periodic processing which may be every month/quarterly/half yearly,
    you can distribute the values from one group to the other.
    Best Regards,
    Sadashivan

  • Distribution of cost

    Hi,
    Is it possible to distribute costs from one cost center to other cost centers---but specific cost element at receiver's end?
    or will it go to all cost elements under the receiving cost centers?

    Hi,
    Distribution works on the same cost elements; both for sender and receiver. That is if the sender is X, then the receiver will be also X.
    Regards,
    Eli

  • Allocation of Costs from Cost center to COPA

    Hi
    We are booking costs to a Cost Center with reference to a Primary Cost Element. However, in month end, the same cost has to be transferred to COPA. One of the Characteristics in COPA is also Profit Center.
    The issue is that we can allocate costs from Cost centers to COPA through Assesement Rule, system requirement is for Assesement Cost Element, which is a secondary Cost element. In such a case, the PCA Balances, after execution of Assesement cycle are shown with the Secondary Cost Elements.
    In a case, I have booked costs of INR 100000 in a cost center 103007 against a Primary Cost Element 423101. Since Profit Center 103007 is assigned in Cost Center 103007, the Profit Center Line Items will show a balance of INR 100000 against cost element 423101 for Profit Center 103007.
    After this at month end, we need to allocate costs from Cost Center to COPA. But the requirement is that after allocation also, the balances should be shown against Cost Element 423101 for Profit Center 103007
    Regards
    Sanil

    Hi Sanil
    That is not possible.. There is no "Distribution cycle" available for COPA.. In COPA you can have either an Assessment Cycle or an Indirect Act Allocation or a Template Allocation...
    I dont know about template allocation as I have never used that, but gut feel says even that wont serve the purpose...
    One work around is you allocate from Cost Center to an Internal Order using Distribution cycle... Then Allocate from IO to COPA using assessment... In order to use IO as sender in allocation cycle, use note 605281
    At best, what you can do is to use an Allocation Structure instead of one single assessment cost element per Segment... Using an Alloc Str, you can map, say, GL Accounts for Basic Salary, DA, HRA to one Secondary cost element... This way, create logical groupings of GL accounts and map to multiple secondary cost elements
    But bear in mind, The more you use Secondary cost elements, the more will be the line items in CE1XXXX table...
    Regards
    Ajay M

  • Allocation of cost from service cost center  to production cost center

    Dear sir ,
    Will I use to distribute the cost from service department to production department  and that cost centers also using for activity planing will get currect result in product costing ?

    Hello,
    Can you clarify what you want to do ?
    Allocation of cost from service cost centers to production cost centers can be done with the help of Assessment / Distribution cycles and you can do a activity planning using the same costs as well. The steps for activity planning would be as under:
    1. Create primary cost planning in the service and production cost centers (KP06)
    2. Create activity planning in the production cost centers (KP26) without any rate
    3. Run assessment / distribution cycles to transfer cost from the service cost centers to production cost centers (KSUB / KSVB), in case you are not transferring based on activity quantity then also do SKF planning in KP46
    4. Run plan cost splitting in case you have more then one activity type (do config for splitting structure beforehand) (KSS4)
    5.  Calculate Plan price for the production cost center activity types (KSPI)
    BR // SG

  • Actual cost distribution in cost object hierarchies

    Hi all,
    I cannot distribute the actual costs collected on a cost object hierarchy since the costs are retrieved from an assessment cycle with a cost element with category 42 (assessment).
    I would like to assign my production cost centers balances to cost object hierarchy and then distribute it with transaction KKPX - Distribution of cost object hierarchy costs.
    Would someone have any idea how I could proceed?
    Thanks in advance.
    Ronan

    No answer to this thread

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • How to transfer cost from old sales order (cancelled) to new sales order

    Hi Gurus
    I want to know, how to move cost from one sales order to another sales order.
    SD created sales order before 1 month and there was production order behind this. Production was completed and all the cost was moved to sales order and also SD has raised invoice on customer. This transaction was completed.
    The above order was rejected by customer due to some changes in the order. SD raised another sales order and production order was created to to additional work. Production transfered above stock (produce before on old production order) to new production order.
    My problem is stock is now transfered to new production order but cost is still sitting on old sales order. How do I transfer cost from old sales order to new sales order. SD cancelled old invoice and raised new one with full value (old + new work) on new sales order. Now cost is on old sales order and revenue is on new sales order.
    Please help.
    Thanks

    Hi
    I have reverse the sales order settlement, PP order settlement to sales order and I have also done KB11N for transfering the cost to the new production order.
    The only problem is I was unable to transfer labour hour confirmation as cost element used for this are not for transfering cost. If I will reverse the confirmation in PP order system will reverse material movement also which I don't want any more. Can you please tell me how to I reverse the Labour hours with out affecting goods movement?
    Many thanks

  • Report to fetch Actual cost from a service order

    Hi Gurus,
    The requirement is to create a report to fecth the actual cost from the maintenance order. ie.. material cost , labor cost and some other costs which are directly posted to the order. Can anybody let me know from which tables I can pull the material cost , labor cost ..etc posted against maintenance order?
    Regards,
    John

    John,
    Have a look in table PMCO
    PeteA

  • How to transfer costs from one WBS to another WBS?

    Hi,
    I want to transfer costs from one WBS to another. Remember two currencies are maintained viz. local and group.
    So how can i transfer the balance such that both the local currency and group currency balance gets transferred.
    Please ensure that the transfer should show 0 balance outstanding in CJI3 report.
    I need to transfer because WBS is holding some value which was not settled in the previous year.

    Hi
    You can transfer the Amount from One WBS to Another through KB11N. In this you Choose the Screen Variant as "_WBS/Network_" and do necessary steps.
    Hope it helps.
    Regards
    Babu

  • Secondary costs from WBS to an AuC

    Hi,
    1. I have executed Assessment[KSU5] that actually settled costs from secondary cost element[800099] to a WBS element [AAA]
    2. Now I am trying to settle costs [which is secondary] from WBS element [AAA] to an AuC using CJ88 and I am getting below error
    3. Just for info in allocation structure Z1, I have given settlement cost element for WBS, but still I am getting below error
    Any advises/ideas, thanks
    Complete allocation structure Z1
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 800099 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element 800099 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure Z1
    Regards,
    Sri
    Edited by: Sridhar Nagavarapu on Jul 4, 2008 12:45 AM
    Edited by: Sridhar Nagavarapu on Jul 4, 2008 12:47 AM

    Through MM, contract is created (ME31N) whereby the settlement G/L accounts are identified.
    The contract then is released through MM with TCode ME21N which prompts Commitment Costs to be entered, after which the Service Entry Sheet SES through TCode ME81L which then automatically updates into the WBS.
    Through WBS, CJ88 would be the TCode you would have to use for settlement.
    Hope this helps.
    Thanks.

  • Reposting cost from one value field to another value field in CO-PA

    Good day,
    Some of our FI postings to CO-PA were assigned to the wrong value field (in the PA transfer structure, the cost elements were in the wrong group and thus were recorded at the wrong value field).
    The number of documents invilved is huge - so we cannot reverse, change the configuration and post again.
    Is there a way to repost the costs from one VF to another like we can do with other cost objects?
    Thanks,
    Yoel.

    Hi,
    Please to the below thread on this aspect:
    Value Field adjustment program
    Regards,
    Kiron Kumar T.

Maybe you are looking for

  • I need help with hyperlink PLEASE!!!!!!!

    I hope somebody can help me with this question. I create some button in flash 8. My web page is divided in three frames( using the frame tag), two rows and the second row has two colums. My question is how can i make one of my buttons to open a new w

  • How to create a client other than 800 in sap 4.7E version?

    helo can any body tell how to create another client in 4.7 version?points r assured.

  • Unable to interpret IDoc interface

    Hi, I have a File to multiple IDOC scenario. I have change the IDOC occurance by creating ED. I have developed everything but the following error is coming during my end to end testing. Unable to interpret IDoc interface Thanks, Raj

  • Just another cmp transaction question

    Hi I would like to know if it is possible to manage cmp transaction from the client code. For example I need to execute some business method several times but I don't want the container to commit transaction after each execute but only if all execute

  • Newsletter Scripts