DMR Not showing materials of Lower level WBS

Hi,
I have multiple WBS under 1st level. It is working find with cost reporting. But when i create DMR with DP91, it shows materials attached with activity comes under 1st level WBS only. How can i bring materials of lower level WBS activity materials into DRM while triggering DP91 with Upper level WBS...?

Hi rajsekhar
But generally if you want to transfer the cost of the sub item to  main item then you can  check the box Cumulative cost in copy control VTFL . But your requirement is quite opposite .So you need to go to assign a New Reqt / Alt calc type  to the cond type , telling that the header item cost which is not relevant for pricing has to be transferred to sub item .So you need to integrate with the ABAP'er to give inputs to him and giving our requirement also
Regards
Srinath

Similar Messages

  • How to find first level WBS from Lower Level WBS

    My client is posting cost at wbs which will be at level 5 or 6 and i need to find 1st level wbs for that 5 or 6 level wbs..
    So Is there any Function module to find 1st level wbs from any lower levels...
    or any suitable code?

    Hi Sachin,
    in table PRHI you have the relationship between a WBS element and its superior level WBS element.
    For example:
    Level 1: XYZ (internal code PSPNR: 00000001)
    ..Level 2: ABC (internal code PSPNR: 00000002)
    ..Level 2: DEF (internal code PSPNR: 00000003)
    ....Level 3: PQR (internal code PSPNR: 00000004)
    ...then in table PRHI you'll have:
    PRHI-POSNR = 00000001 ... PRHI-UP = 00000000
    PRHI-POSNR = 00000002 ... PRHI-UP = 00000001
    PRHI-POSNR = 00000003 ... PRHI-UP = 00000001
    PRHI-POSNR = 00000004 ... PRHI-UP = 00000002
    ...meaning:
    WBS element XYZ is top level
    WBS element ABC depends of WBS element XYZ
    WBS element DEF depends of WBS element XYZ
    WBS element PQR depends of WBS element DEF
    Then you can iteratively (or recursively) "climb up" the structure of the project until the WBS element of level 1.
    I hope this helps. Best regards,
    Alvaro

  • Barely used 564 color cartridges show all same low level. 564 XL black cartridge shows 3/4 full

    Two months ago, I purchased and installed 564 XL Black and 3 color cartridges in my Photosmart 309a. I've printed approximately 100 black and white documents and no color documents. My black ink level is 2/3 full but the color cartridges are all showing the exact same level--just above empty. I also just installed a photo black cartridge, which is showing 1/2 full.
    Black copies are great. Color copies are streaked and faded. I've contacted HP tech support on the phone and was given the same answers over and over for almost 20 minutes. After asked his supervisor to help, he quickly came back and gave me almost 10 more minutes of the same explanation as before. No answers, options or solutions--just run-around. And now, I'm out $52 without even printing a single color copy?

    Hi,
    Looks like your setup is to use quality Grayscale. As you know mixing all prime colors together at a right amounts will give you millions of colors from black to white. To print BLACK INK ONLY,  please try:
    (a) Double click printer icon,
    (b) Click Set preferences
    (c) Click Advanced,
    (d) Select "Black ink only" under Grayscale
    (e) Click Apply/OK ...
    Note: As mentioned in my previous reply, printer STILL needs and USES color inks during warming up process and few other processes to keep itself in good health.
    Regards.
    BH
    **Click the KUDOS thumb up on the left to say 'Thanks'**
    Make it easier for other people to find solutions by marking a Reply 'Accept as Solution' if it solves your problem.

  • In Numbers, can I highlight/colour differently to show high and low level requirements from the Y Axis?

    I have a line graph in Numbers 09, but would like to either fill the chart between two points on the Y axis which shows the upper and lower limits of a set of results. Is this possible? I don't seem to be able to select the two points I want and end up with the Grid lines being all the same colours when I select colour or the Chart fill is all or nothing!
    Thanks
    altv

    Jerrold Green1
    I have done it both ways, the way you have suggested, the drawing of two lines for Upper and Lower limits and a combination of the two. They are all working fine. As you say, with use, I'll find other things that can be done with it, certainly from an aesthetic point of view.
    Many thanks
    altv

  • Material Mandatory not showing at sales order level error

    Hi Every one,
    According to my client Requirement  at the time of  sale order creation material is mandatory , but i tried through Incompletion log
    its showing material mandatory but the problem is after entered the material in one line item when i try to save the sales order
    system is asking enter the material  again ie one more line item
    so i have avoid the that error and how to map into SAP system suppose to ask onetime material is mandatory
    Can any one guide me how to solve the issue

    Hi Prasanna,
    As Amit Suggested, in user exit USEREXIT_SAVE_DOCUMENT_PREPARE in MV45AFZZ, you need to add a small 2 liner code telling the system that if VBAP-MATRN is blank then give an error message.
    I had the same requirement and I have used it and it works perfectly fine for me. Let me know if you have any further questions.
    Regards,
    Rohan Gudavalli

  • Images are always magnified and not showing at 100% zoom level

    http://s7.postimg.org/oy0gq3x8b/chrome_firefox.png
    http://www.mozilla.org/en-US/firefox/new/
    left side is Chrome rendering; right side is Firefox
    Notice the 3 images, all rendered zoomed in by Firefox.
    No matter what I set in Preferences, what plugin I tried, i can't reset to 100% zoom.

    Hello,
    Firefox on Windows is now following display scaling options which may render text larger on high resolution displays.
    You can adjust your screen resolution.
    To modify it do the following:
    * Type '''about:config''' into the Firefox address bar and tap on the Enter key.
    * If the warning '''This might void your warranty''' appears, click '''I'll be careful, I promise'''.
    * Search for '''layout.css.devPixelsPerPx'''
    [[Image:Fx22layout.css.devPixelsPerPx]]
    * Double-click on layout.css.devPixelsPerPx to modify its value. The default is -1.0 in Firefox 22 and above. Change it to '''1.0''' to make it work like in previous Firefox versions.
    If necessary, further adjust the value in 0.1 or 0.05 steps. Use values between 1.0 and about 0.5 to reduce elements in size. Use values greater than 1.0 to increase size. For example, a value of 1.25 will increase font size to 125% to accommodate the default DPI setting in Windows 8. '''Double check the value that you enter.''' Setting a too small value will make everything disappear and a too large value will blow things up.
    If web pages still need to be adjusted then you can look at the [https://addons.mozilla.org/firefox/addon/default-fullzoom-level/ Default FullZoom Level] or [https://addons.mozilla.org/firefox/addon/nosquint/ NoSquint] extension.
    To adjust the font size for the user interface, you can use the [https://addons.mozilla.org/firefox/addon/theme-font-size-changer/ Theme Font & Size Changer] extension.
    Did this fix your problems? Please report back to us!
    Thank you.

  • UDF is not showing at Forecast Form - Row Level

    Hi Expert s,
    I am facing a hurdle while showing  UDFs in the Forecast Row Level .
    The UDF is created . but at the Forecast Form , it is not showing at the Row Level as well as it is not showing in the Form Setting .
    Thanks
    Ashish Ranjan

    Hi Ashish......
    Unfortunately SAP has given the provision but it seems it does not work.....
    It does not display UDF at Forecast level......
    Regards,
    Rahul

  • Budget Control at top level WBS only

    Hello All,
    I have a requirement from client where I need to activate the Budget control (90% warning and 100% error). I have done the setting accordingly.
    Now the scenario is such that when client is doing budgeting, they are allocating the budget only at top level WBS (they have a different legacy, where they are doing there detail planning n budgeting, but since they want the feature of budget control in PS, they will do minimal budgeting in PS). As per my settings when I budget top level WBS and save the availabity control is activated (with no budget on lower level WBS). Now when I try to do some postings/or assign that WBS to PO, even with a value of 1 USD, i am getting an error of budget exceeded, which is fine as per the settings as that WBS is having 0 budget.
    The requirement from client side is such that they want AVAC to be activated only at top WBS and do postings to lower WBS. But if the total of lower WBS exceed the budget of top WBS, they should get an warning or error. For example:
    WBS level  BUDGET ACTUALS
      1               100
      2                              50
      2                              50
    so as soon as the actuals touch 100, the system should give an error/warning. Note that the 2nd level WBS are not budgeted in SAP, so budget is 0 on them.
    I have 2 questions:
    1.Is it possible to activate AVAC only for top WBS ?(without any enhancement/development)
    2.How the AVAC will work, if the total of 2nd level WBS exceeds the budget of top WBS (as explained in example above)?
    Awating your replies.
    Thanks
    Sarang

    Thanks Virendra, it was useful.
    I tried other way round also i.e. by not marking the release tab in OPS9 and activating AVAC in CJ30.It works in that way too.
    For my other question, regarding activating AVAC only at top level, we can achiebve that by using transaction control in user status.
    Thanks
    Sarang

  • Settlement Run on Higher Level WBS

    Hello Experts,
    Scenarios is that I need to run settlement on 2nd Level WBSE where I have assigned asset class but my activities are linked on 3rd OR 4th Level WBS Elements due to the requirement of detailed level project planning. Cost is posted against lower level WBS Elements and settlement is to be run on higher level WBS Element.
    Can I roll up the cost from lower level WBS to Higher level WBS so that settlement can be run against the asset class assigned with higher level WBS Element
    Please advise. Thanking you in anticipation...
    Warm Regards

    Hi,
        You can perform this kind of settlement in two ways based on different conditions:
    1. If there is only one asset to be created from project, then instead of hierarchical settlement you can use the line item settlement to the same asset maintained in the settlement rule of superior WBS, by using settlement strategy as in customization as ( Settlement rule generation: account assignment category........4)  Copy rule from superior object. So that settlement of all the object will be done to the same asset.
    2. Otherwise, if you want to have the settlment to the same asset of your project structure in hierarchy, then you can use SAP note number 211324, to have Settlement rule generation: account assignment category as 05 (Superior WBS element), in the customization of settlement strategy.
    I hope this should help you.
    Regards
    Avisek Bhardwaj

  • Low-level code MRP

    Dear gurus,
    i find in the material master (MM02 and in the table MARA) the parameter "Low-level code" = 000 , how  use this parameter ?
    When this value is write?  At saving of Bom? Is a setup of customizing for value possible?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Hi
          Pl go thru the following may be useful
    The lowest level that a material appears in any product structure of the
    company. The low-level code controls the sequence in which the material
    is planned in an MRP run: First the materials with low-level code 0 are
    planned, then the materials with low-level code 1, and so on. The lower
    the low-level code, the higher the number that is assigned to the
    material.
    The level that is set in the material master record represents the level
    at which the material will be planned. This means that the material will
    only be planned once all assemblies in which it occurs have been planned
    and exploded.
    The low-level code is set internally in the material master record when
    the BOM is maintained.
    When you create a bom item for a assemblyparts ,the item's low-level code will equal (assemblyparts's low-level code + 1),but if (assemblyparts's low-level code + 1) < bom item then the bom item's low-level code not changed
    Ram

  • Want to restrict the Purchase order release at lower level...

    Dear Friends,
    The Problem i am facing is that the release strategy defined in Purchase order is such that it will be released by four authorities,
    & When 4th One, The Highest authority releases the order it should not get unreleased by lower level authorities.I want to configure this.
    Partially it is completed, as if Tcode me29n is used for cancel release then it is restricted by Going into
    SPRO-MM-Purchasing-Purchase Order-Release Procedure for Purchase Order- Define Release Procedure for Purchase Order
    & suggesting it there.into Release Indicator
    But still it can get unreleased by Tcode me28.
    Kindly Suggest,
    Gaurav Chopra

    Hi,
    This is the standard like release srtetegy will not have the restriction only the release do the release . He can also should de release the document.
    this can't control.
    SAM

  • Variables Not showing

    Hi All,
    I have added one variable to the query which is having already 4 variables, but when I tried to run it is showing two variables not even what I added.All variable including new one added is showing in the RSRT, but it is not showing in the Query level.Please advice.
    Thanks!
    VJ

    Hi Arun,
    Thanks for reply.
    I checked it, it's having ready for input is checked and variable type is characteristics value.It is reflecting the RSRT but not in query level.
    Any idea?

  • Hi Fi Volume wil nt increase past a low level???

    Using my Hi Fi with 20G ipod and the volume on the Hi Fi would not increase beyond a low level compared to other times I have used the Hi Fi. The volume would lower and when trying to increase the light on the Hi Fi would turn from green to orange and not increase past a certain level??? Please advise.

    Do you have batteries in the Hi-Fi? If so, check that the power cord is properly (firmly) in place. If so, then make sure that power outlet hasn't been turned off at the wall-switch. What you're describing sounds like what the Hi-Fi is designed to do when running on batteries. ..As the batteries wear out, the maximum volume is reduced.
    If you do not have batteries in the Hi-Fi, then I'm at a loss to explain your problem.

  • My iphone 4S only start whit cable plug in and then show battery very low (with red line end) then try to turn on but show searching in operator name command and not connecting and no work properly and when I plug out it turn off!!! what should I do?

    My iphone 4S only start whit cable plug in and then show battery very low (with red line end) then try to turn on but show searching in operator name command and not connecting and no work properly and when I plug out it turn off!!! what should I do?

    I'm afraid you'll have to get the phone serviced, dropping the phone must have damaged additional parts inside the phone.
    But Apple will not service the phone anymore, opening the phone and replacing the battery should only be done by authorized personal, not by users.
    You'll have to look for a 3rd party repair shop and see if they can fix this, sorry.

  • Sales Order does not show up at the resource level.

    Hi guys,
    I have a flour mill of having 4 processs (resources)
    1). Tempering (cleaning).
    2). Milling.
    3). Blending.
    4). Packing.
    I have two identical sales order. One has been through all the process (resources) and showed in the DS Planning board but, other one has not shown up there. It happens to me couple of times that such sales order do not show up at the resource level. Where should I check and correct? Aslo which way can I follow up these missing sales order? and What shoud I do if this situation happens?
    Thanks
    Shaan.
    Edited by: Shaan313 on Sep 27, 2011 8:22 PM

    313,
    https://service.sap.com/sap/support/notes/1406120
    Since you asked the question, I can assume that you don't have an "S" number.  speak to the person in your company who administers your SAP Service Marketplace account (this is usually someone on your Basis team), who can obtain one for you.
    Or, you can try on your own.  A few stars have to be in alignment for the second method to work.
    https://service.sap.com/request-user
    Best Regards,
    DB49

Maybe you are looking for

  • Songs from itunes not playing on iphone 4

    I can play these songs on my macbook pro itunes but when I transfer them over to my iphone 4 they will not play at all! Anyone got any idea's. Thanks

  • AP:  Issue with PO, Quantity is missing after user MR8M

    Good Morning SAP Gurus- We are currently on ECC 6.0.  I have an AP issue.  We had an open PO with QTY of 2 that a manual GR was done and therefore invoice was paid.  We were informed that the items never shipped therefore user executed a credit memo

  • Calling BSP from Workflow

    Hi,   Can we call an BSP page from within workflow step and can it show in Universal worklist of the Enterprise Portal?   If it possible then from which version of Web application server and enterprise portal it is supported? Thank you arun

  • Whenever sqlerror exit failure rollback in IDE's

    Hi all, Sorry to cross-post, but there is a tendancy for people who have a bunch of Expertise in SQL/PL/SQL to not check other forums all that often so I am hoping for more results here. I've started a thread over here: deployment scripts with "exit

  • Re-downloading tracks to a new computer

    hay, my computer got a virus and i was forced to re-format my computer. is there anyway of re-downloading all the songs i have bought off i-tunes in the past to my new hard drive? help!?!