DMR - stock posting for skip lot
hi experts,
i am creating a DMR for raw material GR gainst PO.
I am creating DMR at lot level. i will inspect first batch an skip next 5 batches.
after executing i am getting 6 inpsection lots with first as normal inspection lot and next 5 in skip status.
now the query is in one system after GR of PO i am getting the skip lot stock in quality and in other system (other client) .
i am getting the skip lot stock directly in unrestricted use. both have inspection lots status REL SKIP.
dmr RULE is same , material master inspection type settings are same.
what is standard SAP function shud the stock go to quality or untrestristed for skip lot ?
what might be reason for this different behaviour ? any function module or user exit is used?
anything i need to look in config.?
Thanks
satish
Bit late but maybe other people find this a helpful answer.....
Check the inspection lot control settings in the material master.
If option For each material document item is chosen, the skiplot goes to unrestricted stock.
If option For each material document, batch and storage location is chosen, the skiplot goes to quality stock.
BR,
Arno
Similar Messages
-
Stock posting for lot 010000000121 not supported
Hi Experts,
I am unable to reverse the UD and stock by using SAP NOTE 175842.
By using std program RQEVAC50 activated ZQM_RQEVAC50 and given the transaction code.
When I runn this T Code System is giving error massage "Stock posting for lot 010000000121 not supported"
Cross Checked all parameters find below
1) For movement type 322 and 349 assigned T Code QA11 and QA12
2) Posted stock available in same storage location
3) Lot 10 qty posted to unrested qty 10 and lot status is " UD ICCO SPCO STUP "
4) Material Not serial managed
Pls tell me the reason why it is not happening
Thanks
Shiva Patil
Edited by: SHIVA PATIL on Jan 15, 2010 4:10 PMResolved
-
Hello Guys,
I am getting this error when we background job tries to do AUTO UD
"Error during quantity posting for inspection lot 000000314850, manual proc. required"
Thanks!
Owais>
Owais Ahmed wrote:
> What is the status of Quality level?
> REL
> It also ahs "lot is not inpspected (skip lot)
>
> Have you maintained DMR at lot level in inspection plan? what is the setting of DMR?
> We maintain DMR rule at characteristic level.
Hay Dude!!!
If you want to do "AUTO UD" of insp lot then in inspection plan you should maintain DMR at lot level in header not at char. level.
After that you have to maintain DMR in insp plan header.
To do auto UD quality level next stage should be "SKIP", if it is not inspected or inspect then you have to do inspection & UD manually for first lot then from 2nd lot system will do auto UD.
If still you are getting problem, then let us know what data you have entered in DMR....
Hope this helps.
Thanks!!! -
How to change the posting date in UD stock posting for a HU managed item?
Hi,
We are using Handling Unit managed items with QM activation. For a specific HU managed material, we wanted to post the stock on a previous date. We have created PO on a back date and made GR also on a back date. Now the problem is, the system has generated an inspection lot. Now while trying to do UD and stock posting, I do not see the "Doc" tab which we normally see in UD stock posting for normal inspection lots (non-HU managed items) for changing the date.
I don't see any other way to change the posting date for the HU managed item in UD stock posting. Anyone can help please?
Thanks & Regards,
Madhavan Krishnamoorthy.I don't think you can.
Craig -
No stock posting for this material
I have create a material with item category LEIH for returnable packaging,while doing stock posting in MB1C error comes as "No Cmaterial posting for this material".plz help how to post the material.
Duplicated thread no stock posting for this material
Please close this post.
Regards. -
Initial Stock Posting for Semi Finished Goods
Dear Friends,
I have a small doubt in Initial Stock Posting.
Is Initial Stock Posting for Semifinished Goods (HALB)?
Or Initial Stock Posting available only for Finished Products?
Please answer this.
Regards,
Rajesh LHi,
MB1C + 561 can be used for all of your goods from which you want to keep stock. So, raw materials, SFGs, FGs can be uploaded based on your business requirement.
Your material masters should be extended to the suitable organisational levels (plant, SLoc, WH), so suitable material master views should exist at proper organisational levels.
Regards,
Csaba -
How to perform stock posting for a manually created lot?
Dear Friends
I have a material A for which GRN is made before the inspection type 01 is activated in material master. thus no quality lot is created for the material in qa32.But the material has got an inspection plan
But for 240 units of material, we will have to show in sap that 120 pc is rejected and sent to rejection storage and rest are ok and thus should be sent to ok storage location with 321 mt.
Thus i have created a manual lot in qa01. this lot can be found in qa32. I did result recording for the same. but i am not finding stock posting tab page in UD. please tell me how do I post stock in case?
Thanks
ChandraHi
120 pc is rejected and sent to rejection storage and rest are ok and thus should be sent to ok
Stock posting is not possible for manual generated lot.
What you can do you can only post/Create Manual Lot only for OK Qty.
Rejected Qty 120 you can do Return delivery through Unrestricted after GR is made(after 101 mvt)
This is only solution.
or
Cancel original GR.
Activate 01 inspection.
Do GR again
I hope this will help you
Regards
Sujit -
DMR configuration for skip lot inspection
Hi QM experts,
My client needs to configure DMR for skip inspection lot.
Scenario Requires following steps:
1. Maintain PPAP approved status
2. After PPAP approval inspection of next 10 consecutive lots.
3. If all lots OK, system skip 1 in 2 lots.
4. Then system again checks next 6 consecutive lots, if there is any rejection again repeat step 2 else skip 1 in 3 lots.
5. Same cycle will repeat for skip 1 in 5, then skip 1 in 10, skip 1 in 20 and so onu2026
I am new to PPAP status and DMR. Kindly guide how to map this in SAP. What are the SPRO settings required and what master data to maintain for it, and what will be the process flow.
Regards,in need of experts Advice and Guidance.
Regards, -
Stock posting of Insp. lot in alternative unit of measure
Dear All,
I have a material whose Base unit of measure is Ton and alternative unit is PCS. There is an insp. lot of 10 Ton. Now i want to do its stock posting in PCS. So how can i do that.SAP Note 605861 - Provision of a BAdI for input help for quantities in UD
refer thread
Posting stock in Alternate Unit of Measurement -
Hello All.
After a usage decision has been made to rework all the items in an inpection lot where should I post the material for the rework to occur.
I cannot post it as blocked because order connot backflush from blocked.
Also connot post in unrestricted beacuse fifo will pick from any location and not necessarily the one I want.Thank you for your response,
I mean to say the material will be usable after the rework.
But after the usage decision is made to rework the items where do I post them to,
so that the rework order created consumes the affected parts and not good stock.
For example if there is one rework order and one standard order for the same item in the same work center,
how do I we know to pick the faulty materials for the rework order and the good material for the standard order.
Can an order be created in one storage location (say welding) to consume stock from another storage location such as quarantine?
Does the material reamain as Q stock until after the rework? If this is the case can an order be created to consume the Q stock and after the rework is complete convert to unrestricted use stock?
Regards,
Chris -
Inspection time Capacity Updation in work center for skipped lots
Hi Guys,
I am using in process inspection type 03 along with DMR criteria at lot level i have defined the DMR rule and assigned it in routing header.DMR rule is inspection lot 1 in 5 will be inspected i.e when the inspection lot will be created and if there is no quality level exists it will first create the quality level with 1st inspection lot which will not be skipped lot and then it will skip next 4 lots and 5th will be inspected again.Quality level is updated during lot creation level.
what i am looking is when you have the skip inspection lot he capacity which has been planned for inspection for that work center should not be considered since there is no inspection done because of skipped inspection on that work center although it's the part of Routing/production process.
please let me know if any more inputs required.
your inputs/feedback is really appreciated
Regards
Ashutosh ShendeHi Krishna,
It is distributing unevenly because of the Int. Dist. key maintained for "Labour" capacity category.
Following are the available dist keys.
I think for your scenario, you should select SAP020
SAP000 Overall load for latest start date
SAP010 Overall load for earliest start date
SAP020 Equal distrib. earliest dates, fact.cal.
SAP030 Equal distrib. latest dates, fact. cal.
SAP040 Equal distrib. latest dates, discrete
SAP050 Equal distrib. earliest dates, oper.time
SAP060 Equal distr. latest dates, operat. time
SAP070 Overall load at latest finish date
Please let me know if this works for you.
Regards,
Abhay Kapase -
Hi Group,
At the screen of Usage decision I selects the "accept" UD code, then jump on to the Stock posting screen where system is not showing any quantity in the field for Sample posting. And not calculating the sample while i press on the Proposal button.
Pls can any one help me how to resolve it.
Regards,
ShyamalArun,
I'm not clear.Are you able to see inspection lot stock tab in UD.If not please check the indicator to insopection lot stock at creation.
The details available are basically Insp lot qty,sample size,qty posted and to be posted.I'm not confident if i answered your doubts but pls get back.Thanks
naik -
No Inspection Lot required for Skipped Lot
Hi Experts,
I have used DMR to skip 10 lots from a particular vendor and inspect the 11th lot. But the client's requirement is even inspection lot should not be generated for the skipped lots.
Also, if the material is procured from some other vendor, then the inspection lot should be generated everytime.
How can I map this?
Please advise.
Regards,
RahulThe only alternative I can think of would be to use a development. Set up the inspections to happen . No DMR. You then would use a user exit, (I believe QAAT002, maybe QAAT001 would work). One of those allow you to set a flag in the user exit that supreses the creation of the inspectoin lot.
You would have to have the user exit look up the GR's for the vendor/material/plant combination since the last inspection lot for this combination. Then if the count is equal or greater than ten, you create the lot. If less then 10, you suppress the creation of the lot.
I would be careful how you code the user exit. You'll probably only want this to apply to certain materials so you have to come up with a way that allows flexibability in what materials this is used for. I might suggest using the QMin procuremnet control key. If you have no procurement functions, you usually define a control key 0000 for this . Copy that to 1001 for instance. It will have no functions. But your user exit would only run if the control key was 1001. It would immediately exit for any other control key in use. You might need additional control keys if you do use other features of the conrtol key such as COA receipt. In that case you might have two control keys that trigger your user exit. 1001 and 1002. 1002 would require a cert.
I hope this is clear.
FF
Edited by: FireFighter on Sep 22, 2011 2:50 PM -
Stock Posting for Previous Period
Hi all,
In case, there is a need to update stock for previous period (Stock Transactions: Initial Quantities Stock Tracking and Stock Posting /Stock Posting List ) e.g. Update stock at 31/12/08 where there are stock movements within 2009, there is a System Message : Item quantities are not updated for initial entry of stock balances date, Update Now ?Yes , No, Cancel
How we activate this message, in case that does not appear?
Thanks in AdvanceCheck this WIKI
[How to update stock quantities according to a previous date?|https://wiki.sdn.sap.com/wiki/pages/viewpage.action?pageId=25494266] -
Inspection lot with stock posting for Mvt 642
Dear Sir
While doing PGI reversal(642). The stock is directly going and sitting in Unrestricted but business required to put those stock as Quality Stock
RegardsDear Sir
As per your comment did the changes for mvt 642 E L X E but inspection mot not generated,kindly guide the step where i m going wrong.
Regards
Maybe you are looking for
-
Unable to create variables referencing external schema
I'm stumped with this one. Any help will be appreciated. I'm trying to create a variable to hold the wsse:Security element and not having any luck. I imported the WS-Security schema from http://docs.oasis-open.org/wss/2004/01/oasis-200401-wss-wssecur
-
How do you wait to load certain movie clips or frames?
I have seen flash sites that wait to load different parts of the flash file until you click on a link, thereby starting a loading graphic that then loads the content you're looking for. I can't find any information on how to do this, and I'm guessing
-
No Sound issue and do nothing Show hidden icons arrow are all good now I am please, of course, to say :) <----- smile Solution was a Refresh. It's certainly nice to have sound, again. Glad Refresh did the trick. Cheers, Drew Drew MS Partner / MS Be
-
i wanted to know how does technical support work via icloud and is there any new technology out that helps providing technical support?
-
Does anyone know how to fix launching Kuler?
I cannot launch Kuler in CS6 AI abd PS. I have spent hours on the phone with Adobe and I am not happy about this. I am paying for this service and it doesn't work. How can I get this to work once and for all