Doc Splitting with Project Center wise

If we take each Plant as a Profit Center, Is it possible to see each Profit center wise document splitting for
    P&L and Balance Sheet Accounts?

The Std T Code are S_PL0_86000030 & S_PL0_86000028
Regards
Sanil Bhandari

Similar Messages

  • CUSTOMER BALANCE LINE ITEM DISPLAY WITH PROFIT CENTER WISE

    Dear Folks,
                     Please suggest whether is there any standard report related to
    customer balance report against Profit center wise or suggest the best way to create the Z  REPORT LOGIC
    Thanx In advance
    REGARDS
    ASHOK K

    Hi, Ashok 
    Welcome to SCN
    Please Don't USE ALL CAPS, it is against the Forum Rules, Check Bellow
    Please read "The Forum Rules of Engagement" before posting!  HOT NEWS!!
    Faisal

  • DOC Splitting in New GL and Profit center accounting activation

    Dear All,
    I am in a dilemma regarding the following -
    We are activating doc splitting with profit center and segment as characteristics.
    1) While maintaining Controlling area settings(OKKP) - do we need to activate "Profit Center Accounting" component?
    2) Similarly, in IMG-Controlling - Profit Center Accounting- Basic Settings-Controlling Area Settings-Maintain Controlling Area Settings (0ke5), do we need to maintain any settings?
    I am of the opinion that ,based on the SAP Note - 826357, that we need not activate PC accounting as it is built into New GL Accounting.
    I am also of the opinion, again based on the note, that we can use classic PC accounting, but the note recommends and I quote
    we do not recommend you do this on a long-term basis due to the increased data volume and the increased time and effort required, and in the case of active document splitting, the update response changes.
    But I am not able to come to a conclusion.
    In earlier  implementations, I activated PC accounting in OKK5 in New GL doc split scenario. So keeping that in mind, pl guide me.
    Thanks & regards,
    Gov

    Hi
    Please set the Profit Center Accounting with Controlling Area.
    SPRO->CONTROLLING-->PROFIT CENTER ACCOUNTING -->CONTROLLING AREA SETTING -->MAINTAIN CONTROLLING AREA

  • Profit center wise customer balance Report with reference field

    Dear Experts
    I am using the report S_AC0_52000887 - Receivables: Profit Center but it does not show with reference.
    how can i see this report with reference. (e.g. reference field at the time of posting document) In the background of this report called by report painter and we can see the characteristics are there. I am not able to add the reference field in the characteristics. Can someone please give some insights.
    Regards,
    Vishal

    Hi Vishal,
    Please use FAGLL03 give the customer recon a/c you can see all the customers with profit center wise report.
    Regards,
    Raman

  • Report for actual cost of WBS, Profit center wise

    Hi Experts,
    Do we have any standard report that gives the actual cost of WBS/Project with Profit center wise.
    Thanks,
    Krishna

    Hi,
    Thanks for your solutions.
    But I m looking for the Profit center in the report (display screen), not in selection screen.
    My scenario is like, the cost was posted to WBSE with X profit center/cost center in January, now I changed the profit center to Y for the same WBSE and posted.
    Want to see thru which PC I have posted to WBSE and how much. So that I can reversal.
    Thanks again.
    Krishna.
    Edited by: krishna.gujju on Jul 8, 2011 6:56 PM

  • Profit center wise vendor balances

    Hi guys,
    My client want to vendor balances with profit center wise. I know t.code s_ac0_52000888 it displays reconsilation account wise balances I want to  profit center wise balances not reconsilation account wise balances its urgent please help me
    thanks
    syam

    Dear
    Use T.code FBL1N - Display/Change Line Items.
    when you execute the report , select changelayout and select the field profit center, vendor balance and profit center are displayed.
    when the profit center is displayed, select filter and enter the profit centers and profit center wise vendor balances will be displayed.
    Alternately, use dynamic selections in T.code FBL1N selection screen.
    Please let me know if you need more information.
    Assign points if useful.
    Regards
    MSReddy

  • Document split by profit center

    Hi,
    We are in a re-implementation scenario.Client is using the older version of SAP and the new version is ECC 6.0.The requirement is to activate the document splitting with profit center and segment as scenarios.(Charecteristics for splitting).As on the cutoff date we take the balances and upload the same in the ECC 6.0 system.The question is how these balances will split.How the customer and vendor line items will split.
    Please clarify...let me know if you need further info.
    Thanks

    Hello Aravind
    Pls check this link
    http://help.sap.com/saphelp_erp2004/helpdata/EN/87/3da04028f40160e10000000a1550b0/content.htm
    Maybe of some help.
    Reg
    suresh

  • Trial balance not generate profit center wise

    Dear All,
    Please suggest,
    I am generate the trial Balance "S_PL0_86000030 - G/L Account - Balances " with profit center wise, system not generate the trail balance with profit center wise because profit center or business segment is not updated the system.
    I generate the trial balance at company code level same t-code, system generate the trail balance but system show the column of profit center or business place "not assigned"
    It is possible to update the profit center and business segment table.
    Pleases suggest to solved my problem
    Regards

    Hi, have you activated PC scenario?

  • Doc splitting during manual bank posting

    Hi,
    We are in the process of implementing document splitting with profit center as a mandatory splitting criteria.
    During customer incoming payment, we
    Debit Bank Clearing Account
    Credit Customer
    In this step, New GL will split the above 2 entries with the profit center based on the AR billing document.
    When bank statement comes in from the bank, the normal journal posting is:
    Debit Bank
    Credit Bank Clearing Account
    My problem is: in this posting, we do not reference the incoming payment document, hence system cannot find out which is the profit center to split into. Is that a transaction whereby I can post the bank statement and do the clearing of the "bank clearing account" at the same time, so that the "Bank" line can inherit the profit center from the incoming payment document? We do not want to use the standard bank reconciliation process for now.
    Any suggestions is much appreciated. Thank you.

    Hi
    In such a case you may use the functionality of FF66. This will clear the subledger and post the entry to Bank Accounts, depending on teh configuration of your Posting Transactions for Bank Reconcilliation
    Regards
    Sanil

  • New GL - Doc Splitting - Profit Center not hitting the Zero Balance GL

    Dear SAP New GL Gurus,
    I am trying to activate the doc splitting where the system uses a GL Account to ensure that Profit Center wise Trial Balances are tallied.
    I have done the following configuration till now, and I feel that these steps should ideally split the doc and post the PCA Adjustment Account Entry - I think its the Zero Balance Clearing account that the system should ideally be using.
    I am not sure what I am missing here - This is what is done till now:
    1. Activated Document Splitting - Used Standard Method 0000000012.
    2. Classified GL Accounts for Doc Splitting as per standard SAP categories.
    3. Classify Doc Types with assignments of Transaction and Variant. Done as per standard, no changes made.
    4. Defined Zero Balance Clearing Account.
    5. Define Document Splitting Characteristics for General Ledger Accounting - Made Profit Center field as Mandatory
    6. Define Document Splitting Characteristics for Controlling - Left it BLANK as Point No. 5 is done for GL Accounting.
    7. Define Post-Capitalization of Cash Discount to Assets - Ignored
    8. Edit Constants for Nonassigned Processes - Ignored
    Under Real-Time Integration of Controlling with Financial Accounting:
    1. Standard variant 0001 used.
    2. Assigned 0001 variant on the Co Code.
    3. Define Rules for Selecting CO Line Items - Ignored
    4. Define Account Determination for Real-Time Integration - Ignored
    Accouting Entry posted by me - Both lines are Balance Sheet items:
    DR     Bank GL     Profit Center X
    CR     Bank GL     Profit Center Y
    Please help me out here.
    I will assign full points.
    Many Thanks
    Bob

    Hi,
    Yes. Very much. you need to assign scenarios even if you are using leading ledger.
    In any enty there will be minimum two views, Entry view and Ledger View
    Ex.
    Entry view
    Account    Amt    A/c Assig objects - Profit Center
    Customer  400                                   
    Sale A/c  -400                                     2000
    Gl View
    Account                    Amt    A/c Assig objects - Profit Center
    Customer Recon A/c  400                                   
    Sale A/c                   -400                                     2000
    If you dont assign Profit center in the scenario to the leading ledger, in gl view you will not be able to see profit center against the sales line item
    Assign points if useful
    Regards
    Raghu Ram

  • Unable to open the Projects from Project center with the Alias name PWA 2010

    Hi,
    I am unable to open the Projects from Project center with the Alias name with the server name i am able to open the projects, version is  project server 2010,
    My system is ABC.DC.IN  alias name i have given is DEF.AD.COM  
    With the system name i can able access PWA and all are working fine.
    As i have observed with alias name i can able to login to  pwa and all the server  setting approval center all are working fine but only in the project center i am not able to open the projects (http://DEF.AD.COM/pwa/ProjectDrillDown.aspx .xxxx) its
    is coming in the below of the ie. 
    But with Alias name these are the issues i am facing,
    1.when longing with alias name its asking two times for user name and password
    2.when i click on a project from project center its taking some time and asking for user name and password after i enter user name and password "PAGE cannot displayed" error i am getting.
    3. I have observed one more thing if click on Project details then only this issue  is coming project schedule and project information is also opening with Alias name.
    can any one Help me. 
    Vijay kommireddi

    Hi
    Hope the below link will help you.
    And also please check the browser which you are using as mostly IE 8.0 won't support, Please try it in IE 9.0 and Chrome.
    http://social.technet.microsoft.com/Forums/sharepoint/en-US/c03300d2-2a27-4d5d-b3f6-a3660805e125/alternative-access-mapping-when-accessing-the-site-it-is-asking-for-username-and-password
    Thanks
    Geeth If you feel that the answer which i gave you is Helpful please select it as Answer/helpful.

  • Project with profit center was not created for entire period

    Hi everybody,
    I need a help with a problem here.
    The alert mesage "project with profit center was not created for entire period" was displayed.
    Then I searched for the creation dates and the profit center was created before the project gets its firsts postings. Therefore, some line itens don't exist in profit center (ledgers).
    My two questions:
    The first one, is it possible to input line itens in a retroactive way?
    Everytime I need to use the project master data this alert is displayed. How can I fix avoid this message?
    Thanks,

    Hi,
    Regarding your issue, it is theoretically possible to reverse all settlements up to the start of the project and then to settle again it
    is a must to check in standard if the profit center is valid from the project start date onwards.
    Check the attached note 1048945.
    The system generates error message KM700 ('Profit center <PRCTR> does not exist for <date>') when you enter a profit center on a project definition if the profit center is not valid in the entire period between the basic start and the basic finish date of the project definition . However, only one warning message should only be generated in this case.
    regards
    Waman

  • Clearing docs profit center wise

    Dear Expert
    We clear customer billing documents by SM35 transaction
    and billing documents are created with different profit
    centers used by differernt departments and at the time
    of clearing we need to display those profit centers but
    as profit centers cannot assign to customers and vendors,
    how to segregate billing documents profit center wise at
    the time of clearing.
    Regars VG

    Hi,
    I have some questions and suggestions
    Do you have only 1 profit centre assigned in the billing documents? in case yes the following options may work for you. If no then it may not be possible to clear by the profit centre.
    you can try substitution through SD in the customer line item through SD  using the following exits SDVFX001,SDVFX002 and  SDVFX004 to populate profit centre in assignment/reference/header fields and in clearing you can sort the clearing line items or restrict your selection based on the field and clear the line item.
    You can also in the SD module have custom invoice number maintained based on plant which can be mapped to profit centre and you can select the invoice number based on the range maintained.
    Regards
    K.R

  • Document splitting with two characteristics Business area & Profit Center

    Dear Experts,
    is it possible to split the document with two characteristics .
    Business area
    Profit center
    Can anyone suggest!!
    Regards,
    Naru

    Hi,
    Thanks for you immediate response...
    i tried with this it is splitting only profit center and not splitting for business area, Please correct if i am wrong.
    Amount
    Business area
    Profit center
    Vendor A
    4000
    Expense
    2000
    A
    A
    Expense
    2000
    B
    B
    Should split like below
    Vendor A
    2000
    A
    A
    Expense
    2000
    A
    A
    Vendor A
    2000
    B
    B
    Expense
    2000
    B
    B

  • Document split profit center wise

    Hi All,
    I have a senario.
    I want to post a document were it automatically splits and post it to respect profit centers.
    Ex: Canteen expenses for Rs 1000/- my profit centers are PR01 and PR02. My cost center is CCC1.
    Entry should be:
    Dr. Canteen Exp        1000        CCC1    
    Cr. Bank                   1000
    entry should split
    Dr. canteen CCC1    PR01     600
    Dr. Canteen CCC1   PR02      400
    Cr. Bank                               1000
    this i need for two purposes,
    1) Two get the Profit center wise balance sheet
    2) two reduce the client work.
    What are the things i need to take care to get this. how can i get this
    Thanks
    murali

    Hello,
    I am not sure if you can achieve this splitting,because if you want to use document splitting functionality and the split will happen on the line items where there is no profit center  i.e in your case the cr bank will be splitted in to two if you have two debit entries on expense side.
    See for the following scenario u mentioned ;
    Entry should be:
    Dr. Canteen Exp 1000 CCC1
    Cr. Bank 1000
    entry should split
    Dr. canteen CCC1 PR01 600
    Dr. Canteen CCC1 PR02 400
    Cr. Bank 1000
    its not balanced by profit center as you said/stated.
    If you have any entry like ;
    Dr. canteen CCC1 PR01 600
    Dr. Canteen CCC1 PR02 400
    Cr. Bank 1000
    Document splitting can split in to following:
    Dr. canteen CCC1 PR01 600
    Dr. Canteen CCC1 PR02 400
    Cr. Bank  pro1 600
    cr bank pro2 400
    where you have profit center wise  balance sheet.
    And you have to config as stated in the above post.
    Thanks,
    Sai.

Maybe you are looking for

  • Problem Editing Calendar Information?

    I use the Calendar app extensively on the iPad, modifying the name and description of events, as part of my business. I've noticed that when I'm editing an entry, especially the name of the event, sometimes what I type disappears, and I have to start

  • Adobe Reader - Can the rate of speed for the "voice" be adjusted?

    Hello, I want to make the "voice" of Adobe Reader read more slowly for me as it reads a .pdf. Is this possible, and if so how do I adjust the vocal speed in Adobe Reader?  Thanks! J.

  • When I delete a File on my Mac is it kept on TM?

    I'm brand new to TM and currently performing my first backups of an iMac and Macbook Pro. I've read everything I can find but I still don't understand one simple concept: If I delete anything on my computer is it removed from previous backups or stil

  • How can i Unlock the Sim on my iPad?

    My iPad has a locked Sim symbol in the top left corner. How can I unlock it ?

  • Useful Information about Open Outlook OST Files

    If MS Outlook is connected with Exchange server then it creates .ost file format to save cached data in offline mode and all offline work automatically synchronized with Exchange server if connectivity is available. The process to read offline OST fi