Dear SAP Gurus,
I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
Thanks and Regards
Geravine

I have three documents. One is attached at the BOM header level under the documents tab. The second with item category D is entered as a line item in the BOM Items. The third is in the Item Level under the item's documents tab in the item details. All have same document type.
When I create the production order the second document is copied in the document overview of production order. First and Third are nowhere to be seen.
Is there any config or user exit to achieve the same?

Similar Messages

  • Printing UDF from BOM on Production Order

    I have added some UDF's on my BOM that I'd like to print on the Production Order. How do I get BOM UDF info onto the Production Order?
    Sal

    Sal,
    BOM and Prod Order are 2 different documents and therefore do not share the UDF.  You will need to create similar set of UDF on the Production Order Header / rows (as required) and create formatted seach to copy the data from the UDF.
    Please give me an example of the data in the UDF and I will walk you through
    Suda

  • Document Attachments flow from BOM to WIP

    Hi All,
    We want the attachments flow from BOM to WIP or Org Items to WIP,
    1. Component Items Created and assigned to Org - Attachments uploaded here.
    2. A BOM created - Upload attachments here or the attachments should flow from Items to BOM.
    3. When a WIP job created for the assembly has the attachment, that should flow into WIP job.
    How this can be achieved? Also there are document categories called TO WIP and WIP Job/Schedule Attachments are tried but not working, what is this for?
    Thanks,
    Magesh

    Hi Magesh,
    WIP allows you to create a catalog of standard operation documents. You can then attach these documents to your work in process routing operations in the Operations window.
    Please refer to the --  Oracle Work in Process User's Guide
    and search for --  Defining Operation Documents
    Currently BOM Attachments cannot be made available on the WIP Job.
    But however, an attachment can be added in the Routing definition and then viewed in the Discrete Job at creation time.
    The routing operation copies the attachment and enables viewing from the WIP Discrete Jobs form.
    You may refer to the document:
    Note: 364364.1  BOM/Routing Attachment Relationship with Discrete Jobs
    Further for the document categories called - TO WIP, TO Supplier, etc
    These are Item attachment categories that simply provide a way to classify attachments—this classification identifies the purpose of the attachment to the business object,
    and can also be used as one of the search criteria within an attachment list.
    There is no functional significance otherwise.
    Please refer to the --  Oracle Product Information Management Implementation Guide
    Chapter 3 - Setting Up the Item Catalog
    Section - Defining Item Attachment Categories
    Hope this helps.
    Thanks and Regards
    Khyum Mohammed

  • BOM and production order

    CAn somebody give me the steps for creating BOM alongwith routing  in SAP
    and also the steps involved in creating a Production order //
    Please give me all the t Codes //Iam basically a finance and costing consultant
    Iam trying to create a test scenario for testing a costing variant //
    Also trying to analyse the financial impact during creation of a Prodn order
    Thanx
    Nikhil

    Mr. Nick,
    Creation of BOM:
    1. CS01 -> BOM creation
    a. Enter Mtl No., Plant No., BOM Usage (use the value 3), If you wish to keep track of changes, then generate a change number & assign the same to the change number field & also select the date from which you want the BOM to be valid from.
    b. Once inside this transaction, add the components which you want along with the qty required.
    c. There are more settings which you can do, but for a simple BOM, these entries are sufficient.
    d. If you wish to link another BOM with this, enter the mtl nos which has the BOM, this way you can build multi-level BOM's.
    2. CA01 -> Routing creation
    a. You can create a routing specific to a material or you can have a single routing for multiple materials.
    b. If you want to have a routing per material, then enter the mtl nos, Plant, change nos if you want to keep track of changes & the valid from date.
    c. You can also have routing specific to a sales document or WBS element.
    d. If you wish to have a group routing i.e. a single routing for multiple mtl's which are going to be produced in a similar way, then just enter a name in Group field.
    e. Depending on what you select above, different screens open, i would suggest, you try creating one in the sandbox server & post back if you face any problems.
    3. CO01 -> Production order creation
    a. Once you have created the BOM & routing for the material, then enter the material for which you want to create the production order, enter the production plant & also the order type. If you are not aware of what order type, then please refer to your PP consultant.
    b. After making the initial entry & when you press enter, the system automatically reads the BOM & Routing associated with this material.
    c. Once again i suggest you create a production order in sandbox server & if you face any issues you can post back.
    Also note: You can use CS02, CA02, CO02 for modifications of BOM, Routings & Production orders respectively. CS03, CA03 & CO03 for display.
    Hope i was able to give some assistance to you.
    Regards,
    Vivek

  • Missing raw material position (from BOM) in process order

    Hello to all,
    Please help me on my issue on missing raw material position (from BOM) in process order.
    On transaction CS11, for a particular formula/plant/BOM application, the BOM was produced.  It was found that this BOM has 20 positions (from 0010 to 0200). 
    Now, when the user proceed on the process order for this, the position 20 is missing into the order.  What checks should be needed to proceed on checking why the item is missing into the process order?
    Thanks.
    Regards,
    Patrick

    Patrick,
    The last check what i would suggest is to check the "Plant-Spl- material status" of the material in line item 0020. You have to check this using transaction "MM03" and in MPR1 - view.
    You can check the defination of the status in the customizing transaction "OMS4", here check under "Production Section".
    I definately think that there was a error message which should have popped up and ignored by the user due to this defination of the status.
    Regards,
    Prasobh

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • BOM and Production Order: Multiple Inputs to Multiple Outputs

    Dear All, My client's industry required BOM and Production Order must be Multiple Inputs to Multiple Outputs. We propose to create customization program to work on it but client do not want any customizations. Any suggestions? SAP B1 8.81 PL13 Thank you very much in advance. Best Regards, Vivian

    Hi,
    Please advice your requirement with an example. There is possibility to input multiple components to produce single finished product.
    Not sure you have checked with SAP help file. If not refer SAP help file and below blog.
    http://scn.sap.com/community/business-one/blog/2014/03/01/how-to-implement-production-in-default-sap-business-one
    Thanks & Regards,
    Nagarajan

  • Extraction of document flow from CRM

    Hi experts,
    I am currently struggeling with a generic extractor that will load the document flow from CRM into BW. My problem is that the load takes too long, due to the number of links in the document flow. I use a SAP FM called SREL_GET_NEXT_RELATIONS to get the document links and it works fine. The problem occurs when a campaign is linked to a transaction, since the campaign at my client can have more than 10 000 transactions and those transactions is then linked to other transactions and so on. This makes extraction of the document flow very large and slow to load.
    Is there any standard way of extracting the document flow that I am missing?
    Does anyone have any experience regarding extracting the document flow from CRM and would like to share their knowledge?
    Help are appreciated!
    /Sebastian

    there's a reason why SAP does not deliver extractors for things like this
    sometimes you need to face the end users (or project managers) with the "impact" of their requests... who would ever be able to look at a document flow that contains 50 transactions each of which linked to 1000 (or more) campaigns again each of which linked to a couple of other transactions?
    anyways, you should talk to some very experienced ABAPers if you really wish to continue with this request, rethink your approach or, what I would strongly suggest, rethink your initial request to get this into BI (if your not using web reporting, reporting on this will already crash in Excel versions 2003 and lower)

  • Alternative BOM in Production Order

    Hi PP Experts,
    I have a small issue which is like this:
    I have two Alternative BOM for Material "A".
    When I create production order it displays both Alt Bom for selection.
    When I select the second Alt BOM, in production order it still reads the First Alt BOM.
    Please advice.
    Regards
    Mohan

    Hi Mohan,
    I suggest if you have two alternate BOM for a material, you can use the production versions and assign the same for the material in Material Master MRP4 view.
    Create Production Versions 01 and 02 and assign the alt BOM 1 for the PV 01 and 02 alt bom for PV 02.
    Goto SPRO : Production -> Shop Floor Control -> Define Order type dependent paramters  ( Tcode : OPL8)  : Define the Production Version Slection either 1 for manual and 2 for automatic. (if you use automatic system will select the version based on the material master selection method )
    regards
    radhak mk

  • Users are not able to create POs from PRs having Production Order (F)

    Hi Gurus
    Users are not able to create POs from PRs having Production Order (F) as creation indicator.
    Whenever we are trying to convert the PR to PO we are getting the error message "Requisition has different doc. type NB and item cat. >&<" based on the below OSS# 938154 condition for the creation indicator type F.
    Would you please investigate and advise what OSS notes are required to be able to use item category L (subcontracting) on a PO for a requisition generated from a network activity via Procurement Type = "Preliminary requisition for WBS element".
    Thanks,
    Sada.

    Hi Ajay & Andra
    Whenever we are trying to convert the PR to PO we are getting the error message "Requisition has different doc. type NB and item cat. >&<" based on the below OSS# 938154 condition for the creation indicator type  Production order (F).
    Our Business requirement as shown below.
    1).The problem - we currently have no way to "direct requisition" an item to be procured via      subcontracting - only itu2019s possible via MRP.
    2).These behaviors are inconsistent as the requisition process should not impact the procurement process.  Can we find a way to influence the creation indicator on the requisition so that it does not appear as a production order?
    Please suggest any alternate method for achieving this.
    Thanks & Regards
    Sada

  • Document flow for BOM item components missing

    Hello,
    I would like to seek help on the following:
    I am creating a process where in I can create sales order (OR type) with reference from a sales order (like quotation type). I successfully configured the needed and was able to create one.
    However, I have noticed that if I used BOM products (where there is a header and item components) and check the document flow per line items, only the header BOM (line item position 10) has document flow  reflecting the reference order quotation type while the its components doesnt show such.
    Below is an example of the document flow:
    Bom Header (line itemk position 10):
    Document                                              Quantity Unit                     Reference value      Currency
    Buffer Buyin 111111 / 10                             1        EA                        0.00                          USD
    --> Product Order 222222 / 10                      1        EA                        0.00                          USD
    Line Items Component
    (line itemk position 20):
    Document                                              Quantity Unit                     Reference value      Currency
    --> Product Order 222222 / 20                      1        EA                        0.00                          USD
    (line itemk position 30):
    Document                                              Quantity Unit                     Reference value      Currency
    --> Product Order 222222 / 30                      1        EA                        0.00                          USD
    Thus, in above illustration, the line item component document flow has a missing data that would reflect the reference sales order. Please advise if what needs to be configure here.
    Thanks,
    Ria

    Hello Amit,
    The current scenario is like this:
    1. Reference sales order (OR but assumed as QT type) has item category YYBS for normal material and ZTAR for header BOM and YYBS as components.
    2. When these sales order (OR but assumed as QT type) is being reference to create actual orders to customers  (OR type) the normal material will be changed from YYBS to YZBS while BOM will have ZTAR header and components YZBS. This is the reason why I told you that its like the normal material.
    I checked the copy control line item settings as yes, document flow is ticked.
    Thanks,
    Ria

  • Reg : BOM and production order

    Hi all,
    I have created two production orders for the same material but with diffrent BOM explosion date. now can any one please let me know how will i find which version of alternate BOM of the material is used in the production order.
    In the production order header table ( AFKO) i am getting only the alternate BOM number, i am ubable to find which version of alternate BOM is used for Production order.
    Thanks .
    VIJAY

    the relation is as below
    AFKO-STLNR = STAS-STLNR
    AFKO-STLTY = STAS-STLTY
    AFKO-STLAL= STAS-STLAL
    FROM HERE TAKE ALL
    STAS-STLKN AND STAS-STLTY
    PASS IT TO STPO
    STPO-STLNR = STAS-STLNR
    SPO-STLTY = STAS-STLTY
    STAS-STLKN-= STPO-STKLN
    THIS WILL GIVE YOU ALL THE BOM ITEMS USED IN THAT PROD ORDER.
    IS IT OKAY?

  • Change BOM and Production Order

    Hello Expert,
    I have recuuring problem, hope you can lean help to me. Can you explain to me why this happen?
    we have change a component BOM in CS02, first we create change number in CC01. with effective date for 30.09.2008.
    In BOM 6083, there exist a component 10020379. we want this component to be deleted on 30.09.2008 and be replace with a new component material 10060530 effective on the date 30.09.2008. that was the new set up of the BOM of material 6083 (at this date august).
    Today (27.08.2008) we create a production order for material 6083, relesed it and when we will look at the PO Component Overview of our created PO both BOM component material 10020379 and 10060530 was present both backflushed was tick. but 10060530 component has zero req. qty compared to 10020379 it has a value on req. qty.
    why that even we create the PO in August replacement material 10060530 was exploded and included in PO since this material will be effective on 30.09.2008?
    and when we confirmed the PO via CO11N, we have a COGI error for the replacement material 10060530 "Enter Storage Location"?
    How all this happen Guru?.
    Thanks and more Power

    Hi,
    in this scenario, you can control the BOM explosion better with Revision Levels.
    say you have created the Revision Level with CC11, using the same change master which is effective from 30.08.2008.
    Every time, when you create an Order, system will pick the latest/relevant Revision level.
    If you create an Order on 01.01.2009, suppose there is a chanege again to your BOM, still at the time of confirmation/backflush system will explode the BOM as on 30.08.2008.
    Hope this helps..
    Regards,
    Siva

  • Get DocNum from newly entered Production Order

    I have an add-on that creates a production order from a given BOM (Item).  The code works fine and the production order shows up in B1.  However, following the "ProdOrder.Add" event, I need to find the DocNum and/or DocEntry for the newly added Production Order.  The problem is that none of those fields are actually populated even after the "Add" event.
    How can I retrieve this data from the newly added Production Order?
    Here's my code so far:
    ProdOrder = B1Connections.diCompany.GetBusinessObject(BoObjectTypes.oProductionOrders)
                    ProdOrder.ItemNo = ItemID
                    ProdOrder.PlannedQuantity = Qty       
                    strDate = DueDate.Substring(4, 2) & "/" & DueDate.Substring(6, 2) & "/" & DueDate.Substring(0, 4)
                    dDate = strDate
                    ProdOrder.DueDate = dDate
                    intResult = ProdOrder.Add()
    DocNum = ProdOrder.DocumentNumber
    Even though the DocNum will show up fine in the database, the statement above will return only a "0" value.
    What do I need to do to get this data?
    Thanks!

    Hey Curtis,
    Have you checked out the GetNewObjectCode method in the DI API? I am not sure what version you are using but you can use this for sure in 2004

  • Differ Bom For Production order and Subcontracting

    Dear all
    Is there any process to defined BOM for Subcontracting & production Order  separately and how can we make the Bom For Both case ,If it is possible then how can we choose in the production order for in house production and also for subcontracting for purchase order.
    Rgds
    Pankaj Agarwal

    Hi,
    After giving 'X' in the procurment type, maintain quota arrange usage as '4'.
    Then use T.code meq1, for creating quotas.
    Give the material no. & then give validdity date. Double click the validity date, this will take you to another screen.
    Here give the procurment type as internal production, the %quota & the prod version in the 'Version field'& then in the second row choose external procurement & choose sub-contracting in the special procurement field, then enter the %quota & prod version in the 'version' field.
    After this in T.code omi4 (for lot-size), check if the lot size you use has got a tick in the splitting quota. If not check this indicator & then run mrp. Based on the quota %, pl order & pur req will be created.
    Regards,
    Senthilkumar SD

Maybe you are looking for

  • Crystal Reports 9 and Java

    I have a crystal report that I've done that has a lot of parameters. I want to use java to make a more user friendly interface to enter in the parameters. For example, the user needs to be able to filter by date, stock number, vendor, etc. I'm not a

  • How do I eliminate shaky text from scrolling credits?

    I have added scrolling credits to a video and the scroll is not smooth.  There is no stabilization or shutter roll mechanism to use with built-in, FCPX text and titles.  So, how do I eliminate the shake from scrolling credits?

  • Javac trouble

    I have searched the forums and have found others with my problem but the solutions are not helping me with my problem. I am new to Java and am trying to use "Learning Java 3rd Edition" by Patrick Niemeyer & Jonathan Knudsen. The book recomends we lea

  • What is the maximum amount of ram I can upgrade to?

    I've tried looking into this but I guess i'm not very good at finding things sadly. My notebook is a "hp pavilion dv6-6b26sa" I currently have 6gb RAM and Windows 7 OS Thanks, all help appreciated. This question was solved. View Solution.

  • Registering a new sub account email

    has anyone else had the following issue ? i have contacted bt,s help desk been referred to their "level2" help desk , but still no resolution. i dont have any "extras" on the "mybt" page so cannot create an email sub account for my daughter. the help