Document Flow not updated in CRM from ECC

Hi Experts,
We are having a scenario where we are creating Service Orders in CRM, which in turn creates a meterial reservation document in ECC for the spare part items. However, the material reservation number is not getting updated in the document flow of the service order in CRM. We are using CRM7.0. Any suggestions anyone?

Hi,
Do we need to make any MW settings for the document flow to be updated with the material reservation document created in ECC.
Rgds,
-Sweta

Similar Messages

  • Document flow not updated for Package Quote

    Hi
    I am creating a Packaged Quotation from Opportunity. After creation of document I see that document flow gets updated in Quotation but in an Opportunity it is not updated (in UI). Whereas in GUI it is being shown correctly. Please help me in resolving this.
    Thanks & Regards
    Hits

    not required

  • SO document flow not updated with PR no created

    Hi All,
    A Purchase Requisitions is created from SO for a line item, i can see the PR generated in report ME5A but not in document flow. Is it a standard behavior or i'm missing something ??
    Regards
    Abhilash

    Purchase requisitions are not updated in the document flow, just use SE16 and look at document flow table VBFA. it has 2 fields for document category VBTYP_V and VBTYP_N . If you use F4 on this field then you can see that the PR is not among the possible documents.
    Use the status overview button instead and you can see the PR

  • Vendor Sync Job not updating all vendors from ECC to SRM

    The vendors are updated from ECC to SRM by batch job
    Z_SUP_BAT_VENDORSYNC (object BBP_VENDOR_SYNC).
    This job is missing updation of some vendors from ECC to SRM.
    Its happening on and of.We are updating these leftout vendors manually by TCODE BBPUPDVD and new left out vendors by BBPGETVD.
    We have concluded that information in these vendors is replicated from
    ECC to SRM GUI but it is not reflecting in SRM portal.
    Reasons looks like when vendor data(Incoterms/Payment terms) is replicated from ECC to SRM an
    addition row is created in vendor data in SRM which does have this information(Tcode ;BBPMAININT).
    Though the information is present in second row in vendor data tab of vendor information when executed using TCODE BBPMAININT but Vendor information in portal is picked from 1st row and does not appear when try to shop.
    Can anyone suggest how to resolve this?

    Hi Harleen,
    The problem is because of the inconsistency in the tables BBPM_BUT_FRG0060 and BBPM_BUT_FRG0061.
    From table BUT000 take the partner guid for the problematic vendor.
    Enter the partner guid as input to the table BBPM_BUT_FRG0060  . check the number of available rows.
    Now check the table BBPM_BUT_FRG0061 with the partner guid. check the number of rows.
    You must see the inconsistent number of records in these 2 tables for the partner, like 1 row in BBPM_BUT_FRG0060  and 2 rows in BBPM_BUT_FRG0061.
    Delete the invalid row in the table BBPM_BUT_FRG0061. That should resolve the problem you are facing.
    Regards,
    Sapna

  • Document Flow not updated using BAPI_GOODSMVT_CREATE

    Hi Experts,
    I am using BAPI_GOODSMVT_CREATE for doing PGR of an inbound delivery.
    Material Document(mblnr) is getting populated but Document Flow of that inbound delivery is not getting updated.Its status is Open.
    Can anyone knows how Document Flow can be updated using BAPI_GOODSMVT_CREATE??
    Regards,
    Puja.

    Hello Puja,
    Goto transaction SPRO, Go to Logistics Execution - Shipping - Basic shipping Functions - Configure Clobal Shipping Data, In this put a tick on Document Flow Update.
    Also refer to the below OSS note.
    http://service.sap.com/sap/support/notes/199703
    Regards,
    Thanga

  • Condition records  not generated in CRM from ECC

    Hi all,
    I have downloaded objects DNL_CUST_CNDALL, DNL_CUST_CND , DNL_CUST_PRC, from ECC to CRM successfully.
    I got all the condition types, access sequence and tables.including CUSXXX tables.
    I have also got few condition records for condition types SAPXXX . I am not able to get the condition records for the CUSXXX tables.
    Suggest me how to proceed further.
    Regards
    Yaswanth.K

    Yes I have checked the SLG1. There were one error..
    "No Entries Determined for the A Tables (Block         1)"
    I am not able to judge how to proceed with that error.
    The detailed Text is diapleyed under..
    Diagnosis
    No entries have been transferred from R/3 to CRM for one of the following reasons:
    1. The R/3 condition table does not contain any entries.
    2. The maintenance authorization has been transferred to CRM. This means that data in the R/3 condition table can no longer be downloaded from R/3.
    System Response
    Error message CND_MAP 312
    Procedure
    If this maintenance authorization has been transferred to CRM in error, this can be transferred back in exceptional circumstances so that a data download from R/3 is possible.
    Regards
    Yaswanth.K

  • Document flow not updated?

    I have created a inter company Schedule agreement . Then supplying plant have done delivery and PGI against this after doing picking and transfer Order .
    Now I am trying to do MIGO at receiving plant. While trying to save it's giving an warning message ''Delivery flow for delivery cannot be update'' .
    1. Please expalin why document flow is not updated?
    2. What I should do for updating the document flow?
    Please advise.
    Thanks

    Thanks Warwick. But can you please explain the logic of this message.
    Suppose I need document flow to be updated then what I can do.
    Please advise.
    thanks

  • Postcode can't replicate to CRM from ECC

    hi,guys,
       I found the postcode field and city field could not replicate to CRM from ECC,but other fields can replicate conrrectly.why?Our CRM system is 7.0 EHP1.

    Hi Raymond,
    Are you able to solve your problem. As I am facing the same issue. But I am trying to replicate from ECC TO CRM.
    When I am changing Address like City in R3 and checking BDOC in crm its green and showing change city. But when I am checkign Business partner master date change city is not reflecting.
    Regards
    Nishith

  • How to update Factory calender in CRM from ECC?

    Hi All,
    Factory calenders are downloaded to CRM from ECC, using adapter object DNL_CUST_CAL_C in Initial load (R3AS).  My doubt is, whenever a new holiday is added to Factory calender in ECC, how the particular added holiday will be downloaded to update the same in CRM system?
    Please help me.
    Regards,
    Maddy

    Hello Maddy,
    In my system download object DNL_CUST_CAL_C is for the download from the CRM (online) database to the old consolidated database (CDB, for the offline Mobile Sales scenario). You could see this in transaction R3AC3.
    For your scenario I don't know how to download. This thread here speaks of a manual adjustment in transaction SCAL.
    http://scn.sap.com/thread/274825
    Best regards,
    Thomas Wagner

  • Keynote document saved in icloud not updating with data from Numbers? is icloud the problem

    keynote document saved in icloud not updating with data from Numbers? is icloud the problem.
    If both files are held locally on the computer it looks like there is no problem however if you try and do it though icloud (ie your docs are saved on icloud) you dont get the "source" oprion besides the graph etc. Is this a but or a broken function due to the new implementation of icloud.

    Hi sebnor31,
    This is Visual C# forum, but your question seems not related to Visual C# language itself. It most likely related to the bluetooth message transaction protocal or with the device itself.
    I'll move your question to [where is this forum for...] forum where the morderator may direct you to the correct forum.
    Thanks for your understanding.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Unique data record means you can't  update a record from ECC with same key.

    Unique data record means you can't  update a record from ECC with same key fileds right?
    Details: For example i have two requests Req1 and Req2 in DSO with unique data record setting checked. on day one Req1 has a filed quantity with value 10 in Active data table. On day two Req1 can not be overwitten from ECC with Req2 with the same key fields but different value 20 in the filed quantity because of the Unique data record settings. finally the delta load fails from ECC going to DSO because of this setting. is it right?
    I think we can only use unique record setting going from DSO to cube right?
    Please give me a simple scenario in which we can use this setting.
    I already search the threads and will assign points only to valuable information.
    Thanks in advance.
    York

    Hi Les,
    Unique Data Records:
    With the Unique Data Records indicator, you determine whether only unique data records are to be updated to the ODS object. This means that you cannot load a data record into the ODS object the key combination for which already exists in the system – otherwise a termination occurs. Only use this setting when you are sure that only unique data records are to be loaded into the ODS object (for example, single documents). A typical application of this is in the loading of mass data. It improves the load performance.
    Hope it Helps
    Srini

  • Unable to proceed in change document are not updating in CDHD, CDPOS tables

    Hi all,
    This is a question related to Change document.
    I created one custom Change document object ‘ZBUDGETS’.
    As I am trying to place a trigger on FMIT (Total Funds Management) table I created a Change document object ‘ZBUDGETS’.
    I included some of the authorized fields from FMIT table on which we placed the trigger.
    And of course all those fields are change document enabled in the data element level. I generation of the update program was completed. And I got the function module zbudgets_write_document along with some include programs and structure.
    Everything is fine, But i am unable to get this change document generated information to these tables are CDHDR and CDPOS.
    the problem is when I make any expenditure like PO Posting, it will be logging in the FMIT table and the respective fields also updating. With this the Change document object should trigger and it should send the record in CDHDR and CDPOS tables. This is not happening. If the records are getting updated in the CDHDR and CDPOS tables I can use those include programs and function modules in my program to retrieve the changes in FMIT table.
    Since I am unable to proceed further since the documents are not updating in CDHDR and CDPOS tables.
    Prabhakar

    CDHDR and CDPOS will not be populated with entries only by creating the change document object.Change documents will be written to CDHDR and CDPOS tables only if the function zbudgets_write_document is called in the transaction which updates FMIT.
    You need to find an use exit in the transaction updating FMIT and call the function zbudgets_write_document in that exit.
    Refer the below link http://help.sap.com/saphelp_47x200/helpdata/en/2a/fa01b6493111d182b70000e829fbfe/content.htm
    -Kiran
    *Please reward useful answers

  • SC Item in Transfer process active - follow on document status not updated

    Hi Gurus,
        Follow on document is not updated in SRM after PO creation. Ours is classic scenario (SRM 5.5, ECC6.0) and passed thru the following steps - SC (FFT) created, document approved, sent to SoCo, purchaser assigned vendor and created PO, PO created in ECC.
    In SRM SoCo screen displays message 'PO created 45xxxxxxxxxx'  successfully. Checked the BE PO 45xxxxxxx that was created successfully.
    Ran BBP_GET_STATUS_2 and CLEAN_REQREQ_UP jobs. jobs finished successfully. But status is not updated in SRM. RZ20/SLG1 does not have any errors.
    BBP_PD shows following statuses:
         I105   Awaiting Approval         X
         I1021 Created
         I1038  Complete
         I1106  SC ordered
         I1129  Approved
         I1111 Item in Transfer process 
                        The last status I1111 is still active.
    Any advise are welcome. Not sure if I am missing any OSS Notes.
    Regards
    Viktor Paul

    Hi,
    1. Check in table BBP_DOCUMENT_TAB if the entry exists use CLEAN_REQREQ_UP program.
    2. If entry in the table not exists then check in transaction BBP_PD if the follow on document ( PO ) Number reserved for
    the SC .. then use FM  BBP_PD_SC_RESUBMIT.
    3. none of these use normal process  execute BBP_REQREQ_TRANSFER And then use CLEAN_REQREQ_UP
    Thanks,
    prasad.s

  • A contract modified in IS-U not updated at CRM

    Hi!!!
    I'm try to update the data of crm contract from sap isu contract, but isn't works fine, the status and the description of CRM contract for example is not updated. The Bdoc SI_CONTRACT is generated correctly, and the Badi's DOWNLOAD on ISU and CRM are enhanced with the fields, but the info is not updated in crm when initial load is launched or when a move-out it's do it in isu.
    Can you help me please?
    Regards,
    David

    Hi,
    Please tick the below checklist and tell me if they are set:
    1. Goto R3AC4. Is entry for object class BUPA present in the List. If not, add a new entry: Object class BUPA, RFC destination (destination of ISU)
    2.goto transaction SMOEAC and check if ISU site is subscribed is for BUPA_MAIN. If not, please do the same.
    3. Change and save a BP and check the status of the BDOC. Is it green? if not, let me know.
    4. goto ISU transaction SM30. table CRMRFCPAR. Is RFC destination for CRM maintained. If not, please do the same.
    Let me know if these things are in place.
    Best Regards
    Kaushal

  • 53A comm paper: Flow with update type MM1203- from 05.10.2011 was only fixe

    In TBB1 for a transaction of type 53A I get the message: ""Flow with update type MM1203- from 05.10.2011 was only fixed.
    What should I do in this case? And with which transaction?
    Edited by: EI18 on Feb 24, 2012 9:31 PM

    Hi,
    is this the 1st time you're posting this UT? If so, have you checked the "Indicate Update Types as posting relevant" customizing? If not, have you implemented SNotes recently? If so, check the OSS and in case there is no corresponding SNote to solve the problem -> create a OSS-message.
    Regards
    Lorenz

Maybe you are looking for