Document Flow to Production Orders from BOM

Dear SAP Gurus,
I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
Thanks and Regards
Geravine

Dear Geravine,
You can use a Production Scheduling profile to specify that in a production order or process order
particular business transactions are carried out in parallel
generation of document link from material master on order creation
generation of document link from BOM on order creation
generation of document link from material master on order release
generation of document link from BOM on order release
Include the check boxes for Document links for material and BOM both under order creation and order release.
Check in T Code OPKP.
But in my understanding only the document that are attached to the header and the items with D category alone gets
transferred to the production order.
Regards
Mangalraj.S

Similar Messages

  • Error while generating Production Order from Recommondation Report

    Hi..
    I have got few production orders to be created through Recommendation Report. 
    After getting them 'Checked' when i try to create production order, following error message appears :
    No matching records found 'Product Tree' (OITT) (ODBC - 2028) [message 131-183]
    Please let me know what went wrong ?
    Regards
    Rakhi

    Hi.......
    I think you are trying to make production orders who has no BOM. First prepare BOM and then Create Production Order from Recomemdation Report. Because it supports only Standard Production Order and not Special......
    Regards,
    Rahul

  • How do I insert a document in a production order?

    Hi
    Does anyone know how I can insert a document in a production order on the "Document Links"?
    I have a assembly drawing that I would like to be printed on release.

    Hi,
    As rightly said you can have the documents or document links in material master or in BOM. But if you prefer to have the documents attached to Document links in production order, you can assign those documents to the operation of production order and remember to maintain the document link activated for production order (PORDER) for the document type.
    Thanks.

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Table Name to see the Document Flow for Service Order - T. Code IW33?

    Hi,
    can u advise the Table Name to see the Document Flow for Service Order - T. Code IW33?
    Ravi.

    Hi,
    From SERVICE ORDER you cant get the INVOCIE NUMBER,
    You will get the SALES ORDER number for that Service order in QMEL table and fetch the Sales order and then goto VBFA to get the Invoice number for the sales order with the DOCUMENT CATEGORY M.
    hope it will serve you.
    thanks,
    santosh

  • Document flow in Purchase order

    Hi,
    How can check the document flow in purchase order(me22n).  Please help me on this issue..
    Thanks..

    HI
    There is no document flow like SD in MM
    Inorder to get the doc flow for a PO you can goto ME23N or ME22n and in item details click on PURCHASE ORDER HISTORY TAB here you will get the GR , IR etc.
    Alternatively you can goto table EKBE and enter the EBELN (PO number ) and execute you will get the doc flow
    regards
    Prashanth

  • Print out of production order from co02

    Hi All,
      How do I take a print out of production order from co02. If I go to co02- Functions-Print- I get an error that after the next update the order will be printed. Since the production order is already in the released state how do I take the print.

    Priya,
    What system is prompting is that once you use the print function in the change mode of the order, system prints the papers to Spool or Printer once it is saved, that is the reason it is giving you a message.
    Please save the order after using the Print function in the change mode of the order, I am sure that you would get the print output either directly to the printer configured or to spool. If it was configured for spooling, use the transaction SP01/SP02 to print the spool request.
    Regards,
    Prasobh

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • Accounting Document for a Production Order

    Hi,
    How to get Accounting Document for a Production Order?
    Please help.
    Thanks,
    Shiva

    Hi Shiva,
    Go to table bseg....
    retrieve belnr -
    > accounting document number
    for a particular aufnr-----> production order
    where bukrs = your company code.
    Regards
    Debarshi

  • Can we restrict the partially confirmed production order from getting delet

    Dear all,
    Can we restrict the partially confirmed production order from getting deleted?
    I.e. if the production order is having status PCNF then the deletion flag indicator (status DLFL) should not be allowed to set
    SmanS
    Edited by: SAP PP Consultant on Feb 4, 2009 6:12 AM

    Hi,
    Then must be there is change in BS22.Check allowed transaction setting for Status PCNF/CNF .For reference purpose compare it with other client IDES or sand box.
    For your reference I have pasted Error log on the same.
    Balance of ORD 1000000702 is not zero
    Message no. KO115
    Diagnosis
    The balance on object ORD 1000000702 is not zero. That is, there are still costs on the object.
    System Response
    The object cannot be closed and the deletion flag must not be set.
    regards,
    Dhaval

  • Restricting a production order from releasing

    Hi,
    How can i restrict a production order from releasing if material is not available?
    Regards,
    samir
    Edited by: wadajkar on Jun 2, 2010 2:51 PM
    Edited by: wadajkar on Jun 2, 2010 2:51 PM

    Hi,
    In t code OPJK at material avialibility check section maintain '3' i.e. do not release if components are not avialable.
    Regards,
    Vishal

  • Create production order from sales orders

    Hello,
    I am looking for some detailed documentation in order to make customizing in sales module. The aim is to create production orders from sales orders..
    Thanks  for your help

    See the following link from SAP help online:
    > http://help.sap.com/saphelp_47x200/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    It contains lots of useful information on Make-To-Order Production.
    I hope this helps.
    Gerard

  • Production order from sales order

    Hi experts,
    I have created production order from sales order through t-code co07, there it shows error "Sales order has no CO object" like this.. how to resolve this.
    Thanks

    Hi,
    KA01 configuration is must for CO object And OKB9 config where we configured the Cost Element to Cost Center basing on the profit center as we have the Automatic Acct Assignment.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Gneration of multiple Production Order from multi level BOM

    Hi Experts,
    My customer has multi level BOM. meaning child item also has its own BOM - 4 Level.
    FG-Pack - Make
          FG - Make
               SFG - Make
                    RM - Buy
    Their process is once they create Production Order for final Finished Good, System should also create Production order for child which it self are of make type and has own BOM defined in system.
    They wish that once the create Production order for FG-Pack, system should automatic generate production order for FG and SFG as both of these has BOM defined and are of procurement type Make.
    So first they will close the chile production order and receives qty. in ware house, they will issue this child qty. against main production order, and then completes the main production order.
    So they remains informed about the child item stock.
    My question is SAP Business One supports creation of multiple Production Order?
    BR
    Samir Gandhi

    Hi Samir Gandhi,
    There is no build-in function for this task. You need add-on or SDK for the job.
    If the sub level BOM items are phantom, you can create a big production order including all sub BOM components. That is system supported.
    Thanks,
    Gordon

  • Attached Documents in the Production order

    Hello,
    My question is:
    how to setup the system to be able from the Production order to see (and have access)  to the documents attached to the BOM and/or Routing?
    Thank you in advance.
    Peter

    Hi,
    In production order if you notice you should be able to find a link for documents. In the documents page you would be able to get the documents attached in the BOM (not sure about the routing, please check).
    But do note that this is just a link & the order does not store these documents, you will have to go to DMS (CV03n) to view the document.
    In OPKP (production scheduling profile) you select the option to link the documents on release.
    Hope the above helps.
    Regards,
    Vivek