You have to implement document Management module.
then it can be managed no of drawing for a material bom with versions.

Similar Messages

  • Text linkages from material master to purchase requisition

    I already set the text linkage between basic data text in material master with item text in PR. I left fix indicator blank since I want the text to be adopted automatically.
    I run MRP and create planned orders. Then I convert planned order to purchase requisition. Material master basic data text is not shown in purchase requisition. I tested using N and * and they both show. With N it shows (reading from material master) and I accnot modify it. With * it shows but I have to adopted to actually store the text as part of this document. With blank is not working. We want the text from material master to be automatically adopted in PR without manual intervention as with *.
    Thanks and regards, Jose Oyon.

    Hi
    If got ur query correctly : you want to make short text field in Preq as Display.
    If yes then go to Tcode OLME (or SPRO) -> Purchase requistion->Define Screen layout at doc level->select ME51N--->double click basic data, item and make short text filed as display.
    regards
    rahul.

  • Print DMS Document from Material master

    Hello All,
    Can you advice on how to Print the DMS Document as a smartforms  from Material master ?

    Hi Arvind,
    You have mentioned two different terminologies here.
    DMS
    Material Master
    From DMS, you need to download the attachment and the same attachment can be converted using the FM CONVERT_TO_OTF then try displaying the same into your smartform.
    I'm not aware of Material Master Document attachment.
    Will reply soon with that solution also.
    Regards,
    -Wahid Hussain.

  • Material Description to be overwritten in PR/PO from material master

    Hi,
    when we create a PO/PR from ME51n and ME21n the material description field is mandatory hence inspite of making setting as display only  in SPRO the inital screen will except any description and will save it.
    Is there any thing else by which the description data can be overwritten from material master so that even if the user enters any xyz description the system overwrites it from the material master.
    Regards,
    Reena

    Hi,
    You can very well achieve it by making the field "Material description" a  "Display" field in the IMG path:  Maintain screen layout at document level
    However, you have to use the right "Field selection key" to make the screen changes. For eg. for NB purchase order, the field selection key would be NBF and not ME21N.
    The field selection key that is applicable for the document type can be found in "Define Document types" img activity.
    I have checked this and it works perfectly fine for both PR & PO.
    Once you enter the material number in PR (or PO), the material description is brought from material master and then the field is greyed out. (thought initially the matl. description field looks editable).
    << Moderator message - Point begging removed >>
    Cheers.
    Prabhu S
    Edited by: Rob Burbank on Nov 24, 2011 10:24 AM

  • Reference a document in the material master

    I'm wondering if anyone can suggest a way that we can do the following....
    We basically want to have a field/location in the Material Master that will reference a document stored somewhere on a network server and in turn, display and print on the PO (the document name prints, not the contents). Any suggestions of where to start?
    So in the MM for Material # 123456
    MyField = "MyInspectionDoc.pdf" (MyInspectionDoc.pdx resides on \\mynetworkserver\MyInspectionDoc.pdf)
    Or
    Is there a way to have an attachment in the MM that will automatically be pulled into the PO when the PO is created (with the material item as a line item in the PO of course)

    I think you are mixing DMS (document management) with GOS (generic object services)
    GOS content is created as shown in your screen shots.
    You cannot even see from any transaction which materials have a GOS attachment. The GOS attachment can only be accessed from the object (material master) where it was created.
    DMS is a central component in SAP and embedded to the material master like it is done with classification too.
    You can create the documents in CV01N transaction and link to the material or directly from material master. you can use CV04N to search for documents
    In the material master you will find the link to the document in alternative data tab where you have as well your alternative units.
    This screen looks like this one:
    Those material master attachments/documents do not print automatically in a PO, for this you have to do some ABAP development

  • How to Remove batch mangement indicator from Material Master

    Hi
    I am trying to remove batch mangement indicator from Material master..but system does not allow
    Before this .. I have done all activities also ...clear open SD documnets ,deliveriy documents ,PO documents ,Process order teco and . reservations and activae deletion flag in  batch  ... and made current period  stock an previous period  stock zero... i have cleard all documnets ...still system does not allow remove indicator..could you please guide in this issue ..how to remove batch indicator.
    Regards
    Sasi

    Hi,
    Please refer the below links.
    Re: untick Batch Manegement Indicator on Material Master
    Remove batch management flag and deletion of material documents
    How to remove Batch Management in the Material
    Re: How to remove Batch Management Check in the Material
    Thanks.

  • Deactivate inspection type from material master

    Dears
    i have a inspetion qty with satus LTCA CHCR(Cancelled inspection lot)
    Now i need to deactivate inspection type from material master
    system not allowing to deavtivate as inspection lot was there
    how to remove the insepction qty form system
    Any tips
    Faisal

    Hi Faisal,
    Hi Faisal,
    Try this way,,,
    Run QA08
    Enter the Plant, Material Code
    Then go for the Fourth tab "Mass Processing"
    Activate the check box for Activate Despite Inspection Stock and Create Change Documents
    Then insert the inspection type.
    Execute
    System will prompt a screen similar to Inspection set up from MM02, there deactivate the inspection type and press Enter.
    Select the Line item and Save.
    Pls let me know if doesn't work.
    Regards,
    Shyamal
    Let's do it again, When you complete the following steps, are you getting any list of materials there? after completing it up to
    System will prompt a screen similar to Inspection set up from MM02, there deactivate the inspection type and press Enter.

  • PO text from material master

    I understand text maintained in material master appears in PO under that item. In some purchase order I don't want to print that text. Also I don't want to remove that from material master since I want to use that for other purchase orders.
    Can I delete or remove that PO text from purchase order without changing material master ?

    Hi,
    This you can control through copy control function.
    In SPRO > Materials Management > Purchasing > Purchase Orders > Texts for purchase orders > Define copying rule from item texts, there select material PO text and give the value for fix field as required.
    Based on the fixed indicator, the below mentioned controls can have.
    The text can be fixed (indicator "")*
    A text with the status "*" is then displayed in the document and can be adopted in the document if:
    You change the text and save the document
    You select the text and adopt it (Item -> Texts -> Adopt text)
    Until you adopt the text, changes in the master record will also be adopted in the text.
    The text is fixed (indicator " ")
    The text is copied into the document. Changes to the document text do not have any effect on the original text and changes to the original text have no effect on the document text.
    The text is not fixed (indicator "N")
    The text is only displayed in the document (i.e. it cannot be changed or printed).
    Regards,
    Prabu

  • Inter company PO is not pulling the valuation price from Material Master

    Hi Experts,
    We have a scenario, Inter-company PO with pricing procedure which pulls Material Price from Material Master (Std Price), similar to intra company PO
    Even after maintaining the std price in the supplying plant , system is not pulling the Valuation price from Material master only for a particular Material
    I checked the Plant level attributes ( for ex: Plant Mat status, client level status and everything looks fine )
    Could you guys please mention what would be the issue ?
    Thanks in advance
    Illayaraja

    Hi,
    Is there a routine which pulls the value? then you need debug with ABAP help for that routine where its failing to pull
    Thanks
    Diwakar

  • Purchase group in Purchase order from creator not from Material Master

    Hi All,
    Can you please help me with the next one?
    Points rewarded.
    In the materialmaster is purchase group 44B entered but
    The default purchase group of the buyer is 55C. Is it possible
    that the value 55C is automaticaly placed in the PO when
    the buyer creates the Purchase order?
    At this moment always the default value from Material
    master is proposed.
    Thank you in advance,
    Eric.

    Hi,
    You have to look at the overall process.
    The idea of the Purchasing Group is to indicate which buyer manages that material in that plant.
    SO when the system (or a user) generates a requisition for that item at that plant, the system then knows who should convert it etc.
    So my question to you would be, "why have you got a default P group in the material master record that is NOT the buyer who manages that item at that plant?"
    If several buyers share a list of materials then just use one P group for the "group" of buyers, instead of separate P groups for each buyer.
    The system doesn't have the option to automatically overwrite the P group on the requisition because this may be someone just "helping out" the buyer who is busy and so it does not mean that the requisition should be changed to be linked to this other P group.
    You already have the field "created by" on the PO and so if you need to report on who created what, then simply use this field instead of P group.
    But the P group on the material master (and therefore the requisition) shoudl ALWAYS be the P group that will convert reqs for this item plant combination.
    Steve B

  • Defaulting a PDF from material master to a purchase order

    Hi All,
    I am an SD cosultant working in MM also. I have a requirement wherein I can store some a PDF document in the material master and whenever I create a Purchase Order, the attachment should default in to the document. The idea is to send the PO by mail and also the PDF file should also be sent along with it.
    I do not have any idea about DMS and treid to look out for solution in this forum but am unable to find the right answer. Can somebody please help me by detailing the steps to configure this. I tried using CV01N and gave the material number as the object link. However, it does'nt get defaulted in the PO. It seems that I need to give th PO item in the object link and this does'nt serve my prupose at all.
    Any help would be greatly appreciated.
    Thanks & Regards,
    Vidya

    Hi Chris,
    Thanks a lot for responding. You have cleared my doubt and helped me save good time. We are open to some ABAP development including using exits. But I am not clear where to start with. I am looking at something like this:
    I shall store the document object in the material master first using the generic object service option. Whenever a PO is created it would issue an output using a smartform and print to PDF. Now the smart form would also print the object image with reference to the material number and it's object. My ABAPer tells me that he can modify the smartform to facilitate the image embedding. But I do not know how to develop the spec because I am not aware of the relevant tables and fields for the object. do you think this is feasible ?
    Thanks & Regards,
    Vidya

  • Shelf life from material master not flowing into purchase order

    Hai friend
    I have set a shelf life value in material master ( both minimum & Total shelf life). 
    But while creating purchase order, values are not flowing from material master to purchase order.
    The field is empty.
    How to configure, please help.
    Regards
    Rammohan

    1.activate batch management
    2.to calculate SLED production date/date of goods receipt is mandatory during GRN
    3.Maintain characteristic for production date MCH1 - LFWRT
    4.assign this to class
    5.Maintain this class to material
    6.Now do GR ,it will prompt for production date .based on this ,sytem will calciulate SLED
    hope it helps

  • Profit Center is not taken from Material Master

    Dear all,
    When we post material-related items from SD or MM with link to material/plant (as additional account assginment) then Profit Center is taken from Material Master. But when I manually (FB01 or even FBR2) post similar item with link to material/plant (as additional account assginment) then Profit Center is not taken from Material Master.
    Why this happen? How to fix it? We need to derive Profit Centers from Material Master for items that have links to material and posted via FI.

    >
    Jigar Thakkar wrote:
    > Hi,
    >
    > It will also take effect in FI, as we have defined the same. Status will be 3 (Other transactions + cross-company (orders + billing doc.) for Subsitution in T code 0KEL
    >
    > Regards,
    > Jigar
    Just checked this. It's not worked. This subst. not even called (I've checked w/ active Trace).
    So, the question is still open. How to derive PCtr from material in manual FI (FB01, FBR2) transactions.

  • List of material number with PO text from material master

    I want to get a list of materials number with PO text from material master. Can anybody help ?

    The purchase order texts maintained in the material master are stored
    as SAPScript text files in tables STXH (header) and STXL (lines). For
    material master records:
    Field TDOBJECT = 'MATERIAL'
    Field TDNAME = material number (MARA-MATNR).
    So you should be able to write a small report to extract the data.

  • Use of field "design documents assigned" in material master

    hi,
    kindly help me to use the field "design documents assigned" in material master. whenever i creat material master (MM01) in basic data2 view this field comes with grey/black No Link indicator. how to use this and for what .
    regards
    roshan s.

    Hi Roshan,
    Insted of using this field u can assign Document directly to the Additional Data tab.
    TO attach the document to Material Master go to Additional data ---> Document data, assign Document.
    You can confirm it by pressing F1 key by selecting that Field.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Jul 10, 2008 3:26 PM

Maybe you are looking for

  • Ord depreciation for fixed asset

    Hi, I have raised a credit memos of -$20 to bring down the value of the asset, however under the ord depreciation column is reflected as $60? I am suspecting is because the end of FY is another 3 more periods therefore the amount is multiple by 3x bu

  • Getting list of valid elements

    Say I have a Schema or DTD that says that <foo /> can have 1 or more <bar /> elements in it. When parsing through an XML file and I've got a reference to the "foo" node, is there a way to "know" that only "bar" elements can be a firstChild? Or when I

  • Is it safe to delete these files?

    I'm making a video in iMovie, and as it is around 15 minutes long, all the clips and audio I have imported into iMovie takes up a huge amount of space on my computer, which means I can't make the video into a file as there's not enough space on the h

  • Cp6 project not working on tablets

    Hello.  I have a Cp6 project that I published as swf and html5 (combo) which runs perfectly on a PC with Windows 7 using either IE9 or Google Chrome. This project is also SCORM 1.2 enabled and works fine on the LMS - either SCORM Cloud or the client'

  • Debugging invokeMethod call

    Dear All When debugging OAF code using JDev, I normally use F8, F7 and/or SHIFT+F7 to step through the code. The question is how do you 'Step Into' a method that is called using the an Application Module's invokeMethod API. For example : String resul