Documents in Third Party Processing.

Hi
       What are all the documents that get created in Third Party Sales Processing?
I am confused as to whether we create a delivery for the purchase order following sales order or we do just goods receipt followed by invoice receipt. Don't we create the delivery that is made by the vendor to the final customer.If yes, is it done wrf to purchase order from VL10B or wrf to sales order from VL01N.
Plz clarify.
Regards
Mahesh.

Hi,
hi
Customize the third party sales in summary:
1. Create Vendor XK01
2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and,   therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing     
SD -  3rd party sales order Create Sales Order
VA01
     Order Type
     Sales org, distr chnl, div
     Enter
     Sold to
     PO #
     Material
     Quantity
     Enter
     Save
SD -  3rd party sales order View the PR that is created with a third party sales order
VA01
     Order Number
     Goto Item Overview
     Item ->Schedule Item
SD -  3rd party sales order View the PR that is created
ME52N
     Key in the PR number
     Save
SD -  3rd party sales order Assign the PR to the vendor and create PO
ME57
     Key in the PR number
     Toggle the "Assigned Purchase Requisition"
     Execute
     Check the box next to the material
     Assign Automatically button
     Click on "Assignments" button
     Click on "Process assignment"
     The "Process Assignment Create PO" box , enter
     Drag the PR and drop in the shopping basket
     Save
SD -  3rd party sales order Receive Goods
MIGO_GR
     PO Number
     DN Number
     Batch tab , click on classification
     Serial Numbers tab
     Date of Production
     Flag Item OK
     Check, just in case
     Post
     Save
SD -  3rd party sales order Create Invoice
MIRO
     Invoice Date
     Look for the PO , state the vendor and the Material
     Check the box
     Clilck on "Copy"
     Purchase Order Number (bottom half of the screen)
     Amount
     State the baseline date
     Simulate & Post
     Invoice Number
     *Invoice blocked due to date variance
SD -  3rd party sales order Create a delivery order
VL01N
     In the order screen , go to the menu Sales Document , select "Deliver"
     Go to "picking" tab
     State the qty and save
SD -  3rd party sales order Create a billing document
VF01
     Ensure that the delivery document is correct in the
     Enter
     Go to edit -> Log
     Save
Reward points if helpful.
Regards,
Amrish Purohit

Similar Messages

  • Problem in third party processing billing document

    dear all,
    I am facing problem in creating the billing document for third party processing.
    The error is : Item category ZEXM TAS cannot be invoiced by using billing type ZFAZ.
    I think the problem is  in copy control for billing document item . Kindly tell the solution.
    Thanks...

    Dear Buddi ,
    Now , the billing document is getting saved after changing the copy control for item category.
    But , the system is giving error ( The accounting document is not generated ) .
    I have checked all the settings in VKOA against the account keys maintained in pricing procedure for this merchant exports case.
    One another problem related to this issue is : Which setting is required to capture the Price maintained in item - > conditions at the VA01 level in EUR or USD . I have maintained the condition record in EUR in VK11 , but still while making order , the error is coming mandatory condition type ZBPR( Basic Price ) is missing .
    Awiating your response .

  • Third Party Process and Inventory

    We are using the SAP function "Third-Party Processing". We are using the function in it's standard (SAP R/3 4.7).
    The auditor now has the following issue: Shipping the goods starts after paying the goods. Out of this, while shipping the goods, we are the owner of them. In this circumstance the ship is our warehouse.
    SAP does not allow an Inventory Management within Third-Party Processing:
    "Since a third-party order involves a movement from the vendor direct to the customer, Inventory Management is not in any way affected. If you wish to document the movement in the system, however, you can create a goods receipt for the third-party order."
    With the SAP functions in this scenario it is correct that the warehouse stock is not being impacted. This is a conflict with the opinion of the auditor.
    Let me explain in detail what is wrong out of the view of our auditor:
    For example we initiated the order of a customer in June and we have paid the goods in June. The shipment starts in June and the goods will arive in July. Due to the fact, that we are the owner of the goods on the ship, we have to increase the stock. This is the opinion of our auditor.
    Does any body know, how to solve the issue? How do you manage Third Party Processing & Inventory?

    Some auditors just dont understand the SAP process. Instead of talking to weak users, they should talk to SAP directly.
    What about shipments from standard sales orders that are shipped end of June and do arrive at the customer in July?
    When do you bill your customer? when the goods arrives there, or earlier? Depending on the Incoterms you may still be the owner until the truck is unloaded.
    If you change your process and post goods receipt to your warehouse, then you show inventory where no physical inventory is, you posted a goods receipt without a physical receipt. I am sure the next auditor will not allow such therotical process.
    Get together, IT consultants of FI and MM and SD, strong business people for the same modules and the auditor, and discuss and find an optimal solution.And let the auidor sign the decision paper!!! Very important, I recently had to convice German auditors because they had different opinion than the Australian and US auditors of the same auditing company (and the issue had nothing to do with local legal requirements).

  • Third Party Process ASN

    We have configured a third party process for specific sales orders.  We receive an inbound ASN with shipment information and then we create the outbound invoice, directly from the sales order, after we post the inbound invoice.  Is it possible, and how, to create an outbound ASN, from our system to the end consumer, based on the information in the inbound ASN?  We would prefer not to create an outbound delivery document in our system and would like to generate the outbound ASN off the outbound invoice or the original sales order.
    Thanks for the help.
    Chris

    We have configured a third party process for specific sales orders.  We receive an inbound ASN with shipment information and then we create the outbound invoice, directly from the sales order, after we post the inbound invoice.  Is it possible, and how, to create an outbound ASN, from our system to the end consumer, based on the information in the inbound ASN?  We would prefer not to create an outbound delivery document in our system and would like to generate the outbound ASN off the outbound invoice or the original sales order.
    Thanks for the help.
    Chris

  • Third party process - error

    Dear all,
    In the third party process, have we to create outbound delivery?
    I have created PO from PR of  a third party sales order. And now, i don't understand to delivery to customer.
    Pls tell me solution.
    If we have to create outbound delivery from that sales order, i get errors:
    Item category TAS is not defined and Item category TAS is not defined, so item 000010 will be disregarded. I also checked in VOV4, VOV6, VOV7.
    Thank you,

    Hi
    In third party scenario the material is delivered to your customer thro out side vendor
    You are billing your customer
    Vendor is billing you for the material he has delivered to your customer
    Here we dont make any delivery
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material u2013 Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background 
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO 
    7. Goods receipt MIGO 
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the configuration and,   therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing
    SD -  3rd party sales order Create Sales Order
    VA01
          Order Type
          Sales org, distribution channel, div
          Enter
          Sold to
          PO #
          Material
          Quantity
          Enter
          Save
    SD -  3rd party sales order View the PR that is created with a third party sales order
    VA01
          Order Number
          Go to Item Overview
          Item ->Schedule Item
    SD -  3rd party sales order View the PR that is created
    ME52N
          Key in the PR number
          Save
    SD -  3rd party sales order Assign the PR to the vendor and create PO
    ME57
          Key in the PR number
          Toggle the "Assigned Purchase Requisition"
          Execute
          Check the box next to the material
          Assign Automatically button
          Click on "Assignments" button
          Click on "Process assignment"
          The "Process Assignment Create PO" box , enter
          Drag the PR and drop in the shopping basket
          Save
    SD -  3rd party sales order Receive Goods
    MIGO_GR
          PO Number
          DN Number
          Batch tab , click on classification
          Serial Numbers tab
          Date of Production
          Flag Item OK
          Check, just in case
          Post
          Save
    SD -  3rd party sales order Create Invoice
    MIRO
          Invoice Date
          Look for the PO , state the vendor and the Material
          Check the box
          Click on "Copy"
          Purchase Order Number (bottom half of the screen)
          Amount
          State the baseline date
          Simulate & Post
          Invoice Number
          *Invoice blocked due to date variance
    SD -  3rd party sales order Create a delivery order
    VL01N
          In the order screen , go to the menu Sales Document , select "Deliver"
          Go to "picking" tab
          State the qty and save
    SD -  3rd party sales order Create a billing document
    VF01
          Ensure that the delivery document is correct in the
          Enter
          Go to edit -> Log
          Save
    Hope the process is very clear to you now
    Regards
    Raja
    Edited by: ramanathan raja on Sep 18, 2008 3:06 PM

  • PO based billing in third party process

    How can the Sales Billing be based on the PO net price in a third party process?
    The copying requirements are set up with price source A = Purchase Order
    And the pricing type is = C (copy manual and redet. others)
    The billing quantity is = E (GR based)
    ...but still the billing net value seem to be taken from the sales order and not from the PO?
    We want to bill the customer whenever we have done partial goods receipts for the PO item.

    hi,
    in standard you have only limited possibilities (it's working only for VPRS).
    Let's say your condition is PR00 in the PO. If you wan't this in your billing document, you have to have it in your pricing procedure in the same line, with the same name and same text:
    PO
    n. 1. PR00 standard price
    invoice
    n. 1. PR00 standard price
    Balazs

  • Goods issue in third party process

    Hi All,
    I have done third party process. But I am not clear for goods issue to the customer.
    We will place goods at customer premises at the time of goods receipt with purchase order reference. In this flow will place goods to customer place directly. Why should I go once again goods issue to customer and which document reference can I do.
    Thanks
    Nagi

    Hi
    In Third party scinerio their is no need to issue  stock to customer or vendor,
    In system when we do GR stock is consumed that momvent, after GR quantity is not update.
    Regards
    Chandrajit Patil

  • GR in Third Party Process

    Friends
    I read threads regarding Third Party Process but it made me more confused. Jus want some clarification.
    1.Does GR take place in third party process or not and if not then how can we make it happen.
    2.We want customer invoice to be created before MIRO. Can we do it. If yes then how.

    Hi,
    1) There are two types of Third Party Processes: -
    a) Third Party Process without Shipping Notification
    b) Third Party Process with Shipping Notification.
    Third Party Process without Shipping Notification
    In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. The standard sales order automatically creates a purchase requisition for the materials to be delivered by the third-party vendor.
    The incoming invoice from the vendor updates the billing quantity, so that the customer-billing document can only be created after entering the invoice from the vendor.
    Process flow: Third party Sales Order --> Convert purchase requisitions to purchase order --> Approval of purchase orders --> Invoice verification  --> Billing
    Third Party Process with Shipping Notification
    For this process, the vendor sends a shipping notification. The incoming invoice from the vendor updates the billing quantity, so that the customer-billing document is only possible after entering the invoice from the vendor.
    The vendor then sends a shipping notification. After that a statistical goods receipt is posted. The incoming invoice from the vendor updates the billing quantity, so that the customer-billing document can only be created after entering the invoice from the vendor.
    Process flow: Third Party Sales Order --> Convert Purchase Requisitions to Purchase Order --> Approval of Purchase Orders --> Post Statistical Goods Receipt  --> Invoice verification  --> Billing
    So, technically the 3rd Party Sales w/o SN is commonly used - whereby no GR is required. GI and GR process is between the vendor and the customer in the Sales Order. Once customer confirmed received, only then there will be incoming invoice from the Vendor, which then MIRO and Billing follows..
    2. Standard SAP practice.. it is recommended to perform MIRO before Billing, as the vendor has to advice us that our customer has received the goods of the quantity ordered, which only then we can bill the customer according to the quantity received by the customer.
    Thanks.
    Hope this helps.
    Rgds.

  • Intercompany invoice not getting created in third party processing

    Dear Gurus !
    I am facing a problem in creating the intercompany invoice in case of third party order processing.
    In our organisation , for any type of sale two billing documents are creared :
    1) Commercial Invoice under the co. code for which sales org. is maintained at the sales order bookin level .
    2) Intercompany Invoice under the co. code in which plant is maintained which is used at the sales order level as delivering plant.
    So, as per the configuration req. for third party processing  , i have created Sales order ( with automatic Purchase requistion generated ) , Purchase order creation with reference to the Purchase requisition , goods reciept ( MIGO ) and invoice reciept ( MIRO ) , then billing doc. or commercial invoice ( VF01 ) with the generation of accounting document and finally the intercompany invoice ( VF01 ) .
    But i am facing the problem in final stage , that is , intercompany invoice creation .
    Error Message : No open billing quantity has been determined .
    I have checked the copy control for sales order to intercompany invoice and still not able to resolve it .
    Please reply which setting needs to be done for this .   
    Awaiting your response , that what copy control settings is required .
    Thanks .....

    Hi Buddi / Mahesh / Kiran ,
    It ' s good to see all of your opinion . But my problem has not been resolved .
    I am implementing third party processing in my organisation , where the customer is an export customer ( outside India ) . Hence , this is a merchant export .
    All the configurations / Customisations have been done for this process .
    The process is running fine till commercial invoice , but the problem is in intercompany billing doc. creation.
    I am again repeating - Error message : No open billing quantity has been determined.
    Explanation of the process :
    1) The order has been booked with item category TAS alongwith the item cat. group as BANS for the material used in the order .
    2) The sales area is 1020 / 30 / 35 . Here , 1020 is sales org . under company code 0079 , 30 is export's distribution channel and 35 is the division for components .
    3) The delivering plant used in the sales order is 1009 which is under co. code 0077. The price / condition record maintained for this material is in USD / EUR as it is a case of merchant export .
    4) The purchase requisition is generated automatically when the order is saved . It can be seen at VA02 - > Item details - > Schedule Lines .
    5) With the help of this PR no. , i have created a purchase order for vendor which is maintained under co. code 0077 asking for material in plant 1009 which we need to export / supply to the customer.
    6) The value of material per piece in the P.O. is coming from the material master record -> Accounting 1 view - > Moving av. Price .
    7) Now, the Purchase order is saved . With the help of this P.O. no. , goods reciept ( MIGO )is done .
    8) After MIGO , Invoice reciept or MIRO is done under company code 0077.
    9) After MIRO , customer ' s invoice is created through VF01 .
    Remember : This is an order relevant billing , no delivery or PGI will happen here because the material is not coming into the plant 1009 .
    10)The billing document ( order - related billing doc.) is created and the accounting document is also created under co. code 0079 in USD .
    Till this stage , everything is running successfully as per business requirement , but i am facing the problem in the final stage , that is creation of intercompany invoice under co. code 0077 which is in INR .
    In all other sales document types used in our industry , the process is same , that is : a) Sales order creation b) Delivery and PGI c) Billing doc. creation with accounting doc. under co. code 0079 and finally d) Intercompany invoice with accounting doc. under co. code 0077 and excise invoice creation with reference to intercompany invoice.
    In the above, problem is not there becuase orde is delivery relevant , hence copy control is maintained for interco. billing to delivery type.
    But in the new process , that is , third party processing , sales order relevant billing is done . so i suppose there will be a copy control for intercompany billing and sales doc. type , but i am not able to resolve it .
    Hence , please understand the process before suggesting .
    Thanks and awaits reply........

  • About third party process

    hi friends,
    in third party order processing what is the need of creating purchase requisition, cant we create purchase order with out refrence to puchase requisition?
    Thanks and regards
    sudhakar

    hi
    Yes, wat you said is correct we can create PO with Reference to PR.
    In some situation we need to show this information to the auditing people ( Internal Process ) for that they need to show the reference doct, beacause of this order only we are created PO..
    And also one more scenario
    One customer is palcing material for 100 item but we have only 80 in that case we need to deliver the good the customer from our third party vendor in this sitution also we need some refrence document which is linked to Our Order..
    Because we need to create PR
    Ihope it is clear, Rewards if it is Usefule
    Regards
    Durga Prasad
    Third Party Process
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Clilck on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save

  • Requirement to bill customer before vendor invoice in third party processing

    We have a requirement to bill a customer before the vendor invoice in third party processing. The reason behind this is because the vendor send invoices only once in a month and the customer cannot wait for so long to to receive their invoice from the business.
    I saw some discussions that the third party processing with shipment notification can be used however when I check the business flow in that case I see the following.
    A Third-Party Sales Order is created and a purchase requisition is generated automatically 
    A list of purchase requisitions to be assigned is displayed 
    The assigned purchase requisitions are converted into purchase orders 
    The purchase orders are approved 
    A statistical goods receipt is posted 
    The vendor invoice is verified and posted 
    The billing is created
    It clearly says that the customer billing document is only possible after entering the invoice from the vendor. Which would be the best way to fullfill this requirement?

    Do you mean the goods issue done by the vendor to the customer in the vendor system? And this quantity will be copied into our ( where the third party order is created) system?
    No, MIGO done by in our company system only. May be you might have misunderstood because of  my sentence.instead of company i mentioned as Vendor.
    For Vendor this process will become as standard sales and he will do PGI. However in our system we do MIGO .
    Suppose the customer ordered 10 Qty. Vendor delivered 2 Qty wouldn't the above equation Order qty- MIGO qty= Invoice qty be 10-2= 8? but we should be really billing the customer only for 2 right?
    No you have mistaken my idea, it was not a formula just i was giving example.
    Billing qty is nothing but it is qty copies from source document to target document.
    E
    Goods receipt quantity less invoiced quantity
    for example order qty is =10 and vendor delivered first time 2 qty to the customer and he billed our company for 2qty and we billed the customer for 2 qty.
    And next time let us assume again Vendor delivered 4 more qty and billed us 4qty.And this time when you are billing the customer in VF01 system will propose the 4qty only( total goods receipt qty 6 - already invoiced qty 2).
    Hope now you understood the meaning of E(goods receipt qty less invoices qty).
    And did you try your requirement as mentioned in my first reply?
    thanks,
    Srinu.

  • Re Third Party Processing Interview Questions

    Hai Friends
    This is the similar type of Questions I  faced in the interview.
    a. Explain the third party process
    b. What is the item category used?
    c. How will a PR or a PO get created automatically? What are the settings required?
    d. Is it necessary to make a Goods Receipt before creating the Invoice Receipt? What are the setting involved?
    e. When does a customer invoice get created?
    pl mail me the solutions to these Questions to my mail id <REMOVED>
    Message was edited by:
            Yathish K

    Hi
    Third party order processing is as follows:
    Assume three companies X, Y and Z
    X - The company,
    y - The customer
    Z - Vendor
    When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
    If he is procuring the goods, there are two methods that are generally followed:
    Method 1) After receiving the PO from Y, X creates a sales order against Y.
    Now at the same time he also creates a PO to a vendor Z to produce the goods
    Z produces the goods and supplies to X
    X receives the goods from Z
    Then X delivers the same goods to Y.
    After that X invoices Y and Z invoices X.
    Note : Here there is no direct/ Indirect relation between Z and Y.
    This process is known as Trading Process. and the Material here is created  with Material type HAWA.
    The other method is a Third party order processing method:
    Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
    X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
    Now Z supplies the material to Y and acknowledges the same to X.
    Z  will send a copy of delivery acknowledgement and invoice to X.
    After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
    The next step for X  is to create an invoice and submit to Y
    Only after the invoice verification document is posted  then only X can create an invoice for Y.
    This is the business flow that is followed for third party order configuration.
    There are few steps that have to be configured to enable the system to function as mentioned above.
    Step1)
    If you are always followwing a third party process for a material then you have to create the material using item category group BANS.
    The procument type should be marked as External procurement (F) in MRP 2 view of the material master record.
    if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurment ( in house manufacturing and external procurement).
    step 2)
    the item category in the order should be manually changed as TAS.
    For that you need to confugure the item category determination
    ord type + item cat grp + usge + Hiv level = Item cat + Manual item cat
    OR + NORM +      +       = TAN . + TAS
    OR + BANS +       +       = TAS
    Step 3)
    make sure that during the item category configuration for TAS  you need to mark relevnat for billing indicator as F
    step 4)
    The schedule line cateogry for this type should be CS.
    make sure that you mark  subsequent type as NB - purchase requisition  in this schedule line category as this will trigger the purchase requision order immediately after the creation of the sales order and the PO to vendor is created against this purchase requiesion.

  • Logical GR in Third Party Process

    Hi Friends
    There is logical GR involved in third party process. What if we do not want to trigger it?

    very useful thraed for your Qn-
    [stock not updating after doing MIGO (gr) for third party sales |stock not updating after doing MIGO (gr) for third party sales;
    BR
    Raj

  • Free of charge third party process.

    Dear Gurus,
    I want to create a sales order with a third party material with zero price, create a PO and invoice the PO with zero value.
    Could you please tell me how this can be achieved and what are the necessary settings in config to be changed?
    Thank You
    Kumar

    Hi Kumar,
    the third party process is as follows:
    1.Customer will order the material from the Company X.
    2.Company X will not have stock of the material.
    3.Company will raise a PO for the material to the Vendor & asks the Vendor to deliver the material to the customer.
    4.Vendor will directly deliver the material to the customer & will send the invoice to the Company X.
    5. Company X will then raise a invoice to the Customer wrt on the Sales order.
    Create a Sales order with item category TAS, Schedule line category CS(standard).Once the SO is saved, go to the change mode of the SO, go to Schedule lines tab, & note down the PR number.
    With reference to the PR, create the PO & then MIGO and MIRO.
    Then create the invoice wrt the SO.
    Let me know if you hav any problems.
    Regards,
    MP

  • Credit Check with Third Party Process

    Hi Gurz,
    I know about third party process but my problem is with credit check of the customers.
    If customer has not got enough credit limit to process the order in normal senario credit controller has to manually release the order as system blocks it. In third party process system will give you warning message when saving sales order about customer credit limit but allows you to save sales order. Once saving sales order it authomatically creates Purchase Requisition. From PR purchasing creates P.O. with out knowing about customer credit limit issue. and so on. In other words goods supplied to customer even though credit limit has exceeded. This user don't know untill raising the invoice to the customer which is too late.
    Can we stop creating Purchase requisition or block purchase requistion for credit check ? or there are better way of handling the process for credit check?
    Thanks in advance

    Hi,
    Try to implement OSS note -738171 - Delivery block does not influence purchase requisition.
    Following is the details of the note;
    Summary
    Symptom
    The delivery block in a sales order does not prevent the generattion of the purchase requisition in a third-party or individual purchase order item. Regardless of the Customizing settings in the delivery block, the system confirms the TAB or TAS item and generates the purchase requisition.
    More Terms
    Order, purchase requisition, PReq, TAB, individual purchase order, individual purchase order item, TAS, third-party, third-party item, SD order, delivery block, VBAK-LIFSK, VBEP-LIFSP
    Cause and Prerequisites
    Solution
    Create a user-specific user requirement (for example, 902: BEDINGUNG_PRUEFEN_902 in Include LV07A902) as a copy of standard user requirement 102 and assign it to requirement 'Preq' by using Transaction OVB5.
    In the source code of the user-requirement, program a check for the delivery block which, if necessary, triggers an ERROR_EXCEPTION which prevents the generation of the purchase requisition.
    You can use the existing check for the credit block as a template.
    Regards,