Does JDE-E1 Captures Scrap/Damaged Quantity at Component Level

Hello: I was looking if anyone could point out if JDE-E1 would be able to capture the scrap quantity of component issued to a work order—I do see that the quantity scrap is available in the Work Order completion module for the finished goods items—but don’t see the option to enter the same in the component level transaction. Any insight in this regards is highly appreciated—Thanks, in advance.

Yes it does. The material issues program P31113/Component Scrap P31116 will do this. You have to issue first, before you can scrap.

Similar Messages

  • If my device does not respond in MAX does it mean it is damaged?

    I was using an example vi to acquire digital data, however the output LEDs on the vi front panel started to show random results.  So I closed the vi down and tried again but nothing happened at all?  So I went to check acquisition in MAX and the following error message was displayed:
    The device is not responding to the first IRQ level.
    Does this mean I have damaged the PCI card?  If it does,  will it cost a lot to get fixed and how long will it take to get it back in working order as I have to complete my labview project by early december.
    cheers

    Hi Hannah
    I'm using PCI-6034.  I was able to acquire data in MAX and LabView vi's for the last couple of months so I am presuming that it must have been set-up correctly, although I could be wrong.  I am also concerned by the fact that I could smell a hint of burning coming from the PC when I was performing the last acqusition before MAX could no longer acess the card. 
    I am guessing that this means the card is fried?  Can it be repaired or will it have to be replaced?
    cheers  

  • What are Apple doing to compensate for the damage caused by the iPhone 4 bumper?

    I have noticed damage caused by the bumper.
    It is NOT foreign object but caused by the hard plastic on the inside of the bumper
    (plese do not come out with rubbish like steel is harder than plastic) I am not stupid and I know that the damage matches the pattern of the bumper skeleton.
    What I want to know is when are Apple going to deal with this and replace my phone?
    I dare not go to the so called Genius bar in Milton Keynes as they have adopted a Dixons style "fob off" attitude and I will become rather angry with them.

    Re: What are Apple doing to compensate for the damage caused by the iPhone 4 bumper? 
    15-Jun-2011 15:15 (in response to sfrommilton keynes)
    o Steel is harder than plastic, so the bumper has not caused the damage.
      - You call it rubbish
      - The world calls it physics
    You are totally wrong.  Please go back to School.
    o You can deny physics
      - but that will not change reality.
    You can go to School but that wont change reality.
    o Your description of your Genius bar is incomprehensible
      - I recommend you go to the Genius bar leaving the chip on your shoulder at home and tactfully explain what you think is your issue.
    I recomend you find a day job ans stop TROLLING peoples threads.
      - I've never had them fail me or be the least bit confrontational.
      - But if you act like a jerk then I couldn't predict what would happen
    Yeah because you were there.  Are you having some kind of relationship with the company?  I think you sleep with an Apple under your pillow.
    Finally I am a consumer who has paid for a product that is not living up to expectations.  The plastic skelton is hard and abrasive (I know what that means as I went to School) Abrasion's are marking the product. 
    This is not the only time this has been reported and as such I have no issue with particles entering the bumber.  This has happened from the start (when I used Apples stupid bumber case)
    Please don't patronise or TROLL others threads.
    <Edited by Host>

  • Capture ERFMG - Requirement quantity for a component

    Hi All,
    I have a requirement where in i need to capture the requirement quantity for a component(ERFMG).
    The problem is the value exists only at runtime in the following structure MDPM.
    I am writing the code in an exit   EXIT_SAPMM06E_013 where in i cannot capture this value from this structure.It is not storing in a database table also . how can i get this value  ?
    Kindly help.
    Priya.

    Hi,
    Thank you for your post!
    It is exactly what I have done but as I above mentioned:
    Subsequent problem
    The system schedules the dates correctly on the component level, but re-schedules the dates for the project the day you schedule and erase the complete old scheduling dates except for the activities with constraints.
    If I have an "old" scheduled project and I add some new components anywhere in the complete project structure additional needs. I go then to the project definition level and schedule the complete project. My result is that on project definition and WBS elements no changes but on all activities (without confirmation) the system put the start date the day which I re-schedule the project.
    That what I want  to avoid and let the initial planned schedule date on activity level the same as before re-scheduling the project.
    Do you have any further advices?
    Thank you in advance for your input
    Best regards

  • HT202696 Does Apple care cover water damage?

    Does Apple care cover water damage?

    Applecare+ in the USA covers water and other physical damage, less the $79 deduactabe.
    http://store.apple.com/us/product/S4575LL/A/applecare-for-iphonev

  • Ive cracked my ipod touch 4g screen does my waranty cover accidental damage for cracked screens and if it does do i just take it into an apple store for repair?

    ive cracked my ipod touch 4g screen does my waranty cover accidental damage for cracked screens and if it does do i just take it into an apple store for repair?

    The warranty does not cover accedental damage like a broken screen.  However, some time the Genius at the Genius Bar of an Apple store will replace the iPod at not cost.  Make an appointment at the Genius Bar and ask. If not under warranty, Apple will exchange yours for:
    Apple - Support - iPod - Repair pricing

  • Msi x99 gaming 9 ack does not detect capture card when using with xsplit

    msi x99 gaming 9 ack does not detect capture card when using with xsplit
    i install every but still it does not work.

    Hi
    It wasn&#39;t hard to find your motherboard version:
    http://www.msi.com/support/mb/Z68AGD80_B3.html#down-bios
    Since your BIOS is v20.1, it couldn&#39;t be G3 
    Apart from checking BIOS, you can only check motherboard or moth...

  • Po quantity and Component qty should be same Whildoing Subcontracting PO.

    Hello friends
    I need to do the following setting.
    While doing Subcontracting Purchase Order the Ordered Quantity  entered is to be reflect  Component Quantity.  ( Without entering component qty, automatically ordered qty should come in component qty). The reason is that user should not commit any mistake while doing po.
    Where can i control this. Is there any customization setting or Material Master setting.
    Please give me suggesition. Urgent.
    Thanks and Regards
    Sitaram

    Hi Sitaram,
    As you have maintained the BOM for that material/Plant.
    The finished material and components are maintained with the quantities,
    When you creating  the Subcontracting PO you enter the Material number in the item level
    in the material data tab you have 2 options Components and Explode BOM,
    If you click the Components the system will ask you to enter the components and their quantity.
    If you click the Explode BOM system will pick the components and their quantity from the BOM which is already maintained for that finishing material.
    So no need to maintain the quantity manually by Users, if you use explode BOM options.
    rgds
    Chidanand

  • Round Requirement quantity of component for subcontracting

    Hello,
    I need to round a requirement quantity of component   in subcontracting PO automatically? So in MD04 it shows as rounded quantities not just the base on BOM cmponent quantity ( Only for component what we send to vendor not the kit we recieving back ).
    Any help will be appreciated!
    Best Regards,
    Owais
    Edited by: Owais on Jul 8, 2011 3:13 PM

    Hello,
    It just help planners to plan better.
    We already cofigured so the components gets pick at rounded value on WM side. Its just MM side, if we can round the value for subsequent requirements. (Component requirement QTY - ERFMG)
    Any Help!!!
    Thanks.

  • Does Touch have "remove color cast" and adjust lighting - levels like Photoshop Elements?

    Does Touch have "remove color cast" and adjust lighting -> levels like Photoshop Elements?

    There isn't a "remove color cast" command per se but there are Levels and Curves adjustments so you can effectively remove/diminish colors yourself.

  • IPone 6, iOs 8.1.2 when removing the phone from the charging does not reflect the increase in the percent charge level , by reconnecting displays correctly

    when removing the phone from the charging does not reflect the increase in the percent charge level , by reconnecting displays correctly

    Addendum
    Last night charging for around 3-4 hours only charged a dead phone by 55% then left it to charge overnight
    Today the battery dropped from 6:15 am full charge to 53% at 10:38 am at time of writing this with
    1 phone call out for 30 secs
    1 incoming missed call,
    Whatsapp fetched around 10 msgs
    Email fetched around 20 ermail from 4 accounts but not viewed yet on phone

  • Capturing the apperance of a component before it gets visible and laid out

    Basically, I'm trying to make components fade in. My strategy is to create a BufferedImage instance, and have the component paint on this image (aComponent.paint(img.getGraphics()). When I have the BufferImage, I can easily use Java2D to make the image fade in, by blending it with the background. When the image is fully shown, I simply show the real component instead of the faux image.
    This all works fine, if the component has already been shown, and I want to capture an image of the component and fade it out. The problem is, when the component has never been shown (and been laid out by the layout manager), all I get is a gray image. I have been trying various things, like calling aComponent.doLayout(), and then I usually do get a few of the sub-components painted (that in turn make up the component I'm referring to), but not all of them, and the layout seems wrong. For example, a left-aligned text field (again, part of the component I'm trying to fade in) might appear as it should, whereas a layout-sensitive component such as a JEditorPane will not have gotten its proper size, and other sub-components still will not even be present.
    Are there are Swing gurus present that can help me sort this out?

    Thanks for all your suggestions. Actually, I'm not only trying to fade the component in, I'm also rolling it up and down. The code I'm working with is based on Fr�d�ric Lavigne Apache-licensed JTaskPane (http://common.l2fprod.com/), which supports expanding and contracting an image of a component.
    Basically, the way JTaskPane works (and more specifically, the JCollapsiblePane it uses), is that an image is taken of the component when JTaskPane is initialized. This all works fine when the JTaskPane is initially expanded (that is, the real component is shown), but my application requires that initially, the component is not shown. I have attempted to patch Fr�d�ric Lavigne's code so that the image is taken right before it is to be shown, but I still only get a gray image.
    I have had limited success using SwingUtilities.invokeLater() -- but my component is not fully laid out even when I capture the image in the run() method of the object instance I pass to invokeLater() (specifically, the JEditorPane that is placed on my component, is not yet laid out, but the JTextFields are). Curiously enough, if I use a javax.swing.Timer, I manage to capture the fully laid out image just fine, but I would prefer using a more elegant solution.
    All suggestions are most appreciated.

  • Capture Excise on Purchase through 1st Level and 2nd Level

    Dear all,
    Please clear about the  Functionality to Capture Excise on Purchase through 1st Level and 2nd Level Dealer Invices in details please.
    Regards,
    Vishal

    hi,
    for dealer invoice we first do j1iex here we capture the excise duties
    then we do migo &
    again we do j1iex to post the excise invoice.

  • Capturing scrap in CO11N-time ticket confirmation

    Dear All,
    I would like to know how system is allow capturing of scrap in time ticket confirmation though total yield is confirmed.
    Case-
    Order created- I have production order number say 1000001 having 3 operations and total quantity of order is 100. There is no planning scrap in order.
    confirmation -i have confirmed first and second operation as total yield for 100 each. After confirming total yield quantity of 100 for first operation, if i have enter again 10 quantity as a scrap for first operation, system is allowing to do so.
    Query - Is this a standard behaviour of the system?, how system is allowing though i have confirmed total quantity of yield for the first operation.
    Plz suggest how to control if total quantity is confirmed system should not allow to enter surplus quantity in scrap field of time ticket confirmation.
    Regards,
    Rajesh Sawant

    Dear Rajesh,
    This is standard only. When you are doing confirmation, system will not see the production order quantity against your confirmation quantity. Whatever quantity you are confirming will be stored against the production order.
    Let say Prod. order no 1000001 need to produce 100 no.
    In 1st operation yield -110 no. and crap - 0 no.
    In 2nd operation yield - 105 no. and Scrap - 5 no.
    In 3rd operation Yield - 100 no. and Scrap - 0 no.
    So for this particular production order to produce 100 units, you have issued 110 units. Here yield can be number of units.
    Hope you will understand.
    Regards / US

  • Importing clips from iMovie HD does not preserve capture date

    Hi,
    I am importing iMovie HD projects into iMovie 09.
    The clips in iMovie HD (originally imported from DV) have the correct capture date/time on them.
    However, when I import these clips into iMovie 09, it does not preserve these dates for the events but instead chooses to use the "file create date/time" as the event date time.
    Is this info lost forever in iMovie 09 or is there some setting that can use the original clip capture date info as the event date/time?
    Thanks.

    Hi,
    I am importing iMovie HD projects into iMovie 09.
    The clips in iMovie HD (originally imported from DV) have the correct capture date/time on them.
    However, when I import these clips into iMovie 09, it does not preserve these dates for the events but instead chooses to use the "file create date/time" as the event date time.
    Is this info lost forever in iMovie 09 or is there some setting that can use the original clip capture date info as the event date/time?
    Thanks.

Maybe you are looking for

  • Extract from BSAS and BSIS in FI to BW

    Hi, Can someone please recommend a method of extraction from BSAS and BSIS to BW.Is there a standard datasource available for this or do we have to do it through Generic extraction? thanks Srishti

  • Problem with Pattern Matching

    Hello,  I am using Vision Development Module 8.5 with VB6.   I need immediate help on coming up with a solution for an auto warranty return for incomplete "Fog Lamp" indicator symbol.  I use a match score minumum of 900, but the match score returns a

  • Data conversion of open checks

    Hello, We are preparing our data conversions for a new implementation of SAP in the US. A question came up as to whether we should enter check masters for checks we have printed and mailed to our vendors but haven't been cashed at the time of go-live

  • Vonteera Browser hijacker in about:config, how to remove?

    Hello, I have been infected by a Browser Hijacker, which posts ads on websites. It shows "ads by Volaro" and by doing some reading on the net, Vonteera is involved/ the cause. I have tried to clean the registry and removed several suspicious files fr

  • Thinkvantage toolbox not responding | T510 Windows 7 64 bit

    HI,           I am using Lenovo T510 with windows 7 ultimate 64 bit. The thinkvantage toolbox used to work (i.e, come up an display, scheduled tests of hard drive and other components etc). Recently, probably for last two weeks, whenever I try to lau