In our system, STOs do show up as a procurement elements at the receiving plant, but they do not create a demand at the supplying plant.  Supplying plant is using Strategy 40.  So my question is - Are STOs supposed to create a demand in supplying plant with Strategy 40 ? 
Thanks,
- Chetan

STOs should create requirements in the supplying plant, no matter the planning strategy.
There are though some possible definitions that will alter that, the business case being that you have created PIRs in the supplying plant, and you want these STOs to be included in the scope of your sales plan. In this case, especially with PS 40, STO will not create additional requirements (on top of the PIRs), but rather consume the PIR like a customer order.
Regards,
Mario

Similar Messages

  • Demand Management- Distribution of demand to supplying Plants

    Hi
    We have Plant 001 where demand is being loaded and sales orders are being booked for a single finished good.
    This finished good is to be supplied by two Plants say 002 and 003 (Plants are within same company code) with a ratio say 30% and 70%.
    Since there are 2 Plants so we cant use sp proc key for distribution of demand to supplying Plants.
    Please suggest how to map it?
    thank you
    V

    Hello vineet,
    You are right , if your spliting the requirement more than one plant means you cannot use the SPK.
    Inthat case you can use quota arrangement  MEQ1.Steps as below
    1.Create quota for each plant ( 002 ,003) for demand material at plant 001. There you  can assign the share for each plant.
    2. Assign the quota = 1 at MRP view of Demand material at Plant 001.
    Now create the demand and run the MRP.
    Regards
    Pradeep  Kumar

  • Need to create a sales order that does not create demand

    Hi,
    We need to create a no cost sales order - that does not create demand
    In our current set-up when we try to create a no cost sales order with a material ( It Cat = Norm) we see demand being created in MD04
    What configuration settings will allow us a deliverable order - that does not create demand (no MRP run?)
    Thanks,
    SM

    Hello,
    For this set of requirement i think the best option would be to configure a New Sales Order Type and a new Schedule Line Category. In VOV6, While you are defining a new Schedule line category in the transaction flow make sure to switch off the three check box.
    Transfer of requirements / Begin assembly order from SD
    Availability check for sales
    Product allocation active
    Then when we are assigning this newly defined Schedule line Category to Item category, make sure to leave the field of MRP Type as blank in VOV5.
    Regards,
    Sarthak

  • How does one create the Process List (AdminUI) with the provided SDK API?

    Currently we are developing a custom component for Adobe LiveCycle, which should offer the following service operation:
    Fetch a list of schedulers (= long-lived processes with that loop with a Wait-operation) and check whether there are instances running for them
    Input: none
    Output: A list of (long-lived) process definitions together with a list of (running) process instances in XMLXML format could look like:
    <processes>
         <process>
              <name>Mortage/Util/Scheduler A</name>
              <application>Mortage</application>
              <status>Active</status>
              <creationDate>2015-03-25T13:00</creationDate>
              <processInstances>
                   <processInstance>
                        <id>12314</id>
                        <status>RUNNING</status>
                        <createdOn>2015-03-25T13:01</createdOn>
                        <modifiedOn>2015-03-25T13:02</modifiedOn>
                        <operations>
                             <operation>
                                  <name>Set Value X</name>
                                  <status>COMPLETE</status>
                                  <createdOn>2015-03-25T13:01</createdOn>
                                  <completedOn>2015-03-25T13:01</completedOn>
                             </operation>
                             <operation>
                                  <name>Set Value X</name>
                                  <status>STALLED</status>
                                  <createdOn>2015-03-25T13:02</createdOn>
                                  <completedOn>2015-03-25T13:02</completedOn>
                             </operation>
                        </operations>
                   </processInstance>
                   <processInstance>
                        <id>12315</id>
                        <status>RUNNING</status>
                        <createdOn>2015-03-25T13:02</createdOn>
                        <modifiedOn>2015-03-25T13:02</modifiedOn>
                        <operations>
                             <operation>
                                  <name>Set Value X</name>
                                  <status>COMPLETE</status>
                                  <createdOn>2015-03-25T13:02</createdOn>
                                  <completedOn>2015-03-25T13:02</completedOn>
                             </operation>
                             <operation>
                                  <name>Set Value X</name>
                                  <status>RUNNING</status>
                                  <createdOn>2015-03-25T13:02</createdOn>
                                  <completedOn></completedOn>
                             </operation>
                        </operations>
                   </processInstance>
              </processInstances>
         </process>
         <process>
              <name>Mortage/Util/Scheduler B</name>
              <application>Mortage</application>
              <status>Active</status>
              <creationDate>2015-03-25T13:00</creationDate>
              <processInstances/>
         </process>
    </processes>
    Though I'm unable to retrieve these kind of processes, since the SDK API does not offer a way to fetch these kind of processes.
    I tried the following Quick Start: http://help.adobe.com/en_US/livecycle/10.0/ProgramLC/WS624e3cba99b79e12e69a9941333732bac8- 7d27.html
    Quick Start (EJB mode): Searching for Process Instances using the Java API
    (and yes I went through all the possible options (other Quick Starts, API documentation))

    Yes, removing the block diagram obscures the code so much that not even newer versions of LabVIEW can make sense of it.
    I think under the hood it must be converting it to Perl.
    Spoiler (Highlight to read)
    If you believe this and have lots of money please contact me with your credit card info 
    If you believe this and have lots of money please contact me with your credit card info 
    =====================
    LabVIEW 2012

  • Excise Invoice not available in supplying Plant

    I am procuring material from overseas vendor directly to deppo as it is a trading material.
    Later on I am doing Stock Transfer to other deppo with SD and performa Invoice.
    But at the time of entering goods in receiving deppo, I am entering outgoing Excise Invoice no. from supplying deppo in the Excise header tab.
    It gives the error : Excise Invoice does not exist in the supplying plant.
    I am doing Intra company stock transfer.
    Using Transactions J1IG and J1IJ.

    This is a common message found in depot transactions.
    Here is how the system behaves.
    Stock Transfer from Manufacturing to Depots : Excise invoice at factory is posted via J1IIN or J1IV and creates FI liability. When GR is done and excise invoice is captured all ED transferred from MFG plant is directly copied in J1IEX / GR and no message is given.
    Stock Transfer from Depot to Manufacturing Plant : The excise invoice does not carry financial entry at depot and hence this error is shown. But this does not cause problems in capturing J1IEX and Posting.
    Stock Transfer from Depot to Depot : The excise invoice does not carry financial entry at depot and hence this error is shown. But this does not cause problems in capturing J1IG in depot.
    Thanks & regards
    Hameed Parvez

  • ME27-enter supplying plant.

    Hi,
    1)  I am creating stock transport order through ME27.On the first field supplying plant I have entered valid supplying plant appearing through help (f4).After entering supplying plant,document type,po date and purchasing org.I am getting error "Please enter supplying plant-Message no. 06098".
    What could be reason for this error.
    2) We enter supplying plant in me27.I was viewing some old orders where i can see vendor number for corresponding plant in ME23 .My query is how this vendor number is picked up from supplying plant.
    3) I have checked some of the inter company stock transfer order .In these orders item category U is not mentioned.Is it not mandatory to have item category U in all stock transport order.
    Thanks & regards
    Atharva

    hi,
    Check whether you have defined shipping data for plant under SPRO- MM-Purchasing-PO-set up stock transport order.
    and  check the delivery type NL for UB & NLCC for NB is assigned and also check the proper checking rule is assigned for both.
    If you are  doing stock transfer with delivery & without billing then,
    1. create customer for recieving plant and link the customer no. in define shipping data for plant.
    2.  check the delivery type NL  assigned for UB document type.
    3. While creating PO use doc. type UB.
    If you are  doing stock transfer with delivery & with billing then,
    1. create customer for recieving plant and link the customer no. in define shipping data for plant.
    2. Create vendor for supplying plant and assign supplying plant in vendor master under additional data.
    2.  check the delivery type NLCC  assigned for NB document type.
    3. While creating PO use doc. type NB.
    Regards
    Madhu

  • SQLJ translator for ISO/ANSI does not create .SER profile (Jdev 9.0.0 prev)

    The SQLJ translater that comes with JDeveloper 9.0.3 preview does not create profiles (.SER) when running with -codegen=ansi or iso. Thus producing none runnable code.
    It is not possible to set any switches in JDev.
    Previous versions of the translated did produce the .SER files.
    Is there a workaround possible?
    Thanks,
    Robert

    Fo the answer and a workaround look here:
    Re: A field is missing in my table.....
    -Robert

  • SQLJ translator for ISO/ANSI does not create .SER profile (Jdev 9.0.3 prev)

    The SQLJ translater that comes with JDeveloper 9.0.3 preview does not create profiles (.SER) when running with -codegen=ansi or iso. Thus producing none runnable code.
    It is not possible to set any switches in JDev.
    Previous versions of the translated did produce the .SER files.
    Is there a workaround possible?
    Thanks,
    Robert
    P.S.: I posted this also in the SQLJ forum.

    Robert,
    My mistake - you are correct, the change I mentioned was put in just after the Preview Release. The .ser files will go into the project source directory in the Preview Release. But this should be the same behavior as in previous releases - are you seeing a difference in behavior between a past release and the Preview Release? Everything up to and including the 9.0.3 Preview Release should put the .ser files in the project source directory. When the 9.0.3 Production Release is available, they will be put into the project output directory instead.
    The fix to put the .ser files into the output directory is not in the translator.jar file. It is in the core JDeveloper code (in jdev.jar). So unfortunately it is not a fix that could be easily dropped into the Preview Release. However, it will be available in the 9.0.3 Production Release.
    -Matt Hawkins, JDeveloper Team

  • Third party with sto from supplying plant

    Hi,
    When i am trying to convert Third party purchase requisition NB created through Sales order
    to Stock transport order to transfer the material from other plant i am getting following error
    Error Message
    Third-party not defined in the case of vendor with plant assignment
       essage no. 06769
        You are entering a purchase transaction involving a vendor to whom a
        plant has been assigned. Normally, this will involve the transfer of
        materials from one plant to another.
        This process necessitates a delivery and a billing document in the SD
        system. The PO appears directly in the delivery due list of the issuing
        plant (vendor) and therefore does not need to be transmitted.
        However, an item with the procurement form "third-party" (triangular
        business deal) cannot appear in the delivery due list.
        An item with the procurement form "third-party" can only be ordered from
        vendors without a plant assignment.
    Anybody has any suggestions on this scenario
    Diwakar

    Hi Niel,
    You don't need to create an STO. If you create a normal sales order with delivering plant B, they will see it in their delivery due list or MD04 or whatever. And it doesn't matter for this purpose that the plants belong to different comp. codes. This will only matter after the delivery to the customer - VF01 (or VF04) with reference to the delivery will bill the customer (comp. code A is billing); then another VF01 will generate inter-company billing document where company B charges comp. A.
    So why do you insist on having a STO?
    BR
    Raf

  • Donot want Planned Order to be created for STO in supplying Plant

    Hi Gurus,
    We have material A which in being produced in Plant 1000. This Material A is being used as a Component for a product in plant 2000. By Using Stock Transport order we get the material from supplying plant 1000.
    when we run MRP for the plant 2000, schedule line is generated for the plant 2000. at the same time planned order is generated for the Material A in plant 1000.
    My requirement is i dont want planned order to be created in supplying plant i.e plant 1000.
    Afzal

    Hi,
    Let me Clarify my requirement again.
    Material A is being Produced in plant 1000(supply). The same Material A is being used as Input material in plant 2000(Demand) for product B.
    <b>Master Maintained.</b>
    <b>Material Master</b>
    I maintained Procurement type as F and Special Procurement as 40 in Plant 2000 for Material A.
    I maintained Procurement type as E for Material A in Plant 1000.
    <b>Schedule Agreement</b>
    Schedule Agreement created in Plant 2000 referring plant 1000 as supplying plant and agreement type as LU.
    <b>Source List</b>
    Source List Created based on the schedule agreement and maintained MRP indicator as 2.
    <b>MRP Run</b>
    During MRP run for Product B in plant 2000, It creates schedule line for the Material A in plant 2000. At the same time it creates planned Order for material A in the supplying plant 1000.
    My Requirement is we don't want the planned order in supplying plant 1000. The reason behind is that we want to run MRP in plant 1000 seperately at a different frequency.
    Running MRP in plant 2000 should limit the requirements raising in plant 2000 only and the MRP run for 1000 should limit to plant 1000 only.
    Message was edited by:
            afzal ahmed

  • Excise invoice does not exist in supplying plant

    Dear all,
    We are having a scenario where in we are doing stock transfer from one plant to other the system gives an error message that the excise invoice does not exist in supplying plant.
    Created a PO for stock transfer, posted GI against it, created excise invoice in J1IS with transaction type other. We are having separate excise registeration for the two plants.
    Secondly request to kinldy let me know what account enteries should be generated when we post excise invoice for the supplying plant.
    Regards,
    mahesh.

    Hi,
    In case of STO process using SD the process flow is like
    1. Create a PR against the supplying Plant (ME51N)
    2. Create a STO (PO) with ref to the PR (ME21N)
    3. Create a Outbound Delivery with ref to the STO. (VL10B/VL10D)
    4. Create a Proforma Inv (VF01) No Acc docs gets generated.
    5. Create a Excise Inv for the supplying Plant (J1IIN) Accounting Doc gets Generated.
    The Accounting Entries at the time of Excise Inv creation for the supplying Plant is:
    Excise Duty Expenses on  Sale                               Dr
    Excise Duty  Payable                                    Cr                    
    Sec.& Higher Edu Cess Payable on Excise               Cr                                            
    Edu .Cess Payable on Excise                    Cr
    At the time of Goods Receipt at plant
    1.Good Receipt at Receiving Plant (MIGO) - No Accounting docs get generated only Qty update takesplace.
    2. Capture & post the excise @ the Receiving Plant during MIGO by entering the Supplying Plant excise inv as reference.
    Hope it is Clear.
    Revert incase of any queries.
    Regards,

  • Change in supplying plant in STO

    Hi,
    With ME21N, i'm doing STO and giving supplying plant and receiving plant and saved.
    immediately with ME22N, I have opened same STO and found supplying plant field disabled.
    I want to change supplying plant.
    Can anybody guide me for this?
    Regards,
    Samir Wadajkar

    Dear,
    This is not SAP standard practice. e.g. If you once create sandard purchase order with vendor 'X' and save the PO. And after some time can u change the Vendor 'X' to 'Y'. It is not possible becoz of whenever u create PO that time SAP system give the PO document number. In that Document number it cantain master data like vendor master & material master. U can change material master but not the vendor master that is maintained on header level. This is not standard practice in Material management. If this things are open then everybody change the vendor code after creation of PO.
    So create another STO and block or delete first one.

  • Demand Management: single Supplying Plant to multiple Demand Plant

    Dear All,
    I have following scenario to mapp:
    There is one supplying plant (Plant A) and 3 demand plants (Plant B,C,D). Out of 3 demand plant, two plants (Plant C and D) are assigned to different company code then supplying plant while one demand plant (Plant B) is assigned to same company code as of supplying plant (Plant A).
    Material M1 produced at plant will be consumed at plant A to produce material M2 as well as will be supplied to plant B.
    Material M2 produced at plant A will be supplied to all three demand plant B, C and D.
    As plant A and plant are assigned to same company code and are in same campus, materials will be transferred using Transfer Posting (material movement 301).
    Material from plant A will be supplied to transfer to Plant C and plant D using Stock Transfer (movement type 351) or using standard sales cycle.
    Plant A will use total SAP but plant B,C and D don't want to use any planning functionalities of SAP (no MRP run) as they are using i2 product for planning.
    As except plant A no other plant wants to use SAP for planning run, it was suggested to enter demand at Plant A directly for all plants using Demand Management functionalities using different planning versions. But now the issues are:
    A) As demand from each plant (plant C and D) will be entered at Demand Level using different planning version for each demand plant, how to reduce PIR of corresponding demand version for delivery against sales order of corresponding plant.
    B) As materials will be transferred from plant A to plant B using transfer posting and not stock transfer, how to reduce PIR. As PIR is not reduced but stock reduces then system will create new planned order for PIR which already supplied to plant B.
    Any help will be appreciated.
    Thanks and regards,

    Dear Mario,
    Thanks for your reply.
    Can you explain in bit detail what is option 2 and how can I do same in system....
    I tried using Special Procurement Key 40 in demand plant and maintained PIR in demand plant with MD61 which results into Stock Transfer Order created in demand plant. Now the problem is when I issued material from supply plant to demand plant against stock transfer order, system also reduced the PIR for external sources I maintained in supplying plant. Hence there was two reduction in Supply Plant, one for Stock Transfer Order reservation and second for PIR maintained for external demands (other than demand plants).
    How can I stop reduction of PIR maintained for external sources while delivering against stock transfer order?
    Thanks in advance.
    Regards.........

  • Problem in STO b/t plant with in Company code

    Dear ALL,
            I have done all the configration for STO withing company in two plant(vednor & customer master for both the palnt & assign it also & also shipping point),but i am still getting the error "Shipping data for material is not maintain" while making the P.O.i am doing STO thru MM( By MVT 351).tell me the procedure for configration so that i can cross check.
    thanks in advance.

    Hai,
    The essential things for STO are as follows,
    1.Material which is to be transfer should be maintain in both the plants.
    2.Sales view in MMR is must.
    3.Shipping point is must.
    4.Both the receiving plant & issuing plant should be created as a Vendor.
    5.Both the receiving plant & issuing plant should be created as s Customer.
    6.In VMR, the issuing plant is eneterd as a customer for receiving plant.
    7.In VMR , the receiving plant is entered as acustomer for issuing plant.
    8.In IMG - MM - Purchasing - Purchase order - Setup stock transport order - Define shipping data for plant - Customer no of respective plants should be entered. It is must for STO.
    Check the above said details.

  • Return procedure in STO plant to plant with billing(single co code)

    Hi,
    I'm doing STO plant to plant with billing in one company code.
    But I have one query. Suppose I'm in plant B(Receiving).
    From plant A(Supplying), I have received material.
    I've done goods receipt
    But after that I found few material defective & now I need to return it to the supplying plant(A).
    I have already capture & post excise invoice.
    I want to reverse the same.
    Please help me.
    Thanks & Regards,
    Piyush

    Hi Pyush
    Try cancelling the GR,then post the PART 2 again,now system wil reverse the accounting entries,then cancel the excise invoice. 
    Try in your quality system and confirm
    Regards
    Ratha

Maybe you are looking for

  • Hard drive not recognized on startup. hp pavilion ze4900 laptop

    Receive the following screen message when I try to start.  hp pavilion ze4900 laptop Intel UNDI, PXE-2.0 (build 082) Copyright (C) 1997-2000   Intel Corporation For Realtek RTL8139(X)/8130/810X PCI Fast Ethernet Controller v2.13 (020326) PXE-E61:  Me

  • Apps not remembering which display to use

    I have an iMac with a secondary display. I have Thunderbird on my Secondary display at all times. When I close Thunderbird then reopen, it does not remember to open in the secondary display. How do I fix this?

  • Unexplained incompatibility with Apple Mail / pop services

    I am a technician that supports numerous clients using Apple Mail. I am increasingly running into compatibility problems with Apple Mail. Certain pop accounts will not download at all, for instance 123-reg.co.uk (pophost.123-reg.co.uk). The app seems

  • Knowing function blockdiagram

    how can i khnow the blockdiagram for each function in labview like the function Add Array Element,

  • Listener hangs

    Hi there, I downloaded Oracle 9.2 trial for WinNT and the listener hangs (general protection fault) after a while when trying to connect or send commands... a MessageBox says: memory can't be "read"... Really thanks for any help, Davide