Donot want Planned Order to be created for STO in supplying Plant

Hi Gurus,
We have material A which in being produced in Plant 1000. This Material A is being used as a Component for a product in plant 2000. By Using Stock Transport order we get the material from supplying plant 1000.
when we run MRP for the plant 2000, schedule line is generated for the plant 2000. at the same time planned order is generated for the Material A in plant 1000.
My requirement is i dont want planned order to be created in supplying plant i.e plant 1000.
Afzal

Hi,
Let me Clarify my requirement again.
Material A is being Produced in plant 1000(supply). The same Material A is being used as Input material in plant 2000(Demand) for product B.
<b>Master Maintained.</b>
<b>Material Master</b>
I maintained Procurement type as F and Special Procurement as 40 in Plant 2000 for Material A.
I maintained Procurement type as E for Material A in Plant 1000.
<b>Schedule Agreement</b>
Schedule Agreement created in Plant 2000 referring plant 1000 as supplying plant and agreement type as LU.
<b>Source List</b>
Source List Created based on the schedule agreement and maintained MRP indicator as 2.
<b>MRP Run</b>
During MRP run for Product B in plant 2000, It creates schedule line for the Material A in plant 2000. At the same time it creates planned Order for material A in the supplying plant 1000.
My Requirement is we don't want the planned order in supplying plant 1000. The reason behind is that we want to run MRP in plant 1000 seperately at a different frequency.
Running MRP in plant 2000 should limit the requirements raising in plant 2000 only and the MRP run for 1000 should limit to plant 1000 only.
Message was edited by:
        afzal ahmed

Similar Messages

  • Planned order is not creating for a phantom assembly

    Dear experts
    My fert having two semi finished components
    first semifinished is assigned with a raw material
    And second semifinished is assigned with two different raw material
    in material master of second semifinished mrp2 view Special procurement=50
    and after running mrp, second semifinished is not getting any planned order or dep requirement all the raw material under this getting planned order
    But in my understanding of phantom second semifinished in should not get any planned order?
    Am  i correct?
    Pls advise me where i need to check
    Abu Fathiam

    Hi,
    Phantom assembly will generate planned order for its component when you will maintain:
    Procurement type: E
    Special procurement type: 50
    Also in SPRO: OPPQ BOM explosion
    Also check in BOM In basic data tab
    In MRP Data screen, check explosion type- are you maintained phantom assembly off? Check it if you want planned order.
    If you don't want system generated planned order for your phantom assembly component you should not maintain this indicator.
    Regards,
    Alok Tiwari
    Edited by: Alok Kumar Tiwari on Feb 29, 2012 11:38 AM
    Edited by: Alok Kumar Tiwari on Feb 29, 2012 11:39 AM

  • Seggragating Deliveries created for STO and Sales Order

    Hi Friends,
    I have a requirement..
    I am looking for list of deliveries in LIPS table. But I find that this table lists all deliveries created for STOs as well as Sales order. My requirement is to select only those deliveries which are created for Sales orders. Can anybody tell me how to seggragate the deliveries for sales order from deliveries created for STOs? Any other table should I look for deliveries created only for sales order?
    Please suggest.
    Thanks & Regards
    Satya

    Hi Satya,
    If you need table level data then you can go with method suggested by Andy Slania or if you have access to SQVI, you can join VBFA and LIKP tables and decide on your choice of search and list display. You can save the query for future use.
    -Naminator

  • Planned order not getting generated for FG

    Dear Experts,
    Planned orders not getting generated for the Finished Goods - X which is having MRP Type M0 - MPS fixing type strategy group 20 which is copied fron another FG - Y , its a new product and production plan has been updated through MC88 - Rough cut planning but the planned orders are not getting generated.
    And for the material valid production version exists with selection method 3 and individullcollective as 1.
    Please let me know what might be the possibalities and what all the key fields i need to check.
    Thanks & Regards,
    Sampath
    Edited by: sampath s on Jul 13, 2011 11:31 AM

    Dear,
    In general MPS is run for High value items ( if you use like Gold , Platimum or A class items. ).
    Always only single level is used for Explosion and planning. then only you can analyse the requirements at each stage before procurement.
    Otherwise if you run MPS to multi level, Bottom most high value will be procured without any notice to authorities. Even you may cancel the process in mid way. At that time what will happen to the procured high value material.
    So for that purpose only single item single level MPS concept is evolved.
    Fo that you run MPS at single level so that only for the first level MPS will be carried out.
    Check and revert back.\
    Regards,
    Alok Tiwari

  • Sales order cannot be created  for the delivery date before 20.10.2008

    when i create a sales order today (18102008) sales order cannot be created  for the delivery date before 20.10.2008
    how the system is checking the 2 days duration for delivery date - which table is having this duration days.
    is it dependent on sales order type.....
    actually i checkeup in V0V8 - even then i couldn't  solve this error when i am creating the sales order.
    Pls suggest

    Dear Selvamuthu
    In normal circumstances, you can create as many as sale orders as you can irrespective of delivery date, and system will not  prevent to create unless you apply some user exit for some reason.
    Check any user exit is applied for that sale document type where some logic would have been written in such a way that if stock is available, sale order can be created.
    thanks
    G. Lakshmipathi

  • Planned Order and Purchase Requisition for total Plan

    HI
    As per my client requirement whenever i am giving a plan in Demand Management in MD61 say for quantity 100. System should create purchase requisition for quantity 40 and Planned Order of 60.
    Please let me know if it is possible.
    Regards,
    Anand

    HI
    Thanks a lot. Its working with quota arrangement.
    Regards,
    Anand.

  • Auto-release Planned Orders is not creating WIP job after zero on-hand (i.e. Level Below  safety stock)

    Hi
    The time release fence in defined at item level as 1 day also safety stock level is defined in inventory safety stock form.
    Once MRP launch it should create the discrete job against item as zero onhand for that item but MRP workbench is showing planned order for the item instead of creating item.

    Hi
    The time release fence in defined at item level as 1 day also safety stock level is defined in inventory safety stock form.
    Once MRP launch it should create the discrete job against item as zero onhand for that item but MRP workbench is showing planned order for the item instead of creating item.

  • PLanned order and PO item for a same material in MD04

    A material with Procurement key as F.
    In MD04, There is a planned order for 8657 nos. for a material..
    below that there is a Dep Req XXXX
    Below that there is a purchase order for 8657 Nos.again.
    My question is if there is a open PO for the material,then why is the planned order created for the material.
    The PO reads as
    04/05/2012-POitem--- 4500016092/00050 04/09/2012 15----
    8657
    THe Planned order reads as PLdOrd----0000478483/stpo--
    8657
    Please help me out..

    In MD04,planned order and dependent requirement dates are 2/4/2012
    whereas the PO date is 5/4/2012.
    Inside the planned order the order finish date is 30/3/2012
    and inside the PO the delivery date is 2/4/2012..
    Its bit confusing..can you help in this..
    ANd for your information,the Planned order is now not found in MD04,it was there yesterday..

  • Planned Orders Are Being Created In The Future Period (About Six Months onw

    Dear All,
    We are facing a problem that when we execute the product heuristics for a particular location - item, planned orders are not getting generated as per the demand element in the current period but they are getting generated in future period say six months from now... We could NOT understand that Why the system is pushing the orders in future period. We have checked the following parameters :
    Calendar is active for  the period upto DEC"2012.
    Time Streams have been genereted for the particular resource.
    Resource(s) do exist in Live Cache.
    Sufficient capapcity is available in the current period (as viewed from the resource planning table).
    Please advise that what other parameters should be checked in order to get the planned orders in current period. In this regard, we shall like to confirm that we are facing this issue since last 8 - 10 days, earlier, there was NOT such an issue.
    With Best Regards,
    Sanjeev Chugh
    06-JAN-2012

    Hi Sanjeev,
    Did you maintain any value for planning time fence, and if yes, how big is it? This could be one possible reason why system is not able to plan the orders (also depends on what Heuristics you are using).
    In RRP3, double click on your planned orders and check out the start date and the end date. Is your start date also lying in the future, or is it that due to long time in your operations (somehow your PDS/PPMs got messed up?), orders availability got pushed to the future.
    I am not an expert in PPDS, but I can only think of different lead times coming into picture which could possibly push your planned orders availability to the future.
    See if this helps.
    Thanks - Pawan

  • Want to order a recover disk for 3000 j200 9690 84u but its intimidati​ng the support site.

    Trying to find my way around Lenovo Support but I cannot find where to order a recovery dvd for my unit. Can anyone guide me in the right direction. And is there a fee if I am under warranty to obtain this software?
    Proud supporter of the Toronto Maple Leafs Hockey Club

    Hi, When I ordered on Dec. 2007 the Recovery Disk for my Lenovo 3000 J115 desktop had to call 1-800-426-7378. Don’t remember the prompts, but found a rep that transferred me to what appeared to be the right department. May want to make sure you specify that it is for a Desktop or you’ll get bounced around to other departments, like I did. I gave the 1st rep all my info including model #, name, address, serial code, etc…, to place order, then at the end he asked if it was laptop and I said no and he had to transfer me to the desktop department & I had to start all over with the order.  Would like to have been able to order it online, but that option did not appear to be available. It was out of warranty when I purchased it so it cost around $60 with shipping.
    Now on a related note, my chance to vent about the 1st time I tried to order the recovery disk. 1st a little background info. Purchased my Lenovo 3000 J115 Nov. 2006. It was installed with Windows XP and had a voucher to purchase Vista upgrade, when Vista was released, which I did. Vista arrived around Feb. 2007, & I promptly installed it. So far so good. March 2007 purchased music equipment specifically Digidesign hardware with Pro Tools software to use with my new Lenovo computer.  I know comp. may not be built for that, but I’m just getting into music software editing. Unfortunately Pro Tools software was not compatible with Vista, no problem I thought, I’ll just Call Lenovo & order recovery disk with the original operating system which was Windows XP.  Here’s where the fun begins (sarcasm).  March 2007 I call Lenovo to order recovery disk. I called a 1-800 # I found online, at that time there was no clear way to find the # to order disk & it’s a different number than the one I’ve provided at the top. I was transferred multiple times having to explain to each rep that I wanted to order a recovery disk, only to be told I have the wrong department & get transferred to yet another dept. Finally was transferred to a rep who appeared to be able to help me. I explained to him I wanted to buy recovery disk to DOWNGRADE back to my original pre-installed operating system Windows XP because I have purchased software that is not compatible with Vista.  At first rep said he would be glad to help me with that, and then asked to put me on hold to check with his Supervisor. Well when he came back he told me I could not order recovery disk to downgrade, because downgrading was discouraged or not allowed. So I said OK no problem then I don’t want to downgrade, I just want to purchase recovery disk. He asked me why & I told him to reinstall operating system to original specs. He told me no, that I cannot purchase recovery disk. I told him once more that I would like to simply purchase the recovery disk and he said no then proceeded hang up on me.  Well I guess I used the magic words DOWNGRADE, when Vista was first released and many people were requesting downgrades because many software co’s. had not yet converted to Vista or were experiencing problems with it.  Needless to say I was discouraged with Lenovo Customer Care and didn’t want to experience that anguish again that I just continued to use Vista and was not able to use my music equipment with my Lenovo comp. I ended up ordering the recovery disk Dec. 2007, this time without the hassle. I’ve decided to purchase an Apple Mac for the music equip. and only use the Lenovo 3000 J115 for basic computing such as web surfing, emailing & word processing.
    Sorry for the long post & thanks for reminding me about the recovery disk, I had to share this bad experience with others who may have experienced similar issues. I consider myself an ideal customer, I rarely contact customer service, most problems I try to research & figure out or find answers to on forums, but I was very disappointed with Lenovo Customer Care after the experience of trying to simply purchase a recovery disk. I’ve worked customer service in the past and understand it’s a horrible job, & many customers’ make outrages requests, so I try to make it easy on reps. by 1st doing a little research & then asking realistic questions, but some reps are just plain idiots who don’t try to help customers, they only try to get you off the phone.   
    Good luck purchasing your recovery disk!
    Mak   

  • HT1688 I want to order a new housing for my iPhone 4 (mine is scrathced pretty bad) I just dont trust myself to take the phone apart to do it.. If i bring it to an apple store will they change it for me ?

    I really wanna order a new housing for my iphone 4 (at&t)Ive dropped my phone a million times, and its even gone swimming
    its SURPRISINGLY not shattered, but has a ton of deep scratches in it. i saw on Amazon.com you can buy complete new housings for them, and i watched a couple youtube videos on how to change them, but i really dont trust myself changing it. my luck it destroy it and it will be garbage, and ill be left with no phone...
    question is.. Will APPLE put a new housing on it, if i buy it and bring it to them? (*i dont have apple care, or any kind of insurance on my phone*)

    No, they will only sell you an out of warranty replacement, which for the iPhone 4 is $149 (US).

  • Invoice Not Created for STO

    We have an STO between 2 plants where no invoice was ever created. GI posted, the GR posted, but now the GR cannot clear because there is no invoice.
    Also, it does not show in WE02.
    All other STO's work for us, it is just this combination of specific plants that is not working. Is there a setting we have missed setting up for an STO between these two plants?
    Thanks very much!

    Hi again Allie,
    How fast
    The truth is that I have some difficulties to understand your exact situation.
    the GR posted, but now the GR cannot clear because there is no invoice.
    Maybe it is a cultural difference, maybe because you are not using standard SAP terminology
    Do you know that using tcode MB5T you can display intercompany stock in transit ?
    Uncheck "stock transfer orders" and keep "cross-company-code" checked.
    That will tell you the missing GR for incompany purchase orders.
    Is that what you are looking for?
    Best Regards,
    Franck

  • Partial Deliveries not created for STO

    Hi All,
    There are 2 materials used in STO. One material X has stocks in the supplying plant and other material Y doesn't have stocks in supplying plant. When user try to create using VL10G or VL10B system is giving error that Mat. Y doesn't have a stock and hence delivery no. cannot be generated. When I try to delete or block Mat.Y in STO then delivery can be created for Mat.X. User wants to create partial delivery of the Mat. X which has stocks and different delivery for Mat. Y when its stocks will be available future. How and where else can we check settings for partial deliver for STO.
    I have checked settings in Ship-to party for partial delivery and it is relevant for partial delivery.
    Please let me know your thoughts on this. Thanks!!
    Mohit

    Dear Mohit,
                 In the VL10B transaction you click on Material tab there you enter Material 'X' then execute the transaction it will give the background delivery for the Material 'X' only.
    I hope it will help you
    Thanks,
    Murali.

  • Accounting entries after PGI for STO Within same Plant

    Dear Members,
    We have activated STO within same plant in OLME->PO->Setup STO -> Set up stock transfers between Storage locations
    Cycle is PO ->VL10B->VL02N ->PGI ->GR
    We are using newly created delivery type ZNL ( copying NL ,Using 641 )
    Which is working fine
    Now the thing I am observing here is this
    a > When we have not assigned any pricing procedure  in  Determine Schema for Stock Transport Orders
    after PGI no accounting document was generated
    But our requirement is to add freight cost that is why we added a pricing procedure ZRM200 (copying RM2000)
    Here we are observing after PGI accounting document is generated
    Postings are ( Material cost 500 Eur i.e 100 Kg @ 5.00 Eur in PGI )
    RM stock a/c       500 Cr.
    RM stock a/c       800 Dr.
    Freight clearing   300 Cr
    And it does not matter whether P101 is in ZRM200 or not (Same posting with or without P101)
    Now my question is it correct system behavior ?
    And requirement is postings should only be like this ( i.e without including transfer posting price)
    RM stock a/c       300 Dr
    Freight clearing   300 Cr
    Can it be possible to achieve ?
    Many thanks in advance
    Edited by: redriver on Dec 29, 2011 2:35 PM

    Not necessary to activate Purchase account
    Even for STO we use FRE. It is only a name and called as Purchasing freight account
    So check the pricing procedure at M/08 for freight condition and account key. I think it is FRE
    Check which GL account assigned at OBYC/Purchasing freight account(FRE).
    if the GL is same as your RM and if your need mainatain separate GL enter that GL here.
    Let us know result
    Srinivas

  • Planning File Entry Not Created For MRP Run

    We are running MRP in backgroung at MRP area level as per scheduled. One material is missing from MRP run. We are expecting that we should get the proposals because stock is zero ( below reorder level) on the date of sheduled MRP run. Earlier it is working.The material MRP relevant data is given below.
    MRP Type - VB
    Reorder Level - 6
    Lot Size - Fx
    Fixed Lot Size - 10
    Minimun Safety Level - 10
    Please help us to resolve this issue.
    Thanks in advance. For any clarofiaction, pls revert back.
    Regards,
    Chetan K

    Hi,
    Please check whether you have maintained the Availability check group 01 or 02 in MRP-3 View.
    Also check the Dependent requirement selection in MRP-4 view individual collective and Selection method in MRP-4 view for its assy material.
    Check the Plant specific material status whether it is blocked for any procurement or usage in Basic Data and Purchasing,MRP  views.
    thanks and regards
    muru