DOUBLE Quantity from CUBE to APO

Hello All,
I am trying to load the data from the cube to APO - DP interactive planning via transaction /SAPAPO/TSCUBE.
I loaded once and then reloaded second time. The quantity for the cube for a product is 70. When I loaded first time and saw in the interactive planning it was 70 but when it was loaded second time it got doubled to to 140 in the interactive planning. The quantity should remain same since it is not a change.
What could be the reason ? Please help.
Regards
Raj

I got the answer.
Raj

Similar Messages

  • Help Required for Mapping Key figures from Cube to APO Planning area.

    Hello Experts,
    We have created cube in APO BW and now we want to map it to Planning area how we can map.
    Can any body explain how we can map keyfigures?
    What is the use of livechache how it will be updated?
    Regards
    Ram

    Hi,
    I am not very sure about the 9ARE aggregate (haven't used it in backups), but RTSCUBE is used to copy time Series (TS) KF data from cube to planning area (SNP or DP).
    Are you trying to restore some time series data from your backup cube to the planning area? If yes, then do a mapping of characteristic from cube to planning area in RTSCUBE, and also map the TS KF between cube and planning area.
    If your KF is not a time series KF, then you can't copy it from cube to planning area. You could get data to cube for some reporting, otherwise I am not sure what use the backup is for you. For SNP, most of the data would be received from R/3, so there's not much point in having a backup.
    Hope this helps.
    Thanks - Pawan

  • RE : BI APO Question Reg Data feeding from cube to Planning area.

    Hi BW Experts,
    iam working in an Implementation project for SCM in BW prcisely working with APO Bw..
    For that I have taken historical data as a flat file and loaded it in to the external BW Infocube and its fine...
    Second step I have created generate export datasource on topr of BW infocube and replicated in to Bw and used this export datasource as datasource for APO BW Infocube which is inbulit BW System from External Bw..
    also I have created tranformations and data is loaded in the BW cube in APO system.Also Included Version charecterstics..
    When I try to fed the APO Cube data to planning area Iam gettinga the following  warning itsnot an error:
    1.Key figure copy: InfoCube - planning area (DP) 01.01.2010 to 31.12.2010-- Successful
    *2.No data exists for the selection made (see long text*
      Diagnosis:Data could not be loaded from the Cube for the selection you made. Check whether the Cube actually contains data that is relevant for your selection.
    For the second point I have time charecterstics filled in the infocube which Iam feding to a Planning area like 0CALMONTH,0CALWEEK,FiscVarnt,0CALMONTH
    3.Characteristic assignment: No data copied --- Message
    Can you please help me with your thoughts so that i wll try to corner the issue I will be highly obliged

    Hi,
    As I understood, you have loaded data from external BW cube to APO BW cube and now loading planning area from APO BW cube.
    I hope your settings in /SAPAPO/TSCUBE transaction code would be correct and you have selected the correct planning version with correct cube.
    Check if Data in APO BW cube is available for reporting or not and data is avilable for given selction (if any but I guess you are not giving any).
    Thanks,
    S

  • FOR BACKUP FROM PA TO CUBE IN APO 5.0

    HELLO FRIENDS,
    I HAVE A SMALL QUERY ,HOW TO LOAD DATA FROM PA TO CUBE
    1.CREATE DATA SOURCE IN PLANNING AREA SECEEN
    2.CREATE INFO PACKAGE
    3.CREATE INFO CUBE
    4. CREATE TRANSFORMATION
    5. DPT DATA TRANSFORMATION PROCESS
    THESE STEPS I HAVE CREATED BUT IAM NOT ABLE TO GET THE DATA TO CUBE FOR BACK UP PURPOSE. I AM WRONG PL CORRECT ME ,GIVE ME UR SUGGSIONS.

    Sivaram,
    Something I found in a BI thread:
    1. The data flow is from BW to APO, and from APO to BW.
    from bw to apo, to feed planning area, characteristic value combination, in APO we have infocube to feed the data, as we know APO has BW inside (all the tcodes RSA1 etc are valid), datamart scenario is used here, we create infocube in APO, update rules, infosource and assign datasource from BW.
    The data flow from APO to BW, to get the plan data inputted by user, we generate datasource in APO from planning area (compare with 'generate export datasource' from infocube), transaction /SAPAPO/SDP_EXTR. 'extractor technology' here in practice is just like when we are using datasource
    take a look
    http://help.sap.com/saphelp_scm50/helpdata/en/c9/199170f13711d4b2f20050da385632/frameset.htm
    2. as mentioned in #1, you can use the transaction /SAPAPO//SAPAPO/SDP_EXTR to handle planning area-datasources in APO, or /SAPAPO/MSDP_ADMIN - planning area; choose your planning area, and menu extractor tools (or generate datasources), again datamart scenario is used here, after the datasource generated in APO, it's replicated in BW (APO act as source system), the rest steps are just same as when extract data from other SAP source system
    simply what you need to practice is /SAPAPO/SDP_EXTR to 'generate export datasource',
    Check
    http://help.sap.com/saphelp_scm50/helpdata/en/8f/9d6937089c2556e10000009b38f889/frameset.htm
    FOLLOWING IS A VERY USEFUL LINK:
    http://help.sap.com/saphelp_scm50/helpdata/en/e0/9088392b385f6be10000000a11402f/frameset.htm
    I believe you need to REPLICATE your data sources after generating them. Have you dione that?
    Hope this helps,
    Abhi

  • Master/Transaction data from ECC to APO-BW

    Hi All,
         Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
    Regards,
    Joy

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Fetching data from ECC to APO

    Hi,
    I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
    Thanks in advance

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Transaction data from ECC to APO DP

    Dear All,
    Can you tell me if i can directly load transaction data directly from ECC to APO BW Infocube.
    For example i want to load say sales orders from ECC.
    Can i directly load from ECC --> APO BW Infocube --> DP Keyfigures.
    Or any staging is required inbetween ECC and APO BW
    Thanks
    Santhana.

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Reserved stock quantity from MB25 t-code in R/3

    Hello Guyz
    1. I have to extract reserved stock quantity (difference quantity) from t-code MB25 into my Inventory Cube (0IC-C03) in BW.
    2. The user has advised me that the movement type is always '301' and the storage loc. is always '9998'. The problem is, in the cube, when I look at that specific movement type and storage location, I still have multiple records divided into 'material doc. numbers'. 
    3. On the R.3 side, I have the 'Reservation number and its Item' as the key fields.
    4. How can I get my partilcuar KF from this t-code in R/3 into my cube in BW?
    5. My specific question is: The KF exists at the stor. loc. level.. how can I bring it down further at the material doc number level in the cube?
    Regards,
    Atul.

    Very helpful answer Shalini. Thanks. So, I can enhance this extractor 2LIS_03_UM with these 2 fields. Then based on this, I can extract my 'Reserved Quantity' (KF) into 0IC_C03.
    But I notice in R/3 that the 'reservation number and item' are the same for multiple document numbers. ie
    Doc No.----> Reservation No--
    > Item
    100                      ABC                                1
    101                      ABC                                1
    102                      ABC                                1
    103                      ABC                                1
    104                      ABC                                1
    But in MB25, I have
    Reservation No -
    > Item----
    >Diff. Quantity
           ABC                        1                       5000
    How can I extract my KF, if there is a one-many relationship between reservation no and item & material doc number?
    Any suggestions.. anyone??

  • Delete overlapping requests from cube not working in processchain.

    In a process chain, 'deletion of overlapping requests from the cube ' step is used.
    Before this step a DTP step runs with a full update to load the cube. This process chain is scheduled every day.
    Issue is, the process chain failed at the DTP step and after correcting and repeating, the step got executed.
    However, the next step after the DTP,'delete overlapping requests from the cube'
    gets executed but without deleting the previous day's request.
    In the step details a message that 'No request for deletion were found' can be seen.
    Then next day when the DTPstep is executed without any problem the 'delete overlapping requests from cube' step is successful
    and the previous requests from cube are deleted.
    the deletion selections in the step ' delete overlapping request from infocube' is
    Delete existing requests
    Conditions:
    only delete requests from same DTP
    Selections
    Same or more comprehensive
    Because of this issue on a particular day because of the presence of 2 days requests the data is getting aggregated and shown as double in the reports.
    Please help.

    Hi Archana,
    When you delete the bad request from target and before repeating your DTP in PC, make sure the bad request deleted from table RSBKREQUEST also.
    If you find the same request in table, first delete the request from table and repeat the DTP in PC.
    Now Delete overlapping step should work.
    As this is not the permanent solution, please raise an OSS for SAP
    Regards,
    Venkatesh

  • Loading sales from R3 to BW and from BW to APO

    Hi Experts,
    I am Suvecha having little bit knowledge in APO. I want to know about the exact sense of "LOADING DATA FROM R/3 TO BW AND BW TO APO". Also clarify me whether it is APO BW or SAP BW. Also send me the exact scenario in real time.
    Thanks to one and all
    Suvecha

    HI Suvecha,
    The APO scenario can be of two types. One scenario you may have separate BW system (separate server) and the other scenario is using the internal BW in the APO server itself i.e using the internal BW which is available in APO server.
    In either case, the data from R/3 is loaded from R3 to APO by Data sources. The data from R3 is extracted by data sources using extraction structures and uploaded into the BW info cubes. The data data source will have a extraction structure, the fields from the R3 data will be mapped to the fields of data source by extraction structure. The data is extracted from source system i.e. from R3 and then updated into the info cubes by update or target structure (i.e mapping of fields to the key figures and characteristics of info cubes)  and update rules ( for mapping source field and target field if any calculation is required it can be made by using some routines).
    From the info cubes, it is loaded into APO live-cache (planning area). Hoe this clarifies your query.
    Thanks and regards
    Murugesan

  • Trnasfered plant from Ecc to APO, but location not found

    Transfered plant from Ecc to APO, but the location is not available in APO Master data

    HI
    1.Check the Integration models which you created for the plant
    2.go  to CFM5 TICK THE PLant on the left side and give the plant in the right side box under plant textbox and Execute
    Now u will get a screen on the left side double click on plant and then u will find your plant.
    Select the plant and click on the icon of check
    now if u find any Integration model and the plant is active then do Intial Transfer for the Integaration model.
    otherrwise add the plant in the integration model and do Delta transfer for plants integration model
    Sunil

  • Delete rows from Cube

    Hi,
    How can we delete some rows(rows only) from a cube? I can see duplicate data and want to remove them. Please help.
    Regards,
    Sam.

    hi sam..
    Do you know which are the request IDs with 'duplicate' data? Check them monitor for these 2 request IDs to see when it was loaded. If you are loading deltas to the cube, then normally you should not get duplicate delta...check to see if one of them was loaded as a full load with some selections. You can also see the user ID to find out who did this and if there was a reason to do so.
    In the end, if the data is just a double then you should be able to delete the extra request
    If you cube is compressed you'll have no chance to figure out from cube duplicate records since they would be aggregated form the compressed data part.
    For the part which is not collapsed we would need a program in order to out double records. If you have a characteristic or a combination of chars (excluded the request ID of course) which would uniquely identify a record then the select statement wouldn't be complicated.
    The other way, as already suggested, is to analyze the history of the loadings and identify full requests and/or successions of delta+delta repeats posted to this cube. They are some technical tables enabling this kind of analysis, RSREQDONE, RSICCONT, RSSELDONE.
    Even finding out the data posted wrongly (by request), you'll need to still have your PSA data in order to correct these postings.
    You could identify the records that are duplicated and you identify the PSA that duplicates data (if you still store the PSA data) and change the values of key figures multiplying by -1 and pass the negative values.....the aggregation will make that the values return to the right value......if you dont have the PSA records.....and still you could identify the duplicated records you could create a file wityh the same data and with negative keyfigures and load it....it wikll have the same effect
    hope it helps..

  • Data Marts created on BW Cube to APO cube

    Hi,
         Please tell me the steps that i need to perform when i create data marts from BW cube to APO cube.. We have all source systems set up and everything is fine.. we just need to create the data marts from BW cube to APO cube... i worked on data marts with in BW cubes..but here BW cube to APO cube
    thanks
    arya

    Dear,
    You will ave to create a source system BW in APO. This way you can replicate from BW to APO:
    Step by step procedure as in:
    http://help.sap.com/bp_biv335/BI_EN/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
    http://help.sap.com/bp_biv335/BI_EN/html/BW/DemPlanAnal.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5f229690-0201-0010-84ba-9ee5a8958a05
    Thanks

  • Export datasource from Cube - PSA shows no data

    Hi All,
    I need to create an export Datasource from cube.
    I right clicked on the cube-> Additional functions-> Export DS and the DS was created.
    But when I check the PSA, I see no requests.
    But in case of a DSO, we can see all the requests in DSO as requests in the corresponding export Datasource PSA as well.
    What am I missing out in case of a cube. Why is there no data in the PSA?
    Please advice.
    Thanks,
    Shyam

    Hi,
    But when you make the cube as data source for APO target, PSA won't be exist. PSA is only at first level, it holds source data , i.e ECC Data.
    after making export data source, you make connections/transfer rules whatver related APD terms, make it and try to load and see the data is coming right formate or not.
    Thanks

  • Issue in transfer of data from ECC to APO

    Hi All,
    I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
    How should I proceed...Please help....this is an urgent requirement
    Thanks & Regards,
    SriLalitha

    Hi,
    you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
    Determine Forecast of Replenishment Lead Time
    Use
    In this field, you specify how the extended safety stock planning determines
    the forecast of the replenishment
    lead time (RLT). The following values are available:
    Supply Chain
    The system determines the RLT forecast using the supply chain structure by
    adding the corresponding production, transportation, goods receipt, and goods
    issue times. If there are alternative procurement options, the system always
    takes the
    longest
    option into account.
    Master Data
    The system determines the RLT forecast from the location product master
    data.
    Master Data/ Supply Chain
    First, the system determines the RLT forecast from the location product
    master data. If no RLT forecast can be determined, the system determines the
    forecast using the supply chain structure (as described under
    Supply
    Chain
    Dependencies
    You can retrieve the replenishment lead time forecast yourself by using the
    GET_LEADTIME
    method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
    Replenishment Lead Time in Calendar Days
    Number of calendar days needed to obtain the product, including its
    components, through in-house
    production or external
    procurement.
    Use
    The replenishment lead time (RLT) is used in the enhanced methods of safety
    stock planning in Supply Network Planning (SNP). The goal of safety
    stock planning is to comply with the specified service level, in order
    to be prepared for unforeseen demand that may arise during the replenishment
    lead time. The longer the RLT, the higher the planned safety stock level.
    Dependencies
    The field is taken into account by the system only if you have specified
    master data or master data/supply chain in the RLT: Determine
    Forecast field of the safety stock planning profile used.
    Hope this helps.
    The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
    May be if you maintain the setting in the profile, you may get the value in RELDT.
    Thanks.

Maybe you are looking for

  • New feature under settings

    I just saw a new feature under my settings.  I have an iPhone 4S, using Nationwide tlk&txt share 1400, with unlimited data plan.  Is there a fee to set up and use the personal hotspot?  If so, how much?  Will adding personal hotspot change my current

  • ICal seems to run on its own

    It seems to me that iCal in OS Lion starts and runs sometimes without even opening it. There will be times when I look at the dock and it is running, without me even starting or opening it. I know I have closed it when done working with it. This driv

  • Will BT Vision Work With The TP-LINK N750

    Hi i have got the bt homehub 2 and the connection is really bad when i play games so i was thinking of getting the TP-LINK N750 but i was wondering if you could use it with the bt vision thanks.

  • Problems while facing Materialized Views

    Hello All, I am facing some problems while creating Materialized Views. Senario. SCOTT USER: sql> Grant select on emp to Public; sql> Create materialized view log on emp; Connected to LDB User sql> CREATE MATERIALIZED VIEW mt_emp Refresh fast as sele

  • How to UPDATE 2 Tables simultaneously?

    Hi Gurus I have two Tables : GPF_TXN and SAL_TXN which need to be updated on matching basis. The Table structures of which are as below : CREATED TABLE GPF_TXN ECODE               NUMBER(5), PF_NO               VARCHAR2(10), ENAME               VARCH