Download notifications based on main work center and edit based on task level person responsible

Hi Experts,
               My requirement is to download notifications based on main work center.The downloaded notifications contains task level person responsible.If the notification contains four task assigned to different persons.Let suppose one task is assigned to the mobile user and other three task to another user.Now the first mobile user should able to edit the task  assigned to him ,but he should able to see all other task in disable mode that are assigned to other user.Iam using agentry work manager 5.3
Please help me to achieve this requirement as soon as possible.Thanks in advance.
Thanks & Regards,
Sravanthi Polu
Tags edited by: Michael Appleby

Please refer my earlier posting for Work Order related requirement similar logic can be extended even to your Notification requirement.
Also refer.
Work Order and Notification Assignment Types Supported In Work Manager 5.3
Thanks
Manju

Similar Messages

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • IW51-52 - Updating fields Main work center and Maintenance plant

    Hello Experts.
    I Have a task which includes recieving a file and using the data to create new notifications. I need to update the fields above (Data elements GEWRK & SWERK ) but i can't find the right BAPI or Function which will do this work for me.
    Thanks for your help.
    Motty Gal.

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • Main work center  for notification

    which table stores main work centers  for service notifications stored and how do i link work center table with notification table

    Hi,
    <b>CRHD  - Work Center Header
        QMEL  - Quality Notification   [/b
    U can link this 2 table with the field QMEL-ARBPL = CRHD-ARBPL
    Reward Points if it is Useful.
    Thanks,
    Manjunath MS

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Control Key in Work Center and Routing

    Hi Gurus,
    Can anybody tell me what is the difference between Control Key we are providing in second tab of work center and the control key we input in routing.
    can i use same control keys at both the places.
    Regards,
    Anand.

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • Where can i find Main work center field value in il03 transaction ??

    Hi experts,
    Where can i find <b>Main work center</b> field value in il03 transaction.
    Iam looking for the table from where that value will be filled.
    thanks
    Suresh

    Hi anji reddy,
    No that filed is not avaiable in that . can please tell some other soulution ...
    ASAP...
    thanks,
    Suresh

  • Replace Main work center for maintenance order

    hello
    I have to change the work center maintenance orders to 1000.
    Is there a standard transaction to make this change in mass?
    or I'll have to create a LSMW?
    thanks
    Paulo Picarra

    Hi Paulo
    though you have closed this thread I would like to tell you that In standard T- code IW38 there is a carry out mass change option available through which you can change many data including Main Work center. Pl check the following steps
    Select the orders through IW38 & click on order (at the top menu) & select carry out mass change (or CTRL+F11)
    you will get a popup screen for selection of fields to be changed.
    Pl check & give feedback
    Regards
    Shakti

  • Selection of technical objects by work center and plant

    Hi there,
    I want to select functional locations and equipments that are diretly linked to a workcenter which you can see in the location tab in the standard-transactions.
    How can I select this data the way from work center (and plant) to the technical objects? Which tables I have to use??
    Kind regards
    Jens

    Try using Function Module ITOB_FUNCLOC_READ_SINGLE.

  • Link between work center and G/L Account

    Hi All,
    I need to link work center to the G/L account in PM Module . I know the link between work center and cost center . But would like to know how MO cost hits which cost element/ G/l account and there assignment
    Thanks and Regards,
    Vivek

    Hi check the below definitions
    Cost centre : Organizational unit within a controlling area that represents a defined
    location of cost incurrence.
    Profit Centre: Organizational unit in Accounting that reflects a management-oriented
    structure of the organization for the purpose of internal control.
    Work Centre: An organizational unit that defines where and when an operation should
    be carried out.
    Regards
    Sreeni

Maybe you are looking for

  • 24" iMac Screens better in recent batches? One non-Apple store thinks so...

    I've been thinking about getting the Alu/Glass 24" iMac (waiting until at least Leopard's arrival) but after having read a number of threads here I thought I'd better go and check for myself... I still use a PowerBook G4 15" at home and use a second

  • Anyone having problems with DX after trying bootcamp?

    So I decided to go the boot camp route for the heck of it. i Installed XP Media Center with SP2. My problem is that the Direct X drivers wont load at ALL. Anyone have similar problems?

  • Data discrepency

    Hi, I am extracting the contents of a Report text file to report object and then zipping it. I have to unzip the textfile and then read it.But i find the contents of Report text file and the unzipped text file to be different... How does it happen??

  • Install problem with Photoshop CS6

    Hello! I have here such problem. I downloaded from your site Photoshop CS6 I chose the trial version, I started establishing, but after completion of installation writes: there was a mistake some components to establish. How to correct this problem t

  • Abysmal After Effects CC 2014 threaded CPU usage

    It's pretty saddening (see screenshot below) how ill equipped After Effects is with maximizing CPU usage while rendering. I've run so many tests and configurations with the multiproccessing options in the preferences and have come to the realization