DP/BOM sub-product branding problem.

Hi,
We have a problem in our DP/BOM process.
In our system we want to use DP/BOM for some materials. The materials that are included in a DP/BOM product tree is also sold seperately. The problem we are having in DP/BOM explosion is that it creates unwanted CVCs with the brand of the DP/BOM output material.
For eg.
We have a product A which is in Brand A bucket.
We have a product B which is in Brand B bucket.
We have a DP/BOM product C which includes product A and product B in its product tree.
When we explode DP/PPM two two new CVCs created;
A CVC of product A with  Brand C profile.
A CVC of product B with  Brand C profile.
As a conclusion although these products are not in Brand C category these new CVC created in Brand C. We dont want CVCs created in a category other then the products original category even if these CVCs are created as a part of DP/BOM.
So the question is; Is there a user exit/enhancement/a way to prevent/ modify these CVCs to be created in the sub-materials original Brand category. If we modify is there a way to make sure DP/BOM wil still work properly.
Thanks for any help,
Yücelen Gül.

Hi,
I think you might want to reconsider how it is setup. Why are two products A & B of different Brand sold under C which is under a third brand? Generally BOMs are setup under the same product family.
Hope this helps.
Thanks
Mani Suresh

Similar Messages

  • Some DVDs will play while others will not - told it's an HP brand problem

    A new movie I bought refuses to play on my laptop, not matter which media player I choose. The computer recognizes that there is a disk inserted (though it doesn't recognize what movie it is), but when I try to play the disk the player will freeze.
    I've been told that this is simply an HP brand problem with no viable solution, but I was hoping to learn more about it here.
    The new DVD I bought is the correct region and my disk drive is not dirty or faulty as it will play other DVDs and CDs just fine. This new DVD works with my other DVD player and works perfectly in my roommate's Toshiba laptop.
    Is there some sort of downloadable solution?

    Lawcere,
    Go to HP.com and update the dvd drive and the BIOS.
    Here is a link to the update. You’ll need to select your country and have your product number.
    You might also clear the upper and lower registry values.
    As you play DVDs files will be stored in these folders that can sometimes cause problems.
    Here is a link that will walk you through the steps.
    Clicking the White Kudos star on the left is a way to say Thanks!
    Let me know how everything goes.
    Have a good day.

  • BOM and production order

    CAn somebody give me the steps for creating BOM alongwith routing  in SAP
    and also the steps involved in creating a Production order //
    Please give me all the t Codes //Iam basically a finance and costing consultant
    Iam trying to create a test scenario for testing a costing variant //
    Also trying to analyse the financial impact during creation of a Prodn order
    Thanx
    Nikhil

    Mr. Nick,
    Creation of BOM:
    1. CS01 -> BOM creation
    a. Enter Mtl No., Plant No., BOM Usage (use the value 3), If you wish to keep track of changes, then generate a change number & assign the same to the change number field & also select the date from which you want the BOM to be valid from.
    b. Once inside this transaction, add the components which you want along with the qty required.
    c. There are more settings which you can do, but for a simple BOM, these entries are sufficient.
    d. If you wish to link another BOM with this, enter the mtl nos which has the BOM, this way you can build multi-level BOM's.
    2. CA01 -> Routing creation
    a. You can create a routing specific to a material or you can have a single routing for multiple materials.
    b. If you want to have a routing per material, then enter the mtl nos, Plant, change nos if you want to keep track of changes & the valid from date.
    c. You can also have routing specific to a sales document or WBS element.
    d. If you wish to have a group routing i.e. a single routing for multiple mtl's which are going to be produced in a similar way, then just enter a name in Group field.
    e. Depending on what you select above, different screens open, i would suggest, you try creating one in the sandbox server & post back if you face any problems.
    3. CO01 -> Production order creation
    a. Once you have created the BOM & routing for the material, then enter the material for which you want to create the production order, enter the production plant & also the order type. If you are not aware of what order type, then please refer to your PP consultant.
    b. After making the initial entry & when you press enter, the system automatically reads the BOM & Routing associated with this material.
    c. Once again i suggest you create a production order in sandbox server & if you face any issues you can post back.
    Also note: You can use CS02, CA02, CO02 for modifications of BOM, Routings & Production orders respectively. CS03, CA03 & CO03 for display.
    Hope i was able to give some assistance to you.
    Regards,
    Vivek

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • Want to add Custom text after Product Branding Image for application

    Hi
    Can we add any text after Product Branding Image for application
    By default it will show the responsibility function name
    My requirement is after company logo I want to add Text at the top of application
    with center align
    Need suggestions
    Regards
    Krishna

    Hi Anoop
    If I done what u suggested then the function responsibilty name will also come
    and the application will be disturbed
    Is their a way to edit the text at the top
    Regards
    Krishna

  • BOM and Production Order: Multiple Inputs to Multiple Outputs

    Dear All, My client's industry required BOM and Production Order must be Multiple Inputs to Multiple Outputs. We propose to create customization program to work on it but client do not want any customizations. Any suggestions? SAP B1 8.81 PL13 Thank you very much in advance. Best Regards, Vivian

    Hi,
    Please advice your requirement with an example. There is possibility to input multiple components to produce single finished product.
    Not sure you have checked with SAP help file. If not refer SAP help file and below blog.
    http://scn.sap.com/community/business-one/blog/2014/03/01/how-to-implement-production-in-default-sap-business-one
    Thanks & Regards,
    Nagarajan

  • Selection of BOM with Production version

    Hello friends,
    I have Finish product say A with two alt. BOM and Production Version 1 & 2
    i have semi-finish product say B  with two alt. BOM 1 and 2 in the BOM of the Product A
    Now when i create PIR in MD61 for product A with production version 2 selection,how the system will select the component B
    with alternative BOM 2
    please suggest

    Hi Mangesh,
    The production version is selected based on the setting you are maitaining in MRP-4 view for Dependent Requirement Selection Method. The selection will be based on the Validity dates, Quantity i.e. based on the Lot sizes, and based on the production versions.
    If both the versions are having same date,lot size etc, then the system will select the first version by default.
    IF you do not want any version not to be selected then you can lock that version in MRP-4 view or in C223.
    Thanks and regards
    Muru

  • Using RoboHelp for Product Branding

    My company wants me to be able to use a single source file to
    create different versions of HTML help and printed documentation
    for product branding. Is there a way to simply put in a variable
    like <product name> or <screen name> in the source
    file? Some of our products have ten versions which requires me to
    insert 10 different screens. My boss would like to use a variable
    and have the program call in the correct product names and screens
    for the product branding.
    Has anyone used RoboHelp for product branding and is there a
    better method?

    In addition to Peter's excellent topics I thought I'd chip
    in.
    10 screen shots for each screen! Wow that's alot of work and
    maintenance. I have suggested an approach which I coined the phrase
    "Screen Portrait". This can provide a generic enough image that can
    be suitbale for different brandings and localisations:
    http://techwritetips.wordpress.com/2006/02/21/best-practice-screen-shots-vs-screen-portrai ts/
    http://techwritetips.wordpress.com/2006/03/28/best-practice-screen-portraits/
    The rest of the branding should be able to be achieved with
    your .css (which can also include control of logo images).

  • Product Branding Image does not appear

    Hi,
    I created a simple OA page.
    Added 'productBranding' to the 'PageLayoutRegion'.
    I set the value of Image URI to FNDTAPPBRAND.gif as mentioned in the "Search" Tutorial.
    When I run the page,the image does not appear.
    Only the image associated with the Corporate Branding apear on the page
    How can I solve it?

    You need to check the profile FND : Branding Size, if it is set to Regular or Medium we render the product branding image. If it is set to small then you need to define a formatted text which will be displayed to save the space. There are other ways of setting branding, read the Branding information in the dev guide.

  • Engineering BOM and production BOM-very critical help

    Hello All,
    I am working for a client and below is the requirement, please guide me.
    1) Customer has 2 department here one is engg and other is production as usual.
    2) He needs BOMs only for 2 purposes a) For R and D  b) Production.
    3) He needs any changes in engineering and production to be reflected from certain specified date.
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods  to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.
    Please suggest if any better model can help.
    Regards,
    satish

    Hello Adler,
    That was good response. Here any of both situations can appear. So can you help me in knowing the procedure how to do the same in both cases
    Also below are my pending queries, any one please help
    1) He needs any changes in engineering and production to be reflected from certain specified date as per date he mentions
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.

  • Product branding software

    After replacing the systemboard on a HP Elitebook 8460p, on bootup it is asking for product branding software so that the product name and serial number can be inputted to the new system board. Without this I am unable to complete my company build as it requires these fields. Where can I get hold of this software?

    I very much doubt you can. This will belong to HP and be pretty guarded if it's what I think it is.
    There are ways to get this stuff but not ones I will elaborate on. Suffice to say missing stuff like this gets serious attention from management

  • BAPI_GOODSMVT_CREATE and Product Brand

    Hi all,
    I have a requirement to create a Material Document using a custom Movement type. The issue is the Product Brand in MB1A has been made as a mandaory field by a user-exit. but in the BAPI i am using (BAPI_GOODSMVT_CREATE) there is no field to pass the Product Brand. So is there any alternative way so that i can create the Material Document with Product Brand.
    Thanks and Regards,
    Anoop R.S

    Behind the BAPI there is a set of 2 FM that used to create and post the Material Document. These FM are the:
    MB_CREATE_GOODS_MOVEMENT
    MB_POST_GOODS_MOVEMENT
    First you should create the material document by using the first FM and then you will post the document by using the second one FM.
    Check the following code.
        CALL FUNCTION 'MB_CREATE_GOODS_MOVEMENT'
          EXPORTING
            IMKPF             = T_IMKPF
            XALLP             = 'X'
        XALLB             = ' '
        XALLR             = ' '
           CTCOD             = W_CODE
         IMPORTING
           EMKPF             = T_EMKPF
        E_LVS_TAFKZ       =
          TABLES
           EMSEG             = T_EMSEG
           IMSEG             = T_IMSEG
        IF T_EMKPF-SUBRC = 1.
          CALL FUNCTION 'MB_POST_GOODS_MOVEMENT'
            IMPORTING
              EMKPF  = T_EMKPF
            EXCEPTIONS
              OTHERS = 0.
          IF T_EMKPF-SUBRC = 0.
            COMMIT WORK AND WAIT.
          ENDIF.
      ELSE.
         DO SOMETHING....
    ENDIF.
    With Regards
    George

  • Costing for sales order BOM vs Production BOM

    Hi gurus,
    can some one please explain in clear how is costing different if we use sales order bom versus if we use production bom.
    Thx

    I Feel Your are asking about Sale order costing and Std cost estimate using production BOM
    IN sale order costing- You can use any BOM ( sale BOM or production BOM), IF you carried out costing in sale order level in Va01/Va02, system will read the BOM, routing for that material  & system will take the costing lot as sale order qty and carried out cost estimate, This cost estimate value will update In condition as EK02. & system will take this Ek02 price for production GR value, PGI value and the profit is calculated based on Ek02 not based on VPRS( std cost estimate)
    Production costing:
    System will take the costing lot size in material master costing view, System will read the BOM and routing for the material in Ck11n, And you need to mark and release in Ck24, this value will update as Std cost  price in material master, this value is atken for Goods movement for that material

  • Alternative BOM in Production Order

    Hi PP Experts,
    I have a small issue which is like this:
    I have two Alternative BOM for Material "A".
    When I create production order it displays both Alt Bom for selection.
    When I select the second Alt BOM, in production order it still reads the First Alt BOM.
    Please advice.
    Regards
    Mohan

    Hi Mohan,
    I suggest if you have two alternate BOM for a material, you can use the production versions and assign the same for the material in Material Master MRP4 view.
    Create Production Versions 01 and 02 and assign the alt BOM 1 for the PV 01 and 02 alt bom for PV 02.
    Goto SPRO : Production -> Shop Floor Control -> Define Order type dependent paramters  ( Tcode : OPL8)  : Define the Production Version Slection either 1 for manual and 2 for automatic. (if you use automatic system will select the version based on the material master selection method )
    regards
    radhak mk

  • Updating BOM Sub Items using CS_BC_BOM_CHANGE_BATCH_INPUT

    Hello,
    I am trying to update BOM sub items by using this function module. I am filling up all fields in all tables, still it is giving error.
    Any body has any sample code for this function module...
    Unfortunately there is no documentation for this FM and very little usage in standard programs...
    Regards,
    Krishna.

    Hi,
    My Code for create
    DATA: BOM_HEADER     TYPE CAD_BICSK ,"STRUCTURE FOR HEADER DATA
          IT_BOM_ITEM    TYPE TABLE OF CAD_BOM_ITEM,"INTERNAL TABLE FOR ITEM
          WA_BOM_ITEM    TYPE CAD_BOM_ITEM,"WORK AREA FOR ITEM
          IT_BOM_SUB_ITEM  TYPE TABLE OF CSSUBITEM ,"INTERNAL TABLE FOR SUB ITEM
          WA_BOM_SUB_ITEM  TYPE CSSUBITEM ,"WORK AREA FOR SUB ITEM
          IT_DMS TYPE TABLE OF CLS_CHARAC,"INTERNAL TABLE FOR DMS_CLASS_DATA
          WA_DMS TYPE CLS_CHARAC,"WORK AREA FOR DMS_CLASS_DATA
          IT_SAP_FIELD TYPE TABLE OF RFCDMSDATA,"INTERNAL TABLE FOR SAP_FIELD_DATA
          WA_SAP_FIELD TYPE RFCDMSDATA,"WORK AREA FOR SAP_FIELD_DATA
          E_RETURN       TYPE CAD_RETURN-VALUE,"STRUCTURE FOR RETURN
          E_MESSAGE      TYPE MESSAGE-MSGTX,"STRUCTURE FOR MESSAGE
          E_MESSAGE_LEN  TYPE CAD_RETURN-MESSAGE_LEN."STRUCTURE FOR MESSAGE LENGTH
    LOOP AT IT_DATA INTO WA_DATA.
        MOVE-CORRESPONDING WA_DATA TO WA_DATA1.
        APPEND WA_DATA1 TO IT_DATA1.
      ENDLOOP.
      SORT IT_DATA1 BY MATNR WERKS.
      DELETE ADJACENT DUPLICATES FROM IT_DATA1 COMPARING MATNR WERKS.
      LOOP AT IT_DATA1 INTO WA_DATA1.
        CLEAR: BOM_HEADER, WA_BOM_ITEM,WA_RET.
        REFRESH: IT_BOM_ITEM.
    FILL BOM HEADER
        PERFORM DATE_FORMAT USING WA_DATA1-DATUV CHANGING BOM_HEADER-DATUV.
        BOM_HEADER-MATNR = WA_DATA1-MATNR.
        BOM_HEADER-WERKS = WA_DATA1-WERKS.
        BOM_HEADER-STLAL = WA_DATA1-STLAL.
        BOM_HEADER-STLAN = WA_DATA1-STLAN.
        BOM_HEADER-ZTEXT = WA_DATA1-ZTEXT.
        LOOP AT IT_DATA INTO WA_DATA WHERE MATNR = WA_DATA1-MATNR and werks = wa_Data1-werks.
    FILL ITEM
          if wa_data-postp = 'T'.
            WA_BOM_ITEM-POSNR     = WA_DATA-POSNR.
            WA_BOM_ITEM-POSTP     = WA_DATA-POSTP.
            WA_BOM_ITEM-POTX1     = WA_DATA1-ZTEXT.
          else.
            WA_BOM_ITEM-IDNRK     = WA_DATA-IDNRK.
            WA_BOM_ITEM-POSNR     = WA_DATA-POSNR.
            WA_BOM_ITEM-POSTP     = WA_DATA-POSTP.
            WA_BOM_ITEM-MENGE     = WA_DATA-MENGE.
          endif.
          APPEND WA_BOM_ITEM TO  IT_BOM_ITEM.
        ENDLOOP.
        CALL FUNCTION 'CAD_CREATE_BOM_WITH_SUB_ITEMS'
          EXPORTING
            I_BOM_HEADER   = BOM_HEADER
          IMPORTING
            E_RETURN       = E_RETURN
            E_MESSAGE      = E_MESSAGE
          TABLES
            BOM_ITEM       = IT_BOM_ITEM
            BOM_SUB_ITEM   = IT_BOM_SUB_ITEM
            DMS_CLASS_DATA = IT_DMS
            SAP_FIELD_DATA = IT_SAP_FIELD.
        WA_RET-MATNR = WA_DATA1-MATNR.
        if e_return = 0 .
          wa_ret-status = 'SUCCESS'.
        ELSE.
          wa_ret-status = 'ERROR'.
        ENDIF.
        WA_RET-WERKS = WA_DATA1-WERKS.
        WA_RET-MSG = E_MESSAGE.
        APPEND WA_RET TO IT_RET .
      ENDLOOP.
      LOOP AT IT_RET INTO WA_RET.
        if wa_ret-status =  'ERROR'.
          APPEND wa_ret to it_erv.
          ENDIF.
        WRITE: /.
        WRITE:(12) WA_RET-MATNR,(6) WA_RET-WERKS,(8) wa_ret-status,(70) WA_RET-MSG.
      ENDLOOP.
    Regards,
    Manesh.R

Maybe you are looking for

  • New to the forums, not new to Mac. Need help on failing hard drive.

    Hello, glad to have found this forum...I need all the help I can get. Let me explain what I have, what it's doing, what I want it to do, what I "think" I need to do. *What I have:* 733 G4 with superdrive, 512 MB SDRAM, 40 & 60 gig internal original h

  • How do I create a runtime library reference from a J2EE library DC?

    I've created a J2EE library DC that references some classes in an already deployed library.  The referenced jar file has been correctly deployed, as it's successfully used by some other components.  I can build the DC, since I've created created a co

  • 3rd-party AC adapter for Powerbook and Macbook?

    Looking into buying an AC adapter to keep at a 3rd location I'm spending a lot of time at. My current Powerbook won't live forever, so I'll probably be getting a Macbook (Pro) in a future that's nearer and nearer, and thus it'd be great if I could fe

  • Linking Priority and ABC indicator

    Gentlemen, Here i have an interesting requirement. My customer require to set the priority of notification based on the equipment criticality, ie based on the ABC indicator. How to link these two things ( Priority in notification and ABC indicators o

  • Change PP order from PLANT STOCK to PROJECT STOCK ?

    We are creating a production order via BAPI_PRODORD_CREATE_FROM_REF.  We are using an existing production order as our reference.  The existing production order has account assignment to WBS, and the existing production order is listed under PROJECT