DTP Stuck in Production System

Hi All,
We have a DTP(cube to cube load) which runs daily in a process chain. Last week it got stuck twice without extracting any data and the status as yellow.
We made the status RED and deleted the request and repeated the step in the process Chain and it got completed successfully in 20-25 mins.
It got Stuck for over 7 hrs and as it didn't timeout or abort, we have to forcefully kill the job by going to SM51.
Can anybody please explain in detail why this might have happened.
Thanks,
Max.

Hi,
With out any error or warning message hard to find the cause.
As my guess there might be other loads will be running at the same time. So all available application servers will be busy. so there is no free application servers to process your request.
Next time you can observe available application servers at SM50 and trigger your load. other wise you can ask basis team to increase the required application servers. Or try to schedule your load some other time(where there is less burden on bw server) if your business accepts.
Have you added delete index step on your process chain before loading to cube.
check at your source cube - if any other loads are loading to source cube or filling aggregates are in process or any attribute chnage run is on related master data info object.
Thanks.

Similar Messages

  • Transformation pointing to Quality Client in Production System Repeatedly

    Hi,
    I need to understand one issue which is explained in detail below step by step.
    1. I created one Customized Data Source(Full Load) and replicated in BW.
    2. Also created Info Objects, DSO, Info Package, Transformation, DTP.
    3. While transporting this modelling to Production(first time), i unknowingly/mistakenly missed capturing the datasource in Transport Request.Sequence of transport was -
    Data Source
    Info Area
    Info Object Catalogue
    Info Object
    DSO
    Cube & MP
    Data Source
    Transformation
    Info Package & DTP
         Now, the moment TR for transformation was transported it threw an error - "Data Source does not exist in Quality client". Then I transported the Data Source TR and after that re-transported the transformation TR production and this error was removed.
    But, there were 2 transformations in production - 1) Pointing to Production, 2) Pointing to quality.
    4. I request the basis team to delete the second transformation(pointing to quality) from BW production system.
    5. After that we captured Data Source and transformation in same TR and transport was successful.
    6. Now, after few days we transported a change to production for same object and the system again threw the same error mentioned in point no.3 above and created two transformations again.
    How to resolve this issue permanently and I also want to know the reason of this type of system behavior.

    Mohammed,
    I did that also - please read my step no.4.
    We are able to delete the transformation which was referring to quality client and then captured D.S & transformation in a single TR and transport as successful.
    Now, after few days I did one change in the same transformation and transported to production.
    System Behavior:
    Error - " No source exist (i.e.,system referred to quality in production)".
    Also again transformation was visible in production which was referring to quality client(which we already deleted with the help of BASIS).
    Now since again the transformation needs to be deleted from production, our basis team is telling us to they cannot delete objects every time in production.Thus,
    1. Is there any option to solve this issue permanently?
    2. Also is it necessary to transport data source along with the transformation which is directly linked to data source?
    Please Note: We have Dev+Quality as one client and Production.

  • Generate Export DataSource from InfoCube In Production System

    Software component : BI release 7.0 SP 18
    Dear Gurus,
    we have a strange situation in our production system from a month till now.
    We want to generate an export data source from an infocube to load data into another one but now when we try to generate in prod ( right click on infocube and select "Generate Export DataSource" ) we can't create anymore.
    Following message appears :
    no changes to repository and cross client customizing object allowed
    and the generation is stopped.
    We always did it in production system in the same way as in the other system and then transported the update rule or transformation, but now it seems that is no more possible.
    No setting has been changhed in SCC4 and in object changeability. Maybe is an authorization problem or is due to any other setting?
    Does anybody has a way to solve this problem?
    <removed by moderator>!
    Kind Regards
    Stefano
    Edited by: Siegfried Szameitat on Nov 24, 2008 4:18 PM

    Hi Stefano,
    If you want to generate an export datasource you ask your basis team to open the system so that you can do.
    As per the Sap Best Practise you can do  the export datasoorce in your development system and move it to the quality and after testing you transport to Production.
    Generallly if you can look in to production authorizations you may have only some operation like to display only.SOme times basis may give authorizations like creation of DTP and Infopacks like that.
    Regards

  • Inactive Transformations and DataSources in Production System.

    Hi Experts
    We are working on BI 7.0 engine within Solution Manager.
    We had some issues with DataSources initially while transporting BI Objects from Devp to Prod. We logged it into OSS and followed their procedure to redo the transports.
    In the process, the issue was resolved but 2 New Transformations are created one for each Data Model (since I have only 2 InfoCubes) automatically and is the working model now.
    Actual Transformations from Devp became Inactive in Prod and also there are 2 Inactive DataSources which are also from Devp. 2 New DataSources are again from Devp.
    When I tried to Delete these unwanted Objects from Prod (I asked the Basis to Open Prod for me though this is not the best practice), it is asking for a Request ID. Also, since the Project has Gone Live already, I am scared if I might disturb the Production System.
    Kindly, advise what best could and needs to be done.
    Thanks,
    Chandu

    Initially, we implemented BI-HR module with standard content, which 3.x content (transfer / update rules)... in parallel we also did transformations & DTPs (BI 7.0 model).
    Since, client wasn't sure with conversation of transfer rules (has lots of routines) to transformations & DTPs . So we transported both the models to prod sys... We created daily load process chains with transformations & DTPs... The actual plan was, if PC loads fails, then to go for manual loads of 3.x model...Fortunately 7.0 models was successful...
    Then one month later, we deleted those transfer / update rules and 3.x datasources from prod sys, on the weekend (process chains runs only week days) without any issues...
    We captured those deletion requests and deleted them from SE09 by unlocking them in SE03.

  • IDOCs error in Production System

    Hi Gurus,
       In Production system, there is a CRM oppertunities process chain is running on hourly basis, the data was updated to DSO successfully, but for the past one week it was not updating to further processing InfoCube, there is an error.
    error:  Idoc Ready to be transferred to application.
    Please update me step by step procedure.
    Thanks

    Hi,
    Check the DataSource in RSA3, if it is working fine and able to see the data in RSA3, there is no problem in DS level, then checl the Mappings and any routines in BW for that DS, if this is also fine then check the below options.
    See Dumps in ST22, SM21 also.
    Check RFC Connection between ECC and BW systems, i.e. RSA1-->Source System->Right Click on Source system and Check.
    You must have the following profiles to BWREMOTE or ALEREMOTE users.So add it. Bcoz either of these two users will use in background to get extract the data from ECC, so add these profiels in BW.
    S_BI-WHM_RFC, S_BI-WHM_SPC, S_BI-WX_RFC
    And also check the following things.
    1.Connections from BW to ECC and ECC to BW in SM59
    2.Check Port,Partner Profiles,and Message Types in WE20 in ECC & BW.
    3.Check Dumps in ST22, and SM21.
    4.If Idocs are stuck i.e see the OLTP Idoc numbers in RSMO Screen in (BW) detials tab see in bottom, you can see OLTP Idoc number and take the Idoc numbers and then goto to ECC see the status in WE05 or WE02, if error then check the log else goto to BD87 in ECC and give the Idoc numbers and execute manually and see in RSMO and refresh.
    5.Check the LUWs struck in SM58,User Name = * (star) and run it and see Strucked LUWs and select our LUW and execute manually and see in RSMO in BW.
    See in SDN
    Re: Loading error in the production  system
    Thanks
    Reddy

  • How to active the transformations in production system

    HI
    How to active the transformations in production system when Time stamp error occured in SAP BI.
    In SAP BW we use RS_TRANSTRU_ACTIVATE_ALL for tranfer rules activation.Is there any chance Activation allowes in production system witout any ABAP programme running.

    Hi Gkreddy,
    There is a specific program for that: RSDG_TRFN_ACTIVATE. It will also re-activate the related DTPs.
    Please check the following SAP Notes:
    #1408161 - Program for transformation activation.
    #1471117 - SP25:RSDG_TRFN_ACTIVATE skips if M version has OBJSTAT 'INA'.
    BR

  • Solman 7.1 LVSM Product system has no technical system assigned

    Hi All,
    As reference of blog #sapadmin:: How to assign Product System in SOLMAN 7.1 & How LMDB, SLD, SMSY and Landscape Verification  work in SOLMAN7.1SAPNetworkWeblogs%2528SAPNetworkWeblogs%2529
    I have created product instance from LSVM and now I have problem to add "product system" for Enterprise portal (using NW 7.3)  to the landscape, as its throw me an error "Product system has no technical system assigned".
    From the display help its mentioned:
    *Diagnosis*
    Product system is not assigned a technical system in the system landscape of the Solution Manager.
    *System Response*
    Since the system landscape of the Solution Manager forms the basis for working with SAP Solution Manager, if your product systems are incorrectly assigned, many important functions are not available to you, or are only available on a restricted basis.
    *Procedure*
    Assign one or more technical systems to your product system . SAP recommends that you use the corresponding wizard of the Landscape Verification Tool. To start the wizard, choose the button Change Technical System Assignments next to the message. The user interface of the wizard contains detailed information about its usage.
    I'm not sure with sentence of Assign one or more technical systems to your product system and which wizard are this referring to ?
    I have also checked from the wiki:
    http://wiki.sdn.sap.com/wiki/display/SMSETUP/MaintenanceofProductintheSystemLandscape#MaintenanceofProductintheSystemLandscape-EnterprisePortal
    And its only supported for NW 7.0 not 7.3.
    Is there anyone had this issues ?
    It's feels like I'm the only one stuck in this.
    Thanks in advanced.
    Raff

    Hi Sunny,
    Many thanks for your reply.
    I have followed the guide you mentioned, now I can see 2 EPD Error from LVSM.
    1. Product system EPD has no technical system assigned (new)
    2. Technical system EPD is not assigned to a product system
    For number 1. if I clicked on Change Technical System Assignments I can see EPD there, but when I want to add the EPD by clicking > I've got this error message " Newly linked technical system EPD has already been locked by user" I've tried to remove the lock from sm12 but nothing happen.
    For number 2. if I clicked on Change Product System Assignments, there is an error messages "Technical system EPD was updated in parallel session"
    I believe the number 1. coming because I create it from SMSY, but the number 2. is still there in the first place.
    Cheers,
    Raff

  • Create a Support Message in Production system showing up in Solution Manage

    Has anyone setup the link between creating a support message (under help) in a production system (like ECC) and SAP's Solution Manager.
    I understand that it uses BADI SBCOS001 with the interface method PREPARE_FEEDBACK_BO, but when I try to run it, it tells me that Customizing for feedback functionality missing. What functionality is missing? And how to I correct this? And how do I ensure it shows in SAP Solution Manager under a solution or project?
    Thanks
    Paul

    Hi Paul
    The only way is to use the IMG. I have just completed this via the IMG info. BUT, it is not that simple.
    Make sure your RFC's are trusted and that you have SAP ALL during config.
    I hope this will help:
    Setup Service Desk
    Steps to follow while configuring support desk.
    1) Implement the note 903587 .
    2) Create all the relevant RFC objects in the satellite system and add the appropriate logical components using transaction SMSY.
    3) Check all the objects in the table BCOS_CUST using transaction SM30.
    Appl : OSS_MSG
    + :W
    DEST :BACK RFC NAME (for solution manager system keep this field as 'NONE')
    + :CUST 620
    + :1.0.
    *4) Check whether the BC sets are activated or not using the transaction SCPR20.If the BC sets are not activated then implement the note 898614.The steps to activate the BC sets are described below
    4.1) Activate SOLMAN40_SDESK_BASICFUNC_000 BC Set.
    4.2) Activate this in expert mode with option u201COverwrite everythingu201D.
    4.3) Activation of the following components has to be done by replicating the previous steps
    3.1) SOLMAN40_SDESK_TPI_ACT_AST_001
    3.2) SOLMAN40_SDESK_ACTIONLOG_001
    3.3) SOLMAN40_SDESK_ACT_ADVCLOSE_001
    3.4) SOLMAN40_SDESK_TEXTTYPES_001
    *Depends upon the number of inactive BC set objects that we have after the upgrade.
    4.4) if the actions mentioned in 4.3 are not listed while executing the transaction SCPR20, then implement the note 898614.In the source client 000 of the solution manager system create a transport request using transaction SE09, unpack the file 'PIECELIST_SERVICE_DESK_INIT.ZIP' from the attachment of the note. Copy the contents of the file 'PIECELIST_SERVICE_DESK_INITIAL.TXT' to the transport request. And activate the actions. Use transaction SCC1 to import the transport request to the solution manager client. If any short dump occurs during the activation, implement the note 939116.
    5) Check whether the number range is set correctly. If not set the number ranges of basic notification (ABA) and the support desk message (Service transaction SLFN).To be able to use the same number ranges for both message types, the internal number range for basic notification (ABA) must correspond to the external number range for the support desk message.
    Number ranges for ABA notifications
    5.1) create an internal and external number range using transaction DNO_NOTIF.
    5.2) assign number range intervals to groups internal and external.
    5.3) SLF1 is the internal number range group
    5.4) SLF2 and SLF3 is the external number range interval
    5.5) Use transaction DNO_CUST01 to assign message categories to the number range.
    5.51) Go to transaction DNO_CUST01
    5.52) From the GOTO menu select the menu item DETAILS
    5.53) Now you can assign the number range of basis notification (ABA) into the notification type.
    The number range for ABA notification is 12 characters in length and to make it compatible with the CRM service transaction insert 2 ZEROES at the beginning.
    Number ranges for Support Desk notification
    5.54) Use transaction CRMC_NR_RA_SERVICE, and define the internal and external number ranges. Intervals must correspond to the intervals of the basic notifications (ABA notification).
    5.6) Then assign both the external and internal numbering
    5.61) Go to SPRO and then to SAP Solution Manager
    5.62) Then select General Settings and then select Transaction types
    5.63) Select the transaction type SLFN and then select the menu item DETAILS from the GOTO menu.
    5.64) In the Transaction Numbering block, assign the internal and external number range. The Number Range object should be CRM_SERVIC.
    5.7) To view the priorities use transaction DNO_CUST01 and select the notification type as SLF1 and then select priorities from the left pane of the screen. The priorities of the first four cannot be deleted, but new priorities can be added.
    6) Check the Action profiles for ABA Notifications (Action profiles are used for synchronization of ABA notification with the CRM Service transaction).
    6.1) To check the action profiles use the transaction SPPFCADM and select the application type DNO_NOTIF then select u2018DEFINE ACTION PROFILE AND ACTIONSu2019.
    6.2) Select the item u2018SLFN0001_STANDARD_DNOu2019 and then from the menu GOTO, select the menu item DETAILS.
    7) The Action profile u2018SLFN0001_STANDARD_DNOu2019 has to be assigned to the message category SLF1 (ABA notifications) using the transaction DNO_CUST01.
    8) The action profile for the support desk message can be set to u2018SLFN0001_ADVANCEDu2019.
    8.1) From SPRO select SAP Solution Manager then Scenario Specific Settings.
    8.2) Select the item Service Desk and then to general settings.
    8.3) Execute the category u2018Define Transaction Typesu2019.
    8.4) Select the transaction type as SLFN
    8.5) From the GOTO menu select the menu item u2018DETAILSu2019 and assign the action profile as SLFN0001_ADVANCED .
    9) Activate the partner/ Organization
    9.1) Go to CRM->MASTER DATA->BUSINESS PARTNER->INTEGRATION BUSINESS PARTNER ORGANIZATION MANAGEMENT->SET UP INTEGRATION WITH ORGANIZATIONAL MANAGEMENT.
    9.2)Find the entries starting with HRALX
    HRALX-HRAC WITH VALUE 'X'.
    HRALX-OBPON WITH VALUE 'ON'.
    HRALX-PBPON u2018ONu2019.
    HRALX-MSGRE u2013 u20180u2019.
    9.3) If entries are not found create it.
    10) Generate Business partner screens
    10.1) Go to transaction BUSP.
    10.2) Execute the report with the following parameters
    CLIENT - Client in which business partners should be created (solution manager client)
    APPLICATION OBJECT-
    SCREEN - *
    Generate all/ selected screens - All screens.
    delete sub screen containers -
    11) implement SAP note 450640.
    11.1) Go to transaction SA38 and select the report CRM_MKTBP_ZCACL_UPDATE_30.
    11.2) Execute it with test mode box unchecked.
    If a new relationship is to be created then steps 12 and 13 has to be followed
    12) To create a relationship category
    12.1) Go to transaction BUBA
    12.2) Select the entry CRMH00: Undefined relationship
    12.3) click on copy
    12.4) Rename CRMH00 to ZCRMH00.
    12.5) CREATE A RELATIONSHIP CATEGORY.
    IN GENERAL DATA FILL LIKE ' FROM BP1 : HAS THE ACTIVITY GROUP '.
    ' FROM BP2 : IS A PART OF ATTUNE
    13) Add the relationship category to the support team partner function
    13.1)Use SPRO
    IMG GUIDE->SAP SOLUTION MANAGER->SCENARIO SPECIFIC SETTINGS->
    -> SERVICE DESK->PARTNER DETERMINATION PROCEDURE->DEFINE PARTNER FUNCTION.
    13.2) FIND THE PARTNER FUNCTION SLFN0003 (SUPPORT TEAM).
    13.3) In the field relation ship category, Select the newly created relationship category and save.
    14) Steps 12 and 13 should be repeated for various business partner types like sold-to-party, message processors if new relationship is to be created for the respective business partner types.
    15) Create a new access sequence for the support team determination
    15.1) Go to the following IMG Path: SAP Solution Manager Implementation Guide ->
    SAP Solution Manager -> Configuration ->
    -> Scenario Specific Settings ->Service Desk -> Partner Determination Procedure ->
    ->Define Access Sequence
    15.2) Click on New Entries
    15.3) Define a new access sequence with sequence name as u2018Z001u2019 and description u2018NEW BP RELATIONSHIP ACTIVITY GROUPu2019
    15.4) Create an new Individual Access with the following value:
    u2022 Batch Seq: 10
    u2022 Dialog Seq : 10
    u2022 Source : Business Partner Relationship.
    u2022 Detail on the source:
    u2022 Partner Function : Reported By (CRM)
    u2022 Mapping/restrictions
    u2022 Flag Mapping/definition for partner being Searched
    u2022 Partner Function in Source: Support Team (CRM).
    Save it.
    This Access Sequence will give us the Partner which has the relationship assigned
    to the Support Team in the Reported By partner data.
    16) Adapt the partner determination schema/Function
    16.1) Go to the following IMG Path: SAP Solution Manager Implementation Guide ->
    SAP Solution Manager -> Scenario Specific Settings ->Service Desk ->
    -> Partner Determination Procedure -> Define Partner Determination Procedure.
    16.2) The two options to adapt partner determination schema are
    16.21) Adapt the standard Procedure (SLFN0001) or to create a new one by copying the standard one.
    16.22) select the line starting with SLFN0001 or the newly created procedure.
    16.23) Double Click on Partner Function in Procedure.
    16.24) Select the Partner Function "Support Team", and click Details.
    16.25) in the detail view only change the Partner Determination/access Sequence to
    the one we've just created. Save your entry.
    17) Create a root organizational model.
    17.1) Go to the following IMG Path: SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Configuration-> Scenario Specific Settings ->Service Desk -> Organizational Model ->Create a Root Unit for Your Organizational Structure.
    17.2) creating an organizational unit by entering the data in the BASIC DATA tab.
    17.3) enter the organizational unit, the description and save it.
    18) Create the support team organization
    18.1) go to the following IMG Path: SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Scenario Specific Settings ->Service Desk -> Create Organizational Objects in the Organizational Structure. Or use transaction (PPOMA_CRM).
    19) Create the business Partners.
    19. 1) Key users- End user (Business Partner General) ,Address should be specified.
    19.2) go to the transaction BP.
    19.3) create a new Person, Select the role: Business Partner (Gen).
    For Identification of the key user
    19.31) click on the identification tab
    19.32) enter a line in the identification number formatted as follows
    IDTYPE : CRM001.
    Identification number : <SID><INSTALL NUMBERS><CLIENT><USERNAME>
    eg: USER NAME : USER1.
    CLIENT : 100.
    SID : ER1.
    INSTALL NUMBER : 123456789.
    IDENTIFICATION NUMBER : ER1 123456789 100 USER1.
    20) Message Processors- Support Team members .
    20.1) they should be created first as the users in the corresponding client of the solution manager.
    20.2) As business partners they will have the role 'EMPLOYEE'.
    20.3) Go to transaction BP .
    20.4) Create New Person with the role employee.
    20.5) In the Identification tab you should enter the user name in the employee data/User Name.
    eg: username: proc1
    enter proc1 in the field User name.
    21) Organizational Business Partner- Organizational BPS have the same country in there main address tab. They should be created through the organizational model. Business partner corresponding to the root organization have the role 'SOLD TO PARTY'.
    22) Assign the business partners (Message Processors) to the previously created support team.
    22.1) Go to transaction PPOMA_CRM.
    22.2) Select the support team 1.
    22.3) Click on create
    22.4) select position
    22.5) call it 'MPROC_T1/Message Processors for team 1
    22.6) Replicate it for the other support teams.
    22.7) Select the position MPROC_T1/Message Processors for team1 and click assign,
    choose owner/Business Partner find and select the business partner
    22.8) Validate and Save it.
    22.9) If the assignment of business partner is not possible then implement the note 1008656
    Or 997009
    23) Create the iBase component
    23.1) IMG Path: SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Basic Settings -> Standard Configuration of Basic Settings -> Solution Manager -> iBase -> Initially Create and Assign the Component Systems as iBase Components.
    23.2) or use the transaction IB51 to create the installed base.
    23.3) it is also possible to create the SOLUTION_MANAGER, select the solution and go to menu Edit -> Initial Data Transfer for iBase.
    24)Assign Business Partners to iBase Components
    IMG Path: SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Basic Settings
    -> SAP Solution Manager System ->ServiceDesk-> iBase -> Assign Business Partners to iBase Components.
    *--optional--
    If you want to be able to assign the System Administrator: Go to the IMG: SAP Solution Manager Implementation Guide -> Customer Relationship Management -> Basic Function -> Partner Processing -> Define Partner Determination Procedure.
    Select the entry "00000032 Installed Base/IBase" and double click on Partner Functions in Procedure.
    Then copy the Entry "Contact Person (CRM)" to a new entry with the partner Function "System Administrator (CRM)" , save it.
    Go back to transaction IB52, select a component, and Goto -> Partner, you should be able
    now to assign the partner Function "System Administrator".
    25) Assign the SAP Standard Role to the user. Message Creator should have the role : SAP_SUPPDESK_PROCESS.
    26)Define the transaction variant for the message processors
    Go to the following IMG Path: SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Configuration -> Scenario Specific Settings ->Service Desk -> General Settings -> Specify User Selection Variant.
    Here we will create variants for the central message processing transaction CRM_DNO_MONITOR.so that the user will have direct access to there dedicated message.
    27) Go to transaction PFCG
    27.1) Enter the role name as Z_MSG_PROCESSORS and choose single role.
    27.2) Give a description Message Processor role and save it.
    27.3) Go to the menu tab and choose add report
    27.4) select the report type : ABAP Report
    27.5) And in the report enter the report name as 'CRM_DNO_SERVICE_MONITOR'.
    27.6) Enter the previously created variant.
    27.7) flag the skip initial screen box.
    27.8) flag the SAPGUI for windows.
    27.9) Create a new transaction with tcode starting with Y or Z.
    27.10)Display this transaction and check the values at the bottom of the screen
    in the subscreen Default Values, you should have the following parameters:
    u2022 D_SREPOVARI-REPORT = CRM_DNO_SERVICE_MONITOR
    u2022 D_SREPOVARI-VARIANT = MY_TEAM_MSG
    u2022 D_SREPOVARI-NOSELSCRN = X
    And also all the user should have the correct role.

  • Best practice to reduce downtime  for fulllaod in Production system

    Hi Guys ,
    we have  options like "Initialize without data transfer  ", Initialization with data transfer"
    To reduce downtime of production system for load setup tables , first I will trigger info package for  Initialization without data transfer so that pointer will be set on table , from that point onwards any record added as delta record , I will trigger Info package for Delta , to get delta records in BW , once delta successful, I will trigger info package for  the repair full request to  get all historical data into setup tables , so that downtime of production system will be reduced.
    Please let me know your thoughts and correct me if I am wrong .
    Please let me know about "Early delta Initialization" option .
    Kind regards.
    hari

    Hi,
    You got some wrong information.
    Info pack - just loads data from setup tables to PSA only.
    Setup tables - need to fill by manual by using related t codes.
    Assuming as your using LO Data source.
    In this case source system lock is mandatory. other wise you need to go with early delta init option.
    Early delta init - its useful to load data into bw without down time at source.
    Means at same time it set delta pointer and will load into as your settings(init with or without).
    if source system not able lock as per client needs then better to go with early delta init options.
    Thanks

  • Not able to change the data of test data containers in production system

    Dear All,
    We have created eCATT scripts in Development SolMan System and moved the transports to Production SolMan System.  Customer wants to change the data at Test data containers and run the scripts in production system but we are not able to edit the data. 
    May be the reason is SCC4 transaction code has set the below option.
    Changes and transports for client-specific Objects
    u2022 No changes allowed
    Customer doesnu2019t want to change the above option and wanted to change the test data containers to give different datau2019s and run the eCATT scripts.
    Could you please let me know the solution for this?
    Your help is really appreciated.
    Thanks,
    Mahendra

    eCatt has the feature where you don't need to transport the scripts or test configuration to our target system. We can keep all our scripts and test data in Solman and run this script any other system in your landscape using the System data container and target system.
    Maintain the production as one of the target system in System container in Solman and point that system while running the script. Change the test data in Solman to run this script.
    Let me know if you need more information
    thanks
    Venkat

  • Error while extracting the data in R/3 production system,

    Hi Team,
    We got the following error while extracting the data in R/3 production system,
    Error 7 When Sending an IDoc R3 3
    No Storage space available for extending the inter 44 R3 299
    No storage space available for extending the inter R3 299
    Error in Source System RSM 340
    Please guide us to fix the issue

    It´s very difficult to help you without knowing
    - what is going to be transferred
    - where you get this error
    - system configuration
    - actual memory usage
    - operating system
    - database and configuration etc. etc.etc. etc.
    I suggest you open an OSS call and let the support have a look on your system. It´s much easier if one has system access to find out the cause for that problem.
    Markus

  • Unable to load the data into Cube Using DTP in the quality system

    Hi,
    I am unable to load the data from PSA to Cube using DTP in the quality system for the first time
    I am getting the error like" Data package processing terminated" and "Source TRCS 2LIS_17_NOTIF is not allowed".
    Please suggest .
    Thanks,
    Satyaprasad

    Hi,
    Some Infoobjects are missing while collecting the transport.
    I collected those objects and transported ,now its working fine.
    Many Thanks to all
    Regards,
    Satyaprasad

  • Activating Update Rules in BW Production Systems? How

    Hi all...
    How do we activate Update rules in Production systems?
    As we dont have the activate button high lighted in update rules.
    Urgent.
    Thansk in Advance.

    Hi,
    Since the production system is not chnagable you will will not get the activate button. you can only see the updaterules in display mode.
    You should activate the update rule in the Dev environment and capture the same in a transportable request and transport the same to Production environment.
    If it is very urgent and the transport from Dev would take time. You can as the basis to open the productyion client from tcode scc4, once the procuction client is open you will be able to activate the update rules in production system itself.
    assign points if useful
    regards
    Venkata Devaraj

  • Unable to delete Role from User ID in SAP SOLMAN production system but able to from DEV with the same authorization, pls suggest

    unable to delete Role from User ID in SAP SOLMAN production system but able to from DEV with the same authorization, pls suggest

    Hi,
    For SU01 role removal, you do not need S_USER_AGR with 02, and as you mentioned both authorizations available in production, if so trace should not show you the S_USER_AGR with 02 with RC=04.
    I would recommend to do role comparison for the user performing the activity. and then check if you have the S_USER_AGR with 02 in user buffer SU56.
    But ideally it should not ask you S_USER_AGR for 02 through SU01, so please take help of abaper to debug it.
    Also put trace in non-prd to see if S_USER_AGR is getting checked with 02 for removal through SU01.
    BR,
    Mangesh

  • Process Order tables and Production System Performance

    Hi All,
    What are the different tables of Process order? Also how do i know which table affects the system performance of Production system and to what extent if Change Logging is made active ?
    The issue is in our clients place we would like to set the Change Logging ( Records changes made for any transaction )  for Process orders and we would like to know to which tables change logging should be made active so that Production system performance is not affected.
    Please help me regarding this.
    Thanks in Advance,
    Neetha Avani.

    All the changes done in any transaction are saved in CDPOS table.
    when there is any report developed based on this table then the performance will be very slow.
    Tables used for process orders are
    AFKO            Order header data PP orders
    AFPO            Order item
    AFRU            Order Confirmations
    AFRUHR        Order Confirmations for HR
    AFRV             Confirmation pool
    AFVC             Operation within an order
    Hope the above helps.

Maybe you are looking for

  • Query tunning in Oracle using Explain Plan

    Adding to my below question: I have now modified the query and the path shownby 'Explain plan' has reduced. The 'Time' column of plan_table is also showing much lesser value. However, some people are suggesting me to consider the time required by the

  • Dropped iphone 5 and damaged edge can it interfere with connection

    I dropped my iPhone 5 about 4 feet onto a tile floor.  It landed on the edge and took a good chuck out of it.  Since then, I seem to be having trouble connecting to my network.  No trouble with calls or texts, but trouble with internet, app store, et

  • OSX and Windows Vista / 7 master browsers

    Hi all. I have spent a good deal of time troubleshooting this issue with my OSX machines being unable to browse to my windows machines through the network window of Finder. I currently have 2 Macbooks running 10.5.8 and an iMac running 10.4.11 that a

  • Column width for inetractive report not working in IE 8

    Hi all, I have an IR for which I don't want the columns to rap and the last column (DESCR) should have a fixed width, so this is what I added in the region header : <style type="text/css">    table.apexir_WORKSHEET_DATA td {       white-space:nowrap;

  • Mountain Lion notification center shows no events/items at all!

    Okay, so, I've updated Lion to Mountain Lion. I've gone into the Notifications area in the system preferences area and everything is enabled. I've swiped my fingers across to pull the notification window into view. I've sent myself an e-mail from my