While creating master recipe curling, edge forming, trimming and painting are assign to a single operation and a resource (work center)is assign to this operation in master recipe. Now my problem is that when I enter the scrap quantity during confirmation in COR6N painting material is consume for scrap quantity also.
I decided to create a dummy work center  for painting and painting material to be assigned to next operation  40.frist advice me am I right and explain me how to create a dummy work center ,what about the cost center and activity types in costing view of work center .pl. give me detailed steps with T codes.

Hi,
You can create a dummy work center and assign to the same operation. This is the only way i think you can do it, Suppose it will be like this,
Operation 0030 Workcenter1
Operation 0030 Woekcenter2
then you can use same cost center, If you want to do costing then use the activity that you want to cost.
Pls refer this also,
[Example|http://help.sap.com/saphelp_nw04/helpdata/en/50/13a8946d7611d2a5a80060087a7a74/frameset.htm]
Regards,
R.Brahmankar

Similar Messages

  • Work Center(Capacity Level) Change Documents

    We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
    Thank you in advance.

    Hi Usman,
    I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
    When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
    To avoid it... i followed below steps
    1. Uncheck the capacity requirement indicator in all open orders
    2. when u try to delete, it will say "Capacity is still being used"
    3. Table KBED, use capacity ID and run, it will list out the pending orders
    4. When the table has no entries, delete the capacity category
    5. check all capacity indicator
    - Pithan

  • Dummy Profit Center in New GL

    Hi,
    we activated New GL with Segment Balancing. The P&L accounts will get the profit Center from the cost objects. We have defined a default segment in the constant for unassigned process, and we only have zero balancing at the segment, and not the profit center. This is a business requirement.
    However, I am not sure how to cover the scenario where there might be no profit center in the cost center master or the material master or any other scenarios. I have tried configuring the default profit center in FAGL3KEH. but when I tested, the document splitting is not working correctly. SAP recommends not using default profit center if document splitting is activated. 
    I wanted to see if dummy PCTR is an option. I have read in the SAP library, but they do not explain clearly about the dummy PCTR. It says activating dummy PCTR is optional, but do not give a good alternative option. They say we can activate balancing by PCTR, but that is not our requirement. Also, if we assign a default PCTR in the non assigned process, it will apply for the balance sheet accounts as well, which we do not want. 
    I am not sure what are the other options. Please suggest if there are any other options. Also SAP does not mention if we activate dummy profit center from the New GL side (not through the classic PCA menu path), does it still activate the Classic PCA tables?
    Please let me know.
    Thanks

    Hi,
    As I have already explained, both the default profit center and configuring the default profit center for non assigned processes does not work for us.
    The default profit center conflicts with document splitting. SAP recommends not to use default PCTR if we do document splitting.
    As far as the constant for non assigned processes goes, we have assigned a default segment here (not a default PCTR), since we are doing only segment balancing (reporting by segment), and also the business wants to be able to pick only the segment for any b/s adjustment postings.
    Also, my earlier question has not been answered. Does activating the dummy profit center from GL side still activate the Classic PCA ledger 8A?
    Thanks

  • Picking DUMMY Profit Center in COGS line item

    Dear All,
    My Client is on ECC6 and document splitting is activated.
    My problem is, in current month we have created on Finishd good(Material) and done PGI but dont know why system is picking dummy profit center in line item of COSG only, in line item of material profit center is proper.
    1. Profit center is assigned in Material Master.
    2.No  User Exit is applied
    3. No Validation & Sub-situation done.
    4. No FAGL3KEH setting is done.
    COGS Ac Dr         100               PC Dummy
      To Inv of FG              100         PC 2000
    Other material created in same valuation class is working properly.
    Regards,
    Shayam
    Edited by: Shayam_210 on Aug 23, 2011 9:13 AM

    Hi, to find bugs like these is always "triggy" and I am afraid that there are no easy solutions!
    You could try to go in TC GGB1 - go down to the substitution in "Create sales order" and there "activate total trace" or perhaps Expert trace - set breakpoint. After you done those go in and create the sales order again in the same session.
    In order to be successful here ... will you need the help of an ABAP'er.
    I believe the error to be related to master data as itu2019s usually are u2026 but sometimes are there a bug in the system.
    Good luck
    René V. Nielsen

  • PP work center integration with PM equipment

    Hello PM Guru's,
    I have a requirement for my client who is producing glass bottles.
    The single line producing glass, consist of some 10 stages of processing. The entire line is an integrated one. Like this line equipment they are having around 30 line apprx. During PP implementation, they had considered that line as only one work center/per line and established hourly entry of production confirmation.
    Now, during PM implementation, they wanted to consider that line as one equipment, and its sections as either as assembly/sub-equipment.
    Currently, if one section fails, the remaining sections runs, and the breakdown are considered as 1/10th.
    They are prepared to create dummy PP work center for their sections individually.
    Also, they don't want to attach that single PP work center to that entire equipment and its assembly/sub-equipment, because they don't want to have the impact of breakdown stoppage of single section into the whole line. (Due to discrete manufacturing set-up)
    They also want to have OEE established, section-wise. Please let me know, for this scenario, how to map that line equipement, and integarte with the PP work center.
    Thank you with regards,
    Sekar

    Hi
    If you want to interface between PP &PM. then only you have to think of disturbing already inplmented PP.
    Interface between PP& PP means , when PM order is created due to schedule breakdown on a particlur equipment, it should be unaavailble for planning for production.
    In your update , you have not mentioned  clearly this point.
    Is it rquired or not.
    Pl. update.
    Regards
    YMREDDY

  • Temporary shut down of Work Center

    We are taking capacity planning into consideration, and work center is
    temporarily shutdown for a period of 12 hrs.
    How to capture the temporary shutdown of the work center in SAP, in order
    no production orders takes work center into consideration as available capacity during this temporary shut down time
    Lastly, if shutdown time is able to capture in SAP, and fixing of work center
    is less than 12 hrs (lets assume 8 hrs) How to chance dynamically in orders for the production orders
    to consider the work center as available

    Thanks for your inputs
    We have not implemented PM module. As a work around, we created a
    dummy production order (without material - c007) and assigned a operation to the
    temporary shutdown work center, this production order filled the work center
    temp. shutdown time slot (so, other production orders cannot use it)
    Other Parameters we considered:
    1. Backward Scheduling
    2. Basic Finish Date (day on W/C is temp. shut down)
    3. Basic Start Date calculated (From Routing Operation Mins)- Routings operation
       minutes maintained in par the temporary shut down time
    4. Operation costs: 1cent/hr

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Prevent documets getting posted to DUMMY profit center for

    Hi All,
    During posting of accounting documents (for eg: In T-code F-02), we need to prevent documents getting posted to dummy profit-centers when I post documents with cost-centers which are un-assigned to any profit center (T-Code KS02). Instead we need to bring in to the profit-center posted by the user. We have PCA activated.
    We have tried to achieve with a substitution along with an user-exit (T-code: GGB1). But the user-exit is getting invoked only after the assignment of Dummy profit-center and is overwriting my profit center. Is this approach right? FYI, the substitution is done at the Financial Accounting/ Line-item level.
    Kindly enlighten me with your solutions.
    Thanks and Regards,
    Gnanasambanthan.V

    At my company, we have profit center as a required field on the cost center master - so when posting to a cost center, there is always a profit center.
    However, if requiring a profit center on the cost center master is not an option in your case, then I'm wondering if it would work to set up a validation to check that the profit center on a posting is not the dummy.
    Regards,
    Shannon

  • How to set exist profit center to dummy profit center?

    Dear all:
            My profit center setting in DEV was set to dummy profit center, but when I transport to QAS that the profit center is normal dummy profit center. therefore the 0KE5 dummy profit center was blank.
            How to fix this problem?
    Best Regards,
    Nicole Chen

    Dear NSRobert:
            Thanks you very much. But still not work!!
    Best Regards,
    Nicole Chen

  • Change dummy profit center to original in New GL Concept

    Hello experts
    We have implemented New GL Concept in ECC6.0. However, some of the documents posted into various GL accounts had gone to Dummy profit center. Is there any way such that already posted documents with dummy profit center can be assigned corresponding original profit center? As of now due to the common dummy profit center has been assigned to various entries, the plant wise reports are not able to display correct figures because dummy profit center is not apportioned to respective plants.
    Similar case is also with Vendor and Customer account balances.
    We had already gone trough few notes and one of them (1164356) suggests using a BAdI FAGL_MIGR_SUBST, but its scope / use is somewhat ambiguous. (It suggests some ABAP work in VALIDATE_ITEM method, although this method is not present in its interface.)
    Kindly help as early as possible...
    Thanks and Regards,
    Srinivas

    Hi
    You are not clear on your post
    1) whether you have implemented Document Slitting or not?
    2) Mapped Zero Balance account or not and
    3) Profit Center and Zero Balance account are checked  in document soplitting charactreristiocs or not?
    I am posting this reply based on the assumption that you have mapped the above configuration.
    If You have assigned Dummy Profit center in FAGL_3KEH, this always overrides the profit center derived, and the system posts with a dummy profit center. Remove the FAGL_3KEH assignment if any so that the system posts to the correct profit Centers.
    Now If you have made the configuration as discussed in points 1,2 3  and other document splitting configurations, then removing FAGL_3KEH will force system to look for the profit centers in all the line items and posts only when this is satisfied.
    A pre requisite will be "Assign Scenarios and Customer Fields to Ledgers" in FA global Settings(New)> Ledgers>Ledger which should be "Profit Center".
    As a concept you may not need assignment of FAGL_3KEH once you have implemented document Splitting.
    Hope this clarifies your situation.
    Don't Forget to award points
    Sarma

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Dummy Profit Center -- Customer Line item

    Hello
    I have a scenerrio on dummy profit center
    1. On Augst 2006 -- A customer invoice has been posted using FB70 and some how the customer account  line item when to dummy profit center and other line items were posted to a the correct profit center.
    2. On August 2006 -- Due to this business reversed original customer invoice using FB08 which again has customer account line item when to dummy profit center and other line items were posted to the correct profit center.
    Origianl Invoice: Customer XYZ Ltd - GL 130024 ( Customer Reconciliation Account)--- Dummy profit Center -- Dr. 235,000 USD
    Reversal          : Customer XYZ Ltd - GL 130024 (Customer Reconciliation Account) -- Dummy profit center -- Cr. 235,000 USD
    This is want we want and this is want we see in our FI entries and all are with the same posting dates.
    Now some how when you look at KE5Z (Profit Center line items report) for dummy profit centers even today.
    1. You see the original customer invoice showing dummy profit center  on the customer account  line item as Dr. 235,000 on GL 130024.
    2. You see the reversal customer invoice showing correct profit center on the other line items and you dont see customer account line item that is GL130024 on this document.
    3. Because of which dummy profit center is showing Dr.balance.
    PCA report:
    Origianl Invoice: Customer XYZ Ltd - GL 130024 ( Customer Reconciliation Account)--- Dummy profit Center -- Dr. 235,000 USD
    Reversal          : Customer XYZ Ltd - No entry except the same document number with the other line items.
    Could you please give us the thoughts except the PCA entry only as business dont have to have this entry. Business basically want to know the reason for not showing the customer line item on the reversal document which will knot out the dummy.
    Will assign good points
    Thanks
    Kumar

    Not answered but closing

  • Work center wise production order infomation report

    Hi all,
    i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
    Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
          i have three operation in production order.
          my order scheduled start date - todays date.
    In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
    Clent want like that (with quantity break) report..
    Any standard report ???
    If customization.... How it can be mapped in SAP.??
    Thanks in advance

    Hi,
    You can use the FM COIS_SELECT_ORDER_DATA_READ.
    CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
          EXPORTING
            iv_prod_order_sel       = lv_prod_order_sel
            iv_proc_order_sel       = lv_proc_order_sel
            iv_planned_order_sel    = lv_planned_order_sel
            iv_rem_objects_only_sel = lv_rem_objects_only_sel
            is_objects_to_read      = ls_objects_to_read
            it_parameter            = lt_parameter  "General Structure for PARAMETERS and SELECT-OPTIONS
            it_status_hdr           = lt_status_hdr
            it_status_opr           = lt_status_opr
            it_status_cmp           = lt_status_cmp
          TABLES
            ct_ioheader             = lt_ioheader
            ct_ioitem               = lt_ioitem
            ct_iodocl               = lt_iodocl
            ct_ioopdocl             = lt_ioopdocl
            ct_iomamo               = lt_iomamo
            ct_ioconf               = lt_ioconf
            ct_ioopconf             = lt_ioopconf
            ct_iosoconf             = lt_iosoconf
            ct_iogomo               = lt_iogomo
            ct_ioopgomo             = lt_ioopgomo
            ct_iosogomo             = lt_iosogomo
            ct_iogmer               = lt_iogmer
            ct_ioopgmer             = lt_ioopgmer
            ct_iosogmer             = lt_iosogmer
            ct_iosequen             = lt_iosequen
            ct_iooper               = lt_iooper
            ct_iosoper              = lt_iosoper
            ct_ioopcomp             = lt_ioopcomp
            ct_iooppreq             = lt_iooppreq
            ct_iosopreq             = lt_iosopreq
            ct_iooppord             = lt_iooppord
            ct_iosopord             = lt_iosopord
            ct_ioopmst              = lt_ioopmst
            ct_ioopprt              = lt_ioopprt
            ct_ioopcap              = lt_ioopcap
            ct_ioopscap             = lt_ioopscap
            ct_iosocap              = lt_iosocap
            ct_iososcap             = lt_iososcap
            ct_ioopsccf             = lt_ioopsccf
            ct_iososccf             = lt_iososccf
            ct_ioprodlist           = lt_ioprodlist
            ct_iomatver             = lt_iomatver.
    This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
    Thanks and regards,
    Pradip
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:27 AM

Maybe you are looking for